This is a Sprinkler System Inspection and Test Report for Building 59 at a facility, documenting the 2026 year inspection results. The report provides comprehensive testing data for the facility's water-based fire protection systems, including static pressure readings, residual pressure measurements, chamber refill times, and flow test results across multiple zones (Basement, First Floor, Second Floor, and Attic). The inspection covers main drain tests, zone-specific testing for Zones A, B, and C, and tamper valve tests at various device locations including the Pressure Isolation Valve at the rear of Building 13, main riser/OS&Y in the plumbing shop basement, hose cabinets, standpipes, and the Sprinkler Box Fire Department Connection (FDC).

The testing was conducted in accordance with NFPA 25: Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems, 2023 Edition, with the FDC tested semi-annually as required. The report uses a standardized notation system indicating passed (P) or failed (F) results, with timed results documented in minutes and seconds format. This inspection report directly supports the federal contract solicitation 36C24426Q0415 for Fire Suppression Sprinklers at Coatesville VAMC, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4, which requires five-year obstruction inspections, internal pipe assessments, valve inspections, FDC hydrostatic testing, and related maintenance activities to be completed within 30 calendar days of award.

View the file

Other files

File Type Posted
36C24426Q0415 0005.docx DOCX document
36C24426Q0415 0004.docx DOCX document
Site Visit Information 07-9-2026.docx DOCX document
RFI Q and As.docx DOCX document
SPKLR2-2026 Blank.xlsx XLSX spreadsheet
SPKLR38-2026 Blank.xlsx XLSX spreadsheet
SPKLR57-2026 Blank.xlsx XLSX spreadsheet
36C24426Q0415 0003.docx DOCX document
SPKLR139-2026.xlsx XLSX spreadsheet
SPKLR1-2026 Blank.xlsx XLSX spreadsheet
SPKLR39-2026 Blank.xlsx XLSX spreadsheet
SPKLR7-2026 Blank.xlsx XLSX spreadsheet
SPKLR8-2026 Blank.xlsx XLSX spreadsheet
SPKLR9-2026 Blank.xlsx XLSX spreadsheet
SPKLR4-2026 Blank.xlsx XLSX spreadsheet
SPKLR138-2026 Blank.xlsx XLSX spreadsheet
SPKLR3-2026 Blank.xlsx XLSX spreadsheet
SPKLR6-2026.xlsx XLSX spreadsheet
SPKLR69-2026.xlsx XLSX spreadsheet
SPKLR138E-2026 Blank.xlsx XLSX spreadsheet
36C24426Q0415 0002.docx DOCX document
36C24426Q0415 0001.docx DOCX document
SCA 2015-5791 Rev 31.pdf PDF
36C24426Q0415.docx DOCX document
852.219-75 MUST SIGN AND RETURN WITH PROPOSAL.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 59

SPRINKLER SYSTEM INSPECTION AND TEST
Building 59
Year 20261 ST2ND
Date
Inspector
Main Drain
Static Pressure
Residual Pressure
Chamber Refill Time
Flow Test Results
FloorTest Location6"Zone6"Zone
BASEMENTOUTSIDE RM.10
FIRST FLOORNORTH STAIRWELL
ZONE "A"
ZONE "B"
ZONE "C"
SECOND FLOORNORTH STAIRWELL
ATTICNORTH STAIRWELL
Tamper Valve Test Results
DeviceLocation
P.I.V.REAR OF BLDG13
MAIN RISER/OS&YPLUMBING SHOP
BASEMENT ZONEHall by Plmb Shop
NORTH HOSE CABBY RM. 15
SOUTH HOSE CABBY RM. 4B
N.E. STNDPIPEBSMT STAIRS
S.W. STNDPIPEBSMT STAIRS
1ST FL. ZONENORTH STAIRWELL
ZONE "A"
ZONE "B"
ZONE "C"
2ND FL. ZONEN.E. STAIRWELL
ATTICN.E. STAIRWELL
SPRINKLER BOX
FDC
TESTED SEMI-ANNUALLY IAW
NFPA 25: STANDARD FOR THE INSPECTION, TESTING AND MAINTENANCE
OF WATER BASED FIRE PROTECTION SYSTEMS, 2023 EDITION
ACCEPTABLE TESTING RESULTS
P = PASSED INSPECTION / TEST
F = FAILED INSPECTION / TEST
TIMED RESULTS NOTED IN MINUTES AND SECONDS ( EXAMPLE 1M 30S )