A0002_Att_21_(New)_40-D-60001_0002.pdf

PDF 114 KB Posted

Attached to
Hyrum Dam Spillway Replacement
Solicitation number
140R4024R0020
Issued by

About this file

This document is a technical drawing for an Electrical Equipment Support, Type I. The drawing provides details on the base plate, combination channel, connection plate, and overall dimensions and construction requirements for the support structure. Key details include:

The electrical equipment support is designed to withstand a 90 mph wind load per ASCE 7-05 standards. The contractor is responsible for determining the final size based on the electrical cabinet being supported. The drawing specifies required materials, hardware, welding, and fabrication details. The foundation design engineer is responsible for verifying the foundation stability, concrete/reinforcement strength, and anchorage requirements. The electrical equipment supports are to be installed at locations shown on the specification drawings or as directed by the Contracting Officer's Representative (COR).

View the file

Other files

File Type Posted
A0003_Att_5_(Revised)_33_46_36___Drain_Pipes_0003.pdf PDF
A0003_Att_7_Updated_Continuation_of_Section_B_in_Excel_Format_0003.xlsx XLSX spreadsheet
A0003_Att_6_Updated_Solicitation_Pages_12-14_0003.pdf PDF
Sol_140R4024R0020_Amd_0003.pdf PDF
A0003_Att_4_(Revised)_03_30_00___Cast-In-Place_Concrete_0003.pdf PDF
A0003_Att_1_Informational_Page_0003.pdf PDF
A0003_Att_2_140R4024R0020_Additional_Technical_Questions_and_Answers_0003.pdf PDF
A0003_Att_3_(Revised)_188-D-60267_0003.pdf PDF
A0002_Att_19_(New)_40-D-6592_0002.PDF PDF
A0002_Att_4_140R4024R0020_Technical_Questions_and_Answers_0002.pdf PDF
A0002_Att_23_Evaluations_of_Potential_Filter_Sand_and_Drain_Gravel_Sources_for_Hyrum_Dam_Modifications_0002.pdf PDF
A0002_Att_8_(Replacement)_31_03_33_-_Removal_and_Control_of_Water_0002.pdf PDF
A0002_Att_13_(Revised)_188-D-60379_Gate_Hoist_Enclosure_Panel_Schedules_0002.pdf PDF
A0002_Att_7_(Revised)_02_41_07_-_Removal_and_Disposal_of_Existing_Features_0002.pdf PDF
A0002_Att_20_(New)_40-D-7017_0002.PDF PDF
A0002_Att_6_(New)_01_46_20_-_Testing_Agency_Services_0002.pdf PDF
A0002_Att_15_(New)_40-D-4335_0002.pdf PDF
A0002_Att_16_(New)_40-D-6477_0002.pdf PDF
A0002_Att_22_(New)_40-D-60002_0002.pdf PDF
A0002_Att_25_Hyrum_Spillway_Replacement_Geological_Investigations_2022_0002.pdf PDF
A0002_Att_24_Geologic_Investigations_of_Hyrum_Dam_Spillway_2016-2019_0002.pdf PDF
Sol_140R4024R0020_Amd_0002.pdf PDF
A0002_Att_11_(Revised)_51_02_82_-_Hazardous_Materials_Survey_and_Analytical_Results_0002.pdf PDF
A0002_Att_14_(New)_40-D-4334_0002.pdf PDF
A0002_Att_18_(New)_40-D-6552_0002.pdf PDF
A0002_Att_17_(New)_40-D-6551_0002.pdf PDF
A0002_Att_1_Informational_Page_0002.pdf PDF
A0002_Att_5_(New)_01_14_20_-_Reservoir_Spillway_and_Outlet_Works_Operations_0002.pdf PDF
A0002_Att_10_(New)_51_00_20_-_Reservoir_Water_Surface_Elevation_Data_0002.pdf PDF
A0002_Att_2_140R4024R0020_Contracting_Questions_and_Answers_0002.pdf PDF
A0002_Att_9_(New)_35_21_20_-_Stoplog_Guides_0002.pdf PDF
A0002_Att_3_Updated_Solicitation_Pages_62-67_0002.pdf PDF
A0002_Att_12_(New)_188-D-60215_Existing_Spillway-Dike_Plan_0002.pdf PDF
A0001_Att_1_Informational_Page_0001.pdf PDF
Sol_140R4024R0020_Amd_0001.pdf PDF
A0001_Att_2_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Attachment_4_Continuation_of_Section_B_in_Excel_Format.xlsx XLSX spreadsheet
Attachment_6_Subcontracting_Plan_Template.docx DOCX document
Attachment_2_140R4024R0020_Drawings_90_.pdf PDF
Attachment_5_Construction_Wage_Rate_Requirements_for_Cache_County__UT.pdf PDF
Attachment_1_140R4024R0020_Specifications_90_.pdf PDF
Sol_140R4024R0020.pdf PDF
Attachment_3_Current_Spillway_Drawings_(Info_Only).pdf PDF
Solicitation_No__140R4024R0020_Hyrum_Dam_Spillway_Replacement.pdf PDF
Attachment_7_SF24_Bid_Bond_Form.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base plate (Typ.)

B

"Y

(6

0" M ax

Combination channel (Typ.)

Connection plate, each side. Provide 5 bolts as shown (Typ.)

Electrical cabinet, bolt to frame as required

"Y" (4'-0" Max.)

"Y

(3

0" M ax

1"

N on sh ri nk g ro ut

TOC

Foundation, see Note 3

ELECTRICAL EQUIPMENT SUPPORT, TYPE I

(Est. Wt. 135 lbs.)

B

AA

3/

8"

7/

8"

3/

8"

CL. Drain hole

R1 /2

Combination channel

Connection plate, each side

Combination channel

CL. 13/16"Ø Holes in base plate, see Note 2

CL. 9/16"Ø Holes for 1/2"Ø bolts

7 1/2"

1/

2"

8" Pl.

5"

1/

2"

1/ 2"

5"

7/ 8"

7/8"

2 1/2"2 1/2"

2 1/2"

7/8"

5 3/4"

2 7/8" 2 7/8"

CL. 9/16"Ø Holes in plates and combination channel as required

3/8" Pl.

Combination channel

3/8" Pl. (Typ.)

VIEW

A

SECTION

B BASE PLATE DETAIL

VIEW

C

VIEW

D

D

D

CC 1

7/

8"

3/8" Pl. (Typ.)

3/8" Pl.

1/

4"

1/ 4"

7/8"

1 3/4"

1 1/4" 1 1/4"

TOC

Foundation, see Note 31' -6

(M in

3"

M in

Bottom of foundation

Fill combination channel with concrete

Combination channel

DETAIL - ALTERNATE ANCHORAGE A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-1 .D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

TR

YA

N

¦D_DT¦

¦STATUS¦

S

TA

N D

A R D

D R A W

IN

G

S

S

TA

N D

A R D

A N

D T

YP

IC

A L

D

ES

IG

N

S

M

IS

C

EL

LA

N

EO

U

S M

ET

A

LW

O R K

ELECTRICAL EQUIPMENT

SUPPORT, TYPE I

SECTIONS AND DETAIL

DENVER, CO

40-D-60001

2015-03-23

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL

£TT£

£AT£

£AA£

£TA£

Bernard Lajimodiere

RBarthel

Olaff G. Huerta

Barthel, Rodney J P.E.

Bernstein, Alfred I P.E.

Plant Structures Group

NOTES

1. Contractor determines final size of electrical equipment support based on electrical cabinet furnished.

2. Unless noted otherwise, or as directed by the foundation design engineer, install 5/8"Ø post-installed anchors with a minimum embedment of 6" or 5/8"Ø cast-in-place threaded anchors with a minimum embedment of 1'-6" having a minimum projection of 2".

3. Foundation design engineer shall verify foundation stability, concrete and reinforcement strength requirements, and anchorage requirements.

4. Install electrical equipment supports at locations shown on specifications drawings and/or as directed by COR.

5. Estimated electrical equipment support weight shown is based on maximum dimensions and five hole connection plates.

ASCE denotes American Society of Civil Engineers

ASTM denotes American Society for Testing and Materials

AWS denotes American Welding Society

COR denotes Contracting Officer's Representative

Max. denotes maximum

Min. denotes minimum

Pl. denotes plate

TOC denotes top of concrete

Typ. denotes typical

All welds, sections and details are typical for all similar conditions.

Electro-galvanized finish combination channels.

Unless noted otherwise, galvanize base plate and plates after fabrication per ASTM A385.

Unless noted otherwise, galvanize hardware per ASTM A123.

Metal framing combination channels shall be as manufactured by Globe Strut, United Gypsum Corporation, 101 South Wacker Drive, Chicago, IL 60606; Unistrut Corporation, 35660 Clinton Street, Wayne, MI 48184; or Cooper B-Line, 509 West Monroe Street, Highland, IL 62249.

Combination Channels: Globe Strut No. G7612A, B-Line B12A, or Unistrut P5501; or equal, having the following essential characteristics: No. 12 gauge steel and channel 1 5/8-inch wide by 4 7/8-inch deep with 7/8-inch openings.

Connection Plates:

With five holes per Globe Strut G2057, B-Line B532, Unistrut P1726; or equal.

With seven holes per Globe Strut G2068, B-Line B334, Unistrut P1950; or equal.

Connection hardware shall be suitable for combination channel strut attachments.

Fabricated Metalwork:

Plates and bars_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ASTM A36

Length of bolt threads per ASME B18.2.1 and thread class 2 free-fit, American National coarse-thread series.

Unless noted otherwise, make all welds continuous and in the shop.

Start and stop all welds at center of member or tubing.

Unless noted otherwise, fabricator shall determine edge preparation and root opening for groove welds. Shop detail drawing shall show edge preparation.

Arc-Welding Electrodes: Filler metal and required shielding gases or fluxes shall be per AWS D1.1 with filler metal for steel having a minimum tensile strength of 70,000 psi.

Unless noted otherwise, all bolted connection bolt holes are standard 1/16" oversize.

"Y" dimensions are the responsibility of the Contractor and are based on the electrical cabinet furnished.

DESIGN CRITERIA

Electrical equipment support is designed to withstand a three-second gust basic wind speed of 90 mph in accordance with ASCE 7-05.

It is assumed that no electrical cabinets will be installed in lower portion of frame.

GENERAL NOTES

R

EV

N O

¦R_DT¦ £RA£

D

U

PD

A

TE

D D

R A W

IN

G

T

EX

T S

TY

LE

T

O C

U R R

EN

T D

R A W

IN

G

R

EC

O R D

S S

YS

TE

M

M

IN

O R R

EV

IS

IO

N

S

-0

4-

D

BA

RT

HE

L, R O

D

NE

Y J.

P .E

M

IN

O R M

O D

IF

IC

A

TI

O N

S

Pu tn am

S ar a K P

.E

-0 4-

R el ea se d

File details come from the government source that posted it. Updated .