This is a Sprinkler System Inspection and Test Report for Building 59 at a facility, documenting the 2026 year inspection results. The report provides comprehensive testing data for the facility's water-based fire protection systems, including static pressure readings, residual pressure measurements, chamber refill times, and flow test results across multiple zones (Basement, First Floor, Second Floor, and Attic). The inspection covers main drain tests, zone-specific testing for Zones A, B, and C, and tamper valve tests at various device locations including the Pressure Isolation Valve at the rear of Building 13, main riser/OS&Y in the plumbing shop basement, hose cabinets, standpipes, and the Sprinkler Box Fire Department Connection (FDC).
The testing was conducted in accordance with NFPA 25: Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems, 2023 Edition, with the FDC tested semi-annually as required. The report uses a standardized notation system indicating passed (P) or failed (F) results, with timed results documented in minutes and seconds format. This inspection report directly supports the federal contract solicitation 36C24426Q0415 for Fire Suppression Sprinklers at Coatesville VAMC, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4, which requires five-year obstruction inspections, internal pipe assessments, valve inspections, FDC hydrostatic testing, and related maintenance activities to be completed within 30 calendar days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24426Q0415 0005.docx | DOCX document | |
| 36C24426Q0415 0004.docx | DOCX document | |
| Site Visit Information 07-9-2026.docx | DOCX document | |
| RFI Q and As.docx | DOCX document | |
| SPKLR2-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR38-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR57-2026 Blank.xlsx | XLSX spreadsheet | |
| 36C24426Q0415 0003.docx | DOCX document | |
| SPKLR139-2026.xlsx | XLSX spreadsheet | |
| SPKLR1-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR39-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR7-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR8-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR9-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR4-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR138-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR3-2026 Blank.xlsx | XLSX spreadsheet | |
| SPKLR6-2026.xlsx | XLSX spreadsheet | |
| SPKLR69-2026.xlsx | XLSX spreadsheet | |
| SPKLR138E-2026 Blank.xlsx | XLSX spreadsheet | |
| 36C24426Q0415 0002.docx | DOCX document | |
| 36C24426Q0415 0001.docx | DOCX document | |
| SCA 2015-5791 Rev 31.pdf | ||
| 36C24426Q0415.docx | DOCX document | |
| 852.219-75 MUST SIGN AND RETURN WITH PROPOSAL.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 59
| SPRINKLER SYSTEM INSPECTION AND TEST | ||
| Building 59 | ||
| Year 2026 | 1 ST | 2ND |
| Date |
| Inspector |
| Main Drain | |||||
| Static Pressure | |||||
| Residual Pressure | |||||
| Chamber Refill Time | |||||
| Flow Test Results | |||||
| Floor | Test Location | 6" | Zone | 6" | Zone |
| BASEMENT | OUTSIDE RM.10 | ||||
| FIRST FLOOR | NORTH STAIRWELL | ||||
| ZONE "A" | |||||
| ZONE "B" | |||||
| ZONE "C" | |||||
| SECOND FLOOR | NORTH STAIRWELL | ||||
| ATTIC | NORTH STAIRWELL | ||||
| Tamper Valve Test Results | |||||
| Device | Location | ||||
| P.I.V. | REAR OF BLDG13 | ||||
| MAIN RISER/OS&Y | PLUMBING SHOP | ||||
| BASEMENT ZONE | Hall by Plmb Shop | ||||
| NORTH HOSE CAB | BY RM. 15 | ||||
| SOUTH HOSE CAB | BY RM. 4B | ||||
| N.E. STNDPIPE | BSMT STAIRS | ||||
| S.W. STNDPIPE | BSMT STAIRS | ||||
| 1ST FL. ZONE | NORTH STAIRWELL | ||||
| ZONE "A" | |||||
| ZONE "B" | |||||
| ZONE "C" | |||||
| 2ND FL. ZONE | N.E. STAIRWELL | ||||
| ATTIC | N.E. STAIRWELL |
| SPRINKLER BOX |
| FDC |
| TESTED SEMI-ANNUALLY IAW |
| NFPA 25: STANDARD FOR THE INSPECTION, TESTING AND MAINTENANCE |
| OF WATER BASED FIRE PROTECTION SYSTEMS, 2023 EDITION |
| ACCEPTABLE TESTING RESULTS |
| P = PASSED INSPECTION / TEST |
| F = FAILED INSPECTION / TEST |
| TIMED RESULTS NOTED IN MINUTES AND SECONDS ( EXAMPLE 1M 30S ) |