F-22 Low Observable Component Repair Facility (LOCRF) Federal contract opportunity
Solicitation number
W9123621R2023
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document contains a contract line item schedule and description for a federal construction contract to build a Low Observable Composite Repair Facility at Joint Base Langley-Eustis in Virginia. The contract includes line items for construction of the facility building and site work, offsite electrical and communications improvements, optional audio-visual equipment, fixtures and furniture, and options for soil disposal and replacement. Pricing is provided for the base work and seven options to be exercised within 180 to 365 days of the notice to proceed. The statutory cost limitation for the project is $52,259,314.32, covering specific line items for the facility construction.

View the file

Other files for this federal contract opportunity

Other files attached to F-22 Low Observable Component Repair Facility (LOCRF), newest first.
File Type Posted
Attachment 8 - Revised Bid Schedule.pdf PDF
W9123621R2023 Amendment 13.pdf PDF
Attch 40 06 61 16 AMENDMENT 09 FEB 22.pdf PDF
Attch 38 LOCRF DRAWINGS AMENDMENT 09FEB2022.pdf PDF
Attch 41 Copy of GFE Equipment List_mjm edits 2020.09.24.xlsx XLSX spreadsheet
Attch 38 08 81 00 Glazing.pdf PDF
Attch 35 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT.pdf PDF
Attch 25 01 11 00 Appendix to 01 11 00 Government Furnished Equipment.pdf PDF
Attch 24 P 601 PLUMBING SCHEDULES.pdf PDF
Attch 23 A 533 ROOF DETAILS.pdf PDF
Attch 22 A 011 EQUIPMENT SCHEDULE METALS TECH and SHOPS.pdf PDF
Attch 36 32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS.pdf PDF
Attch 33 10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED).pdf PDF
Attch 32 09 97 13.27 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES.pdf PDF
Attch 31 09 90 00 PAINTS AND COATINGS.pdf PDF
Attch 30 08 34 16 CORROSION CONTROL HANGAR DOORS.pdf PDF
Attch 27 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
Attch 26 01 14 00 WORK RESTRICTIONS.pdf PDF
Attch 37 33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATION.pdf PDF
Attch 34 13 34 19 METAL BUILDING SYSTEMS.pdf PDF
Attch 28 03 45 00 PRECAST ARCHITECTURAL CONCRETE.pdf PDF
W9123621R2023 Amendment 10.pdf PDF
Site Visit 10 January.pdf PDF
W9123621R2023 Amendment 9.pdf PDF
Attachment 19 LOCRF RTA SID PACKAGE.pdf PDF
Attachment 16 LOCRF RTA DWGS PART 2 OF 3.pdf PDF
Attachment 15 LOCRF RTA DWGS PART 1 OF 3.pdf PDF
Attch 13- LOCRF 20Oct21 Blended Drawings Part 3 of 3.pdf PDF
Attch 10- LOCRF 20Oct21 Blended Drawings Part 1 of 3.pdf PDF
W9123621R2023 Amendment 8.pdf PDF
Attch 11- LOCRF 20Oct21 Blended Drawings Part 2 of 3.pdf PDF
W9123621R2023 Amendment 7.pdf PDF
W9123621R2023 Amendment 6.pdf PDF
W9123621R2023 LOCRF Amend 5.pdf PDF
W9123621R2023 Amendment 4.pdf PDF
A.07.24 - Amendment 3.pdf PDF
A.07.24 - Amendment 2.pdf PDF
Attch 12 - LOCRF 100 Specification Part 1 of 1.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Solicitation W9123621R2023.pdf PDF
Attch 11 - LOCRF 100 Dwgs Part 2 of 2.pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attch 10 - LOCRF 100 Dwgs Part 1 of 2.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Attachment 9 - Langley Environmental Management Special Conditions.pdf PDF
Show all 50

F-22 Low Observable Component Repair Facility (LOCRF) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOW OBSERVABLE COMPOSITE REPAIR FACILITY (LOCRF) W91236-21-R-2023

Joint Base Langley-Eustis (JBLE)

CLIN Schedule (3Feb22)

OFFEROR’S NAME:

CONTRACT LINE ITEM SCHEDULE

CLIN Description Unit Unit Amount Base Proposal

0001 Low Observable Composite Repair Facility (LOCRF) All work, labor, materials, and equipment required to the Low Observable Composite Repair Facility (LOCRF), including all building related construction within the 5’ line, complete as prescribed in the construction documents excluding work described in CLIN 0002 – CLIN 0012. Source of funding is MILCON.

(1)JOB

0002 LOCRF site improvements All work, labor, materials, and equipment required to construct the LOCRF site improvements, including all construction outside of the 5’ line, complete as prescribed in the construction documents excluding work described in CLIN 0001 and CLIN 0003 – CLIN 0012. Source of funding is MILCON.

0003 Offsite Electrical distribution system by Dominion Energy Offsite electrical distribution system by Dominion Energy All work, labor, materials, and equipment by Dominion Energy required to construct electrical service to the new LOCRF facility, complete as prescribed in the construction documents excluding work described in CLIN 0001 – CLIN 0002 and CLIN 0004 – CLIN 0012. Source of funding is MILCON.

0004 Deleted

Total Base Amount

0005 Audio-Visual (AV) Equipment Option 1 All work, labor, materials, and equipment required to furnish and install Audio-Visual (AV) Equipment complete as prescribed in the construction documents excluding work described in CLIN 0001 – CLIN 0004 and CLIN 0006 – CLIN 0012. Source of funding is NON-MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.

CLIN Description Unit Unit Amount

Fixtures, Furniture and Equipment (FF&E)

OPTION 2

All work, labor, materials, and equipment required to furnish and install Fixtures, Furniture and Equipment (FF&E) complete as prescribed in the construction documents excluding work described CLIN 0001 – CLIN 0005 and CLIN 0007 – CLIN 0012. Source of funding is NON- MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217- 7.

0007 Offsite Communications Improvements

OPTION 3

All work, labor, materials, and equipment required to construct Offsite Communications improvements, from connection point at HH179E (including structure HH179E) to and including interior improvements in Building 330, with exception of 12 Strand Single Mode Fiber Option cable from LOCRF to telcon room inside Bldg 330 (12 Strand FO Cable is base bid), complete as prescribed in the in the construction documents excluding work described in CLIN 0001 – CLIN 0006 and CLIN 0008 – CLIN 0012. Source of funding is MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217- 7.

(1)JOB

0008 Disposal of any other-than-clean soil

OPTION 4

All work, labor, materials, and equipment required to dispose any other-than-clean soil complete as prescribed in the construction documents, including but not limited to specification section 01 57 19 Temporary Environmental Controls 01 57 19 ATTACHMENT JBLE-Langley Environmental Special Conditions para 1.1.2.2, excluding work described in CLIN 0001 – CLIN 0007 and CLIN 0009 – CLIN 0012.

Source of funding is MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217- 7.

(250)

CY

Dispose and Replace any Unsatisfactory Soils Removed as Uncontrolled Fill

OPTION 5

Provide unit price for all work, labor, materials, and equipment required to Dispose any Unsatisfactory Soils Removed as Uncontrolled Fill and Replace with structural fill complete as prescribed in the construction documents, excluding work described in CLIN 0001 – CLIN 0008 and CLIN 0010 - CLIN 0012. Source of funding is MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217- 7.

0010 Deleted

CLIN Description Unit Unit Amount 0011 Paint Booth in Room 141

Option 6 All work, labor, materials, and equipment required to furnish and install Paint Booth in Room 141 complete as prescribed in the construction documents excluding work described in CLIN 0001 – CLIN 0010 and CLIN 0012. Source of funding is NON-MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with

FAR 52.217-7.

0012 Dispose and Replace any Unsatisfactory Soils Failing Proof rolling

OPTION 7

Provide unit price for all work, labor, materials, and equipment required to Dispose any Unsatisfactory Soils Failing Proof rolling and Replace with aggregate base course complete as prescribed in the construction documents, excluding work described in CLIN 0001 – CLIN 0011. Source of funding is MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.

TOTAL BASE AMOUNT

TOTAL AMOUNT(BASE PLUS OPTIONS)

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. CLINs 0008, 0009 and 0012 are unit price items. Offerors must insert both the unit price and the extended price. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The total evaluated price will be calculated as the sum of all base and option CLIN items in accordance with 52.217-5, Evaluation of Options.

Evaluation of options will not obligate the Government to exercise the option(s).

Statutory Cost Limitations This acquisition will result in a firm fixed price contract for design-bid-build construction services. In accordance with FAR 36.205 the statutory cost limitation for the F-22 Low Observable Component Repair Facility (LOCRF) project is $52,259,314.32 for CLINs 0001, 0002, 0003, 0007, 0008, 0009, and 0012.

File details come from the government source that posted it. Updated .