This solicitation is for the construction of a Low Observable Component Repair Facility at Langley Air Force Base in Virginia. The facility will include three corrosion control hangar bays, one wash rack hangar bay, shops, administration spaces, and building systems support to provide maintenance for 38 additional F-22A aircraft relocated from Tyndall Air Force Base. Construction includes site work, a structural steel frame building, utilities, pavements, and security features. The three hangar bays will house corrosion control maintenance and be equipped with air filtration systems. The facility must withstand seismic and wind loads according to applicable codes and design guides. Construction will integrate sustainable practices and have a contract duration of 730 calendar days. The Department of the Army Corps of Engineers Engineering District Norfolk issued this solicitation.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOW OBSERVABLE COMPOSITE REPAIR FACILITY W91236-21-R-2023
Langley Air Force Base
SECTION 33 32 16
PACKAGED UTILITY WASTEWATER PUMPING STATIONS
11/19
AMENDMENT 31 JAN 22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B1.20.1 (2013; R 2018) Pipe Threads, General Purpose (Inch)
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C115/A21.15 (2011) Flanged Ductile-Iron Pipe With Ductile-Iron or Gray-Iron Threaded Flanges
AWWA C500 (2009) Metal-Seated Gate Valves for Water Supply Service
AWWA C509 (2015) Resilient-Seated Gate Valves for Water Supply Service
AWWA C515 (2015) Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service
AWWA C600 (2017) Installation of Ductile-Iron Mains and Their Appurtenances
AWWA C605 (2014) Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings
AWWA M23 (2002; 2nd Ed) Manual: PVC Pipe - Design and Installation
SECTION 33 32 16 Page 1
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A615/A615M (2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM C443 (2020) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets
ASTM C478 (2018) Standard Specification for Circular Precast Reinforced Concrete Manhole Sections
ASTM D883 (2020a) Standard Terminology Relating to Plastics
ASTM D1784 (2020) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D1785 (2015; E 2018) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2241 (2015) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
ASTM D2464 (2015) Standard Specification for Threaded Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2466 (2017) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
ASTM D2467 (2015) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D3139 (2019) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM D3753 (2019) Glass-Fiber-Reinforced Polyester Manholes and Wetwells
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
SECTION 33 32 16 Page 2
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 1940-1 (2003; R 2008) Mechanical Vibration - Balance Quality Requirements for Rotors in a Constant (Rigid) State - Part 1:
Specification and Verification of Balance Tolerances
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-80 (2019) Bronze Gate, Globe, Angle and Check Valves
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2018) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 67 (2018; Reprint Oct 2019) UL Standard for Safety Panelboards
UL 489 (2016) UL Standard for Safety Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. "G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Fabrication Drawings
SD-03 Product Data
Submersible Sewage Grinder Pumps; G , AE
Pump Performance Curve; G , AE
Pump Motor; G , AE
Pump Control System; G , AE
SECTION 33 32 16 Page 3
Wet Well and Valve Vault; G , AE
Flexible Flanged Coupling; G , AE
Station Piping and fittings; G , AE
Valves; G , AE
Spare Parts Data; G , AE
Access Hatch Covers
SD-05 Design Data
Buoyancy Calculations; G , AE
SD-06 Test Reports
Pump Test; G , AE
Float Test; G , AE
SD-07 Certificates
Submersible Sewage Grinder Pumps; G , AE
Access Hatch Covers
Dehumidifier; G , AE
Pump Motor; G , AE
SD-08 Manufacturer's Instructions
Access Hatch Covers
Pump Control System; G , AE
Dehumidifier; G , AE
Pump Motor; G , AE
Special Tools; G , AE
Posted Instructions; G , AE
SD-10 Operation and Maintenance Data
Operation And Maintenance Manuals
SD-11 Closeout Submittals
Warranty; G , AE
SECTION 33 32 16 Page 4
1.3 QUALITY CONTROL
1.3.1 Installer Qualifications
Provide manufacturer's authorized pump representative who is trained and approved for installation of pumps and packaged pump station required for this project.
1.4 DELIVERY, STORAGE, AND HANDLING OF MATERIALS
1.4.1 Delivery and Storage
Inspect materials delivered to site for damage. Unload and store with minimum handling. Store materials in enclosures or under protective covering. Rubber gaskets which are not to be installed immediately must be stored under cover, out of direct sunlight. Do not store materials directly on the ground. Keep interior of pipes, valves and fittings free of dirt and debris.
1.4.2 Handling
Handle pipe, fittings, valves, and other accessories in such manner as to ensure delivery to the trench in sound, undamaged condition. Avoid injury to coatings and linings on pipe and fittings; make repairs if coatings or linings are damaged. Carry pipe to the trench; do not drag it. Do not use any device or fitting inserted into (such as loader forks) or attached to (such as chain hooks) the bell or spigot ends of the pipe to transport pipe. Handle ductile iron pipe, fittings, and accessories in accordance with AWWA C600. Handle PVC pipe, fittings, and accessories in accordance with AWWA C605.
1.5 WARRANTY
Provide manufacturer's standard warranty for a minimum of one year for package pump station including pumps, valves, controls, wet well basin and accessories.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide a complete packaged sewage pump station with submersible grinder pumps including equipment and materials, installed and ready for operation. The pump supplier furnishes the controls, pumps and rail system to ensure unit integrity.
Submit fabrication drawings before installation. Submit drawings covering necessary or recommended changes to accommodate the equipment offered.
Show on the drawings the design of the fiberglass basin, with dimensions, types, and thicknesses of materials, and elevation levels with reference to those elevations indicated.
2.2 SUBMERSIBLE SEWAGE GRINDER PUMPS
Provide submersible sewage pumps with grinder units as indicated. Provide UL listed pumps for explosion proof Class 1, Division 1, Groups C and D hazardous locations. Provide submersible, centrifugal sewage pumps and grinder units capable of grinding the materials found in normal domestic sewage, including plastics, rubber, sanitary napkins, disposable diapers, animal hair and wooden articles into a finely ground slurry with particle
SECTION 33 32 16 Page 5 dimensions no greater than 1/4 inch . Provide pump capacity, number of pumps and motor characteristics as indicated on the drawings. Select pumps to continuously operate in a submerged or partially submerged condition.
2.2.1 Pump Construction
2.2.1.1 Casing
Provide hard, close-grained cast iron casing or steel that is free from blow holes, porosity, hard spots, shrinkage defects, cracks, and other injurious defects. Provide casings permitting replacement of wearing parts. Ensure all joints are gasketed to prevent leakage. Ensure passageways permit smooth flow of sewage and are free of sharp turns and projections. Use free standing pump support legs of cast-iron providing enough clearance for the solids to get into the grinder.
2.2.1.2 Impeller
Provide a cast iron impeller for the grinder pump with stainless steel cutter, grinder, or slicer assembly. Fit and key, spline, or thread impeller on shaft, and lock in such manner that lateral movement is prevented and reverse rotation will not cause loosening.
2.2.1.3 Bearings
Provide heavy duty ball thrust bearing or roller type bearing sized to withstand imposed loads. Oil lubricate bearings.
2.2.1.4 Lubrication
Provide self lubricating, permanently sealed bearings.
2.2.1.5 Balance
Balance rotating parts of the equipment mechanically and hydraulically to operate throughout the required range without excessive end thrust, vibration, and noise. Conform allowable vibration limits with ISO 1940-1 , Table 1. Existence of defects that cannot be eliminated by adjustment will be sufficient cause for rejection of the equipment.
2.3 PUMP MOTOR
Provide hermetically sealed electric motors with moisture and temperature-sensing probes in the wet well NEMA MG 1, 3500 RPM, 240 volt, 3 phase, and 60 Hz cycle for submersible pumps. Motor horsepower must not be less than pump horsepower at any point on the pump performance curve.
Fit motors with lifting "eyes" capable of supporting entire weight of pump and motor. Seal the power cable inside the motor end bell. Provide a waterproof power cable for its full length. Motors shall be UL listed for explosion proof Class 1, Division 1, Groups C and D. Air filled motors are not acceptable. Oil used must be able to be disposed as non-hazardous waste.
SECTION 33 32 16 Page 6
2.4 PUMP CONTROL SYSTEM
2.4.1 General
Provide an automatic type pump operating control including all necessary components to function reliably. Mount controls in a NEMA 4Xrated stainless steel control panel. Ensure equipment subject to contact with sewage or sewage gases is corrosion-resistant metal. Provide an electronic controller that automatically activates and alternates the pump operation. If the liquid level continues to rise to the plans-specified level, the controller engages both pumps to operate simultaneously until both shut off at the specified low level. Provide hand-off-auto switches to choose the mode of operation for each pump. Provide controls with a 12 VDC powered float switch connected to the alarm contact of the battery charger to activate high-level alarms.
Protect pumping stations from lightning and transient voltage surges and equip with phase protection.
Provide the station with a three-wire, 4-pole (grounding) receptacle for a portable generator in case there is an external power outage.
Design the control system to operate pumps at the power characteristics as shown on the plans. Ensure all controls and wiring meet or exceed the requirements of NFPA 70 .
For pumps specified as explosion proof, have pump power and control installation meets NEC requirements for Class 1, Division 1, Group D Hazardous Location, including intrinsically safe controls. Provide components that are UL listed or FM approved.
Require the control function to provide for the operation of the pumps under normal conditions and alternates the pumps on each pump down cycle.
In the event the incoming flow exceeds the pumping capacity of the lead pump, the offline pumps automatically start to handle the increased flow.
As the flow decreases, the pumps cut off at the elevations set on the controller.
2.4.2 Level Control System
Provide a sealed, mercury-free float switch control system to sense variations of sewage level in the wet well.
Use a direct acting float switch consisting of a normally-open mercury switch enclosed in a float. Use float molded of rigid high-density polyurethane foam, color-coded and coated with a durable, water and corrosion-resistant jacket of clear urethane.
Provide stainless steel float brackets in accordance with manufacturer's recommendations.
Mount floats at fixed elevations as shown on the drawings.
Use floats designed to tilt and operate their switches causing sequential turn-on turn-off of the pump, when the liquid level being sensed rises or falls past the float.
Float switches must be intrinsically safe relays. Provide an
SECTION 33 32 16 Page 7 intrinsically safe barrier relay between the wet well and the control panel.
Provide an intrinsically safe barrier relay between the wet well and the control panel.
2.4.3 Alternator
Provide an alternator control switch to operate in connection with each float. Use an alternator control switch to alternate the operation of the pumps and operate both pumps if the water level rises above the second high water level. Incorporate time delay function and devices in the alternator controls such that both sewage pumps cannot be started simultaneously for an adjustable period of 10 to 120 seconds after shutdown. Use the delay function designed to operate in any condition of start-up in either normal or emergency operational mode.
2.4.4 Sewage Pump Alarm and Control Panel
Enclose alarm panel in NEMA 4X enclosure and with a flashing red light that is visible from 50 feet away, with long life bulb in guarded enclosure and 6 inch diameter horn. Use horns capable of emitting 120 DB at 10 feet. Power alarm horn and light from 12V DC power supply with battery backup. Provide a rechargeable battery rated to power both the horn and light for a minimum of two hours upon loss of main power. Provide circuitry to automatically recharge the battery after main power is restored. Use batteries capable of being fully recharged in no more than 20 hours. Use panel with power on light, push to test button for horn and light and push to silence button for horn and light with automatic reset for next alarm.
2.4.4.1 Alarms
Provide a test function ability for the alarm system. Provide alarms to activate under the following conditions:
a. High liquid level as sensed by the level control system.
b. Loss of main power.
c. No flow light as sensed by limit switch on the check valve or as sensed by current sensors.
d. Pump failure via temperature overload or motor heat sensor trip;
provide motor high temperature light.
e. Seal failure with indication light.
2.4.4.2 Circuit Breakers
a. Provide an individual circuit breaker for each pump.
b. Include a control circuit breaker and an alarm circuit breaker in the control panel.
c. Allow for two additional spare 115V single phase 20A circuit breakers for local pole lighting and future spare.
d. Provide circuit breakers in accordance with UL 489
SECTION 33 32 16 Page 8
e. Conform to UL 67 for circuit breaker mounting.
2.4.4.3 Motor Starter and Overload Protection
Provide an International Electrotechnical Commission (IEC) rated motor starter and thermal overload protection located in the control panel for each pump. Include undervoltage release, manual reset buttons and hand-automatic selector switches.
2.4.4.4 Power Lugs
a. Size the incoming power lugs for the proper voltage, amperage, and horsepower for each pump station.
b. Include grounding lugs for the incoming power. Provide a dedicated grounding lug in the control panel for each pump.
c. Size ground lug and rod according to local and base electrical codes and install by a licensed electrician.
d. Use UL listed power lugs.
e. Conform to UL 67 for required power lug mounting.
2.4.4.5 Anti-Condensation Heater
a. Provide an anti-condensation heater in the control panel that is sized based upon the size of the particular pump station's control panel size.
b. Power the heater from the control voltage transformer for three phase pump motor units and from the incoming power for single phase pump motor units.
c. Control the heater by a thermostat, coming on at 50 degree F and going off at 65 degree F.
d. Clearly label panel directory for breakers.
2.4.4.6 Trouble Light
Provide a fluorescent trouble shooting light in the panel that is hard-wired into an appropriately sized circuit breaker. It is acceptable for the light and one of the convenience outlets to share the same circuit breaker.
2.4.4.7 Convenience Outlets
a. Place two duplex convenience outlets in the control panel; utilize one for the battery charger. The battery receives power from the control voltage transformer via the alarm fuse.
b. Upsize the alarm fuse to 1 to 1.5 amps for the battery charger.
c. Provide each outlet with its own 20 amp 115/1/60 circuit breaker.
SECTION 33 32 16 Page 9
2.4.4.8 Connection for Portable Generator
Provide receptacle for connection for portable generator. Provide manual transfer switch for receptacle matching generator electrical power requirements.
2.4.4.9 Additional Requirements
a. Provide elapsed time meter for each pump that measures run time in hours to 9999.9.
b. Do not place junction boxes between pumps, control systems and control panels; provide conduit seals at all wet well penetrations. If this is unavoidable, use NEMA 7 construction.
2.4.5 Electrical Requirements
Install labels to identify switches and controls. Provide internal wiring for components of packaged equipment as an integral part of the equipment. Provide power wiring and conduit for field installed equipment.
2.5 WET WELL AND VALVE VAULT
AMENDMENT 31 JAN 22* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
2.5.1 Wet Well and Valve Vault
Provide a fiberglass reinforced polyester resin basin with integral valve vault ; include a separate precast concrete valve vault. Provide a wet well and valve vault with inside diameters as indicated and to the depths indicated on the drawings.
Precast structures may be provided in lieu of cast-in-place structures.
2.5.1.1 Fiberglass Basins
a. Buoyancy Calculations: Submit buoyancy calculations sealed by a licensed professional engineer assuming seasonal high groundwater elevation at proposed finished grade. Prevent flotation in accordance with manufacturer's written instructions. Include manufacturer's written instructions with submitted calculations.
b. Select Fiberglass Reinforced Polyester (FRP) wet well in accordance with ASTM D883 relating to plastics and ASTM D3753.
(1) Use commercial grade polyester resins evaluated as a laminate by test or determined by previous service to be acceptable for use in the wastewater environment.
(2) Use a commercial grade continuous strand fiberglass reinforcement material.
(3) Design FRP based on the following assumed conditions. Provide independent third party testing.
(a) Hydrostatic pressure of 62.4 pounds/square foot with water at ground surface.
(b) Saturated soil weight of 120 pounds/cubic foot.
(c) Soil modulus of 700 pounds/square foot.
SECTION 33 32 16 Page 10
RoseborS Line
RoseborS Line
RoseborS Line
(d) Pipe stiffness values as specified in ASTM D3753.
(e) Provide FRP laminate with a surface hardness of 90 percent Barcol.
2.5.1.2 Pr ecast Concr et e Val ve Vaul t
Const r uct pr ecast concr et e st r uct ur es i n accor dance wi t h ASTM C478, except as speci f i ed her ei n, and wi t h di amet er i ndi cat ed. Pr ovi de pr ecast concr et e st r uct ur es wi t h a compr essi ve st r engt h of 4000 psi at 28 days and an ai r ent r ai nment of 6 per cent , pl us or mi nus 2 per cent , and a mi ni mum wal l t hi ckness of 5 i nches. ASTM A615/ A615M r ei nf or ci ng bar s. ASTM C443, Type B gasket s f or j oi nt connect i ons. Use monol i t hi c base and f i r st r i ser .
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * AMENDMENT 31 Jan 22
2.5.2 Access Hatch Covers
Provide aluminum access hatch covers as indicated. Include lifting mechanism, automatic hold open arm, slam lock with handle, and flush lift handle with vinyl grip. Use automatic hold open arm that locks in the 90 degree position. Use cover that is 1/4 inch diamond plate with 1/4 inch channel frame and continuous anchor flange. Use access hatch cover capable of withstanding a live load of 300 lb/sq. ft. Provide stainless steel cylinder lock with two keys per lock. Key all the locks the same.
2.5.3 Wet Well Base Material
Provide crushed stone as indicated and specified in Section 31 00 00
EARTHWORK.
2.5.3.1 Dehumidifier
Furnish and install a packaged dehumidifier in accordance with lift station manufacturer's recommendations. Include in controls a humidistat and low-temperature cutout/discharge condensate to the wet well.
2.6 STATION PIPING
Provide pressure piping, emergency pump connection, air release valves, and related accessories for force main piping outside the sewage wet well and valve vault in accordance with Section 33 30 00 SANITARY SEWERAGE.
2.6.1 PVC Plastic Pressure Pipe and Associated Fittings
2.6.1.1 Pipe and Fittings Less Than 4 inch Diameter
Use pipe, couplings and fittings manufactured of materials conforming to ASTM D1784, Class 12454-B.
a. Screw-Joint: Follow dimensional requirements of ASTM D1785 Schedule 80 pipe, with joints meeting requirements of 150 psi working pressure, SECTION 33 32 16 Page 11
200 psi hydrostatic test pressure, unless otherwise shown or specified. Follow ASTM D2464 and ASME B1.20.1 for use with Schedule 80 threaded pipe and fittings. Test pipe couplings when used, as required by ASTM D2464.
b. Push-On Joint: ASTM D3139, with ASTM F477 gaskets. Fittings for push-on joints: AWWA C110/A21.10 or AWWA C111/A21.11 . Iron fittings and specials: cement-mortar lined (standard thickness) in accordance with AWWA C104/A21.4 .
c. Solvent Cement Joint: Use pipe that matches the dimensional requirements of ASTM D1785 or ASTM D2241 with joints meeting the requirements of 150 psi working pressure and 200 psi hydrostatic test pressure. Use fittings for solvent cement jointing that match the requirements of ASTM D2466 or ASTM D2467.
2.6.2 Insulating Joints
Provide between pipes of dissimilar metals a rubber gasket or other approved type of insulating joint or dielectric coupling to effectively prevent metal-to-metal contact between adjacent sections of piping.
2.6.3 Accessories
Provide flanges, connecting pieces, transition glands, transition sleeves, and other adapters as required.
2.6.4 Flexible Flanged Coupling
Provide flexible flanged couplings applicable for sewage as indicated.
Use flexible flanged coupling designed for a working pressure of 350 psi.
2.7 VALVES AND OTHER PIPING ACCESSORIES
2.7.1 Isolation Gate Valves in Valve Vault
Use valves from one manufacturer.
2.7.1.1 Valves Larger Than 2 Inches
Resilient seat gate valves conforming to AWWA C509 with non-rising stems and flanged ends.
2.7.1.2 Valves 2 Inches and Smaller
Gate valves conforming to MSS SP-80 with non-rising stems and threaded ends.
Ball valves with PTFE seats and seals, brass body and end cups, chrome plated brass ball and screwed ends.
2.7.2 Check Valves Less Than 4 inch Diameter
Neoprene ball check valve with integral hydraulic sealing flange, designed for a hydraulic working pressure of 175 psi.
SECTION 33 32 16 Page 12
APPENDIX 31 JAN 22*********************************************************
2. 7. 3 Ai r Rel ease Val ves
Pr ovi de aut omat i c ai r r el ease val ves f or wast ewat er ser vi ce t hat wi l l al l ow t he aut omat i c r el ease of ai r f r om t he l i ne when i t i s bei ng f i l l ed. Ai r i s al l owed t o escape when t he syst em i s i n f ul l oper at i on and under pr essur e.
The val ve body, t op and f l ange ar e of cast i r on wi t h st ai nl ess st eel t r i m and Buna- N seat .
2.7.4 Wast ewat er Combi nat i on Ai r Val ves
Pr ovi de combi nat i on ai r r el ease and vacuum sewage val ves f or wasewat er ser vi ce t hat wi l l al l ow t he aut omat i c r el ease of ai r f r om t he l i ne when i t i s bei ng f i l l ed and per mi t s ai r t o ent er when bei ng empt i ed. Ai r i s al l owed t o escape when t he syst em i s i n f ul l oper at i on and under pr essur e, due t o t he compound l ever i n conj unct i on wi t h a l ar ge and smal l or i f i ce i n one body cast i ng.
Li qui d r i s i ng i n t he val ve wi l l al l ow ai r t o escape t hr ough t he l ar ge or i f i ce. When l i qui d ent er s t he val ve r ai ses t he f l oat and l ever syst em, al ong wi t h t he pr essur e pl unger and t he mai n val ve. As t he l i qui d r eaches i t s l i mi t t he val ve r est agai nst t he seat and t he pr essur e pl unger al so r est agai nst i t s seat ( t he mai n val ve) . The val ve i s now cl osed and no l i qui d can escape.
Accumul at i ng ai r may r i se i nt o t he val ve whi l e i n oper at i on and under pr essur e di spl aci ng t he l i qui d at t he t op of t he val ve body, t he f l oat wi l l t hen dr op as t he l i qui d r ecedes. As t hi s happens t he pr essur e val ve wi l l open al l owi ng t he accumul at i ng ai r t o escape, t hen t he l i qui d l evel wi l l r i se and t he val ve wi l l agai n c l ose.
I f t he l i ne shoul d br eak or dr ai n t he f l oat wi l l dr op al l t he way down as t he l i qui d dr ai ns f r om t he body. The val ve t hen st ays i n t he open posi t i on al l owi ng t he ent r ance of ai r and el i mi nat i ng t he danger of vacuum.
As each condi t i on pr esent s i t sel f t he val ve wi l l r epeat t hese cycl es automatically.
The val ve body, t op and f l ange ar e of cast i r on wi t h st ai nl ess st eel t r i m and Buna- N seat .
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * APPENDI X 31 JAN 22
2.7.5 Identification Tags and Plates
Provide the manufacturer's name or trademark on a corrosion-resistant identification plate or cast integrally, stamped, or otherwise permanently marked in a conspicuous place on each item of equipment. Include on the pump identification plate the pump capacity in gpm, pump head in feet and speed of rotation. Cast on the body of the pump the direction of rotation.
2.7.6 Pipe Support
Use pipe support schedule 40 galvanized steel piping matching ASTM A53/A53M.
Provide either ASME B16.3 or ASME B16.11 galvanized threaded fittings.
SECTION 33 32 16 Page 13
2.7.7 Miscellaneous Metals
Use stainless steel bolts, nuts, washers, anchors, and supports for installation of equipment.
2.7.8 Quick Disconnect System with Hydraulic Sealing Flange and Rail System
Use quick disconnect system consisting of a steel base plate for supporting the pumps, a hydraulic sealing flange, pump guide rails and the discharge pipe supports. Provide stainless steel guide rails, brackets and lifting chain for raising and lowering the pump in the basin. Build guides onto pump housing to fit the guide post to assure perfect alignment between pump and guide rails.
2.7.9 Wet Well Vent
Provide a flanged ductile iron pipe and bend, conforming to AWWA C115/A21.15 with insect screening.
2.8 EXCAVATION, TRENCHING, AND BACKFILLING
Provide in accordance with Section 31 00 00 EARTHWORK, except as specified herein.
PART 3 EXECUTION
3.1 INSTALLATION
Provide pump station in accordance with drawings and requirements of the respective equipment manufacturers. Dampen and isolate equipment vibration.
3.1.1 Equipment Installation
Install equipment in accordance with these specifications and the manufacturer's installation instructions. Grout equipment mounted on concrete foundations before installing piping. Install piping to avoid imposing stress on equipment. Match flanges before securing bolts.
3.1.2 Installation of PVC Plastic Pressure Pipe and Fittings
Unless otherwise specified, install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS FOR INSTALLATION OF PIPELINES of Section 33 30 00 SANITARY SEWERAGE, with the recommendations for pipe joint assembly and appurtenance installation in AWWA M23, "Installation."
3.1.2.1 Pipe Less than 4 Inch Diameter:
a. Make threaded joints by wrapping the male threads with joint tape or by applying an approved thread lubricant, then threading the joining members together. Tighten joints with strap wrenches that will not damage the pipe and fittings. Do not tighten joint more than 2 threads past hand-tight.
b. Push-On Joints: Bevel ends of pipe for push-on joints to facilitate assembly. Mark pipe to indicate when the pipe is fully seated.
Lubricate gasket to prevent displacement. Ensure that the gasket remains in position in the bell or coupling while making the joint.
SECTION 33 32 16 Page 14
c. Solvent-weld joints: Comply with the manufacturer's instructions.
AMENDMENT 31 JAN 22* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
3.1.3 Valves
Make and assemble joints to gate valves and check valves as specified for making and assembling the same type joints between pipe and fittings.
Install valves , i ncl udi ng ai r r el ease and combi nat i on val ves, in accordance with manufacturer's installation instructions. Install gate valves as described in AWWA C500, AWWA C509, and AWWA C515 and with AWWA C600 for valve-and-fitting installation and with the recommendations of the Appendix ("Installation, Operation, and Maintenance of Gate Valves") to
AWWA C500.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * AMENDMENT 31 JAN 22
3.2 FIELD QUALITY CONTROL
Provide appliances, materials, water, and equipment for testing, except that water and electric power needed for field tests will be provided as set forth in Division 01. Conduct testing after equipment, electrical services, and piping are installed, and the pump station is ready for operation. Correct defects discovered to the satisfaction of the Contracting Officer, and tests repeated, at no expense to the Government, until the equipment functions as intended and designed.
3.2.1 Testing Procedure
Perform a pump test, float test. Submit the test results to the Contracting Officer.
Test all panels to the power requirements as shown on the plans to assure proper component operation. Activate each control function to check for proper operation and indication.
3.2.2 Field Representative
A representative of the pump manufacturer is to direct the startup of the station and instruct representatives of the Government in startup and operation procedures.
3.3 CLOSEOUT ACTIVITIES
3.3.1 Operation and Maintenance
Submit operation and maintenance manuals in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA for package lift stations, including Equipment Description, Assembly and Installation Procedures, Adjustment and Alignment, Checkout Procedures, Procedures of Operation and Troubleshooting. Include preventative maintenance and inspection procedures for package lift stations. Include in procedures the frequency of preventative maintenance, inspection, adjustment, lubrication, and cleaning necessary to minimize corrective maintenance and repair.
Supply special tools that are required for maintenance and testing of the package lift stations.
SECTION 33 32 16 Page 15
Submit spare parts data, including a complete list of parts and supplies with current unit prices and source of supply. List parts and supplies that are either normally furnished at no extra cost with the purchase of equipment, or specified to be furnished as a part of the contract, and list additional items recommended by the manufacturer to ensure an efficient operation for a period of one year.
Install on or near the package lift stations, a complete package of posted instructions, consisting of labels, signs, and templates of operating instructions.
Provide a list or reference all specific operation and maintenance procedures that are required to keep the warranty valid.
-- End of Section --
SECTION 33 32 16 Page 16
| 33 32 16 - PACKAGED UTILITY WASTEWATER PUMPING STATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY CONTROL |
| 1.3.1 Installer Qualifications |
| 1.4 DELIVERY, STORAGE, AND HANDLING OF MATERIALS |
| 1.4.1 Delivery and Storage |
| 1.4.2 Handling |
1.5 WARRANTY
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.2 SUBMERSIBLE SEWAGE GRINDER PUMPS |
| 2.2.1 Pump Construction |
| 2.2.1.1 Casing |
| 2.2.1.2 Impeller |
| 2.2.1.3 Bearings |
| 2.2.1.4 Lubrication |
| 2.2.1.5 Balance |
| 2.3 PUMP MOTOR |
| 2.4 PUMP CONTROL SYSTEM |
| 2.4.1 General |
| 2.4.2 Level Control System |
| 2.4.3 Alternator |
| 2.4.4 Sewage Pump Alarm and Control Panel |
| 2.4.4.1 Alarms |
| 2.4.4.2 Circuit Breakers |
| 2.4.4.3 Motor Starter and Overload Protection |
| 2.4.4.4 Power Lugs |
| 2.4.4.5 Anti-Condensation Heater |
| 2.4.4.6 Trouble Light |
| 2.4.4.7 Convenience Outlets |
| 2.4.4.8 Connection for Portable Generator |
| 2.4.4.9 Additional Requirements |
2.4.5 Electrical Requirements
| 2.5 WET WELL AND VALVE VAULT |
| 2.5.1 Wet Well and Valve Vault |
| 2.5.1.1 Fiberglass Basins |
| 2.5.1.2 Precast Concrete Valve Vault |
| 2.5.2 Access Hatch Covers |
| 2.5.3 Wet Well Base Material |
| 2.5.3.1 Dehumidifier |
| 2.6 STATION PIPING |
| 2.6.1 PVC Plastic Pressure Pipe and Associated Fittings |
| 2.6.1.1 Pipe and Fittings Less Than 4 inch Diameter |
| 2.6.2 Insulating Joints |
| 2.6.3 Accessories |
| 2.6.4 Flexible Flanged Coupling |
| 2.7 VALVES AND OTHER PIPING ACCESSORIES |
| 2.7.1 Isolation Gate Valves in Valve Vault |
| 2.7.1.1 Valves Larger Than 2 Inches |
| 2.7.1.2 Valves 2 Inches and Smaller |
| 2.7.2 Check Valves Less Than 4 inch Diameter |
| 2.7.3 Air Release Valves |
| 2.7.4 Wastewater Combination Air Valves |
| 2.7.5 Identification Tags and Plates |
| 2.7.6 Pipe Support |
| 2.7.7 Miscellaneous Metals |
| 2.7.8 Quick Disconnect System with Hydraulic Sealing Flange and Rail System |
| 2.7.9 Wet Well Vent |
2.8 EXCAVATION, TRENCHING, AND BACKFILLING
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Equipment Installation |
| 3.1.2 Installation of PVC Plastic Pressure Pipe and Fittings |
| 3.1.2.1 Pipe Less than 4 Inch Diameter: |
3.1.3 Valves
| 3.2 FIELD QUALITY CONTROL |
| 3.2.1 Testing Procedure |
| 3.2.2 Field Representative |
| 3.3 CLOSEOUT ACTIVITIES |
| 3.3.1 Operation and Maintenance |