Fire Suppression Sprinklers at Coatesville VAMC

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24426Q0415
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Coatesville, Pennsylvania 19320, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Integrated Service Network 4 seeks a five-year obstruction inspection, testing, and maintenance contract for fire suppression sprinkler systems at Coatesville VA Medical Center in Pennsylvania, with quotations due July 27, 2026 at 10:00 AM EDT. This is an SDVOSB set-aside closed to all other contractors.

Place of performance is Coatesville, PA. Work encompasses internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, sprinkler gauge replacement, and annual fire pump inspections in Building 1's attic across 15 buildings (1–9, 38–39, 57, 59, 69, 138–139). The contract covers a base year plus four one-year option periods, with three buildings per contract year; the government estimates approximately 135 gauge replacements over five years, averaging 27 annually. All work must comply with NFPA 25 (2023 Edition) and VA policies, be completed within 30 calendar days of award, and performed Monday through Friday, 8:00 a.m. to 4:30 p.m. Building 1 annual fire pump inspections require flow testing at 100% rated capacity, suction and discharge pressure measurements, manufacturer curve comparison, and voltage and amperage documentation.

This is a firm-fixed-price Request for Quotation. The estimated contract value is $12.5 million with NAICS code 811310 and PSC code H312. Quoters must be registered in SAM and certified in the SBA Veteran Small Business Certification database at submission and award. All contractor personnel must wear visible company identification badges and coordinate system shutdowns with the VA Point of Contact. Evaluation is lowest price for responsible, responsive quoters. A mandatory site visit is scheduled for July 9, 2026 at 10:00 AM EST at Building 1; vendors must register by July 8 at 11:00 AM EST with attendee names and contact information to edward.ferkel@va.gov or christopher.clements1@va.gov. Quoters must complete and return VA Form 852.219-75 (Limitations on Subcontracting Certificate) with their submission. Invoices are submitted electronically through Tungsten Network in arrears and paid via electronic funds transfer. SCA prevailing wage requirements apply under Wage Determination 2015-5791, Revision 31.

Notice text

4 versions

Update #4 · Latest ·

Amendment 0005

- Deleted requirements for CLINs 0003 and 0004. No other substantive changes, all other requirements remain unchanged.


Amendment 0004

- Changed the Site visit time on the 9th to 10:00AM EST

- Added attachment for contractors to provide notice of attendees: titled "Site Visit Information". Failure to submit this prior the Site Visit will result in admittance to tour the facilities- this will be strictly enforced. 

Amendment 0003

-Delected Base and Option Years for "Program Management"

- Added: RFI Questions and Answers

-Added: Sprinkler Inspection Reports

Statement of Work

Five-Year Obstruction Inspection of Sprinkler System

Coatesville VA Medical Center

1. Scope

The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility’s sprinkler systems in accordance with NFPA (National Fire Protection Association’s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges.

2. Applicable Standards

All work shall comply with NFPA  25 (current edition) and VA policies and directives. 

3. Requirements

The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee’s name.

3.1. Building 1 Annual Inspection

The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer’s pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC.

3.2. Sprinkler System Maintenance & Internal Inspection

 A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139.  Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed:

Base Year- Services for Buildings 1, 2, 3

Option Year 1- Services for Buildings 4, 6, 7

Option Year 2- Services for Buildings 8, 9, 38

Option Year 3- Services for Buildings 39, 57, 59

Option Year 4- Services for Buildings 69, 138, 139

Building maintenance will be grouped together with their respective contract years and will billed as one “job”. Each job shall include the following requirements: service, testing and inspection, maintenance, replacement of all necessary materials, and supplies. The contractor shall provide full maintenance services, including all adjustments, calibration, and tuning. As part of this service, the Contractor shall include diagnosis and evaluation of all equipment, any deficiencies, malfunctions, inspection and acceptance; as well as documentation of all tasks and services provided.

3.3. Miscellaneous Maintenance Repairs

Each repair shall include all service, testing and inspection. The Contractor shall provide all parts, materials, supplies, labor, supervision, tools, shipping, travel, and equipment necessary to resolve the deficiency or malfunction.

4. Deliverables

Contractor shall submit inspection reports to the VA POC within five business days after work completion. Reports must document inspection findings, deficiencies, photographic evidence where required, and recommended corrective actions.

5. Government Responsibilities

The VA POC will provide access to equipment, coordinate fire watch procedures if needed, and review contractor-submitted documentation.

6. References

The VA Fire Protection Design Manual (Attachment A) and the Fire Safety Guidebook (Attachment B) are the guidelines supporting this requirement.

Update #3 ·

Amendment 0004

- Changed the Site visit time on the 9th to 10:00AM EST

- Added attachment for contractors to provide notice of attendees: titled "Site Visit Information". Failure to submit this prior the Site Visit will result in admittance to tour the facilities- this will be strictly enforced. 

Amendment 0003

-Delected Base and Option Years for "Program Management"

- Added: RFI Questions and Answers

-Added: Sprinkler Inspection Reports

Statement of Work

Five-Year Obstruction Inspection of Sprinkler System

Coatesville VA Medical Center

1. Scope

The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility’s sprinkler systems in accordance with NFPA (National Fire Protection Association’s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges.

2. Applicable Standards

All work shall comply with NFPA  25 (current edition) and VA policies and directives. 

3. Requirements

The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee’s name.

3.1. Building 1 Annual Inspection

The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer’s pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC.

3.2. Sprinkler System Maintenance & Internal Inspection

 A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139.  Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed:

Base Year- Services for Buildings 1, 2, 3

Option Year 1- Services for Buildings 4, 6, 7

Option Year 2- Services for Buildings 8, 9, 38

Option Year 3- Services for Buildings 39, 57, 59

Option Year 4- Services for Buildings 69, 138, 139

Building maintenance will be grouped together with their respective contract years and will billed as one “job”. Each job shall include the following requirements: service, testing and inspection, maintenance, replacement of all necessary materials, and supplies. The contractor shall provide full maintenance services, including all adjustments, calibration, and tuning. As part of this service, the Contractor shall include diagnosis and evaluation of all equipment, any deficiencies, malfunctions, inspection and acceptance; as well as documentation of all tasks and services provided.

3.3. Miscellaneous Maintenance Repairs

Each repair shall include all service, testing and inspection. The Contractor shall provide all parts, materials, supplies, labor, supervision, tools, shipping, travel, and equipment necessary to resolve the deficiency or malfunction.

4. Deliverables

Contractor shall submit inspection reports to the VA POC within five business days after work completion. Reports must document inspection findings, deficiencies, photographic evidence where required, and recommended corrective actions.

5. Government Responsibilities

The VA POC will provide access to equipment, coordinate fire watch procedures if needed, and review contractor-submitted documentation.

6. References

The VA Fire Protection Design Manual (Attachment A) and the Fire Safety Guidebook (Attachment B) are the guidelines supporting this requirement.

Update #2 ·

Amendment 0003

-Delected Base and Option Years for "Program Management"

- Added: RFI Questions and Answers

-Added: Sprinkler Inspection Reports

Statement of Work

Five-Year Obstruction Inspection of Sprinkler System

Coatesville VA Medical Center

1. Scope

The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility’s sprinkler systems in accordance with NFPA (National Fire Protection Association’s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges.

2. Applicable Standards

All work shall comply with NFPA  25 (current edition) and VA policies and directives. 

3. Requirements

The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee’s name.

3.1. Building 1 Annual Inspection

The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer’s pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC.

3.2. Sprinkler System Maintenance & Internal Inspection

 A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139.  Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed:

Base Year- Services for Buildings 1, 2, 3

Option Year 1- Services for Buildings 4, 6, 7

Option Year 2- Services for Buildings 8, 9, 38

Option Year 3- Services for Buildings 39, 57, 59

Option Year 4- Services for Buildings 69, 138, 139

Building maintenance will be grouped together with their respective contract years and will billed as one “job”. Each job shall include the following requirements: service, testing and inspection, maintenance, replacement of all necessary materials, and supplies. The contractor shall provide full maintenance services, including all adjustments, calibration, and tuning. As part of this service, the Contractor shall include diagnosis and evaluation of all equipment, any deficiencies, malfunctions, inspection and acceptance; as well as documentation of all tasks and services provided.

3.3. Miscellaneous Maintenance Repairs

Each repair shall include all service, testing and inspection. The Contractor shall provide all parts, materials, supplies, labor, supervision, tools, shipping, travel, and equipment necessary to resolve the deficiency or malfunction.

4. Deliverables

Contractor shall submit inspection reports to the VA POC within five business days after work completion. Reports must document inspection findings, deficiencies, photographic evidence where required, and recommended corrective actions.

5. Government Responsibilities

The VA POC will provide access to equipment, coordinate fire watch procedures if needed, and review contractor-submitted documentation.

6. References

The VA Fire Protection Design Manual (Attachment A) and the Fire Safety Guidebook (Attachment B) are the guidelines supporting this requirement.

Update #1 ·

Five-Year Obstruction Inspection of Sprinkler System

Coatesville VA Medical Center

1. Scope

The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility’s sprinkler systems in accordance with NFPA (National Fire Protection Association’s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges.

2. Applicable Standards

All work shall comply with NFPA  25 (current edition) and VA policies and directives. 

3. Requirements

The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee’s name.

3.1. Building 1 Annual Inspection

The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer’s pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC.

3.2. Sprinkler System Maintenance & Internal Inspection

 A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139.  Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed:

Base Year- Services for Buildings 1, 2, 3

Option Year 1- Services for Buildings 4, 6, 7

Option Year 2- Services for Buildings 8, 9, 38

Option Year 3- Services for Buildings 39, 57, 59

Option Year 4- Services for Buildings 69, 138, 139

Building maintenance will be grouped together with their respective contract years and will billed as one “job”. Each job shall include the following requirements: service, testing and inspection, maintenance, replacement of all necessary materials, and supplies. The contractor shall provide full maintenance services, including all adjustments, calibration, and tuning. As part of this service, the Contractor shall include diagnosis and evaluation of all equipment, any deficiencies, malfunctions, inspection and acceptance; as well as documentation of all tasks and services provided.

3.3. Miscellaneous Maintenance Repairs

Each repair shall include all service, testing and inspection. The Contractor shall provide all parts, materials, supplies, labor, supervision, tools, shipping, travel, and equipment necessary to resolve the deficiency or malfunction.

4. Deliverables

Contractor shall submit inspection reports to the VA POC within five business days after work completion. Reports must document inspection findings, deficiencies, photographic evidence where required, and recommended corrective actions.

5. Government Responsibilities

The VA POC will provide access to equipment, coordinate fire watch procedures if needed, and review contractor-submitted documentation.

6. References

The VA Fire Protection Design Manual (Attachment A) and the Fire Safety Guidebook (Attachment B) are the guidelines supporting this requirement.

Files

File Type Posted
36C24426Q0415 0005.docx DOCX document
36C24426Q0415 0004.docx DOCX document
Site Visit Information 07-9-2026.docx DOCX document
RFI Q and As.docx DOCX document
36C24426Q0415 0003.docx DOCX document
SPKLR139-2026.xlsx XLSX spreadsheet
SPKLR57-2026 Blank.xlsx XLSX spreadsheet
SPKLR3-2026 Blank.xlsx XLSX spreadsheet
SPKLR138E-2026 Blank.xlsx XLSX spreadsheet
SPKLR69-2026.xlsx XLSX spreadsheet
SPKLR9-2026 Blank.xlsx XLSX spreadsheet
SPKLR7-2026 Blank.xlsx XLSX spreadsheet
SPKLR59-2026.xlsx XLSX spreadsheet
SPKLR4-2026 Blank.xlsx XLSX spreadsheet
SPKLR39-2026 Blank.xlsx XLSX spreadsheet
SPKLR138-2026 Blank.xlsx XLSX spreadsheet
SPKLR1-2026 Blank.xlsx XLSX spreadsheet
SPKLR2-2026 Blank.xlsx XLSX spreadsheet
SPKLR38-2026 Blank.xlsx XLSX spreadsheet
SPKLR6-2026.xlsx XLSX spreadsheet
SPKLR8-2026 Blank.xlsx XLSX spreadsheet
36C24426Q0415 0002.docx DOCX document
36C24426Q0415 0001.docx DOCX document
36C24426Q0415.docx DOCX document
852.219-75 MUST SIGN AND RETURN WITH PROPOSAL.pdf PDF
SCA 2015-5791 Rev 31.pdf PDF
Show all 26

Notice history

Notice Type Posted
Fire Suppression Sprinklers at Coatesville VAMC Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
J012--Fire Suppression Testing Remains the same 32608, United States · NAICS 811310 Veterans Integrated Service Network 8 Service-Disabled Veteran-Owned Small Business
36C26127Q0086, Fire Extinguisher Inspection and Maintenance Services San Francisco, California, United States · NAICS 811310 Veterans Integrated Service Network 21 Service-Disabled Veteran-Owned Small Business
Z1DA--542-21-113 | Correct FCA Deficiencies – Repair Water Penetration | NCO 4 Construction East (VA-26-00020634) (VA-26-00020634) Coatesville VA Medical Center 1400 Black Horse Hill Road 19320 · NAICS 238190 Veterans Integrated Service Network 4 Service-Disabled Veteran-Owned Small Business
Annual Inventory and Inspection of Fire and Smoke Doors Dallas, Texas 75216, United States · NAICS 541350 Veterans Integrated Service Network 17 Service-Disabled Veteran-Owned Small Business
H212--Annual Test/Inspection of FireFly Device and Door Drop Cleveland VA Medical Center Department of Veteran Affairs The Louis Stokes Cleveland VA Medical Center Cleveland, Ohio 44106, United States · NAICS 541350 Veterans Integrated Service Network 10 Service-Disabled Veteran-Owned Small Business