This document appears to be a technical drawing for pipe guardrails, including elevation, sections, and details. It provides specifications for the construction of top-mounted pipe guardrails, including dimensions, materials, and installation requirements. Key details include:

The drawing shows the standard design for 1.5-inch and 2.5-inch diameter steel pipe guardrails, with required dimensions, anchoring methods, chain details, and guidance on splicing and welding. It specifies galvanizing of all ferrous metalwork and the use of expansion joints. The drawing notes that contractors should coordinate guardrail lengths and placement with the structure drawings. Overall, this appears to be a standard technical design reference for pipe guardrail installations that could be used in association with a federal construction project, but the document does not directly address any specific contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Hyrum Dam Spillway Replacement, newest first.
File Type Posted
A0003_Att_5_(Revised)_33_46_36___Drain_Pipes_0003.pdf PDF
Sol_140R4024R0020_Amd_0003.pdf PDF
A0003_Att_1_Informational_Page_0003.pdf PDF
A0003_Att_2_140R4024R0020_Additional_Technical_Questions_and_Answers_0003.pdf PDF
A0003_Att_3_(Revised)_188-D-60267_0003.pdf PDF
A0003_Att_4_(Revised)_03_30_00___Cast-In-Place_Concrete_0003.pdf PDF
A0003_Att_6_Updated_Solicitation_Pages_12-14_0003.pdf PDF
A0003_Att_7_Updated_Continuation_of_Section_B_in_Excel_Format_0003.xlsx XLSX spreadsheet
A0002_Att_22_(New)_40-D-60002_0002.pdf PDF
A0002_Att_16_(New)_40-D-6477_0002.pdf PDF
A0002_Att_25_Hyrum_Spillway_Replacement_Geological_Investigations_2022_0002.pdf PDF
A0002_Att_24_Geologic_Investigations_of_Hyrum_Dam_Spillway_2016-2019_0002.pdf PDF
A0002_Att_12_(New)_188-D-60215_Existing_Spillway-Dike_Plan_0002.pdf PDF
A0002_Att_2_140R4024R0020_Contracting_Questions_and_Answers_0002.pdf PDF
A0002_Att_3_Updated_Solicitation_Pages_62-67_0002.pdf PDF
A0002_Att_5_(New)_01_14_20_-_Reservoir_Spillway_and_Outlet_Works_Operations_0002.pdf PDF
A0002_Att_9_(New)_35_21_20_-_Stoplog_Guides_0002.pdf PDF
A0002_Att_10_(New)_51_00_20_-_Reservoir_Water_Surface_Elevation_Data_0002.pdf PDF
Sol_140R4024R0020_Amd_0002.pdf PDF
A0002_Att_23_Evaluations_of_Potential_Filter_Sand_and_Drain_Gravel_Sources_for_Hyrum_Dam_Modifications_0002.pdf PDF
A0002_Att_18_(New)_40-D-6552_0002.pdf PDF
A0002_Att_21_(New)_40-D-60001_0002.pdf PDF
A0002_Att_8_(Replacement)_31_03_33_-_Removal_and_Control_of_Water_0002.pdf PDF
A0002_Att_14_(New)_40-D-4334_0002.pdf PDF
A0002_Att_13_(Revised)_188-D-60379_Gate_Hoist_Enclosure_Panel_Schedules_0002.pdf PDF
A0002_Att_15_(New)_40-D-4335_0002.pdf PDF
A0002_Att_17_(New)_40-D-6551_0002.pdf PDF
A0002_Att_20_(New)_40-D-7017_0002.PDF PDF
A0002_Att_1_Informational_Page_0002.pdf PDF
A0002_Att_4_140R4024R0020_Technical_Questions_and_Answers_0002.pdf PDF
A0002_Att_6_(New)_01_46_20_-_Testing_Agency_Services_0002.pdf PDF
A0002_Att_7_(Revised)_02_41_07_-_Removal_and_Disposal_of_Existing_Features_0002.pdf PDF
A0002_Att_11_(Revised)_51_02_82_-_Hazardous_Materials_Survey_and_Analytical_Results_0002.pdf PDF
A0001_Att_1_Informational_Page_0001.pdf PDF
A0001_Att_2_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Sol_140R4024R0020_Amd_0001.pdf PDF
Attachment_4_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Attachment_5_Construction_Wage_Rate_Requirements_for_Cache_County__UT.pdf PDF
Attachment_6_Subcontracting_Plan_Template.docx DOCX document
Attachment_1_140R4024R0020_Specifications_90_.pdf PDF
Attachment_2_140R4024R0020_Drawings_90_.pdf PDF
Sol_140R4024R0020.pdf PDF
Attachment_7_SF24_Bid_Bond_Form.pdf PDF
Solicitation_No__140R4024R0020_Hyrum_Dam_Spillway_Replacement.pdf PDF
Attachment_3_Current_Spillway_Drawings_(Info_Only).pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7"

Drill for

"-coupling with chase nipple.

Weld all around

" Nipple to suit with reamed inside edges

Conduit fitting

For in and out installation

Top of concrete

Coupling, or elbow hub, as required

DETAIL 1

" 2

"1

" 1

8"

1 2

M i n

1 2

CL. Std. pipe and

"Ø vent hole

Face of concrete

" Pl.

CL.

"Ø Holes in plate for

"Ø expansion anchors

SECTION A-A

1 2

1 2

Gate or walkway side

" Std. pipe

" Std. pipe

CL. Guardrail

SECTION B-B

G

"Ø Expansion eye bolt

See Note 8

Typical return or typical end post

" Std. pipe

To Pipe To Wall

TYPICAL CHAIN DETAILS

AS REQUIRED

A

A

8'-0" Max. between guardrail posts 8'-0" Max. between guardrail posts

G

Face of wall or CL. of adjacent pipe guardrail

1'-0"

90° L.R. Std. butt welding elbow

" Std. pipe

Top of concrete

TYPICAL RETURN TYPICAL CENTER POST TYPICAL END

POST

TOP MOUNTED PIPE GUARDRAIL

G

4"

" Std. pipe

Min.

6"

TYPICAL LIGHT POST

B B

C o o r d i n a t e w i t h e l e c t r i c a l i n s t a l l a t i o n s

" Std. pipe

" Std. pipe

1'-0"

G

90° L.R. Std. butt welding elbow

Provide post 1'-0" from all horizontal bends

" Std. pipe

TYPICAL GUARDRAIL

HORIZONTAL BEND

M a x

T o n e x t p o s t

" Std. pipe

6"

Min.

Top of concrete Top of concrete

See Detail 1

A L W

A Y S

T H

I N

K

S A F E T Y

SHEET

D

C

B

A

D

C

B

A

B U

R E A U

O

F

R E C L A M

A T I O

N

U S

D

E P A R T M

E N

T

O

F

T H

E

I N

T E R I O

R

Managing

LAR M TA IOCE N

W in theWa estter

C

D

S Y S T E M

A u t o C s

C

F I L E N

A M

E

D

R D

D

W G

L A S T

S A V E

T E

L A S T

S A V

B Y

R R O

D R I G

U

Z

T A N

D A R

A W

I N

G S

S T A N

D A

N

D

T Y P I C A L

D

E S I G

N S

M I S C E L L A N

E O

U S

M

E T A L W

O R K

PIPE GUARDRAILS

TOP MOUNTED PIPE

GUARDRAILS

ELEVATION, SECTIONS,

AND DETAILS

DENVER, CO

40-D-6592

1993-01-07

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER -

T.E. SADUSKY

T.E. SADUSKY

T.C. GRABER/DCD

CHIEF, CIVIL ENG. DIVISION

E V

N

O

NOTES

1. Not all information shown on this drawing may be needed for every job. Use information on this drawing as required.

2. Galvanize all ferrous metalwork after fabrication. Provide vent holes as required in bottom of pipe.

3. All material is steel unless otherwise noted.

4. Splice guardrail as required with splice locks. Provide splice lock suitable for expansion joint at 50 foot centers maximum and at expansion joints in concrete.

5. Contractor determines guardrail lengths based on dimensions of structures. See structure drawings for location and extent of guardrails.

6. Grind all welds smooth.

7. Details, welds, and other connections shown are typical for all similar conditions.

8.

"Ø Galvanized chain with maximum sag of 2-inches. Provide "S" hook and heavy duty swivel snap at one end. Weld single chain link to opposite end post or return.

T. C. GRABER

JOHN D. SMART

R E V

N

O

D

H u e r t a

O l a f f

G

P E

U P D

A T

A W

I N

G

T E X T

S T Y L E

B O

R D

E R

A N

D

T I T L E

B L O

C K

C

R R E N

T

D

R A W

I N

G

R E C O

R D

S

S Y S T E M

M

B E R

T E S

A N

D

D

E L E T E D

S U

B M

I T T

G

N A T U

R

N

O R

R E V I S I O

N S

R O

A D

D

C H

O R

C T I O

N

A

C H

A N

G E D

G U

A R D

R A I L

H

E I G

H T

F R O

M

R el ea se d

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .