About this file

This document is a Solicitation Amendment (A0002) for the Hyrum Dam Spillway Replacement project, Solicitation Number 140R4024R0020. The amendment includes various attachments, such as contracting and technical questions and answers, updated specification sections, revised drawings, and additional informational documents.

The key details are: the overall work involves construction of a new spillway and removal of the existing spillway, including associated civil, mechanical, and electrical features; the anticipated performance period is March 2025 through January 2029; the proposal due date has been extended from November 8, 2024 to November 13, 2024; and the federal agency involved is the Department of the Interior Bureau of Reclamation. The amendment provides clarifications and updates to the original solicitation through the included attachments.

View the file

Other files for this federal contract opportunity

Other files attached to Hyrum Dam Spillway Replacement, newest first.
File Type Posted
A0003_Att_6_Updated_Solicitation_Pages_12-14_0003.pdf PDF
A0003_Att_7_Updated_Continuation_of_Section_B_in_Excel_Format_0003.xlsx XLSX spreadsheet
Sol_140R4024R0020_Amd_0003.pdf PDF
A0003_Att_1_Informational_Page_0003.pdf PDF
A0003_Att_2_140R4024R0020_Additional_Technical_Questions_and_Answers_0003.pdf PDF
A0003_Att_3_(Revised)_188-D-60267_0003.pdf PDF
A0003_Att_4_(Revised)_03_30_00___Cast-In-Place_Concrete_0003.pdf PDF
A0003_Att_5_(Revised)_33_46_36___Drain_Pipes_0003.pdf PDF
A0002_Att_13_(Revised)_188-D-60379_Gate_Hoist_Enclosure_Panel_Schedules_0002.pdf PDF
A0002_Att_15_(New)_40-D-4335_0002.pdf PDF
A0002_Att_17_(New)_40-D-6551_0002.pdf PDF
A0002_Att_20_(New)_40-D-7017_0002.PDF PDF
A0002_Att_4_140R4024R0020_Technical_Questions_and_Answers_0002.pdf PDF
A0002_Att_6_(New)_01_46_20_-_Testing_Agency_Services_0002.pdf PDF
A0002_Att_7_(Revised)_02_41_07_-_Removal_and_Disposal_of_Existing_Features_0002.pdf PDF
A0002_Att_11_(Revised)_51_02_82_-_Hazardous_Materials_Survey_and_Analytical_Results_0002.pdf PDF
A0002_Att_12_(New)_188-D-60215_Existing_Spillway-Dike_Plan_0002.pdf PDF
A0002_Att_2_140R4024R0020_Contracting_Questions_and_Answers_0002.pdf PDF
A0002_Att_3_Updated_Solicitation_Pages_62-67_0002.pdf PDF
A0002_Att_5_(New)_01_14_20_-_Reservoir_Spillway_and_Outlet_Works_Operations_0002.pdf PDF
A0002_Att_9_(New)_35_21_20_-_Stoplog_Guides_0002.pdf PDF
A0002_Att_10_(New)_51_00_20_-_Reservoir_Water_Surface_Elevation_Data_0002.pdf PDF
Sol_140R4024R0020_Amd_0002.pdf PDF
A0002_Att_19_(New)_40-D-6592_0002.PDF PDF
A0002_Att_23_Evaluations_of_Potential_Filter_Sand_and_Drain_Gravel_Sources_for_Hyrum_Dam_Modifications_0002.pdf PDF
A0002_Att_18_(New)_40-D-6552_0002.pdf PDF
A0002_Att_21_(New)_40-D-60001_0002.pdf PDF
A0002_Att_8_(Replacement)_31_03_33_-_Removal_and_Control_of_Water_0002.pdf PDF
A0002_Att_14_(New)_40-D-4334_0002.pdf PDF
A0002_Att_22_(New)_40-D-60002_0002.pdf PDF
A0002_Att_16_(New)_40-D-6477_0002.pdf PDF
A0002_Att_25_Hyrum_Spillway_Replacement_Geological_Investigations_2022_0002.pdf PDF
A0002_Att_24_Geologic_Investigations_of_Hyrum_Dam_Spillway_2016-2019_0002.pdf PDF
Sol_140R4024R0020_Amd_0001.pdf PDF
A0001_Att_1_Informational_Page_0001.pdf PDF
A0001_Att_2_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Sol_140R4024R0020.pdf PDF
Attachment_7_SF24_Bid_Bond_Form.pdf PDF
Solicitation_No__140R4024R0020_Hyrum_Dam_Spillway_Replacement.pdf PDF
Attachment_3_Current_Spillway_Drawings_(Info_Only).pdf PDF
Attachment_2_140R4024R0020_Drawings_90_.pdf PDF
Attachment_4_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Attachment_5_Construction_Wage_Rate_Requirements_for_Cache_County__UT.pdf PDF
Attachment_6_Subcontracting_Plan_Template.docx DOCX document
Attachment_1_140R4024R0020_Specifications_90_.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. 140R4024R0020

HYRUM DAM SPILLWAY REPLACEMENT

Amendment 0002 (A0002)

Attachment 1 Informational Page

1. All Contracting Questions and Answers, and associated documents are included as attachments to this amendment as follows:

• A0002_Att 2 140R4024R0020 Contracting Questions and Answers

• A0002_Att 3 Updated Solicitation Pages 62-67

2. All Technical Questions and Answers, and associated documents are included as attachments to this amendment as follows:

• A0002_Att 4 140R4024R0020 Technical Questions and Answers

• Updated Specification Sections (Changes shown in Bold and Italics):

o A0002_Att 5 (New) 01 14 20 - Reservoir Spillway and Outlet Works Operations o A0002_Att 6 (New) 01 46 20 - Testing Agency Services o A0002_Att 7 (Revised) 02 41 07 - Removal and Disposal of Existing Features o A0002_Att 8 (Replacement) 31 03 33 - Removal and Control of Water o A0002_Att 9 (New) 35 21 20 - Stoplog Guides o A0002_Att 10 (New) 51 00 20 - Reservoir Water Surface Elevation Data o A0002_Att 11 (Revised) 51 02 82 - Hazardous Materials Survey and Analytical Results

• Updated Drawings:

o A0002_Att 12 (New) 188-D-60215 Existing Spillway-Dike Plan o A0002_Att 13 (Revised) 188-D-60379 Gate Hoist Enclosure Panel Schedules

• Additions to Solicitation Attachment 3: Current Spillway Drawings (Info Only) o A0002_Att 14 (New) 40-D-4334 o A0002_Att 15 (New) 40-D-4335 o A0002_Att 16 (New) 40-D-6477 o A0002_Att 17 (New) 40-D-6551 o A0002_Att 18 (New) 40-D-6552 o A0002_Att 19 (New) 40-D-6592 o A0002_Att 20 (New) 40-D-7017 o A0002_Att 21 (New) 40-D-60001 o A0002_Att 22 (New) 40-D-60002

• Informational Documents o A0002_Att 23 Evaluations of Potential Filter Sand and Drain Gravel Sources for

Hyrum Dam Modifications o A0002_Att 24 Geologic Investigations of Hyrum Dam Spillway 2016-2019 o A0002_Att 25 Hyrum Spillway Replacement Geological Investigations 2022

3. The Proposal Due Date has been extended as follows:

From: November 8, 2024, 1400 Hours (MST) To: November 13, 2024, 1400 Hours (MST)

File details come from the government source that posted it. Updated .