SPKLR3-2026 Blank.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Fire Suppression Sprinklers at Coatesville VAMC
- Solicitation number
- 36C24426Q0415
About this file
This is a blank inspection and testing template for the Building 3 sprinkler system at the Coatesville VA Medical Center for the year 2026. The template is designed to document semi-annual inspection and testing results in accordance with NFPA 25: Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems, 2023 Edition. The form captures data for two inspection periods (1st and 2nd) and includes sections for recording inspector names, main drain static and residual pressures, chamber refill times, flow test results across multiple zones and floors, tamper valve test results, pre-action device testing (trouble, alarm, and supervisory), and fire department connection (FDC) testing results. Specific locations referenced include the elevator pit, basement elevator lobby, ground floor sprinkler closet in the CT scan area, and first-floor test locations such as Room B-37 and Building 3 sprinkler closets. The template uses standardized result codes: "P" for passed inspection/test, "F" for failed inspection/test, "D" for disconnected, and "C" for contractor test, with timed results documented in minutes and seconds format.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24426Q0415 0005.docx | DOCX document | |
| 36C24426Q0415 0004.docx | DOCX document | |
| Site Visit Information 07-9-2026.docx | DOCX document | |
| RFI Q and As.docx | DOCX document | |
| SPKLR2-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR38-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR57-2026 Blank.xlsx | XLSX spreadsheet | |
| 36C24426Q0415 0003.docx | DOCX document | |
| SPKLR139-2026.xlsx | XLSX spreadsheet | |
| SPKLR1-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR39-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR7-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR59-2026.xlsx | XLSX spreadsheet | |
| SPKLR8-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR9-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR4-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR138-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR6-2026.xlsx | XLSX spreadsheet | |
| SPKLR69-2026.xlsx | XLSX spreadsheet | |
| SPKLR138E-2026 Blank.xlsx | XLSX spreadsheet | |
| 36C24426Q0415 0002.docx | DOCX document | |
| 36C24426Q0415 0001.docx | DOCX document | |
| SCA 2015-5791 Rev 31.pdf | ||
| 36C24426Q0415.docx | DOCX document | |
| 852.219-75 MUST SIGN AND RETURN WITH PROPOSAL.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 3
| SPRINKLER SYSTEM INSPECTION AND TEST | ||
| Building 3 | ||
| YEAR 2026 | 1ST | 2ND |
| Date |
| Inspector(s) |
| Main Drain | |||||
| Static Pressure | |||||
| Residual Pressure | |||||
| Chamber Refill Time | |||||
| Flow Test Results | |||||
| Floor | Test Location | 6" | Zone | 6" | Zone |
| Grd Fl. Flow 1702-0156 | Inside Rm B-37 | ||||
| 1st Fl. Flow 1702-0158 | Sprinkler Closet in Cat scan | ||||
| Tamper Valve Test Results | |||||
| DEVICE | LOCATION | ||||
| Elevator pit 1702-0137 | Bsmt Elevator Lobby above ceiling | ||||
| PIV | INSIDE OVAL CENTER OF BLDG | ||||
| Grd. Floor 1702-0157 | Sprinkler Closet in Cat scan | ||||
| 1st Floor 1702-0159 | Sprinkler Closet in Cat scan | ||||
| Pre-action Trouble 1702-0161 | B-38 | ||||
| Pre-action Alarm 1702-0160 | B-38 | ||||
| Pre-action Suprvisory 1702-0162 | B-38 |
| SPRINKLER BOX |
| FDC |
| TESTED SEMI-ANNUALLY IAW |
| NFPA 25: STANDARD FOR THE INSPECTION, TESTING AND MAINTENANCE |
| OF WATER BASED FIRE PROTECTION SYSTEMS, 2023 EDITION |
| ACCEPTABLE TESTING RESULTS |
| P = PASSED INSPECTION / TEST |
| F = FAILED INSPECTION / TEST |
| D= DISCONNECTED |
| C= CONTRACTOR TEST |
| TIMED RESULTS NOTED IN MINUTES AND SECONDS ( EXAMPLE 1M 30S ) |