A0002_Att_1_Informational_Page_0002.pdf
PDF 119 KB Posted
- Attached to
- Hyrum Dam Spillway Replacement Federal contract opportunity
- Solicitation number
- 140R4024R0020
About this file
This document is a Solicitation Amendment (A0002) for the Hyrum Dam Spillway Replacement project, Solicitation Number 140R4024R0020. The amendment includes various attachments, such as contracting and technical questions and answers, updated specification sections, revised drawings, and additional informational documents.
The key details are: the overall work involves construction of a new spillway and removal of the existing spillway, including associated civil, mechanical, and electrical features; the anticipated performance period is March 2025 through January 2029; the proposal due date has been extended from November 8, 2024 to November 13, 2024; and the federal agency involved is the Department of the Interior Bureau of Reclamation. The amendment provides clarifications and updates to the original solicitation through the included attachments.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. 140R4024R0020
HYRUM DAM SPILLWAY REPLACEMENT
Amendment 0002 (A0002)
Attachment 1 Informational Page
1. All Contracting Questions and Answers, and associated documents are included as attachments to this amendment as follows:
• A0002_Att 2 140R4024R0020 Contracting Questions and Answers
• A0002_Att 3 Updated Solicitation Pages 62-67
2. All Technical Questions and Answers, and associated documents are included as attachments to this amendment as follows:
• A0002_Att 4 140R4024R0020 Technical Questions and Answers
• Updated Specification Sections (Changes shown in Bold and Italics):
o A0002_Att 5 (New) 01 14 20 - Reservoir Spillway and Outlet Works Operations o A0002_Att 6 (New) 01 46 20 - Testing Agency Services o A0002_Att 7 (Revised) 02 41 07 - Removal and Disposal of Existing Features o A0002_Att 8 (Replacement) 31 03 33 - Removal and Control of Water o A0002_Att 9 (New) 35 21 20 - Stoplog Guides o A0002_Att 10 (New) 51 00 20 - Reservoir Water Surface Elevation Data o A0002_Att 11 (Revised) 51 02 82 - Hazardous Materials Survey and Analytical Results
• Updated Drawings:
o A0002_Att 12 (New) 188-D-60215 Existing Spillway-Dike Plan o A0002_Att 13 (Revised) 188-D-60379 Gate Hoist Enclosure Panel Schedules
• Additions to Solicitation Attachment 3: Current Spillway Drawings (Info Only) o A0002_Att 14 (New) 40-D-4334 o A0002_Att 15 (New) 40-D-4335 o A0002_Att 16 (New) 40-D-6477 o A0002_Att 17 (New) 40-D-6551 o A0002_Att 18 (New) 40-D-6552 o A0002_Att 19 (New) 40-D-6592 o A0002_Att 20 (New) 40-D-7017 o A0002_Att 21 (New) 40-D-60001 o A0002_Att 22 (New) 40-D-60002
• Informational Documents o A0002_Att 23 Evaluations of Potential Filter Sand and Drain Gravel Sources for
Hyrum Dam Modifications o A0002_Att 24 Geologic Investigations of Hyrum Dam Spillway 2016-2019 o A0002_Att 25 Hyrum Spillway Replacement Geological Investigations 2022
3. The Proposal Due Date has been extended as follows:
From: November 8, 2024, 1400 Hours (MST) To: November 13, 2024, 1400 Hours (MST)