Attachment_4_Continuation_of_Section_B_in_Excel_Format.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Hyrum Dam Spillway Replacement Federal contract opportunity
Solicitation number
140R4024R0020
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document is a Construction Price Schedule for the Hyrum Dam Spillway Replacement project, which is being solicited by the Department of the Interior Bureau of Reclamation. The project involves the construction of a new reinforced concrete spillway, removal of the existing spillway, and associated civil, mechanical, and electrical work. The price schedule includes numerous contract line items for tasks such as concrete work, excavation, drainage systems, roadways, and spillway equipment. Estimated quantities are provided for comparison of offers, but the contract includes a clause for variation in estimated quantities. The solicitation has an anticipated performance period from March 2025 through January 2029. The Construction Price Schedule also includes several optional contract line items for supplementary work related to wells, well points, and temporary observation wells.

View the file

Other files for this federal contract opportunity

Other files attached to Hyrum Dam Spillway Replacement, newest first.
File Type Posted
Sol_140R4024R0020_Amd_0003.pdf PDF
A0003_Att_1_Informational_Page_0003.pdf PDF
A0003_Att_2_140R4024R0020_Additional_Technical_Questions_and_Answers_0003.pdf PDF
A0003_Att_3_(Revised)_188-D-60267_0003.pdf PDF
A0003_Att_4_(Revised)_03_30_00___Cast-In-Place_Concrete_0003.pdf PDF
A0003_Att_5_(Revised)_33_46_36___Drain_Pipes_0003.pdf PDF
A0003_Att_6_Updated_Solicitation_Pages_12-14_0003.pdf PDF
A0003_Att_7_Updated_Continuation_of_Section_B_in_Excel_Format_0003.xlsx XLSX spreadsheet
Sol_140R4024R0020_Amd_0002.pdf PDF
A0002_Att_19_(New)_40-D-6592_0002.PDF PDF
A0002_Att_23_Evaluations_of_Potential_Filter_Sand_and_Drain_Gravel_Sources_for_Hyrum_Dam_Modifications_0002.pdf PDF
A0002_Att_18_(New)_40-D-6552_0002.pdf PDF
A0002_Att_21_(New)_40-D-60001_0002.pdf PDF
A0002_Att_8_(Replacement)_31_03_33_-_Removal_and_Control_of_Water_0002.pdf PDF
A0002_Att_14_(New)_40-D-4334_0002.pdf PDF
A0002_Att_12_(New)_188-D-60215_Existing_Spillway-Dike_Plan_0002.pdf PDF
A0002_Att_2_140R4024R0020_Contracting_Questions_and_Answers_0002.pdf PDF
A0002_Att_3_Updated_Solicitation_Pages_62-67_0002.pdf PDF
A0002_Att_5_(New)_01_14_20_-_Reservoir_Spillway_and_Outlet_Works_Operations_0002.pdf PDF
A0002_Att_9_(New)_35_21_20_-_Stoplog_Guides_0002.pdf PDF
A0002_Att_10_(New)_51_00_20_-_Reservoir_Water_Surface_Elevation_Data_0002.pdf PDF
A0002_Att_22_(New)_40-D-60002_0002.pdf PDF
A0002_Att_16_(New)_40-D-6477_0002.pdf PDF
A0002_Att_25_Hyrum_Spillway_Replacement_Geological_Investigations_2022_0002.pdf PDF
A0002_Att_24_Geologic_Investigations_of_Hyrum_Dam_Spillway_2016-2019_0002.pdf PDF
A0002_Att_13_(Revised)_188-D-60379_Gate_Hoist_Enclosure_Panel_Schedules_0002.pdf PDF
A0002_Att_15_(New)_40-D-4335_0002.pdf PDF
A0002_Att_17_(New)_40-D-6551_0002.pdf PDF
A0002_Att_20_(New)_40-D-7017_0002.PDF PDF
A0002_Att_1_Informational_Page_0002.pdf PDF
A0002_Att_4_140R4024R0020_Technical_Questions_and_Answers_0002.pdf PDF
A0002_Att_6_(New)_01_46_20_-_Testing_Agency_Services_0002.pdf PDF
A0002_Att_7_(Revised)_02_41_07_-_Removal_and_Disposal_of_Existing_Features_0002.pdf PDF
A0002_Att_11_(Revised)_51_02_82_-_Hazardous_Materials_Survey_and_Analytical_Results_0002.pdf PDF
Sol_140R4024R0020_Amd_0001.pdf PDF
A0001_Att_1_Informational_Page_0001.pdf PDF
A0001_Att_2_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Attachment_2_140R4024R0020_Drawings_90_.pdf PDF
Attachment_5_Construction_Wage_Rate_Requirements_for_Cache_County__UT.pdf PDF
Attachment_6_Subcontracting_Plan_Template.docx DOCX document
Attachment_1_140R4024R0020_Specifications_90_.pdf PDF
Sol_140R4024R0020.pdf PDF
Attachment_7_SF24_Bid_Bond_Form.pdf PDF
Solicitation_No__140R4024R0020_Hyrum_Dam_Spillway_Replacement.pdf PDF
Attachment_3_Current_Spillway_Drawings_(Info_Only).pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Price Schedule

CONTINUATION OF SECTION B IN EXCEL FORMAT
CONSTRUCTION PRICE SCHEDULE
(a) Offers will be considered for award on the following price schedule, but no offer will be considered for award on only a part of the price schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the price schedule are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in

Estimated Quantity, no claim shall be made against the Government for overruns and underruns. The Contract Clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to the lump sum items.

(d) See the contract clause at WBR 1452.232-81 AI, Payment for Mobilization and Preparatory Work - Bureau of Reclamation AI, for CLIN 00010-01.
(e) Definitions
(1) CLIN - Contract Line Item Number
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
00010-01WBR
1452.232-81 AIMobilization and Preparatory WorkFor the Lump Sum of$ - 0
00010-0201 31 30Contract Document Management SystemFor the Lump Sum of$ - 0
00010-0302 41 07Removal and Disposal of Existing FeaturesFor the Lump Sum of$ - 0
00010-0402 83 33Removal and Disposal of Equipment with Coatings Containing Regulated MetalsFor the Lump Sum of$ - 0
00010-0503 11 10Concrete Forming110,000ft²$ - 0$ - 0
00010-0603 15 126-inch PVC Waterstops5,900LF$ - 0$ - 0
00010-0703 20 00Concrete Reinforcing6,000,000lb$ - 0$ - 0
00010-0803 20 00Weldable Concrete Reinforcing2,200lb$ - 0$ - 0
00010-0903 30 00Cast-In-Place Concrete3,100yd³$ - 0$ - 0
00010-1003 30 00Reinforced Structural Mass Concrete (RSMC)16,000yd³$ - 0$ - 0
00010-1103 30 00Spillway Test SectionFor the Lump Sum of$ - 0
00010-1203 30 39Precast Concrete Deck PanelsFor the Lump Sum of$ - 0
00010-1303 41 33Pretensioned Concrete Bridge BeamsFor the Lump Sum of$ - 0
00010-1403 81 10Saw/Wire Cut Existing Concrete750LF$ - 0$ - 0
00010-1503 81 10Concrete Removal3,280yd³$ - 0$ - 0
00010-1603 81 10Existing Bridge RemovalFor the Lump Sum of$ - 0
00010-1705 50 00Miscellaneous MetalworkFor the Lump Sum of$ - 0
00010-1807 21 20Extruded Polystyrene Rigid Foam Insulation6,500ft²$ - 0$ - 0
00010-1907 92 00Joint SealantsFor the Lump Sum of$ - 0
00010-2013 34 20Metal Building SystemFor the Lump Sum of$ - 0
00010-2126 05 02Complete Electrical SystemFor the Lump Sum of$ - 0
00010-2226 32 10Diesel Engine-Generator SetFor the Lump Sum of$ - 0
00010-2326 42 13Galvanic Anode Cathodic Protection SystemFor the Lump Sum of$ - 0
00010-2431 02 10Water for Dust AbatementFor the Lump Sum of$ - 0
00010-2531 03 23New Spillway CofferdamFor the Lump Sum of$ - 0
00010-2631 03 33Stilling Basin UnwateringFor the Lump Sum of$ - 0
00010-2731 03 33Crest Structure UnwateringFor the Lump Sum of$ - 0
00010-2831 03 33Upper Chute UnwateringFor the Lump Sum of$ - 0
00010-2931 03 33Deep Wells3,400LF$ - 0$ - 0
00010-3031 03 33Deep Wells Operation and PowerFor the Lump Sum of$ - 0
00010-3131 03 33Well Points1,000LF$ - 0$ - 0
00010-3231 03 33Well Points Operation and PowerFor the Lump Sum of$ - 0
00010-3331 03 33Passive Wells2,300LF$ - 0$ - 0
00010-3431 03 33Temporary Observation Wells1,350LF$ - 0$ - 0
00010-3531 09 10Abandoning Existing PiezometersFor the Lump Sum of$ - 0
00010-3631 09 26Temporary Measurement Points (TMP)26EA$ - 0$ - 0
00010-3731 09 26Spillway Measurement Points (SMP)110EA$ - 0$ - 0
00010-3831 09 26Monitoring During ConstructionFor the Lump Sum of$ - 0
00010-3931 14 10Stripping46acre$ - 0$ - 0
00010-4031 23 30Excavation300,000yd³$ - 0$ - 0
00010-4131 23 51Sand Filter18,000yd³$ - 0$ - 0
00010-4231 23 52Gravel Drain Material3,800yd³$ - 0$ - 0
00010-4331 23 54Miscellaneous Fill82,000yd³$ - 0$ - 0
00010-4431 23 56Structural Fill2,500yd³$ - 0$ - 0
00010-4531 24 10Impervious Fill35,000yd³$ - 0$ - 0
00010-4631 24 20Additional Embankment Materials500yd³$ - 0$ - 0
00010-4731 32 26Single Pier Modulus TestsFor the Lump Sum of$ - 0
00010-4831 32 26Multiple Pier Modulus TestFor the Lump Sum of$ - 0
00010-4931 32 26Installed Piers18,500LF$ - 0$ - 0
00010-5031 32 52Inspection Well at the Existing SpillwayFor the Lump Sum of$ - 0
00010-5131 37 00Type 1 Riprap2,900yd³$ - 0$ - 0
00010-5231 37 00Type 2 Riprap3,900yd³$ - 0$ - 0
00010-5331 37 00Type 3 Riprap15,500yd³$ - 0$ - 0
00010-5431 37 10Type 1 Riprap Bedding3,400yd³$ - 0$ - 0
00010-5531 37 10Type 2 Riprap Bedding1,400yd³$ - 0$ - 0
00010-5631 37 10Type 3 Riprap Bedding6,900yd³$ - 0$ - 0
00010-5731 41 16Steel Sheet Piles18,000ft²$ - 0$ - 0
00010-5831 56 20Cutoff37,000ft²$ - 0$ - 0
00010-5932 12 00County Road2,800yd²$ - 0$ - 0
00010-6032 12 00Access Roads2,200yd²$ - 0$ - 0
00010-6132 12 00Demolition of Existing County Road2,800yd²$ - 0$ - 0
00010-6232 15 10Gravel Surfacing2,200yd²$ - 0$ - 0
00010-6332 31 10Chain Link FenceFor the Lump Sum of$ - 0
00010-6432 31 30Barbed Wire Fence1,600LF$ - 0$ - 0
00010-6532 91 19Placing Topsoil6acre$ - 0$ - 0
00010-6632 91 60Topsoil Erosion Control Matting15,700yd²$ - 0$ - 0
00010-6732 92 20Seeding7.5acre$ - 0$ - 0
00010-6833 05 33Spillway Stilling WellFor the Lump Sum of$ - 0
00010-6933 11 14East Field Inverted SiphonFor the Lump Sum of$ - 0
00010-7033 11 14Hyrum Feeder Ditch Pipeline Inverted SiphonFor the Lump Sum of$ - 0
00010-7133 11 16Line Pipe – PVC50LF$ - 0$ - 0
00010-7233 11 16Filling, Testing, and Draining PipeFor the Lump Sum of$ - 0
00010-7333 46 364-inch-Diameter Non-perforated HDPE Air Vent Pipe93LF$ - 0$ - 0
00010-7433 46 368-inch-Diameter Perforated HDPE Pipe1,500LF$ - 0$ - 0
00010-7533 46 3610-inch-Diameter Perforated HDPE Pipe5,200LF$ - 0$ - 0
00010-7633 46 3610-inch-Diameter Non-perforated HDPE Pipe2,000LF$ - 0$ - 0
00010-7733 46 3612-inch-Diameter Perforated HDPE Pipe790LF$ - 0$ - 0
00010-7833 46 3612-inch-Diameter Non-perforated HDPE Pipe220LF$ - 0$ - 0
00010-7933 46 3618-inch-Diameter Non-perforated HDPE Pipe32LF$ - 0$ - 0
00010-8033 46 36Cleanouts39EA$ - 0$ - 0
00010-8133 46 36Air Vents7EA$ - 0$ - 0
00010-8233 46 42Perimeter Drain Weir BoxesFor the Lump Sum of$ - 0
00010-8334 71 10Guardrail2,900LF$ - 0$ - 0
00010-8435 21 20Stoplog GuidesFor the Lump Sum of$ - 0
00010-8535 23 50Radial GatesFor the Lump Sum of$ - 0
00010-8641 22 32Radial Gate HoistsFor the Lump Sum of$ - 0

TOTAL FOR CONSTRUCTION PRICE SCHEDULE $ - 0

OPTION 1
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
0011031 03 23New Spillway Cofferdam Emergency Ice Berm - Year OneFor the Lump Sum of$ - 0

TOTAL FOR OPTION 1 $ - 0

OPTION 2
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
0012031 03 23New Spillway Cofferdam Emergency Ice Berm - Year TwoFor the Lump Sum of$ - 0

TOTAL FOR OPTION 2 $ - 0

OPTION 3
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
00130-0131 03 33Supplementary Deep Wells Installation/Removal900LF$ - 0$ - 0
00130-0231 03 33Supplementary Deep Wells Materials900LF$ - 0$ - 0

TOTAL FOR OPTION 3 $ - 0

OPTION 4
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
0014031 03 33Supplementary Deep Wells Operation and PowerFor the Lump Sum of$ - 0

TOTAL FOR OPTION 4 $ - 0

OPTION 5
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
00150-0131 03 33Supplementary Well Points Installation/Removal510LF$ - 0$ - 0
00150-0231 03 33Supplementary Well Points Materials510LF$ - 0$ - 0

TOTAL FOR OPTION 5 $ - 0

OPTION 6
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
0016031 03 33Supplementary Well Points Operation and PowerFor the Lump Sum of$ - 0

TOTAL FOR OPTION 6 $ - 0

OPTION 7
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
00170-0131 03 33Supplementary Passive Wells Installation/Removal1,510LF$ - 0$ - 0
00170-0231 03 33Supplementary Passive Wells Materials1,510LF$ - 0$ - 0

TOTAL FOR OPTION 7 $ - 0

OPTION 8
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
00180-0131 03 33Supplementary Temporary Observation Wells Installation/Removal690LF$ - 0$ - 0
00180-0231 03 33Supplementary Temporary Observation Wells Materials690LF$ - 0$ - 0

TOTAL FOR OPTION 8 $ - 0

TOTAL FOR OPTION SCHEDULES 1 - 8 $ - 0

TOTAL FOR CONSTRUCTION PRICE SCHEDULE AND OPTION SCHEDULES 1 - 8 $ - 0

File details come from the government source that posted it. Updated .