Attch 10- LOCRF 20Oct21 Blended Drawings Part 1 of 3.pdf
PDF 46 MB Posted
- Solicitation number
- W9123621R2023
About this file
This solicitation is for the construction of a Low Observable Component Repair Facility to support additional F-22A aircraft relocated to Langley Air Force Base in Virginia. The project includes construction of a 6,735 square meter facility with three corrosion control hangar bays, one wash rack bay, shops, administration spaces, restrooms, and building systems support. Each hangar bay will be equipped with appropriate air filtration systems. The facility must be able to withstand seismic and wind loads according to applicable codes and designs. Sustainable design principles will be incorporated. The facility will provide maintenance spaces, fire protection, utilities, and security for specialized F-22A stealth technology repairs. The construction contract duration is estimated at 730 calendar days. The solicitation was issued by the Department of the Army Corps of Engineers Norfolk District.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_G_R19.rvt
9/13/2021 1:49:57 PM
G-001
C O
V E
R S
H E
E T
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
D
S
T A
P L E
S
D S
T A
P L E
S
N G
IG
A
N T
E
-1
-2
READY TO ADVERTISE
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
09-14-2021
FY19 F-22 FORMAL TRAINING UNIT (FTU)
LOW OBSERVABLE COMPOSITE REPAIR FACILITY (LOCRF)
PROJECT LOCATION
N
PROJECT LOCATION MAP
PROJECT VICINITY MAP
HAMPTON
NEWPORT NEWS
JOINT BASE, LANGLEY - EUSTIS (JBLE)
READY TO ADVERTISE
OPEN COMPETITION OF PRODUCTS
DURING DESIGN PRODUCTS ARE IDENTIFIED AND VALIDATED TO MEET THE NECESSARY
TECHNICAL REQUIREMENTS OF THE PROJECT, AND ARE INDICATED AS "BASIS OF DESIGN"
WITHIN THE DESIGN DOCUMENTS. THIS DOES NOT LIMIT THE PROVISION OF THE PRODUCTS
AS OTHER PRODUCTS THAT MEET THE STATED TECHNICAL REQUIREMENTS ARE ALSO
ACCEPTABLE. PRODUCTS LISTED HEREIN ARE NOT INTENDED TO BE PROPRIETARY UNLESS
SPECIFICALLY INDICATED. ALTERNATE PRODUCTS WILL BE EVALUATED AND MAY BE ACCEPTED
ON THE BASIS OF COMPLIANCE WITH THE SALIENT AND PERFORMANCE CHARACTERISTICS
OF THE SPECIFICATIONS.
W91236-21-R-2023
NOTE TO READERS
Redesign AE Modification P00002 (Aug 2021): The project is experiencing minor redesign to incorporate some customer requested changes including the addition of a dedicated chiller in the administrative spaces, relocation and resizing of the High Expansion Foam (HEF) tank and incorporation of a contractor provided small-part paint booth in Room 141. Due to this limited scope change, this 100% PreFinal submittal includes only those drawings and specifications that were changed from the previous RTA set (Jan 2021). Subsequent design submittals are scheduled to include all documents.
“Blended Set, 21Oct21.
Includes documents changed in Fall 2021 blended with any unchanged Mar2021 RTA documents. Not for Construction.”
BLENDED 21OCT21
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_G_R19.rvt
9/13/2021 1:49:57 PM
G-002
S H
E E
T I
N D
E X
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
D
S
T A
P L E
S
D S
T A
P L E
S
N G
IG
A
N T
E
-1
-2
READY TO ADVERTISE
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SHEET INDEX
SHEET NUMBER SHEET NAME
EP101D POWER PLAN - AREA D
EP101E POWER PLAN - AREA E
EP102 POWER PLAN - ROOF
EP103 BLDG 330 - LIGHTING AND POWER PLAN
EP401 ENLARGED POWER PLAN - ELECTRICAL ROOMS
EP402 ENLARGED POWER PLAN - MECHANICAL ROOM
EP501 POWER DETAILS
EP502 POWER DETAILS
EP503 POWER DETAILS
EP601 POWER RISER DIAGRAM
EP701 PANELBOARD SCHEDULES
EP702 PANELBOARD SCHEDULES
EP703 PANELBOARD SCHEDULES
EP704 PANELBOARD SCHEDULES
EP705 PANELBOARD SCHEDULES
EP706 PANELBOARD SCHEDULES
EP707 PANELBOARD SCHEDULES
EP708 PANELBOARD SCHEDULES
EP709 MECHANICAL EQUIPMENT SCHEDULE
EP710 EQUIPMENT SCHEDULE
EG101 GROUNDING PLAN
EG102 LIGHTNING PROTECTION PLAN
EG103 CATHODIC PROTECTION PLAN
EG104 CATHODIC PROTECTION PLAN
EG501 LIGHTNING PROTECTION DETAILS
EG502 LIGHTNING PROTECTION DETAILS
EG601 GROUNDING RISER DIAGRAM
16. TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
T-002 TELECOMMUNICATIONS DIAMOND PLAN
TS100 TELECOMMUNICATIONS SITE PLAN - OVERALL
TD101 TELECOMMUNICATIONS DEMOLITIONS SITE PLAN - PARTIAL
TD102 TELECOMMUNICATIONS DEMOLITIONS SITE PLAN - PARTIAL
TS101 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS102 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS103 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS104 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS105 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS501 TELECOMMUNICATIONS SITE DETAILS
T-100 OVERALL TELECOMMUNICATIONS PLAN
T101A TELECOMMUNICATIONS PLAN - AREA A
T101B TELECOMMUNICATIONS PLAN - AREA B
T101C TELECOMMUNICATIONS PLAN - AREA C
T101D TELECOMMUNICATIONS PLAN - AREA D
T101E TELECOMMUNICATIONS PLAN - AREA E
T-102 BLDG 330 - TELECOMMUNICATIONS PLAN
T-401 ENLARGED TELECOMMUNICATIONS PLANS
T-501 TELECOMMUNICATION DETAILS
T-502 TELECOMMUNICATION DETAILS
T-503 TELECOMMUNICATION DETAILS
T-601 TELECOMMUNICATIONS RISER DIAGRAMS
T-602 TELECOMMUNICATION DETAIL
X-001 SECURITY LEGEND AND ABBREVIATIONS
X-100 OVERALL SECURITY SYSTEMS PLAN
X101A SECURITY SYSTEMS PLAN - AREA A
X101B SECURITY SYSTEMS PLAN - AREA B
X101C SECURITY SYSTEMS PLAN - AREA C
X101D SECURITY SYSTEMS PLAN - AREA D
X101E SECURITY SYSTEMS PLAN - AREA E
X-501 SECURITY SYSTEMS DETAILS
X-601 SECURITY SYSTEMS RISER DIAGRAM
17. AUDIO VISUAL
TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
TA100 OVERALL AUDIO VISUAL PLAN
TA101A AUDIO VISUAL PLAN - AREA A
TA501 AUDIO VISUAL DETAILS
TA601 AUDIO VISUAL SIGNAL FLOWS
SHEET INDEX
SHEET NUMBER SHEET NAME
11. PLUMBING
P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
P-101 UNDERFLOOR PLUMBING PLAN - OVERALL
P101A UNDERFLOOR PLUMBING PLAN - AREA A
P101B UNDERFLOOR PLUMBING PLAN - AREA B
P101C UNDERFLOOR PLUMBING PLAN - AREA C
P101D UNDERFLOOR PLUMBING PLAN - AREA D
P101E UNDERFLOOR PLUMBING PLAN - AREA E
P-110 FIRST FLOOR PLUMBING PLAN - OVERALL
P110A FIRST FLOOR PLUMBING PLAN - AREA A
P110B FIRST FLOOR PLUMBING PLAN - AREA B
P110C FIRST FLOOR PLUMBING PLAN - AREA C
P110D FIRST FLOOR PLUMBING PLAN - AREA D
P110E FIRST FLOOR PLUMBING PLAN - AREA E
P-401 ENLARGED PLANS - PLUMBING
P-402 ENLARGED PLANS - PLUMBING
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-602 PLUMBING SCHEDULES
P-701 HIGH EXPANSION FOAM CONTAINMENT DIAGRAMS
P-702 WASTE AND VENT RISER DIAGRAM
P-703 DOMESTIC WATER RISER DIAGRAM
13. MECHANICAL
M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
MP101 FIRST FLOOR PIPING PLAN - OVERALL
MP101A FIRST FLOOR PIPING PLAN - AREA A
MP101B FIRST FLOOR PIPING PLAN - AREA B
MP101C FIRST FLOOR PIPING PLAN - AREA C
MP101D FIRST FLOOR PIPING PLAN - AREA D
MP101E FIRST FLOOR PIPING PLAN - AREA E
MH101 FIRST FLOOR VENTILATION PLAN - OVERALL
MH101A FIRST FLOOR VENTILATION PLAN - AREA A
MH101B FIRST FLOOR VENTILATION PLAN - AREA B
MH101C FIRST FLOOR VENTILATION PLAN - AREA C
MH101D FIRST FLOOR VENTILATION PLAN - AREA D
MH101E FIRST FLOOR VENTILATION PLAN - AREA E
MH103 BUILDING 330 VENTILATION PLANS
M-140 MECHANICAL ROOF PLAN
M-301 LO BAY SECTION N-S
M-302 LO BAY SECTION E-W
M-303 SECTIONS - AIR HANDLING EQUIPMENT
M-304 SECTIONS
M-305 MECHANICAL ROOM SECTIONS
M-306 SECTION - AHU-2 & AHU-3
M-307 SECTION - LO HALLWAY
M-308 SECTION-WASHRACK
M-401 ENLARGED PLAN - MECHANICAL ROOM EQUIPMENT LAYOUT
M-402 ENLARGED PLAN - MECHANICAL ROOM PIPING
M-403 ENLARGED PLAN - MECHANICAL ROOM VENTILATION
M-501 DETAILS - HEATING
M-502 DETAILS - VENTILATION
M-503 DETAILS - HEATING
M-601 SCHEDULES - HEATING/COOLING
M-602 SCHEDULES - HEATING/COOLING
M-603 SCHEDULES - VENTILATION
M-604 SCHEDULES - VENTILATION
M-701 DIAGRAMS - HEATING/COOLING
M-702 DIAGRAMS - WATER-COOLED CHILLER PIPING
M-703 DIAGRAM - LO BAY AND PAINT BOOTH AIRFLOW
M-704 DIAGRAMS - AIR-COOLED CHILLER PIPING
M-801 CONTROL SEQUENCES
M-802 CONTROL SEQUENCES
M-803 CONTROL SEQUENCES
M-804 CONTROL SEQUENCES
M-805 CONTROL SEQUENCES
M-806 CONTROL SEQUENCES
M-807 CONTROL SEQUENCES
M-808 CONTROL SEQUENCES
M-809 CONTROL SEQUENCES
M-810 CONTROL SEQUENCES
M-811 CONTROL SEQUENCES
M-812 CONTROL SEQUENCES
M-813 CONTROL SEQUENCES
M-814 CONTROL SEQUENCES
M-815 CONTROL SEQUENCES
14. ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
E-002 HAZARDOUS CLASSIFICATION PLAN
ES100 ELECTRICAL SITE PLAN - OVERALL
ED101 ELECTRICAL DEMOLITION SITE PLAN - PARTIAL
ED102 ELECTRICAL DEMOLITION SITE PLAN - PARTIAL
ES101 ELECTRICAL SITE PLAN - PARTIAL
ES102 ELECTRICAL SITE PLAN - PARTIAL
ES501 ELECTRICAL SITE DETAILS
ES502 ELECTRICAL SITE DETAILS
ES601 ELECTRICAL SITE ONE-LINE DIAGRAM
EL100 OVERALL LIGHTING PLAN
EL101A LIGHTING PLAN - AREA A
EL101B LIGHTING PLAN - AREA B
EL101C LIGHTING PLAN - AREA C
EL101D LIGHTING PLAN - AREA D
EL101E LIGHTING PLAN - AREA E
EL102 LIGHTING PLAN - ROOF
EL501 LIGHTING CONTROL DETAILS
EL502 LIGHTING CONTROLS DETAILS
EL601 LUMINAIRE SCHEDULE
EL602 LUMINAIRE DETAILS
EL603 LUMINAIRE DETAILS
EP100 OVERALL POWER PLAN
EP101A POWER PLAN - AREA A
EP101B POWER PLAN - AREA B
EP101C POWER PLAN - AREA C
SHEET INDEX
SHEET NUMBER SHEET NAME
A-201 BUILDING ELEVATIONS
A-202 BUILDING ELEVATIONS
A-203 PARTIAL BUILDING ELEVATIONS
A-204 PARTIAL BUILDING ELEVATIONS
A-205 PARTIAL BUILDING ELEVATIONS
A-206 PARTIAL BUILDING ELEVATIONS
A-207 PARTIAL BUILDING ELEVATIONS
A-301 BUILDING SECTION
A-302 BUILDING SECTION
A-303 BUILDING SECTION
A-304 BUILDING SECTION
A-305 BUILDING SECTIONS
A-311 EXTERIOR WALL SECTIONS
A-312 EXTERIOR WALL SECTIONS
A-313 EXTERIOR WALL SECTIONS
A-314 EXTERIOR WALL SECTIONS
A-401 ENLARGED PLANS
A-402 ENLARGED PLANS & CASEWORK ELEVATIONS & SECTIONS
A-403 ENLARGED PLANS - AIR SHOWERS
A-404 RESTROOM ELEVATIONS
A-405 LOCKERS/SHOWERS ELEVATIONS
A-406 TOWER - ENLARGED PLANS
A-501 PLAN DETAILS
A-511 CEILING & EXPANSION JOINT DETAILS
A-521 SECTION DETAILS - CTK ENCLOSURE
A-522 SECTION DETAILS
A-531 ROOF DETAILS
A-532 ROOF DETAILS
A-533 ROOF DETAILS
A-534 ROOF DETAILS
A-541 BUILDING ELEVATION DETAILS
A-542 BUILDING ELEVATION DETAILS
A-551 EXTERIOR DOOR DETAILS
A-552 INTERIOR DOOR DETAILS
A-553 SPECIALTY DOOR DETAILS
A-554 OVERHEAD DOOR DETAILS
A-561 WINDOW & FRAME TYPES
A-562 WINDOW DETAILS
A-563 WINDOW DETAILS
A-564 LOUVER DETAILS
A-601 DOOR FRAMES & TYPES
A-602 DOOR SCHEDULE
A-701 LO BAY BOOTH FITOUT
A-702 SMALL PARTS PAINT BOOTH FITOUT
A-801 EXTERIOR SIGNAGE
A-802 STRIPING PLAN - OVERALL
08. INTERIOR DESIGN
I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL
I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A
I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B
I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C
I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D
I101E FIRST FLOOR INTERIOR FINISH PLAN - AREA E
I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES
I-611 SIGNAGE SCHEDULE, ELEVATIONS AND NOTES
I831A PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA A
I831B PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA B
I831C PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA C
I831D PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA D
I831E PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA E
08. INTERIORS
IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL
IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A
IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B
IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C
IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D
IF101E FIRST FLOOR INTERIOR FURNITURE PLAN - AREA E
10. FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL
FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A
FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B
FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C
FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D
FA101E FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA E
FA501 FIRE ALARM DETAILS
FA502 FIRE ALARM DETAILS
FA601 FIRE ALARM SEQUENCE OF OPERATIONS
FA701 FIRE ALARM RISER DIAGRAMS
10. FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL
FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A
FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B
FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C
FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D
FX101E FIRST FLOOR FIRE SUPPRESSION PLAN - AREA E
FX401 FIRE PROTECTION ENLARGED PLANS
FX402 FIRE PROTECTION SECTIONS
FX501 FIRE PROTECTION DETAILS
FX901 FIRE PROTECTION ISOMETRICS
SHEET INDEX
SHEET NUMBER SHEET NAME
CP100 AIRFIELD PHASING PLAN
CP101 APRON AND TOWWAY GEOMETRY PLAN
CP201 APRON AND TOWWAY JOINT LAYOUT PLAN
CP301 APRON AND TOWWAY SPOT ELEVATION PLAN
CP401 APRON AND TOWWAY TYPICAL SECTIONS
CP501 APRON AND TOWWAY JOINT DETAILS
CP502 APRON AND TOWWAY JOINT DETAILS
CP503 APRON AND TOWWAY JOINT DETAILS
CM101 APRON AND TOWWAY MARKING PLAN
CM501 APRON AND TOWWAY MARKING DETAILS
5.0 LANDSCAPE
L-101 LANDSCAPE PLAN
L-102 LANDSCAPE PLAN
L-103 LANDSCAPE PLAN
L-104 LANDSCAPE PLAN
L-105 LANDSCAPE PLAN
L-501 LANDSCAPE DETAILS
06. STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 WIND PRESSURE CHARTS & DIAGRAMS
S-101 FOUNDATION PLAN - OVERALL
S101A FOUNDATION PLAN - AREA A
S101B FOUNDATION PLAN - AREA B
S101C FOUNDATION PLAN - AREA C
S101D FOUNDATION PLAN - AREA D
S101E FOUNDATION PLAN - AREA E
S-102 SLAB PLAN - OVERALL
S102A SLAB PLAN - AREA A
S102B SLAB PLAN - AREA B
S102C SLAB PLAN - AREA C
S102D SLAB PLAN - AREA D
S102E SLAB PLAN - AREA E
S-103 ROOF FRAMING PLAN - OVERALL
S103A ROOF FRAMING PLAN - AREA A
S103B ROOF FRAMING PLAN - AREA B
S103C ROOF FRAMING PLAN - AREA C
S103D ROOF FRAMING PLAN - AREA D
S103E ROOF FRAMING PLAN - AREA E
S-104 LINTEL PLAN
S-201 ENTRY TOWER FRAMING ELEVATIONS
S-202 DUCT TOWER FRAMING ELEVATIONS
S-301 FOUNDATION SECTIONS - I
S-302 FOUNDATION SECTIONS - II
S-303 PEMB FOUNDATION SECTIONS & DETAILS
S-311 HANGAR SECTION - LO BAY
S-312 HANGAR SECTION - WASH RACK
S-321 ROOF FRAMING SECTIONS - I
S-322 ROOF FRAMING SECTIONS - II
S-323 ROOF FRAMING SECTIONS - III
S-324 ENTRY TOWER SECTIONS & DETAILS
S-325 MISC. SECTIONS & DETAILS
S-326 CHILLER ENCLOSURE FRAMING DETAILS
S-331 SITE SECTIONS & DETAILS - I
S-332 SITE SECTIONS & DETAILS - II
S-401 ENLARGED PLANS - I
S-402 ENLARGED PLANS - II
S-501 CONCRETE DETAILS - I
S-502 CONCRETE DETAILS - II
S-503 CONCRETE DETAILS - III
S-504 CONCRETE DETAILS - IV
S-511 ROOF FRAMING DETAILS - I
S-512 ROOF FRAMING DETAILS - II
S-513 ROOF FRAMING DETAILS - III
S-514 MASONRY DETAILS - I
S-515 MASONRY DETAILS - II
S-516 MASONRY DETAILS - III
S-601 SCHEDULES - GENERAL
S-700 H.E.F. DISCHARGE TANK PLAN
S-701 STORAGE TANK DETAILS
S-702 STORAGE TANK STRUCTURAL DETAILS
S-901 3D PERSPECTIVE VIEWS
07. ARCHITECTURAL
A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
A-002 ABA ACCESSIBILITY GUIDELINES
A-003 ABA PLAN
A-004 SECURE AREAS PARTIAL PLANS
A-005 AIRCRAFT CLEARANCE REQUIREMENT PLAN & SECTIONS
A-006 PARTITION TYPES
A-007 PARTITION TYPES
A-008 PARTITION HEAD CONDITIONS
A-009 PENETRATION DETAILS
A-010 PENETRATION DETAILS
A-011 EQUIPMENT SCHEDULE - METALS TECH & SHOPS
A-020 BLDG 330 COMM ROOM - DEMO & NEW
AS101 ARCHITECTURAL SITE PLAN
AS501 ARCHITECTURAL SITE PLAN DETAILS - CHILLER
AS502 ARCHITECTURAL SITE PLAN DETAILS - DUMPSTER ENCLOSURE
A-101 FIRST FLOOR PLAN - OVERALL
A101A FIRST FLOOR PLAN - AREA A
A101B FIRST FLOOR PLAN - AREA B
A101C FIRST FLOOR PLAN - AREA C
A101D FIRST FLOOR PLAN - AREA D
A101E FIRST FLOOR PLAN - AREA E
A-102 ROOF PLAN - OVERALL
A102A ROOF PLAN - AREA A
A102B ROOF PLAN - AREA B
A102C ROOF PLAN - AREA C
A102D ROOF PLAN - AREA D
A102E ROOF PLAN - AREA E
A-111 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL
A111A FIRST FLOOR REFLECTED CEILING PLAN - AREA A
A111B FIRST FLOOR REFLECTED CEILING PLAN - AREA B
A111C FIRST FLOOR REFLECTED CEILING PLAN - AREA C
A111D FIRST FLOOR REFLECTED CEILING PLAN - AREA D
A111E FIRST FLOOR REFLECTED CEILING PLAN - AREA E
A-141 AIR BARRIER PLAN & SECTIONS
SHEET INDEX
SHEET NUMBER SHEET NAME
00. GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
G-003 CODE COMPLIANCE SUMMARY
G-004 CODE COMPLIANCE SUMMARY
G-005 CODE COMPLIANCE SITE PLAN
G-006 FIRST FLOOR LIFE SAFETY PLAN - OVERALL
PH101 PHASE 1 SITE DIAGRAM
PH102 PHASE 2 SITE DIAGRAM
PH103 PHASE 3 SITE DIAGRAM
02. SURVEY / MAPPING
VF001 LEGENDS AND NOTES
VF100 EXISTING CONDITIONS PLAN
VF101 EXISTING CONDITIONS PLAN
VF102 EXISTING CONDITIONS PLAN
VF103 EXISTING CONDITIONS PLAN
VF104 EXISTING CONDITIONS PLAN
VF105 EXISTING CONDITIONS PLAN
VF106 EXISTING CONDITIONS PLAN
VF107 EXISTING CONDITIONS PLAN
04.CIVIL
C-001 LEGEND AND GENERAL NOTES
C-002 CONSTRUCTION ACCESS PLAN
C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL
C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL
C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN INITIAL
C-006 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN FINAL
C-007 EROSION AND SEDIMENT CONTROL - PHASE 2A PLAN INITIAL
C-008 EROSION AND SEDIMENT CONTROL - PHASE 2A PLAN FINAL
C-009 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN INITIAL
C-010 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN FINAL
CD001 DEMOLITION LEGEND & NOTES
CD100 EXISTING CONDITIONS - OVERALL
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CD103 DEMOLITION PLAN
CD104 DEMOLITION PLAN
CD105 DEMOLITION PLAN
CD106 DEMOLITION PLAN
CD107 DEMOLITION PLAN
CS001 SITE LAYOUT LEGEND & CONTROL POINTS
CS101 SITE LAYOUT PLAN
CS102 SITE LAYOUT PLAN
CS103 SITE LAYOUT PLAN
CS104 SITE LAYOUT PLAN
CS105 SITE LAYOUT PLAN
CS106 SITE LAYOUT PLAN
CS107 SITE LAYOUT PLAN
CG001 GRADING LEGEND & NOTES
CG002 STORM SCHEDULES & NOTES
CG101 GRADING & DRAINAGE PLAN
CG102 GRADING & DRAINAGE PLAN
CG103 GRADING & DRAINAGE PLAN
CG104 GRADING & DRAINAGE PLAN
CG105 GRADING & DRAINAGE PLAN
CG106 GRADING & DRAINAGE PLAN
CG107 GRADING & DRAINAGE PLAN
CG201 STORM SEWER PROFILES
CG202 STORM SEWER PROFILES
CG203 STORM SEWER PROFILES
CG204 STORM SEWER PROFILES
CG205 STORM SEWER PROFILES
CG206 STORM SEWER PROFILES
CG700 POST DEVELOPMENT DRAINAGE AREAS
CG701 STORMWATER MANAGEMENT CALCULATIONS
CG702 STORMWATER MANAGEMENT CALCULATIONS
CG703 STORMWATER MANAGEMENT CALCULATIONS
CU001 UTILITY LEGEND, CONTROL POINTS & SCHEDULES
CU101 UTILITY PLAN
CU102 UTILITY PLAN
CU103 UTILITY PLAN
CU104 UTILITY PLAN
CU105 UTILITY PLAN
CU106 UTILITY PLAN
CU107 UTILITY PLAN
CU201 SANITARY FORCE MAIN PROFILE
CU202 SANITARY FORCE MAIN PROFILE
CU203 SANITARY FORCE MAIN PROFILE
CU204 SANITARY FORCE MAIN PROFILE
CU205 SANITARY FORCE MAIN PROFILE
CU206 SANITARY SEWER PROFILE
CU207 8" DOMESTIC WATER PROFILE
CU208 8" DOMESTIC WATER PROFILE
CU209 8" DOMESTIC WATER PROFILE
CU210 12" FIRE WATER PROFILE
CU211 HEF MAIN PROFILE
C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-505 EROSION AND SEDIMENT CONTROL DETAILS
C-506 DETAILS
C-507 DETAILS
C-508 DETAILS
C-509 DETAILS
C-510 DETAILS
C-511 DETAILS
C-512 DETAILS
C-513 DETAILS
C-514 DETAILS
C-515 DETAILS
C-516 DETAILS
C-517 DETAILS
FIRE PROTECTION / LIFE SAFETY / ACCESSIBILITY CODE REVIEW
LOW OBSERVABLE COMPONENT REPAIR FACILITY (LOCRF), JBLE, HAMPTON, VA
PROJECT'S APPLIED CODES & STANDARDS
UFC 1-200-01: DOD BUILDING CODE, 8 OCTOBER 2019
UFC 3-600-01: DESIGN: FIRE PROTECTION ENGINEERING FOR FACILITIES, WITH CHANGE 4, 7 FEBRUARY 2020
UFC 4-021-01: DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, WITH CHANGE 1, JANUARY 2010
UFC 4-211-01: AIRCRAFT MAINTENANCE HANGARS, WITH CHANGE 2, MAY 18, 2020
IBC 2018: INTERNATIONAL BUILDING CODE, FOR FIRE RESISTANCE REQUIREMENTS, ALLOWABLE FLOOR AREA, BUILDING HEIGHT
LIMITS, AND BUILDING SEPARATION DISTANCE, EXCEPT AS MODIFIED BY UFC 3-600-01
NFPA 1, 2018: FIRE CODE, FOR DETERMINING VEHICLE ACCESS REQUIREMENTS
NFPA 101, 2018: LIFE SAFETY CODE, FOR BUILDING EGRESS AND LIFE SAFETY EXCEPT AS MODIFIED IN UFC 3-600-01
NFPA 10, 2018: STANDARD FOR PORTABLE FIRE EXTINGUISHERS
NFPA 13, 2019: STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS, MINIMUM REQUIREMENTS FOR DESIGN AND
INSTALLATION OF AUTOMATIC FIRE SPRINKLER SYSTEMS AND EXPOSURE PROTECTION
NFPA 20, 2019: STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, FOR CONSTRUCTION &
INSTALLATION RQMTS FOR FIRE PUMPS
NFPA 30, 2018: FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, FOR CONSTRUCTION REQUIREMENTS AND FIRE RESISTANCE
RATINGS FOR LIQUID STORAGE AREAS
NFPA 70, 2020: NATIONAL ELECTRICAL CODE (NEC)
NFPA 80, 2019: STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES
NFPA 72, 2019: NATIONAL FIRE ALARM AND SIGNALING CODE
NFPA 90A, 2018: STANDARD INSTALLATION OF AIR CONDITIONING & VENTILATION SYSTEMS, FOR PROTECTION OF OPENINGS, SHAFTS, FIRE DAMPERS, SMOKE DAMPERS, PENETRATIONS AND FAN CONTROL
NFPA 291, 2019: RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYDRANTS
ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARDS FOR DOD FACILITIES, CHAPTERS 1-10, ADOPTED BY DOD BY
MEMORANDUM DATED OCTOBER 2015
1. BUILDING CODE REQUIREMENTS:
A. OCCUPANCY CLASSIFICATION:
B OFFICES, CIRCULATION, SIMULATOR ROOMS, CLASSROOMS, AND CONFERENCE
ROOMS < 50 OCCUPANTS
IBC CHAPTER 3
F-1 WORKSHOP, INDUSTRIAL/SPRAYING NOT CONSIDERED HIGH HAZARD
H-3 HAZARDOUS STORAGE/USE EXCEED MAQS.
B. CONSTRUCTION TYPE: TYPE IIB CONSTRUCTION
IBC CHAPTER 6
C. MIXED USE & OCCUPANCY SEPARATIONS UNLIMITED AREA BUILDING IN ACCORDANCE WITH IBC SECTION 507.4 AND 507.8. EACH
OCCUPANCY IS UNLIMITED IN ACCORDANCE WITH THE UNLIMITED AREA BUILDING.
GROUP H-3 OCCUPANCIES ARE REQUIRED TO BE SEPARATED WITH 1-HOUR
CONSTRUCTION IN ACCORDANCE WITH TABLE 508.4 PER IBC 507.8.3.
B, F-1 AND S-1 OCCUPANCIES DO NOT REQUIRE FIRE RESISTANCE RATED SEPARATIONS
IN ACCORDANCE WITH IBC SECTION 508.3.
IBC SECTION 508
D. AREA LIMITATIONS / MODIFICATIONS: UNLIMITED AREA BUILDING IN ACCORDANCE WITH IBC SECTION 507.4 AND 507.8. EACH
OCCUPANCY, EXCEPT AS NOTED, IS UNLIMITED IN ACCORDANCE WITH THE UNLIMITED
AREA BUILDING. THE AGGREGATE AREA OF GROUP H OCCUPANCIES IS LIMITED TO 10%
OF THE AREA OF THE BUILDING OR THE AREA LIMITATION FOR GROUP H OCCUPANCIES
SPECIFIED IN IBC SECTION 506. IBC SECTION 507.8.2 REQUIRES NOT LESS THAN 25
PERCENT OF THE H-3 PERIMETER TO BE AN EXTERIOR WALL.
ALLOWABLE H-3 AREA IS 7,200 SF BASED ON 10% OF THE 72,000 SF BUILDING. 14,000 SF
ALLOWABLE BY TABLE 506.2. 1,029 SF DESIGNATED AS H-3.
MINIMUM PERIMETER OF H-3 AREA TO BE 41'-1" BASED ON 30% OF PERIMETER (INTERIOR
AND EXTERIOR) OF 137'-0". 41'-10" PROVIDED.
IBC SECTION 503, 506, 507
E. HEIGHT LIMITATIONS: ALLOWABLE BUILDING HEIGHT IS UNLIMITED WHEN THE BUILDING IS CONSTRUCTED
IN ACCORDANCE WITH UFC 4-211-01. THE NUMBER OF STORIES IS BASED ON IBC AND
IS PERMITTED 2 STORIES ABOVE GRADE. THE BUILDING IS 1 STORY AND COMPLIES
WITH BUILDING HEIGHT LIMITATIONS.
UFC 4-211-01 SECTION 3-3.1.7
F. VERTICAL ENCLOSURES, CONTINUITY &
PROTECTION:
THE BUILDING IS 1 STORY AND DOES NOT HAVE STAIRS OR SHAFTS REQUIRING A FIRE
RESISTANCE RATING.
IBC: SECTION 708, NFPA 101: 7.2.2, 8.6
G. OPENING PROTECTIVES & THRU-
PENETRATIONS
1-HOUR FIRE BARRIER: 1-HOUR THRU-PENETRATIONS, 45-MINUTE OPENING PROTECTIVES.
NFPA 101: 8.3 THRU 8.6, NFPA 80 AND 90A
SMOKE PARTITION: SEALED THRU-PENETRATIONS, SELF-CLOSING/SELF-LATCHING
OPENING PROTECTIVES.
H. HORIZONTAL ASSEMBLIES: THE BUILDING IS 1 STORY AND DOES NOT HAVE FIRE RESISTANCE RATED HORIZONTAL
ASSEMBLIES. THE PAINT BAY CEILING IS REQUIRED TO HAVE A 1-HOUR FIRE
RESISTANCE RATING.
IBC: SECTION 712, UFC 4-211-02: 3-2.2.4
I. FIRE RESISTIVE REQUIREMENTS: TYPE IIB IN ACCORDANCE WITH IBC CHAPTER 6.
IBC: TABLE 601 AND SECTION 602 PRIMARY STRUCTURAL FRAME - 0 HOUR RATING
EXTERIOR BEARING WALLS - 0 HOUR RATING
INTERIOR BEARING WALLS - 0 HOUR RATING
EXTERIOR NONBEARING PARTITIONS - 0 HOUR RATING
INTERIOR NONBEARING PARTITIONS - 0 HOUR RATING
FLOOR CONSTRUCTION & SECONDARY MEMBERS - 0 HOUR RATING
ROOF CONSTRUCTION & SECONDARY MEMBERS - 0 HOUR RATING
J. ENCLOSURE PROTECTION: HAZMAT STORAGE ROOM (GROUP H-3) - 1-HOUR FIRE BARRIER WITH 45-MINUTE
PROTECTIVE. B (IBC TABLE 508.4)
NFPA 101: SPECIFIC OCCUPANCY CHAPTERS SPRAY BOOTH - 1-HOUR FIRE BARRIER WITH 45-MINUTE PROTECTIVE OR 3 FT.
SEPARATION DISTANCE FROM OTHER OPERATIONS. A,B (NFPA 33 SECTION 5.5)
ASME A17.1
CONTROL AREA - 1-HOUR FIRE BARRIER WITH 45-MINUTE PROTECTIVE. B (NFPA 400 TABLE
5.2.2.1)UFC 4-211-01
FIRE PUMP ROOM - 1-HOUR FIRE BARRIER WITH 45-MINUTE PROTECTIVE. B (UFC
4-211-01 SECTION 3-6.7)
UFC 4-211-02
HANGAR BAY SEPARATION - 1-HOUR FIRE BARRIER WITH 45-MINUTE PROTECTIVE. B
(UFC 4-211-01 SECTION 3-3.1.3)
HIGHER HAZARD ROOMS - SEPARATION WITH SMOKE PARTITION. (NFPA 101 SECTION 8.7.1)
K. FIRE PROTECTION SYSTEM: WET-PIPE SPRINKLER SYSTEMS WILL BE PROVIDED THROUGHOUT THE BUILDING.
HANGAR BAYS WILL BE PROVIDED WITH HIGH EXPANSION (HI-EX) FOAM SYSTEMS. THE
BUILDING WILL BE PROVIDED WITH A FIRE PUMP TO SUPPLEMENT THE PRESSURE
PROVIDED BY THE FIRE PUMPS IN B348.
UFC 3-600-01: CHAPTER 9
UFC 4-211-01: CHAPTER 3
UFC 3-600-01: CHAPTER 9 LIGHT HAZARD: 0.1 GPM/SF OVER 1,500 SF. OFFICES, CORRIDORS, BATHROOMS, LOCKER ROOMS, CONFERENCE ROOMS.
UFC 3-600-01: APPENDIX B
ORDINARY HAZARD: 0.2 GPM/SF OVER 2,500 SF. MEP SPACES, STORAGE, INDUSTRIAL
AREAS, WELD SHOPS, LO CORRIDOR.
EXTRA HAZARD: 0.3 GPM/SF OVER 2,500 SF. HAZARDOUS MATERIALS STORAGE ROOM.
HANGAR HAZARD: 0.2 GPM/SF OVER 5,000 SF. HANGAR BAYS.
UFC 3-600-01: CHAPTER 9-7 COVERAGE PER SPRINKLER MUST BE IN ACCORDANCE WITH NFPA 13.
NFPA 13 LIGHT HAZARD: 225 SF
ORDINARY HAZARD: 130 SF
EXTRA HAZARD: 100 SF
UFC 4-211-01: CHAPTER 3 HI-EX GENERATORS TO BE WITHIN CLOSE PROXIMITY BUT NOT OVER THE AIRCRAFT.
HI-EX SYSTEM TO COVER 90% OF THE SILHOUETTE WITHIN 1 MINUTE AND PROVIDE A
DEPTH OF 3.2 FEET WITHIN 4 MINUTES. HYDRAULIC CALCULATIONS PERFORMED WITH
FOAM SYSTEM AND CEILING-LEVEL SPRINKLER SYSTEM FLOWING.
L. AVAILABLE WATER SUPPLY TESTING HYDRANT FLOW TESTS WERE PERFORMED ON JUNE 19, 2020 AND WITNESSED BY THE
DESIGN TEAM.
FLOW HYDRANT: SOUTH OF B361
PRESSURE HYDRANT: NORTH OF B361 ADJACENT TO B379.
STATIC: 58 PSI
RESIDUAL: 40 PSI
FLOW: 1,000 GPM.
TESTED LOOP TO PROVIDE SUPPLY TO NEW FIRE HYDRANTS AND PROVIDE ADEQUATE
FIRE FLOW.
FIRE PROTECTION SYSTEMS WILL BE SERVED FROM BUILDING 348 FIRE PUMP HOUSE.
BUILDING 348 HAS FOUR 2,000 GPM PUMPS AT 100 PSI ARRANGED IN PARALLEL.
UFC 3-600-01: 9-6.4
NFPA 291
M. WATER STORAGE TANK REQUIREMENTS EXISTING 1,000,000 GALLON TANK (NOMINAL) PROVIDED TO SUPPLY BUILDING 348. NO
NEW STORAGE PROVIDED.
UFC 3-600-01: CHAPTER 9-4
N. BACKFLOW PREVENTER & TESTING NO BACKFLOW PREVENTION ASSEMBLIES WILL BE PROVIDED OUTSIDE OF OR IN THE
BUILDING AS THE BUILDING IS SERVED FROM A DEDICATED FIRE WATER STORAGE
TANK AND PUMP HOUSE IN B348.NFPA 13: 8.16.4.6.1
UFC 3-600-01; 9-6.6.1
O. FIRE PUMP(S) FIRE PROTECTION SYSTEMS WILL BE SUPPLIED FROM BUILDING 348. BUILDING 348 HAS
4, 100 PSI 2000 GPM FIRE PUMPS INSTALLED IN PARALLEL. THE LOCRF BUILDING WILL BE
PROVIDED A 100 PSI 500 GPM FIRE PUMP WHICH SERVES THE BUILDING ONLY. THE
PUMP WILL BE ARRANGED TO PROVIDE PRESSURE TO THE FOAM SYSTEMS ONLY.
SPRINKLER SYSTEMS WILL BE SUPPLIED SOLELY FROM BUILDING 348.
UFC 3-600-01: 9-5
NFPA 20
2. LIFE SAFETY REQUIREMENTS:
A. CLASSIFICATION OF OCCUPANCY: BUSINESS, INDUSTRIAL - GENERAL, INDUSTRIAL - HIGH HAZARD AND STORAGE.
THE BUILDING IS A MIXED OCCUPANCY BUILDING AND IS REQUIRED TO MEET NFPA 101
SECTION 6.1.14.3 WHERE THE BUILDING MUST COMPLY WITH THE MOST RESTRICTIVE
REQUIREMENTS OF THE OCCUPANCIES INVOLVED.
NFPA 101: CH 6
B. OCCUPANT LOAD:
NFPA 101: 7.3.1.2 & CHAPTERS 12-42
C. CAPACITY OF MEANS OF EGRESS:
NFPA 101: 7.3.3 & CHAPTERS 12-42
D. NUMBER OF EXITS: TWO EXITS REQUIRED FROM ANY STORY AND SECTION OF THE STORY. 21 EXITS FROM
THE FIRST FLOOR ARE PROVIDED, INCLUDING EXITS FROM DEDICATED BUILDING
SERVICE/MEP SPACES. HIGH HAZARD SPACES ARE REQUIRED TO HAVE 2 MEANS OF
EGRESS FROM THE SPACE SIZED AT 0.4 IN./PERSON.
NFPA 101: 7.4 & CHAPTERS 12-42
E. ARRANGEMENT OF MEANS OF EGRESS EXITS ARE REQUIRED TO BE SEPARATED BY NOT LESS THAN ONE-THIRD THE OVERALL
DIMENSION IN A SPRINKLERED BUILDING. EXITS ARE ADEQUATELY SEPARATED AROUND
THE PERIMETER OF THE BUILDING.NFPA 101: 7.5 & CHAPTERS 12-42
F. TRAVEL DISTANCE TO EXITS:
BUSINESS: 100 FEET 50 FEET 300 FEETNFPA 101: 7.6 & CHAPTERS 12-42
INDUSTRIAL: 100 FEET 50 FEET 250 FEET
UNLIMITED
HIGH HAZARD:
G. ILLUMINATION OF MEANS OF EGRESS: ILLUMINATION OF STAIRS SHALL BE 10 FT-CANDLE AND 1 FT-CANDLE FOR WALKING
SURFACES DURING OCCUPANCY. ILLUMINATION WILL BE PROVIDED BY LIGHTING
FIXTURES. REFER TO ELECTRICAL DRAWINGS.NFPA 101: 7.8 & CHAPTERS 12-42
H. EMERGENCY LIGHTING: ILLUMINATION SHALL BE FOR 90 MINUTES AND PROVIDE NOT LESS THAN AN AVERAGE 1
FT-CANDLE. LIGHTING FIXTURES WITH INTEGRAL BATTERY PACKS WITH 90 MINUTES OF
BATTERY POWER WILL BE PROVIDED. REFER TO ELECTRICAL DRAWINGS.NFPA 101: 7.9 & CHAPTERS 12-42
I. MARKING OF MEANS OF EGRESS: ACCESS TO EXITS SHALL BE MARKED WHERE THE EXIT OR WAY TO REACH THE EXIT IS
NOT READILY APPARENT. EXIT SIGNS WILL BE INSTALLED WHERE THE DIRECTION TO
THE EXIT IS NOT READILY APPARENT. REFER TO ELECTRICAL DRAWINGS.NFPA 101: 7.10 & CHAPTERS 12-42
J. INTERIOR FINISH CLASSIFICATION LIMITS:
BUSINESS (NEW): WALL A, B OR C A, B OR C A, B OR C
FLOOR I, II OR NO REQ.1
NFPA 101: TABLE A.10.2.2
INDUSTRIAL: WALL A, B OR C A, B OR C A, B OR C
FLOOR I, II OR NO REQ.1 I, II OR NO REQ.1
K. DETECTION, ALARM & COMMUNICATIONS: A FIRE ALARM SYSTEM IS REQUIRED SINCE OCCUPANCY IS GREATER THAN 100 TOTAL
OCCUPANTS (40.3.4.1). THE SYSTEM WILL BE ACTIVATED BY MANUAL MEANS, FIRE
DETECTION AND SPRINKLER SYSTEM ACTIVATION AND PROVIDE OCCUPANT
NOTIFICATION. IN ADDITION, FLAME DETECTION, FOAM START/STOP STATION AND A
RELEASING SERVICE FIRE ALARM CONTROL UNIT SHALL BE PROVIDED. THE FIRE ALARM
SYSTEM MUST BE COMBINED WITH THE FACILITY MASS NOTIFICATION SYSTEM UTILIZING
A FIRE ALARM CONTROL UNIT AND MASS NOTIFICATION AUTONOMOUS CONTROL UNIT
(FMCP). THE HIGH EXPANSION FOAM RELEASING SYSTEM WILL BE DEDICATED VIA A
RELEASING SERVICE FIRE ALARM CONTROL UNIT (RSFACU).
CO DETECTION IS REQUIRED IN FACILITIES WITH COMBUSTIBLE FUEL BURNING
EQUIPMENT BUT OMITTED IN OPEN SPACES WITH CEILING HEIGHTS GREATER THAN 12
FEET PER UFC 3-600-01 SECTION 9-19.2.3.
UFC 3-600-01, 9-18 AND 9-19
NFPA 101: 9.6 & CHAPTERS 12-42
OCCUPANCY COMMON PATH DEAD-END TRAVEL DISTANCE
25 FEET 150 FEET
DOORS SPACED 150 FEET
ALONG PERIMETER
HANGAR:
OTHER SPACES
O. SMOKE DAMPERS: SMOKE DAMPERS ARE NOT REQUIRED BECAUSE THE AIR INLETS AND OUTLETS ARE
LIMITED TO A SINGLE SMOKE COMPARTMENT AND AIR-HANDLING UNITS ARE
LOCATED ON THE FLOOR THEY SERVE OR ON THE ROOF ABOVE.IBC: SECTION 716
NFPA 90A: 4.3.10.2, 5.3.5.1
P. DUCT SMOKE DETECTORS DUCT SMOKE DETECTORS INSTALLED DOWNSTREAM OF THE AIR FILTERS AND AHEAD
OF ANY BRANCH CONNECTIONS IN AIR SUPPLY SYSTEMS HAVING A CAPACITY GREATER
THAN 2,000 CFM.NFPA 90A: 6.4.2.1
Q. ELEVATORS NO ELEVATORS ARE LOCATED IN THE BUILDING. THE BUILDING IS A SINGLE STORY.
UFC 3-600-01: 4-12
IBC CHAPTER 30
R. ROOF ACCESS: A STAIR TO THE ROOF IS NOT REQUIRED. ACCESS TO THE ROOF REQUIRED TO BE BY
AN ALTERNATING TREAD DEVICE, SHIP'S LADDER OR PERMANENT LADDER. A LADDER
TO THE ROOF HAS BEEN PROVIDED.UFC 3-600-01: 2-9
IBC Chapter 1009.13
S. HAZARDOUS LOCATIONS ALL SPACES WITHIN 5 FEET HORIZONTALLY AND 5 FEET VERTICALLY FROM THE
AIRCRAFT SHALL BE A MINIMUM CLASS I DIVISION 2. SPACES ADJACENT TO THE HANGAR
BAYS ARE NOT REQUIRED TO BE CONSIDERED HAZARDOUS AS THE DOOR HAS SEALED
OPENINGS EXCEPT WITHIN 3 FEET RADIUS OF ALL DOORS SHALL BE CLASS I DIVISION 2.
THE SPRAY ROOMS IN THE LO BAYS SHALL BE CLASS I DIVISION 1 THROUGHOUT.
HANGAR BAYS AND THE HAZARDOUS MATERIALS STORAGE ROOM WILL BE CLASSIFIED
IN ACCORDANCE WITH NFPA 70.
NFPA 70:
UFC 4-211-01: 3-7.1
UFC 4-211-02: 3-7.2
T. FIRE DEPT VEHICLE ACCESS ONE MEANS OF ALL-WEATHER GROUND ACCESS TO ALLOW EMERGENCY VEHICLES
UNIMPEDED ACCESS TO THE FACILITY. ALL-WEATHER GROUND ACCESS MUST BE PAVED,
START FROM THE ROAD, AND TERMINATE NO FARTHER THAN 33 FEET FROM AN
EXTERIOR DOOR ACCESSIBLE FOR FIRE DEPARTMENT INGRESS. THE ROUTE BETWEEN
THE ACCESS SURFACE AND EXTERIOR DOOR MUST BE ABLE TO BE TRAVERSED WITHOUT
THE USE OF A LADDER. ADDITIONALLY, PROVIDE SUITABLE EXTERIOR FIRE APPARATUS
ACCESS ON AT LEAST TWO COMPLETE SIDES OF THE BUILDING INCLUDING APRONS,
AUTOMOTIVE PARKING AREAS, FIRE APPARATUS ACCESS ROADS AND STABILIZED
LANDSCAPED AREAS.
ACCESS IS PROVIDED TO THE APRON-SIDE DOORS FOR FIRE DEPARTMENT INGRESS TO
THE FACILITY.
UFC 3-600-01: 2-10
NFPA 1: 3.5
U. FIRE HYDRANT INSTALLATION HYDRANTS REQUIRED AT NOT MORE THAN 300 FOOT SPACING AROUND THE BUILDING.
UFC 3-600-01: 3-7.3 ALL PARTS OF THE FACILITY EXTERIOR MUST BE WITHIN 350 FEET OF A HYDRANT.
HYDRANTS WILL NOT BE INSTALLED IN FRONT OF HANGAR BAY DOORS.
ONE HYDRANT WILL BE PROVIDED WITHIN 100 FEET OF EACH CORNER OF THE BUILDING.
WHERE THE APRON ABUTS THE BUILDING, HYDRANTS WILL BE LOCATED WITHIN 10
FEET OF THE BUILDING.
HYDRANTS ADJACENT TO AIRFIELD PAVEMENT WILL NOT HAVE THEIR TOPS MORE THAN
2.5 FEET ABOVE THE LEVEL OF ADJACENT AIRFIELD PAVEMENT.
V. KITCHEN COOKING EXHAUST EQUIPMENT THERE IS NO KITCHEN IN THE FACILITY.
NFPA 101: 9.2.3, CHAPTERS 12-42
NFPA 96
3. MASS NOTIFICATION:
UFC 4-021-01 A COMBINED FIRE ALARM AND MASS NOTIFICATION SYSTEM WILL BE INSTALLED UTILIZING
A FIRE ALARM CONTROL UNIT AND MASS NOTIFICATION AUTONOMOUS CONTROL UNIT
(FMCP). ALL NOTIFICATION APPLIANCES WILL UTILIZE CLEAR STROBES AND BE MARKED
"ALERT." AMBER LENSES AND APPLIANCES MARKED "FIRE" WILL NOT BE USED. TEXT
SIGNS WILL BE SCROLLING TYPE, PROGRAMMABLE AND DISPLAY THE SAME CONTENT OF
THE VOICE MESSAGE BEING PLAYED. TEXT SIGNS TO BE INSTALLED OVER SUBSTANTIAL
MEANS OF EGRESS. EXTERIOR DOORS FROM A SINGLE ROOM DO NOT REQUIRE A TEXT
SIGN.
ENGINEERING AND CONSTRUCTION
BULLETIN 2018-17
4. ACCESSIBILITY REQUIREMENTS:
ABA CHAPTERS 1-10 THE FACILITY SHALL BE COMPLETELY ACCESSIBLE IN ACCORDANCE WITH ABA.
NFPA 33, 2018: STANDARD FOR SPRAY APPLICATION USING FLAMMABLE OR COMBUSTIBLE MATERIALS
NFPA 11, 2016: STANDARD FOR LOW-, MEDIUM-, AND HIGH-EXPANSION FOAM
NFPA 24, 2019, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES
NFPA 400, 2019: HAZARDOUS MATERIALS CODE
A - THE LO BAY SPRAY BOOTHS ARE SEPARATED FROM OTHER OPERATIONS BY MORE
THAN 3 FT. AND, THEREFORE, DO NOT REQUIRE FIRE-RESISTANCE RATED
CONSTRUCTION. THE SPRAY BOOTH IN THE PANEL SPRAY ROOM WILL BE PROVIDED
WITH ADMINISTRATIVE CONTROLS AND FLOOR MARKINGS SUCH THAT THE REQUIRED 3
FT. SEPARATION FROM OTHER OPERATIONS IS PROVIDED. THEREFORE, THE BOOTH WILL
NOT HAVE A FIRE RESISTANCE RATING.
B - A FIRE DAMPER IS NOT REQUIRED FOR DUCTED PENETRATIONS THROUGH 1-HOUR
FIRE-RESISTANCE RATED PARTITIONS (NFPA 90A SECTION 5.3.1). A 90-MINUTE RATED
FIRE DAMPER IS REQUIRED IN ALL AIR-TRANSFER OPENINGS IN 1-HOUR FIRE-
RESISTANCE RATED PARTITIONS (NFPA 90A SECTION 5.3.1).
REFER TO OCCUPANT LOAD TABLE ON SHEET G004.
REFER TO EXIT CAPACITY TABLE ON SHEET G004.
NFPA 409, 2016: STANDARD ON AIRCRAFT HANGARS (ONLY APPLICABLE WHERE REFERENCED SPECIFICALLY BY THE UFC)
UFC 4-211-01: 3-3.1.2
UFC 4-211-01: 3-3.1.11
L. PORTABLE FIRE EXTINGUISHERS: FIRE EXTINGUISHERS ARE REQUIRED IN THE BUILDING PER NFPA 101. FIRE
EXTINGUISHERS WILL BE PROVIDED IN ACCORDANCE WITH NFPA 10.
NFPA 101: 9.7.4
M. CORRIDORS: CORRIDORS ARE NOT REQUIRED TO BE RATED SINCE THE BUILDING IS PROTECTED
THROUGHOUT BY A SUPERVISED AUTOMATIC SPRINKLER SYSTEM. A MINIMUM
CORRIDOR WIDTH OF 44 INCHES MUST BE MAINTAINED FOR ANY CORRIDOR
SERVING AN OCCUPANT LOAD OF 50 OCCUPANTS OR MORE AND 36 INCHES
SERVING LESS THAN 50 OCCUPANTS (NFPA 101 SECTION 7.3.4).
NFPA 101: CHAPTERS 12-42
N. FIRE DAMPERS: NO FIRE DAMPERS ARE REQUIRED AS ALL PENETRATIONS THROUGH 1-HOUR FIRE
RESISTANCE-RATED PARTITIONS ARE DUCTED. NO 2-HOUR CONSTRUCTION IS
PROVIDED.NFPA 90A: 5.3.1, 5.4.1 & 5.4.2
NFPA 33: 5.5
NFPA 400: TABLE 5.2.2.1
UFC 4-211-01
UFC 4-211-02: AIRCRAFT CORROSION CONTROL AND PAINT FACILITIES, 1 DECEMBER 2012
UFC 4-010-01: DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12 DECEMBER 2018
UFC 4-211-01
N/A
N/A
STORAGE: WALL A, B OR C A, B OR C A, B OR C
FLOOR I, II OR NO REQ.1
S-1 LO BAYS, STORAGE ROOMS, ELECTRICAL ROOMS AND MECHANICAL ROOMS
EXITS EXIT ACCESS CORRIDORS
1 MINIMUM RADIANT FLUX OF 0.1 W/CM2 REQUIRED
A.
B.
D.
E.
G.
H.
T.
I.
K.
L.
N.
P.
R.
Q.
S.
U.
X.
O.
J.
M.
V.
W.
F.
C.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_FP_R19.rvt
9/10/2021 10:53:38 AM
G-003
C O
D E
C O
M P
L
IA
N C
E S
U M
M A
R Y
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
C
B
U T
T E
R W
O R
T H
L
IV
E R
S O
N
J A
N D
E R
S O
N
-1
-2
READY TO ADVERTISE
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SHEET NOTES:
1. THE OCCUPANCY CLASSIFICATION SHOWN ON THE OCCUPANT LOAD
CALCULATIONS TABLE IS FOR REFERENCE ONLY. THE OCCUPANT LOAD IS
CALCULATED PER ROOM USING SQUARE FOOTAGE AND OCCUPANT LOAD
FACTOR/USE DEFINED IN NFPA 101 AND UFC 3-600-01.
TOTAL 3
HALLWAY 153 - EXTERIOR 36 33 0.2 165 7
STORAGE 155 - EXTERIOR 36 33 0.2 165 1
TOTAL 496
EXIT DISCHARGE DOOR NOMINAL WIDTH CLEAR WIDTH FACTOR EGRESS CAPACITY ACTUAL USE
VESTIBULE 100 - EXTERIOR 72 66 0.2 330 120
ADMIN HALLWAY 101 ADJACENT TO 107 - EXTERIOR 36 33 0.2 165 63
LO BAY 1 - SW EXTERIOR 36 33 0.2 165 6
EXIT ACCESS DOOR NOMINAL WIDTH CLEAR WIDTH FACTOR EGRESS CAPACITY ACTUAL USE
HAZMAT STORAGE - SOUTH DOOR 76 70 0.4 175 2
HAZMAT STORAGE - EAST DOOR 76 70 0.4 175 1
LO BAY 1 - NE EXTERIOR 36 33 0.2 165 6
OPEN STORAGE - EXTERIOR 36 33 0.2 165 4
LO BAY 2 - NE EXTERIOR 36 33 0.2 165 6
LO HALLWAY ADJACENT TO HAZMAT - EXTERIOR 36 33 0.2 165 53
LO HALLWAY ADJACENT TO MECHANICAL - EXTERIOR 36 33 0.2 165 61
MECHANICAL 133 - EXTERIOR 36 33 0.2 165 8
FIRE 135 - EXTERIOR 72 66 0.2 330 2
ELECTRIC 134 - EXTERIOR 72 66 0.2 330 1
LO BAY 3 - NW EXTERIOR 36 33 0.2 165 6
LO BAY 3 - NE EXTERIOR 36 33 0.2 165 6
METALS TECH WELDING - NORTH EXTERIOR 36 33 0.2 165 21
METALS TECH MACHINE - EAST EXTERIOR 36 33 0.2 165 60
HALLWAY 144 - EXTERIOR 36 33 0.2 165 52
WASH RACK - NW EXTERIOR 36 33 0.2 165 6
WASH RACK - NE EXTERIOR 36 33 0.2 165 6
MECHANICAL 151 - EXTERIOR 72 66 0.2 330 1
154 COMM 80 GROUP S-1 STORAGE IT 300 1
155 RR 65 GROUP B BUSINESS BUSINESS 150 1
156 OFFICE 222 GROUP F-1 GENERAL INDUSTRIAL BUSINESS 150 2
157 STORAGE 246 GROUP S-1 STORAGE STORAGE 500 1
158 WASHRACK 5983 GROUP S-1 STORAGE STORAGE 500 12
TOTAL 496
107 CONFERENCE ROOM 429 GROUP B BUSINESS UNCONCENTRATED ASSEMBLY 15 29
108 AIR SHOWER 67 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 1
109 STORAGE 46 GROUP S-1 STORAGE STORAGE 500 1
110 COMM 114 GROUP S-1 STORAGE IT 300 1
111 ELEC 99 GROUP S-1 STORAGE MEP 500 1
112 JAN 53 GROUP S-1 STORAGE STORAGE 500 1
113 WOMEN RR 251 GROUP B BUSINESS BUSINESS 150 2
114 MEN RR 305 GROUP B BUSINESS BUSINESS 150 3
115 BREAK ROOM 599 GROUP B BUSINESS UNCONCENTRATED ASSEMBLY 15 40
116 AIR SHOWER 47 GROUP B BUSINESS BUSINESS 150 1
117 LAUNDRY / RESPIRATOR ROOM 342 GROUP B BUSINESS INDUSTRIAL 100 4
118 WOMEN'S DIRTY LOCKER ROOM 269 GROUP B BUSINESS LOCKER 50 6
119 WOMEN'S SHWR 164 GROUP B BUSINESS LOCKER 50 4
120 WOMEN'S CLEAN LOCKER ROOM 231 GROUP B BUSINESS LOCKER 50 5
121 MEN DIRTY LOCKER ROOM 531 GROUP B BUSINESS LOCKER 50 11
122 MEN SHWR 376 GROUP B BUSINESS LOCKER 50 8
123 MEN CLEAN LOCKER ROOM 472 GROUP B BUSINESS LOCKER 50 10
124A LO HALLWAY 2198 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 22
124B LO HALLWAY 1556 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 16
124C LO HALLWAY 1955 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 20
124D LO HALLWAY 431 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 5
125 FILTER ROOM 652 GROUP S-1 STORAGE STORAGE 500 2
126 LO BAY 1 5636 GROUP S-1 GENERAL INDUSTRIAL STORAGE 500 12
127 OPEN STORAGE 1844 GROUP S-1 STORAGE STORAGE 500 4
128 LO BAY 2 5658 GROUP S-1 GENERAL INDUSTRIAL STORAGE 500 12
129 FILTER ROOM 652 GROUP S-1 STORAGE STORAGE 500 2
130 HAZMAT STG/DISPENSARY 1029 GROUP H-3 HIGH-HAZARD STORAGE STORAGE 500 3
131 LO BAY 3 5635 GROUP S-1 GENERAL INDUSTRIAL STORAGE 500 12
132 FILTER ROOM 652 GROUP S-1 STORAGE STORAGE 500 2
133 MECHANICAL 3306 GROUP S-1 STORAGE MEP 500 7
134 ELECTRIC 690 GROUP S-1 STORAGE MEP 500 2
135 FIRE 697 GROUP S-1 STORAGE MEP 500 2
136 LO UNISEX RR 61 GROUP B BUSINESS BUSINESS 150 1
137 JAN 29 GROUP S-1 STORAGE STORAGE 500 1
138 LO UNISEX RR 62 GROUP B BUSINESS BUSINESS 150 1
139 LO COMM 113 GROUP S-1 STORAGE IT 300 1
140 HOPPER 265 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 3
141 PANEL SPRAY ROOM 1955 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 20
142 BONDING/LAYUP AREA 1956 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 20
143 DAMAGE REMOVAL/PREPARATION AREA 1938 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 20
144 HALLWAY 165 GROUP B BUSINESS BUSINESS 150 2
145 UNISEX RR 56 GROUP B BUSINESS BUSINESS 150 1
146 UNISEX RR 56 GROUP B BUSINESS BUSINESS 150 1
147 JAN. 29 GROUP S-1 STORAGE BUSINESS 150 1
148 METALS TECH STAFF 808 GROUP B BUSINESS # OF SEATS # OF SEATS 20
149A METALS TECH SHOP - MACHINE 5209 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 53
149B METALS TECH SHOP - WELD 4154 GROUP F-1 GENERAL INDUSTRIAL INDUSTRIAL 100 42
149C CTK 541 GROUP F-1 GENERAL INDUSTRIAL STORAGE 500 2
150 HALLWAY 156 GROUP B BUSINESS BUSINESS 150 2
150A MEN SHOWER/ LOCKER 249 GROUP B BUSINESS LOCKER 50 5
150B WOMEN SHOWER/ LOCKER 187 GROUP B BUSINESS LOCKER 50 4
151 MECH ROOM 263 GROUP B BUSINESS MEP 500 1
152 HALLWAY 151 GROUP B BUSINESS BUSINESS 150 2
153 ELECTRIC 81 GROUP S-1 STORAGE MEP 500 1
ROOM # NAME SF
OCCUPANCY CLASSIFICATION
USE
OCCUPANT LOAD
FACTOR
OCCUPANTS
IBC LSC
100 VEST 113 GROUP B BUSINESS BUSINESS 150 1
101 ADMIN HALLWAY 1032 GROUP B BUSINESS BUSINESS 150 7
102 COMPUTER ROOM 768 GROUP B BUSINESS BUSINESS 150 6
103 LO/CRF STAFF 348 GROUP B BUSINESS BUSINESS 150 3
104 TELEPHONE 43 GROUP B BUSINESS COLLABORATION 30 2
105 TELEPHONE 43 GROUP B BUSINESS COLLABORATION 30 2
106 FABRICATIONS FLIGHT 348 GROUP B BUSINESS BUSINESS 150 3
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_FP_R19.rvt
3/12/2021 12:53:29 PM
G-004
C O
D E
C O
M P
L
IA
N C
E S
U M
M A
R Y
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
C
B
U T
T E
R W
O R
T H
L
IV
E R
S O
N
J A
N D
E R
S O
N
-1
-2
READY TO ADVERTISE
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: N.T.S.
B6
EXIT CAPACITY TABLE
SCALE: N.T.S.
B1
OCCUPANT LOAD TABLE
0W 1 0W
8W
W
W
0W
W
W
W
6W
W
W
0 W
8W
W
W
W
8W
W
W
8W
W
2W
2W
W
W
W
2W
W
8W
W
6W
W
W
0W
W
W
0W
6W
W
W
W
W
2W
W
W
8W
W
6W
W
W
8W
W
W
W
6W
W
W
W
6W
8W
W
8W
6W
W
8W
6W
W
W
W
W
8W
0W
0W
W
6W
0W
W
W
W
W
W
0W
W
8W
6W
8W
6W
6W
0W
W
W
W
6W
8W
0W
0W
W
8W
W
6W
6W
W
8W
6W
6W
W
6W
W
2W
0W
W
W
0W
W
W
6W
W
W
W
W
4W
W
8W
W
6W
W
W
0W
W
W
0W
6W
W
W
W
W
0W
6W
W
W
W
6W
W
0W
2W
6 W
W
W
W
W
W
6W
W
W
0W
W
W
W
8W
6W
W
0W
2W
8W
0W
W
0W
W
W
W
W
W
0W
W
W
W
W
W
W
6W
0W
1W
W
6W
W
3W
2W
4W
2W
2W
2W
1W
4W
W
388376
H E F
12" HEF
" F
6" W.
8" W.
W
SEPARATION DISTANCES
UFC 4-211-01 SECTION 3-3.1.8 REQUIRES COMPLIANCE WITH IBC AND NFPA
409. NFPA 409 REQUIRES 50 FEET OF SEPARATION.
A SEPARATION OF 60 FEET IS REQUIRED BY IBC SECTION 507.4. 60 FEET TO
BUILDING 794. ALL OTHER BUILDINGS GREATER THAN 60 FEET.
BUILDING PERIMETER USED FOR FRONTAGE
NO FRONTAGE INCREASES REQUIRED AS THE BUILDING WILL BE
CONSTRUCTED AS AN UNLIMITED AREA AIRCRAFT PAINT HANGAR IN
ACCORDANCE WITH IBC SECTION 507.4 AND 507.8. BUILDING TO BE PROVIDED
SEPARATION OF 60 FEET.
FIRE DEPARTMENT ACCESS
EXISTING FIRE DEPARTMENT ACCESS TO THE AIRFIELD IS THROUGH THE
PROJECT SITE. THE PROJECT WILL INCLUDE THE ADDITION OF TWO FIRE
DEPARTMENT ACCESSES TO THE APRON OF THE BUILDING AND NEW
CONNECTION TO THE AIRFIELD.
THE APRON PROVIDES FIRE DEPARTMENT ACCESS WITHIN 33 FEET OF AN
EXTERIOR DOOR FOR FIRE DEPARTMENT INGRESS.
FIRE LANE WIDTH, MARKING, APPROACH ROADS AND TURN RADIUS
ALL ACCESSES TO BE 20 FEET WIDE OR GREATER AND HAVE AN
UNOBSTRUCTED CLEARANCE OF 13 FEET 6 INCHES. ALL FIRE DEPARTMENT
ACCESS ROADS WILL BE PAVED AND BE CAPABLE OF SUPPORTING A FIRE
SERVICE APPARATUS. NO TURNING RADIUS OR DEAD ENDS ARE EXPECTED
SINCE TWO NEW ACCESS TO THE APRON IS AVAILABLE.
TYPE AND QUANTITY OF ANTITERRORISM SECURE ACCESS
THE BUILDING IS LOCATED WITHIN THE BASE SECURE BOUNDARY. 33 FOOT
UNOBSTRUCTED SPACE PROVIDED.
INTENDED MAIN ENTRANCE TO THE FACILITY
THE MAIN ENTRANCE TO THE FACILITY IS THE VESTIBULE TO THE
ADMINISTRATIVE AREA OF THE LO BAYS.
LOCATION OF FIRE DEPARTMENT CONNECTIONS
FIRE DEPARTMENT CONNECTION IS LOCATED ON THE NORTH EXTERIOR
WALL OF METALS TECH SHOP 149A.
FIRE HYDRANTS, POST INDICATOR VALVES AND CONNECTED DISTRIBUTION
FIRE HYDRANTS ARE SERVED FROM THE DOMESTIC/WATER LOOP ON BASE
AND ARE NOT SERVED FROM THE PRESSURIZED FIRE LOOP. THE SERVICE
MAIN SERVING HYDRANTS FOR BUILDING 361 WILL BE EXTENDED TO PROVIDE
HYDRANTS AROUND THE BUILDING.
HYDRANTS ARE REQUIRED AT 300 FOOT INTERVALS ALONG FIRE
DEPARTMENT ACCESS ROADS. ALL PARTS OF THE FACILITY EXTERIOR MUST
BE WITHIN 350 FEET OF A HYDRANT. HYDRANTS WILL NOT BE INSTALLED IN
FRONT OF HANGAR BAY DOORS. ONE HYDRANT WILL BE PROVIDED WITHIN
100 FEET OF EACH CORNER OF THE BUILDING. WHERE THE APRON ABUTS
THE BUILDING, HYDRANTS WILL BE LOCATED WITHIN 10 FEET OF THE
BUILDING. HYDRANTS ADJACENT TO AIRFIELD PAVEMENT WILL NOT HAVE
THEIR TOPS MORE THAN 2.5 FEET ABOVE THE LEVEL OF ADJACENT AIRFIELD
PAVEMENT. HYDRANTS WILL BE PROVIDED, AS REQUIRED.
SECTIONAL VALVES ARE REQUIRED TO BE PROVIDED SUCH THAT A
COMBINED 5 HYDRANTS OR THREE BUILDING FEEDS ARE NOT OUT OF
SERVICE WITH A SINGLE BREAK OF A PIPE. SECTIONAL VALVES WILL BE
PROVIDED, AS REQUIRED. A POST INDICATOR VALVE IS REQUIRED ON THE
INCOMING FIRE SERVICE AND IS REQUIRED TO BE LOCATED AT LEAST 40
FEET FROM THE BUILDING. POST INDICATOR VALVES WILL BE LOCKED IN THE
NORMAL POSITION. A POST INDICATOR VALVES WILL BE PROVIDED, AS
REQUIRED.
FIRE PUMP ROOM
THE BASE HAS PRESSURIZED UNDERGROUND SERVICE MAINS AND SERVICE
LATERALS FROM THE FIRE PUMPS LOCATED IN BUILDING 348.
BUILDING 348 HOUSES FOUR (4) FIRE PUMPS EACH RATED AT 100 PSI 2000
GPM. ALL FOUR (4) PUMPS ARE ARRANGED IN PARALLEL SUCH THAT THE
FLOW RATINGS ARE ADDITIVE.
THE DESIGN INCLUDES A NEW FIRE PUMP IN THE FIRE PUMP/FIRE FOAM
ROOM WHICH WILL SERVE THE FOAM SYSTEMS ONLY. SPRINKLER SYSTEMS
WILL BE SEPARATED PRIOR TO THE PUMP AND RELY ON PRESSURE
PROVIDED BY BUILDING 348. THE BUILDING PUMP WILL BE RATED AT 100 PSI
500 GPM.
WATER STORAGE TANKS
THE EXISTING WATER STORAGE TANK SERVING BUILDING 348 WILL CONTINUE
TO SERVE BUILDING 348.
HAZARDOUS MATERIAL SPILL CONTAINMENT TANKS
ONE 5,200 GALLON FUEL CAPTURE TANK (OWT-1) WILL BE PROVIDED IN
MECHANICAL ROOM 151.
ONE 38,000 GALLON FOAM/WATER CAPTURE TANK (HCT-1) FOR
CONTAINMENT OF THE DISCHARGE OF THE HIGH EXPANSION FOAM SYSTEM
WILL BE PROVIDED. TANK SIZING BASED ON CRITERIA PROVIDED BY OWNER.
CODE COMPLIANCE SITE PLAN
60' - 0"
BUILDING 348 - EXISTING FIRE PUMP HOUSE - FOUR (4)
100 PSI 2000 GPM FIRE PUMPS ARRANGED IN PARALLEL
EXISTING WATER STORAGE TANK
- 1,000,000 GALLONS
33' - 0
33' - 0"
33' - 0
NEW FIRE HYDRANT
WITH ISOLATION VALVE
MAIN ENTRANCE
FIRE PUMP/FOAM TEST HEADER
NEW FIRE HYDRANT WITH ISOLATION VALVE
NEW FIRE HYDRANT WITH ISOLATION VALVE
NEW 12-INCH EXTENSION OF
FIRE SERVICE FROM B348
NEW 8-INCH EXTENSION OF WATER MAIN
SERVING HYDRANTS
NEW 8-INCH EXTENSION OF WATER
MAIN SERVING HYDRANTS
FIRE/FOAM ROOM
NEW FIRE DEPARTMENT
ACCESS TO AIRFIELD
NEW FIRE DEPARTMENT
ACCESS TO AIRFIELD
ATFP SETBACK
LOCRF
BUILDING
20' - 0"
HIGH EXPANSION FOAM
CONTAINMENT TANK (HCT-1)
SECTIONAL VALVE
SECTIONAL VALVE
SECTIONAL VALVE
SECTIONAL VALVE
NEW FIRE HYDRANT WITH ISOLATION VALVE
NEW PIV ON INCOMING FIRE SERVICE
AT LEAST 40'-0" FROM THE BUILDING
22' - 0
NEW FUEL CAPTURE TANK (OWT-1)
FIRE DEPARTMENT CONNECTION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_FP_R19.rvt
9/10/2021 10:53:39 AM
G-005
C O
D E
C O
M P
L
IA
N C
E S
IT
E
P L
A N
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
C
B
U T
T E
R W
O R
T H
L
IV
E R
S O
N
J A
N D
E R
S O
N
-1
-2
READY TO ADVERTISE
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: 1" = 100'-0"
A1
CODE COMPLIANCE SITE PLAN
N
SCALE: = 100'-0"
0 100 200100
1"
C A
A A
A
A
C
C
A
C
A
A
A
A
A
A
A
A
A
A
C
C
C
B
C
D
A
AA
AA
A
A
A
S S
S S
S S
S S
S S
S S
S
S
S
S
S S
S
S S
S
S S
S S
S
S
S SS S S S S S S S S S
SS SS
S
S
S
S SS
1 5 8
B
F
L
E
4'
6"
66' - 6" 66' - 6"
66' - 6"
66' - 6"
70' - 6"
TD - 202 FT, 250 FT ALLOWED
CPT - 77 FT, 100 FT ALLOWED
TD - 104 FT, 250 FT ALLOWED
CPT - 27 FT, 100 FT ALLOWED
TD - 138 FT, 250 FT ALLOWED
CPT - 38 FT, 100 FT ALLOWED
2 4 763
H
J
D
3.7 9 11 12 17 191410 15 1813 16
N
K.5
J.5
H.5
G.5
"6'
6"
7'
6"
7'
6"
66' - 6"
66' - 6"17
RR
LO BAY 1
FILTER ROOM
OPEN STORAGE
LO BAY 2
FILTER ROOM
LO HALLWAY
124B
HAZMAT
STG/DISPENSARY
LO HALLWAY
124C
FILTER ROOM
LO BAY 3
WASHRACK
MECH ROOM
OFFICE
STORAGE
CTK
149C
METALS TECH SHOP -
MACHINE
149A
METALS TECH STAFF
JAN.
UNISEX RR
MEN SHOWER/ LOCKER
150A
WOMEN SHOWER/
LOCKER
150B
LO HALLWAY
124A
ELECTRIC
MECHANICAL
LO UNISEX RR
LO UNISEX RR
HOPPER
PANEL SPRAY ROOM
BONDING/LAYUP AREA
DAMAGE
REMOVAL/PREPARATION
AREA
AIR SHOWER
LAUNDRY /
RESPIRATOR ROOM
WOMEN DIRTY LOCKER
ROOM
WOMEN CLEAN LOCKER
ROOM
WOMEN SHWR
MEN DIRTY LOCKER
ROOM
MEN SHWR
WOMEN RR
MEN RR
MEN CLEAN LOCKER
ROOM
BREAK ROOM
TELEPHONE
COMPUTER ROOM
LO/CRF STAFF
CONFERENCE ROOM
FABRICATIONS FLIGHT
TELEPHONE
ADMIN HALLWAY
HALLWAY
HALLWAY
LO COMM
FIRE
VEST
JAN
COMM
ELEC
JAN
METALS TECH SHOP -
WELD
149B
AIR SHOWER
STORAGE
UNISEX RR
HALLWAY
LO HALLWAY
124D
COMM
ELECTRIC
38' - 6"32' - 6"
K.2
K
G.8
G
C
A.5
A
B.2
KEYED NOTES:
DEAD-END CORRIDOR OF 34 FEET. 50 FEET ALLOWED.1
DEAD-END CORRIDOR OF 15 FEET. 50 FEET ALLOWED.2
TRAVEL DISTANCE OF 156 FEET. 250 FEET ALLOWED. COMMON PATH OF
TRAVEL OF 0 FEET, 100 FEET ALLOWED.
TRAVEL DISTANCE OF 172 FT. 250 FEET ALLOWED. COMMON PATH OF
TRAVEL OF 0 FEET, 100 FEET ALLOWED.
TRAVEL DISTANCE OF 73 FEET. 250 FEET ALLOWED. COMMON PATH OF
TRAVEL OF 40 FEET, 100 FEET ALLOWED.
SMALL PARTS SPRAY BOOTH TO BE INSTALLED AND SEPARATED FROM
OTHER OPERATIONS BY AT LEAST 3 FEET. NO FIRE RESISTANCE RATING IS
REQUIRED PER NFPA 33 SECTION 5.5. ADMINISTRATIVE CONTROLS AND
FLOOR MARKINGS TO BE PROVIDED TO PROHIBIT STORAGE AND
OPERATIONS WITHIN 3 FEET OF THE SPRAY BOOTH. ALL ELECTRICAL
EQUIPMENT WITHIN THE SPRAY BOOTH SHALL BE CLASS I DIVISION 1. ALL
AREAS WITHIN 3 FEET (VERTICALLY AND HORIZONTALLY) OF ANY SPRAY
BOOTH OPENING SHALL BE CLASS I DIVISION 2. SPRAY BOOTH TO BE
PROVIDED WITH ALL REQUIRED INTERLOCKS TO COMPLY WITH NFPA 33 FOR
SPRAY BOOTHS USED FOR DRYING AT ELEVATED TEMPERATURES.
SPRAY OPERATIONS NOT PERFORMED OUTSIDE OF SPRAY BOOTH. AREAS
OUTSIDE OF SPRAY BOOTH SHALL COMPLY WITH NFPA 30, SECTION 18.5
INCIDENTAL OPERATIONS.
SHEET NOTES:
1. HAZARDOUS MATERIALS CONTROL AREAS TO BE PROVIDED WITH A
MINIMUM 1-HOUR FIRE BARRIER SEPARATION. FOUR CONTROL AREAS ARE
PERMITTED AND ARE CONFIGURED AS FOLLOWS:
- LO BAY 1 - 225 GALLONS COMBINED CLASS IA/IB/IC MAXIMUM EXPECTED.
- LO BAY 2 - 225 GALLONS COMBINED CLASS IA/IB/IC MAXIMUM EXPECTED.
- LO BAY 3 - 225 GALLONS COMBINED CLASS IA/IB/IC MAXIMUM EXPECTED.
- REMAINDER OF BUILDING (EXCLUDING THE HAZMAT STORAGE ROOM,
WHICH IS GROUP H-3)
2. HAZMAT STORAGE ROOM CLASSIFIED AS H-3 (IBC) AND LEVEL 3
PROTECTION, HIGH-HAZARD INDUSTRIAL (LSC AND NFPA 30). SEPARATION
OF 1-HOUR FIRE BARRIERS TO BE PROVIDED IN ACCORDANCE WITH IBC
TABLE 508.4 FOR SEPARATION OF H-3 AND B, F-1 AND S-1. AREA NOT
CONSIDERED PART OF CONTROL AREA(S) REFERENCED ABOVE.
3. WASHRACK TO BE SEPARATED FROM OTHER AREAS WITH 1-HOUR FIRE
BAR…
This is the start of the file's text. The full file is on GovTribe.