- Fire Suppression Sprinklers at Coatesville VAMC
- Solicitation number
- 36C24426Q0415
About this file
This file is a Building 6 Sprinkler System Inspection and Test Report documenting the 2026 semi-annual inspection and testing results for the sprinkler system at the Coatesville VA Medical Center facility. The report captures inspection data across multiple zones and floors, including the basement, first floor (Room 102A), second floor (Room 203A), and attic, with detailed testing of critical components such as the main drain static pressure, residual pressure, chamber refill time, and flow test results. All testing was conducted in accordance with NFPA 25: Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems, 2023 Edition, with results documented using a standardized coding system (P for Passed, F for Failed, D for Disconnected, C for Contractor Test). The report includes tamper alarm test results for multiple devices located throughout the building, including OS & Y valves, pressure independent valves, standpipes, and zone-specific equipment identified by their component numbers (e.g., 2702-0147, 2702-0145, 2702-0148).
The sprinkler system testing encompasses the Fire Department Connection (FDC) and associated infrastructure, with all inspections performed semi-annually to ensure compliance with applicable federal and VA safety protocols. This documentation directly supports the federal solicitation 36C24426Q0415 for the Five-Year Obstruction Inspection of the sprinkler system at Coatesville VAMC, which requires comprehensive internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and sprinkler gauge replacements performed by qualified technicians within 30 calendar days of contract award, Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.).
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 6
| SPRINKLER SYSTEM INSPECTION AND TEST | ||
| Building 6 | ||
| YEAR 2026 | 1 ST | 2ND |
| Date |
| Inspector |
| Main Drain | |||||||
| Static Pressure | |||||||
| Residual Pressure | |||||||
| Chamber Refill Time | |||||||
| Flow Test Results | |||||||
| Floor | Test Location | 6" | Zone | 6" | Zone | ||
| BASEMENT 6'' Main Flow 2702-0147 | B11-A | ||||||
| Bsmt. Zone Flow 2702-0145 | B15 | ||||||
| FIRST FLOOR | RM. 102A | ||||||
| SECOND FLOOR | RM. 203A | ||||||
| ATTIC 2702-0168 | ELEV CONT. RM. | ||||||
| Tamper Alarm Test Results | |||||||
| Device | Location | ||||||
| OS & Y 2702-0148 | RM. B11 | Key # 24 | KEY #24 | ||||
| P.I.V. 2702-0153 | CTR. OF BLDG | ||||||
| BSMT. ZONE 2702-0146 | OUTSIDE RM.B07 | ||||||
| MAIN RISER 2702-0152 | RM. B15B | ||||||
| EAST STANDPIPE 2702-0151 | E. BSMT. STAIR | ||||||
| W. STANDPIPE 2702-0149 | W. BSMT. STAIR | ||||||
| 1ST. FL. ZONE 2702-0179 | IN RM 102A | ||||||
| 2ND FL. ZONE 2702-0181 | RM 203A | ||||||
| ATTIC 2702-0169 | ELEV. CONT. RM |
| SPRINKLER BOX |
| FDC |
| TESTED SEMI-ANNUALLY IAW |
| NFPA 25: STANDARD FOR THE INSPECTION, TESTING AND MAINTENANCE |
| OF WATER BASED FIRE PROTECTION SYSTEMS, 2023 EDITION |
| ACCEPTABLE TESTING RESULTS |
| P = PASSED INSPECTION / TEST |
| F = FAILED INSPECTION / TEST |
| D= DISCONNECTED |
| C= CONTRACTOR TEST |
| TIMED RESULTS NOTED IN MINUTES AND SECONDS ( EXAMPLE 1M 30S ) |