About this opportunity

This solicitation seeks construction services for a Low Observable Component Repair Facility at Langley Air Force Base in Virginia. The U.S. Army Corps of Engineers, Norfolk District, will evaluate proposals to construct a 6,735 square meter facility with four high bays, including three bays for low observable critical repair and one wash rack bay. Proposals will be evaluated based on specialized experience, past performance, schedule, small business participation plan, and price. The response deadline is February 17, 2022.

The solicitation does not utilize any set-aside designations. The project involves construction under NAICS code 2362 and PSC code S206. The facility size is 6,735 square meters and must provide capabilities to support maintenance of 38 additional F-22A aircraft relocated from Tyndall Air Force Base. The statutory cost limitation is $52,259,314 and construction performance period is 730 calendar days at Langley Air Force Base in Hampton, Virginia.

Notice text

16 versions

Update #16 · Latest ·

Amendment 0014 is uploaded to add revised Small Business Participation Plan

Uploaded revised Bid Schedule - Amendment 0013

Amendment 12 Technical / ProjNet Responses and FAR clauses

Amendment 11  Technical Amendment and extend the solicitation closing date to 17 February 2022. 

Amendment 10  to extend the solicitation closing date to 11 February 2022.

Site Visit 10 January is uploaded 

Amendment 9 is uploaded

Amendment 8 is uploaded.

Amendment 7 is upload

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #15 ·

Uploaded revised Bid Schedule - Amendment 0013

Amendment 12 Technical / ProjNet Responses and FAR clauses

Amendment 11  Technical Amendment and extend the solicitation closing date to 17 February 2022. 

Amendment 10  to extend the solicitation closing date to 11 February 2022.

Site Visit 10 January is uploaded 

Amendment 9 is uploaded

Amendment 8 is uploaded.

Amendment 7 is upload

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #14 ·

Amendment 12 Technical / ProjNet Responses and FAR clauses

Amendment 11  Technical Amendment and extend the solicitation closing date to 17 February 2022. 

Amendment 10  to extend the solicitation closing date to 11 February 2022.

Site Visit 10 January is uploaded 

Amendment 9 is uploaded

Amendment 8 is uploaded.

Amendment 7 is upload

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #13 ·

Amendment 11  Technical Amendment and extend the solicitation closing date to 17 February 2022. 

Amendment 10  to extend the solicitation closing date to 11 February 2022.

Site Visit 10 January is uploaded 

Amendment 9 is uploaded

Amendment 8 is uploaded.

Amendment 7 is upload

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #12 ·

Amendment 10  to extend the solicitation closing date to 11 February 2022.

Site Visit 10 January is uploaded 

Amendment 9 is uploaded

Amendment 8 is uploaded.

Amendment 7 is upload

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #11 ·

Site Visit 10 January is uploaded 

Amendment 9 is uploaded

Amendment 8 is uploaded.

Amendment 7 is upload

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #10 ·

Amendment 8 is uploaded.

Amendment 7 is upload

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #9 ·

Amendment 7 is upload

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #8 ·

Amentment 6  is uploaded

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #7 ·

Amendment 5 is uploaded please review for current information.

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #6 ·

Amendment 4 is uploaded please review for current information on closing.  USACE has received authority to proceed with the acquisition of this construction project and is extending its initial solicitation phase. This is still a bifurcated project. Offerors are encouraged to submit proposals in response to Factors 1 and 2.

All offerors, including those that submitted proposals by the original solicitation due date, will be afforded equal consideration throughout the source selection process.

Refer to the SF30 for additional details.

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #5 ·

Amendment 4 is uploaded please review for current information on closing.   This is still a bifurcated project. 

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #4 ·

Amendment 3 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #3 ·

Amendment 2 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #2 ·

Amendment 1 is available.

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Update #1 ·

This is the Solicitation.

Description: This project is the construction of a 6,735-square-meter, four-bay high-bay (three low observable critical repair and one wash rack) Low Observable Component Repair Facility in support of 38 additional F-22A aircraft from Tyndall Air Force Base (AFB), relocated to bed-down at Langley AFB, in Hampton, Virginia, to provide adequate maintenance capacity. Construction includes a compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house three corrosion control hangar bays, one wash rack hangar, shops, tools/support, staff administration, ready room, break room, restrooms/showers/lockers, and building systems support. Each hangar bay will be equipped with appropriate air filtration supply and return systems. The project includes all utilities, site improvements, pavements, detection protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable code and design guides. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum anti-terrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 300 Tons.

The three hangar bays will be used for corrosion control maintenance and one bay as a wash rack. The facility will provide fire protection and suppression systems, offices, male/female restrooms with showers and lockers, and electrical/mechanical/ telecommunications support rooms. Site utilities must provide sufficient electrical and communications service to meet F-22A in-bay power-up, data automation system and computerized diagnostic equipment requirements. The facility must provide a secure and climate-controlled space, in which to accomplish the specialized maintenance and repair procedures required for the F-22A’s state-of-the-art stealth mission technology.

Construction contract duration is expected to be 730 calendar days.

Files

File Type Posted
Attachment 7- Revised Small Business Participation Plan.pdf PDF
W9123621R2023 Amendment 14.pdf PDF
Attachment 8 - Revised Bid Schedule.pdf PDF
W9123621R2023 Amendment 13.pdf PDF
Attch 41 Copy of GFE Equipment List_mjm edits 2020.09.24.xlsx XLSX spreadsheet
Attch 40 06 61 16 AMENDMENT 09 FEB 22.pdf PDF
Attch 38 LOCRF DRAWINGS AMENDMENT 09FEB2022.pdf PDF
W9123621R2023 Amendment 12.pdf PDF
Attch 39 08 33 23 AMENDMENT 09 FEB 22.pdf PDF
Attch 38 08 81 00 Glazing.pdf PDF
Attch 37 33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATION.pdf PDF
W9123621R2023 LOCRF Amendment 11.pdf PDF
Attch 36 32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS.pdf PDF
Attch 34 13 34 19 METAL BUILDING SYSTEMS.pdf PDF
Attch 29 06 61 16 SOLID SURFACE FABRICATIONS.pdf PDF
Attch 33 10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED).pdf PDF
Attch 28 03 45 00 PRECAST ARCHITECTURAL CONCRETE.pdf PDF
Attch 21 01FEB2022 AMENDMENT_DRAWINGS.pdf PDF
Attch 32 09 97 13.27 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES.pdf PDF
Attachment 8 - Revised CLIN Schedule.pdf PDF
Attch 31 09 90 00 PAINTS AND COATINGS.pdf PDF
Attch 35 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT.pdf PDF
Attch 30 08 34 16 CORROSION CONTROL HANGAR DOORS.pdf PDF
Attch 25 01 11 00 Appendix to 01 11 00 Government Furnished Equipment.pdf PDF
Attch 27 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
Attch 24 P 601 PLUMBING SCHEDULES.pdf PDF
Attch 26 01 14 00 WORK RESTRICTIONS.pdf PDF
Attch 23 A 533 ROOF DETAILS.pdf PDF
Attch 22 A 011 EQUIPMENT SCHEDULE METALS TECH and SHOPS.pdf PDF
W9123621R2023 Amendment 10.pdf PDF
Site Visit 10 January.pdf PDF
Attachment 20 LOCRF RTA Specifications.pdf PDF
Attachment 15 LOCRF RTA DWGS PART 1 OF 3.pdf PDF
W9123621R2023 Amendment 9.pdf PDF
Attachment 18 LOCRF RTA FF and E PACKAGE.pdf PDF
Attachment 19 LOCRF RTA SID PACKAGE.pdf PDF
Attachment 17 LOCRF RTA DWGS PART 3 OF 3.pdf PDF
Attachment 16 LOCRF RTA DWGS PART 2 OF 3.pdf PDF
Attachment 14 LOCRF RTA AF Sust Scoresheet GP vFeb2017.xlsx XLSX spreadsheet
W9123621R2023 Amendment 8.pdf PDF
Attch 13- LOCRF 20Oct21 Blended Drawings Part 3 of 3.pdf PDF
Attch 12- LOCRF 20Oct21 Blended Specifications.pdf PDF
Attch 11- LOCRF 20Oct21 Blended Drawings Part 2 of 3.pdf PDF
Attch 10- LOCRF 20Oct21 Blended Drawings Part 1 of 3.pdf PDF
W9123621R2023 Amendment 7.pdf PDF
W9123621R2023 Amendment 6.pdf PDF
W9123621R2023 LOCRF Amend 5.pdf PDF
W9123621R2023 Amendment 4.pdf PDF
A.07.24 - Amendment 3.pdf PDF
A.07.24 - Amendment 2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
F-22 Low Observable Component Repair Facility (LOCRF) Award Award Notice
W9123621R2023 - F22 LOCRF - Notice of Intent Latest special notice Special Notice
This notice Solicitation
F22 locrf Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Airfield Lighting Computer System Langley AFB, Virginia 23665, United States · NAICS 238210 Air Combat Command No set-aside
Environmental Control Work Booth/ Sanding Booth. Langley AFB, Virginia, United States · NAICS 332312 Air Combat Command Total Small Business
F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah Hill Air Force Base, Utah, United States · NAICS 236210 ENDIST Sacramento No set-aside
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO Wright Patterson AFB, Ohio 45433, United States · NAICS 236220 ENDIST Louisville No set-aside
PKA Relocatable Facility FE Warren AFB, Wyoming 82005, United States · NAICS 332311 Global Strike Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors