Attachment 20 LOCRF RTA Specifications.pdf

PDF 25 MB Posted

Attached to
F-22 Low Observable Component Repair Facility (LOCRF) Federal contract opportunity
Solicitation number
W9123621R2023
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This solicitation is for the construction of a Low Observable Component Repair Facility to support additional F-22A aircraft being relocated to Langley Air Force Base in Virginia. The facility will include three corrosion control hangar bays, one wash rack hangar bay, administrative and support spaces totaling 6,735 square meters. Construction will include site work, utilities, security features, and building systems to provide a secure and climate-controlled space for specialized F-22A maintenance and repair procedures. The facility design must meet seismic and wind code standards and incorporate sustainable practices. The construction contract duration is expected to be 730 calendar days. The soliciting agency is the Department of the Army Corps of Engineers Norfolk District.

View the file

Other files for this federal contract opportunity

Other files attached to F-22 Low Observable Component Repair Facility (LOCRF), newest first.
File Type Posted
Attachment 8 - Revised Bid Schedule.pdf PDF
W9123621R2023 Amendment 13.pdf PDF
Attch 40 06 61 16 AMENDMENT 09 FEB 22.pdf PDF
Attch 38 LOCRF DRAWINGS AMENDMENT 09FEB2022.pdf PDF
Attch 41 Copy of GFE Equipment List_mjm edits 2020.09.24.xlsx XLSX spreadsheet
Attch 38 08 81 00 Glazing.pdf PDF
Attachment 8 - Revised CLIN Schedule.pdf PDF
Attch 35 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT.pdf PDF
Attch 25 01 11 00 Appendix to 01 11 00 Government Furnished Equipment.pdf PDF
Attch 24 P 601 PLUMBING SCHEDULES.pdf PDF
Attch 23 A 533 ROOF DETAILS.pdf PDF
Attch 22 A 011 EQUIPMENT SCHEDULE METALS TECH and SHOPS.pdf PDF
Attch 36 32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS.pdf PDF
Attch 33 10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED).pdf PDF
Attch 32 09 97 13.27 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES.pdf PDF
Attch 31 09 90 00 PAINTS AND COATINGS.pdf PDF
Attch 30 08 34 16 CORROSION CONTROL HANGAR DOORS.pdf PDF
Attch 27 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
Attch 26 01 14 00 WORK RESTRICTIONS.pdf PDF
Attch 37 33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATION.pdf PDF
Attch 34 13 34 19 METAL BUILDING SYSTEMS.pdf PDF
Attch 28 03 45 00 PRECAST ARCHITECTURAL CONCRETE.pdf PDF
W9123621R2023 Amendment 10.pdf PDF
Site Visit 10 January.pdf PDF
W9123621R2023 Amendment 9.pdf PDF
Attachment 19 LOCRF RTA SID PACKAGE.pdf PDF
Attachment 16 LOCRF RTA DWGS PART 2 OF 3.pdf PDF
Attachment 15 LOCRF RTA DWGS PART 1 OF 3.pdf PDF
Attch 13- LOCRF 20Oct21 Blended Drawings Part 3 of 3.pdf PDF
Attch 10- LOCRF 20Oct21 Blended Drawings Part 1 of 3.pdf PDF
W9123621R2023 Amendment 8.pdf PDF
Attch 11- LOCRF 20Oct21 Blended Drawings Part 2 of 3.pdf PDF
W9123621R2023 Amendment 7.pdf PDF
W9123621R2023 Amendment 6.pdf PDF
W9123621R2023 LOCRF Amend 5.pdf PDF
W9123621R2023 Amendment 4.pdf PDF
A.07.24 - Amendment 3.pdf PDF
A.07.24 - Amendment 2.pdf PDF
Attch 12 - LOCRF 100 Specification Part 1 of 1.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Solicitation W9123621R2023.pdf PDF
Attch 11 - LOCRF 100 Dwgs Part 2 of 2.pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attch 10 - LOCRF 100 Dwgs Part 1 of 2.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Show all 50

F-22 Low Observable Component Repair Facility (LOCRF) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Specifications Ready to Advertise

December 22, 2021

Solicitation Number:

W91236-21-R-2023 F22 Formal Training Unit (FTU) Joint

Base Langley-Eustis (JBLE)

Low Observable Composite

Repair Facility (LOCRF)

LOW OBSERVABLE COMPOSITE REPAIR FACILITY

Langley Air Force Base

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/11 LIST OF DRAWINGS

Appendix to 00 01 15-Drawings Index

DIVISION 01 - GENERAL REQUIREMENTS

08/15

SUMMARY OF WORK

Appendix to 01 11 00-Government Furnished Equipment List

01 14 00 11/11 WORK RESTRICTIONS

01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 02/15 PROJECT SCHEDULE

01 33 00 08/18 SUBMITTAL PROCEDURES

01 33 29 02/17 SUSTAINABILITY REPORTING

Appendix 1 to 01 33 29-AF

Sustainability Scoresheet Appendix 2 to 01 33 29- Third-Party

Design Assessment Report

01 35 13 11/11 SPECIAL PROJECT PROCEDURES

01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 43 39 12/20 MOCKUP PANEL

01 45 00.00 10 11/16 QUALITY CONTROL

00.15

10 11/16

02/20

RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

SPECIAL INSPECTIONS

Appendix 1 to 01 45 35-Schedule of Special Inspections Appendix 2 to 01 45 35-Statement of Special Inspections

13.00

05/18

07/06

TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

EROSION AND SEDIMENT CONTROL

01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS

Appendix 1 to 01 57 19-JBLE-Langley

Environmental Special Conditions Appendix 2 to 01 57 19-Virginia DEQ

Permits and Approvals Appendix 3 to 01 57 19-IRP Chemical

Data Langley AFB

01 58 00 08/19 PROJECT IDENTIFICATION

02/19

05/19

CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 05/18 FACILITY DATA REQUIREMENTS

01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING

Appendix to 01 91 00.15 10-

Construction Phase Commissioning Plan

DIVISION 02 - EXISTING CONDITIONS

02 41 00 05/10 DEMOLITION

02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

Appendix to 02 81 00-HAZMAT

Report

02 83 00 11/18 LEAD REMEDIATION

PROJECT TABLE OF CONTENTS Page 2

02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

DIVISION 03 - CONCRETE

03 30 00 02/19 CAST-IN-PLACE CONCRETE

03 45 00 05/16 PRECAST ARCHITECTURAL CONCRETE

03 45 33 05/16 PRECAST STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15 UNIT MASONRY

DIVISION 05 - METALS

05 05 20.00

05 12 00

02/21

08/18

POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

STRUCTURAL STEEL

05 21 00 05/15 STEEL JOIST FRAMING

05 30 00 05/15 STEEL DECKS

05 40 00 05/15 COLD-FORMED METAL FRAMING

05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/16 METAL LADDERS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16 ROUGH CARPENTRY

06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/10 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 17 00 02/16 BENTONITE WATERPROOFING

07 21 13 02/16 BOARD AND BLOCK INSULATION

07 21 16 11/11 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16 ROOF AND DECK INSULATION

07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS

07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 63 05/11 FABRICATED WALL PANEL ASSEMBLIES

07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 05/17 FLASHING AND SHEET METAL

07 61 14.00 20 08/16, CHG 1: 08/18 STEEL STANDING SEAM ROOFING

07 71 00 ROOF SPECIALTIES

07 72 00 4/12 ROOF ACCESSORIES

07 84 00 05/10 FIRESTOPPING

07 92 00 08/16 JOINT SEALANTS

07 95 00 3/15 EXPANSION CONTROL

DIVISION 08 - OPENINGS

08 11 13 02/10 STEEL DOORS AND FRAMES

08 31 00 05/17 ACCESS DOORS AND PANELS

08 33 23 11/19 OVERHEAD COILING DOORS

08 34 16 05/17 CORROSION CONTROL HANGAR DOORS

08 34 73 11/19 SOUND CONTROL DOOR ASSEMBLIES

PROJECT TABLE OF CONTENTS Page 3

08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16 DOOR HARDWARE

Appendix to 08 71 00-Hardware

Set

08 81 00 05/19 GLAZING

08 91 00 05/11 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16 GYPSUM BOARD

09 30 10 08/17 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/17 ACOUSTICAL CEILINGS

09 65 00 08/10 RESILIENT FLOORING

09 67 23.16 08/10 FUEL RESISTIVE RESINOUS FLOORING,

5-COAT SYSTEM

09 90 00 05/11 PAINTS AND COATINGS

09 97 13.27 10/16 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 11 00 08/17 VISUAL DISPLAY UNITS

10 14 00.10 08/17 EXTERIOR SIGNAGE

10 14 00.20 08/17 INTERIOR SIGNAGE

10 21 13 08/17 TOILET COMPARTMENTS

10 22 13 08/16 WIRE MESH PARTITIONS

10 26 00 08/17 WALL AND DOOR PROTECTION

10 28 13 08/17 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 05/11 METAL LOCKERS

10 56 26.13 3/15 MOBILE STORAGE SHELVING UNITS

(MECHANICALLY-ASSISTED)

DIVISION 11 - EQUIPMENT

11 51 00 08/20 INSULATED PAINT BOOTH

11 52 00 08/20 SMALL PARTS PAINT BOOTH

DIVISION 12 - FURNISHINGS

12 24 13 08/17 ROLLER WINDOW SHADES

12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 08/17 FURNITURE AND FURNITURE INSTALLATION

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 11/11 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE

PROTECTION

21 13 25 02/19 HIGH-EXPANSION FOAM SYSTEM, FIRE

PROTECTION

Appendix to 21 13 25-Hangar

Acceptance Test Procedures AFCEC

21 30 00 04/08 FIRE PUMPS

PROJECT TABLE OF CONTENTS Page 4

DIVISION 22 - PLUMBING

22 00 00 11/15 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND

SEISMIC CONTROL

22 15 14.00 40 11/14 GENERAL SERVICE COMPRESSED-AIR

SYSTEMS, LOW PRESSURE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 15 02/14 COMMON PIPING FOR HVAC

23 05 48.00 40 08/15 VIBRATION AND SEISMIC CONTROLS FOR

HVAC PIPING AND EQUIPMENT

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

Appendix to 23 05 93-LO Bay TAB Test

Grid

23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 11/15 HVAC CONTROLS CONFIGURATION AND

GENERAL REQUIREMENTS

23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND

OTHER BUILDING CONTROL SYSTEMS

AMENDMENT 14 DEC 21

23 11 20 05/20 FACILITY GAS PIPING

23 21 13.00 20 04/06 LOW TEMPERATURE WATER (LTW) HEATING

SYSTEM

23 21 23 08/17 HYDRONIC PUMPS

23 30 00 05/20 HVAC AIR DISTRIBUTION

23 37 13.00 40 05/15 DIFFUSERS, REGISTERS, AND GRILLS

23 51 43 10/20 CENTRAL VACUUM DUST COLLECTION SYSTEM

23 52 00 04/08 HEATING BOILERS

23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 65 00 11/16 COOLING TOWERS AND REMOTE

EVAPORATIVELY-COOLED CONDENSERS

23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT

23 81 00.00 20 11/09 UNITARY AIR CONDITIONING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 11/17 CYBERSECURITY FOR FACILITY-RELATED

HVAC CONTROL SYSTEMS

25 05 11.02 11/17 CYBERSECURITY FOR FACILITY-RELATED

FIRE ALARM CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 08 00 08/08 APPARATUS INSPECTION AND TESTING

26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM

26 24 13 05/15 SWITCHBOARDS

Appendix to 26 24 13-AMRS Meter

Specifications

26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION

26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 36 23.00 20 07/19 GENERATOR QUICK CONNECT DOUBLE-THROW

SAFETY SWITCH

PROJECT TABLE OF CONTENTS Page 5

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM

(SACRIFICIAL ANODE)

26 51 00 05/20 INTERIOR LIGHTING

26 56 00 05/20 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 40 10 10/20 AUDIO-VISUAL GENERAL

27 40 90.01 11/20 AUDIO-VISUAL PERFORMANCE VERIFICATION

27 41 06 11/20 AUDIO-VISUAL POWER DISTRIBUTION AND

MANAGEMENT EQUIPMENT

27 41 10 11/20 MICROPHONES, CONFERENCING SYSTEM, AND

AUDIO SOURCE EQUIPMENT

27 41 11 11/20 AUTOMATED MIXING, PROCESSING AND

AMPLIFICATION EQUIPMENT

27 41 13 11/20 REINFORCEMENT AND PROGRAM AUDIO

LOUDSPEAKERS

27 41 23 11/20 VIDEO DISPLAY EQUIPMENT

27 41 31 11/20 AUDIO-VISUAL CONTROL SYSTEMS AND

PROGRAMMING

27 41 32 11/20 AUDIO-VISUAL NETWORK EQUIPMENT

27 41 40 11/20 AUDIO-VISUAL CABLING AND CONNECTORS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/11 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 08/08 EARTHWORK

Appendix to 31 00 00-Geotech Report

31 05 19 08/08 GEOTEXTILE

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 05/16 RUBBER AND PAINT REMOVAL FROM AIRFIELD

PAVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 20 08/17 BASE COURSE FOR RIGID PAVING

32 11 23 08/17 AGGREGATE BASE COURSES

32 12 13 05/17 BITUMINOUS TACK COAT

32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

SITE FACILITIES INCLUDING SIGNAGE

32 13 14.13 08/19 CONCRETE PAVING FOR AIRFIELDS AND

OTHER HEAVY-DUTY PAVEMENTS

32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT

SEALANT

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16 PAVEMENT MARKINGS

32 31 13 11/16 CHAIN LINK FENCES AND GATES

32 92 23 04/06 SODDING

32 93 00 08/17 EXTERIOR PLANTS

PROJECT TABLE OF CONTENTS Page 6

DIVISION 33 - UTILITIES

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 11 05 02/18 PUMPED WASTE DISTRIBUTION PIPING

33 16 15 04/08 WATER STORAGE STEEL TANKS

33 30 00 05/18 SANITARY SEWERAGE

33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING

STATIONS

33 40 00 02/10 STORM DRAINAGE UTILITIES

33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

COORD_SHEET INDEX FOR EXCEL

SHEET NUMBER SHEET NAME

00. GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX

G-003 CODE COMPLIANCE SUMMARY

G-004 CODE COMPLIANCE SUMMARY

G-005 CODE COMPLIANCE SITE PLAN

G-006 FIRST FLOOR LIFE SAFETY PLAN - OVERALL

PH101 PHASE 1 SITE DIAGRAM

PH102 PHASE 2 SITE DIAGRAM

PH103 PHASE 3 SITE DIAGRAM

02. SURVEY / MAPPING

VF001 LEGENDS AND NOTES

VF100 EXISTING CONDITIONS PLAN

VF101 EXISTING CONDITIONS PLAN

VF102 EXISTING CONDITIONS PLAN

VF103 EXISTING CONDITIONS PLAN

VF104 EXISTING CONDITIONS PLAN

VF105 EXISTING CONDITIONS PLAN

VF106 EXISTING CONDITIONS PLAN

VF107 EXISTING CONDITIONS PLAN

04.CIVIL

C-001 LEGEND AND GENERAL NOTES

C-002 CONSTRUCTION ACCESS PLAN

C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL

C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL

C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN INITIAL

C-006 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN FINAL

C-007 EROSION AND SEDIMENT CONTROL - PHASE 2A PLAN INITIAL

C-008 EROSION AND SEDIMENT CONTROL - PHASE 2A PLAN FINAL

C-009 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN INITIAL

C-010 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN FINAL

CD001 DEMOLITION LEGEND & NOTES

CD100 EXISTING CONDITIONS - OVERALL

CD101 DEMOLITION PLAN

CD102 DEMOLITION PLAN

CD103 DEMOLITION PLAN

CD104 DEMOLITION PLAN

CD105 DEMOLITION PLAN

CD106 DEMOLITION PLAN

CD107 DEMOLITION PLAN

CS001 SITE LAYOUT LEGEND & CONTROL POINTS

CS101 SITE LAYOUT PLAN

CS102 SITE LAYOUT PLAN

CS103 SITE LAYOUT PLAN

CS104 SITE LAYOUT PLAN

CS105 SITE LAYOUT PLAN

CS106 SITE LAYOUT PLAN

CS107 SITE LAYOUT PLAN

Low Observable Composite Repair Facility

RoseborS Text Box Appendix to 00 01 15

RoseborS Text Box List of Drawings

CG001 GRADING LEGEND & NOTES

CG002 STORM SCHEDULES & NOTES

CG101 GRADING & DRAINAGE PLAN

CG102 GRADING & DRAINAGE PLAN

CG103 GRADING & DRAINAGE PLAN

CG104 GRADING & DRAINAGE PLAN

CG105 GRADING & DRAINAGE PLAN

CG106 GRADING & DRAINAGE PLAN

CG107 GRADING & DRAINAGE PLAN

CG201 STORM SEWER PROFILES

CG202 STORM SEWER PROFILES

CG203 STORM SEWER PROFILES

CG204 STORM SEWER PROFILES

CG205 STORM SEWER PROFILES

CG206 STORM SEWER PROFILES

CG700 POST DEVELOPMENT DRAINAGE AREAS

CG701 STORMWATER MANAGEMENT CALCULATIONS

CG702 STORMWATER MANAGEMENT CALCULATIONS

CG703 STORMWATER MANAGEMENT CALCULATIONS

CU001 UTILITY LEGEND, CONTROL POINTS & SCHEDULES

CU101 UTILITY PLAN

CU102 UTILITY PLAN

CU103 UTILITY PLAN

CU104 UTILITY PLAN

CU105 UTILITY PLAN

CU106 UTILITY PLAN

CU107 UTILITY PLAN

CU201 SANITARY FORCE MAIN PROFILE

CU202 SANITARY FORCE MAIN PROFILE

CU203 SANITARY FORCE MAIN PROFILE

CU204 SANITARY FORCE MAIN PROFILE

CU205 SANITARY FORCE MAIN PROFILE

CU206 SANITARY SEWER PROFILE

CU207 8" DOMESTIC WATER PROFILE

CU208 8" DOMESTIC WATER PROFILE

CU209 8" DOMESTIC WATER PROFILE

CU210 12" FIRE WATER PROFILE

CU211 HEF MAIN PROFILE

C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-505 EROSION AND SEDIMENT CONTROL DETAILS

C-506 DETAILS

C-507 DETAILS

C-508 DETAILS

C-509 DETAILS

C-510 DETAILS

C-511 DETAILS

C-512 DETAILS

Low Observable Composite Repair Facility

C-513 DETAILS

C-514 DETAILS

C-515 DETAILS

C-516 DETAILS

C-517 DETAILS

CP100 AIRFIELD PHASING PLAN

CP101 APRON AND TOWWAY GEOMETRY PLAN

CP201 APRON AND TOWWAY JOINT LAYOUT PLAN

CP301 APRON AND TOWWAY SPOT ELEVATION PLAN

CP401 APRON AND TOWWAY TYPICAL SECTIONS

CP501 APRON AND TOWWAY JOINT DETAILS

CP502 APRON AND TOWWAY JOINT DETAILS

CP503 APRON AND TOWWAY JOINT DETAILS

CM101 APRON AND TOWWAY MARKING PLAN

CM501 APRON AND TOWWAY MARKING DETAILS

05. LANDSCAPE

L-101 LANDSCAPE PLAN

L-102 LANDSCAPE PLAN

L-103 LANDSCAPE PLAN

L-104 LANDSCAPE PLAN

L-105 LANDSCAPE PLAN

L-501 LANDSCAPE DETAILS

06. STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES

S-002 GENERAL STRUCTURAL NOTES

S-003 WIND PRESSURE CHARTS & DIAGRAMS

S-101 FOUNDATION PLAN - OVERALL

S101A FOUNDATION PLAN - AREA A

S101B FOUNDATION PLAN - AREA B

S101C FOUNDATION PLAN - AREA C

S101D FOUNDATION PLAN - AREA D

S101E FOUNDATION PLAN - AREA E

S-102 SLAB PLAN - OVERALL

S102A SLAB PLAN - AREA A

S102B SLAB PLAN - AREA B

S102C SLAB PLAN - AREA C

S102D SLAB PLAN - AREA D

S102E SLAB PLAN - AREA E

S-103 ROOF FRAMING PLAN - OVERALL

S103A ROOF FRAMING PLAN - AREA A

S103B ROOF FRAMING PLAN - AREA B

S103C ROOF FRAMING PLAN - AREA C

S103D ROOF FRAMING PLAN - AREA D

S103E ROOF FRAMING PLAN - AREA E

S-104 LINTEL PLAN

S-201 ENTRY TOWER FRAMING ELEVATIONS

S-202 DUCT TOWER FRAMING ELEVATIONS

S-301 FOUNDATION SECTIONS - I

S-302 FOUNDATION SECTIONS - II

S-303 PEMB FOUNDATION SECTIONS & DETAILS

S-311 HANGAR SECTION - LO BAY

S-312 HANGAR SECTION - WASH RACK

S-321 ROOF FRAMING SECTIONS - I

S-322 ROOF FRAMING SECTIONS - II

S-323 ROOF FRAMING SECTIONS - III

S-324 ENTRY TOWER SECTIONS & DETAILS

S-325 MISC. SECTIONS & DETAILS

S-326 CHILLER ENCLOSURE FRAMING DETAILS

S-331 SITE SECTIONS & DETAILS - I

S-332 SITE SECTIONS & DETAILS - II

S-401 ENLARGED PLANS - I

S-402 ENLARGED PLANS - II

S-501 CONCRETE DETAILS - I

S-502 CONCRETE DETAILS - II

S-503 CONCRETE DETAILS - III

S-504 CONCRETE DETAILS - IV

S-511 ROOF FRAMING DETAILS - I

S-512 ROOF FRAMING DETAILS - II

S-513 ROOF FRAMING DETAILS - III

S-514 MASONRY DETAILS - I

S-515 MASONRY DETAILS - II

S-516 MASONRY DETAILS - III

S-601 SCHEDULES - GENERAL

S-700 H.E.F. DISCHARGE TANK PLAN

S-701 STORAGE TANK DETAILS

S-702 STORAGE TANK STRUCTURAL DETAILS

S-901 3D PERSPECTIVE VIEWS

07. ARCHITECTURAL

A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

A-002 ABA ACCESSIBILITY GUIDELINES

A-003 ABA PLAN

A-004 SECURE AREAS PARTIAL PLANS

A-005 AIRCRAFT CLEARANCE REQUIREMENT PLAN & SECTIONS

A-006 PARTITION TYPES

A-007 PARTITION TYPES

A-008 PARTITION HEAD CONDITIONS

A-009 PENETRATION DETAILS

A-010 PENETRATION DETAILS

A-011 EQUIPMENT SCHEDULE - METALS TECH & SHOPS

A-020 BLDG 330 COMM ROOM - DEMO & NEW

AS101 ARCHITECTURAL SITE PLAN

AS501 ARCHITECTURAL SITE PLAN DETAILS - CHILLER

AS502 ARCHITECTURAL SITE PLAN DETAILS - DUMPSTER ENCLOSURE

A-101 FIRST FLOOR PLAN - OVERALL

A101A FIRST FLOOR PLAN - AREA A

A101B FIRST FLOOR PLAN - AREA B

A101C FIRST FLOOR PLAN - AREA C

A101D FIRST FLOOR PLAN - AREA D

A101E FIRST FLOOR PLAN - AREA E

A-102 ROOF PLAN - OVERALL

A102A ROOF PLAN - AREA A

A102B ROOF PLAN - AREA B

A102C ROOF PLAN - AREA C

A102D ROOF PLAN - AREA D

A102E ROOF PLAN - AREA E

A-111 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL

A111A FIRST FLOOR REFLECTED CEILING PLAN - AREA A

A111B FIRST FLOOR REFLECTED CEILING PLAN - AREA B

A111C FIRST FLOOR REFLECTED CEILING PLAN - AREA C

A111D FIRST FLOOR REFLECTED CEILING PLAN - AREA D

A111E FIRST FLOOR REFLECTED CEILING PLAN - AREA E

A-141 AIR BARRIER PLAN & SECTIONS

A-201 BUILDING ELEVATIONS

A-202 BUILDING ELEVATIONS

A-203 PARTIAL BUILDING ELEVATIONS

A-204 PARTIAL BUILDING ELEVATIONS

A-205 PARTIAL BUILDING ELEVATIONS

A-206 PARTIAL BUILDING ELEVATIONS

A-207 PARTIAL BUILDING ELEVATIONS

A-301 BUILDING SECTION

A-302 BUILDING SECTION

A-303 BUILDING SECTION

A-304 BUILDING SECTION

A-305 BUILDING SECTIONS

A-311 EXTERIOR WALL SECTIONS

A-312 EXTERIOR WALL SECTIONS

A-313 EXTERIOR WALL SECTIONS

A-314 EXTERIOR WALL SECTIONS

A-401 ENLARGED PLANS

A-402 ENLARGED PLANS & CASEWORK ELEVATIONS & SECTIONS

A-403 ENLARGED PLANS - AIR SHOWERS

A-404 RESTROOM ELEVATIONS

A-405 LOCKERS/SHOWERS ELEVATIONS

A-406 TOWER - ENLARGED PLANS

A-501 PLAN DETAILS

A-511 CEILING & EXPANSION JOINT DETAILS

A-521 SECTION DETAILS - CTK ENCLOSURE

A-522 SECTION DETAILS

A-531 ROOF DETAILS

A-532 ROOF DETAILS

A-533 ROOF DETAILS

A-534 ROOF DETAILS

A-541 BUILDING ELEVATION DETAILS

A-542 BUILDING ELEVATION DETAILS

A-551 EXTERIOR DOOR DETAILS

A-552 INTERIOR DOOR DETAILS

A-553 SPECIALTY DOOR DETAILS

A-554 OVERHEAD DOOR DETAILS

A-561 WINDOW & FRAME TYPES

A-562 WINDOW DETAILS

A-563 WINDOW DETAILS

A-564 LOUVER DETAILS

A-601 DOOR FRAMES & TYPES

A-602 DOOR SCHEDULE

A-701 LO BAY BOOTH FITOUT

A-702 SMALL PARTS PAINT BOOTH FITOUT

A-801 EXTERIOR SIGNAGE

A-802 STRIPING PLAN - OVERALL

08. INTERIOR DESIGN

I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL

I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A

I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B

I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C

I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D

I101E FIRST FLOOR INTERIOR FINISH PLAN - AREA E

I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES

I-611 SIGNAGE SCHEDULE, ELEVATIONS AND NOTES

I831A PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA A

I831B PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA B

I831C PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA C

I831D PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA D

I831E PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA E

08. INTERIORS

IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A

IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B

IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C

IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D

IF101E FIRST FLOOR INTERIOR FURNITURE PLAN - AREA E

10. FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA101E FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA E

FA501 FIRE ALARM DETAILS

FA502 FIRE ALARM DETAILS

FA601 FIRE ALARM SEQUENCE OF OPERATIONS

FA701 FIRE ALARM RISER DIAGRAMS

10. FIRE PROTECTION

FX001 FIRE PROTECTION GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL

FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A

FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B

FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C

FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D

FX101E FIRST FLOOR FIRE SUPPRESSION PLAN - AREA E

FX401 FIRE PROTECTION ENLARGED PLANS

FX402 FIRE PROTECTION SECTIONS

FX501 FIRE PROTECTION DETAILS

FX901 FIRE PROTECTION ISOMETRICS

11. PLUMBING

P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

P-101 UNDERFLOOR PLUMBING PLAN - OVERALL

P101A UNDERFLOOR PLUMBING PLAN - AREA A

P101B UNDERFLOOR PLUMBING PLAN - AREA B

P101C UNDERFLOOR PLUMBING PLAN - AREA C

P101D UNDERFLOOR PLUMBING PLAN - AREA D

P101E UNDERFLOOR PLUMBING PLAN - AREA E

P-110 FIRST FLOOR PLUMBING PLAN - OVERALL

P110A FIRST FLOOR PLUMBING PLAN - AREA A

P110B FIRST FLOOR PLUMBING PLAN - AREA B

P110C FIRST FLOOR PLUMBING PLAN - AREA C

P110D FIRST FLOOR PLUMBING PLAN - AREA D

P110E FIRST FLOOR PLUMBING PLAN - AREA E

P-401 ENLARGED PLANS - PLUMBING

P-402 ENLARGED PLANS - PLUMBING

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULES

P-701 HIGH EXPANSION FOAM CONTAINMENT DIAGRAMS

P-702 WASTE AND VENT RISER DIAGRAM

P-703 DOMESTIC WATER RISER DIAGRAM

13. MECHANICAL

M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

MP101 FIRST FLOOR PIPING PLAN - OVERALL

MP101A FIRST FLOOR PIPING PLAN - AREA A

MP101B FIRST FLOOR PIPING PLAN - AREA B

MP101C FIRST FLOOR PIPING PLAN - AREA C

MP101D FIRST FLOOR PIPING PLAN - AREA D

MP101E FIRST FLOOR PIPING PLAN - AREA E

MH101 FIRST FLOOR VENTILATION PLAN - OVERALL

MH101A FIRST FLOOR VENTILATION PLAN - AREA A

MH101B FIRST FLOOR VENTILATION PLAN - AREA B

MH101C FIRST FLOOR VENTILATION PLAN - AREA C

MH101D FIRST FLOOR VENTILATION PLAN - AREA D

MH101E FIRST FLOOR VENTILATION PLAN - AREA E

MH103 BUILDING 330 VENTILATION PLANS

M-140 MECHANICAL ROOF PLAN

M-301 LO BAY SECTION N-S

M-302 LO BAY SECTION E-W

M-303 SECTIONS - AIR HANDLING EQUIPMENT

M-304 SECTIONS

M-305 MECHANICAL ROOM SECTIONS

M-306 SECTION - AHU-2 & AHU-3

M-307 SECTION - LO HALLWAY

M-308 SECTION-WASHRACK

M-401 ENLARGED PLAN - MECHANICAL ROOM EQUIPMENT LAYOUT

M-402 ENLARGED PLAN - MECHANICAL ROOM PIPING

M-403 ENLARGED PLAN - MECHANICAL ROOM VENTILATION

M-501 DETAILS - HEATING

M-502 DETAILS - VENTILATION

M-503 DETAILS - HEATING

M-601 SCHEDULES - HEATING/COOLING

M-602 SCHEDULES - HEATING/COOLING

M-603 SCHEDULES - VENTILATION

M-604 SCHEDULES - VENTILATION

M-701 DIAGRAMS - HEATING/COOLING

M-702 DIAGRAMS - WATER-COOLED CHILLER PIPING

M-703 DIAGRAM - LO BAY AND PAINT BOOTH AIRFLOW

M-704 DIAGRAMS - AIR-COOLED CHILLER PIPING

M-801 CONTROL SEQUENCES

M-802 CONTROL SEQUENCES

M-803 CONTROL SEQUENCES

M-804 CONTROL SEQUENCES

M-805 CONTROL SEQUENCES

M-806 CONTROL SEQUENCES

M-807 CONTROL SEQUENCES

M-808 CONTROL SEQUENCES

M-809 CONTROL SEQUENCES

M-810 CONTROL SEQUENCES

M-811 CONTROL SEQUENCES

M-812 CONTROL SEQUENCES

M-813 CONTROL SEQUENCES

M-814 CONTROL SEQUENCES

M-815 CONTROL SEQUENCES

14. ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

E-002 HAZARDOUS CLASSIFICATION PLAN

ES100 ELECTRICAL SITE PLAN - OVERALL

ED101 ELECTRICAL DEMOLITION SITE PLAN - PARTIAL

ED102 ELECTRICAL DEMOLITION SITE PLAN - PARTIAL

ES101 ELECTRICAL SITE PLAN - PARTIAL

ES102 ELECTRICAL SITE PLAN - PARTIAL

ES501 ELECTRICAL SITE DETAILS

ES502 ELECTRICAL SITE DETAILS

ES503 ELECTRICAL SITE DETAILS

ES601 ELECTRICAL SITE ONE-LINE DIAGRAM

EL100 OVERALL LIGHTING PLAN

EL101A LIGHTING PLAN - AREA A

EL101B LIGHTING PLAN - AREA B

EL101C LIGHTING PLAN - AREA C

EL101D LIGHTING PLAN - AREA D

EL101E LIGHTING PLAN - AREA E

EL102 LIGHTING PLAN - ROOF

EL501 LIGHTING CONTROL DETAILS

EL502 LIGHTING CONTROLS DETAILS

EL601 LUMINAIRE SCHEDULE

EL602 LUMINAIRE DETAILS

EL603 LUMINAIRE DETAILS

EP100 OVERALL POWER PLAN

EP101A POWER PLAN - AREA A

EP101B POWER PLAN - AREA B

EP101C POWER PLAN - AREA C

EP101D POWER PLAN - AREA D

EP101E POWER PLAN - AREA E

EP102 POWER PLAN - ROOF

EP103 BLDG 330 - LIGHTING AND POWER PLAN

EP401 ENLARGED POWER PLAN - ELECTRICAL ROOMS

EP402 ENLARGED POWER PLAN - MECHANICAL ROOM

EP501 POWER DETAILS

EP502 POWER DETAILS

EP503 POWER DETAILS

EP601 POWER RISER DIAGRAM

EP701 PANELBOARD SCHEDULES

EP702 PANELBOARD SCHEDULES

EP703 PANELBOARD SCHEDULES

EP704 PANELBOARD SCHEDULES

EP705 PANELBOARD SCHEDULES

EP706 PANELBOARD SCHEDULES

EP707 PANELBOARD SCHEDULES

EP708 PANELBOARD SCHEDULES

EP709 PANELBOARD SCHEDULES

EP710 MECHANICAL EQUIPMENT SCHEDULE

EP711 EQUIPMENT SCHEDULE

EG101 GROUNDING PLAN

EG102 LIGHTNING PROTECTION PLAN

EG103 CATHODIC PROTECTION PLAN

EG104 CATHODIC PROTECTION PLAN

EG501 LIGHTNING PROTECTION DETAILS

EG502 LIGHTNING PROTECTION DETAILS

EG601 GROUNDING RISER DIAGRAM

16. TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

T-002 TELECOMMUNICATIONS DIAMOND PLAN

TS100 TELECOMMUNICATIONS SITE PLAN - OVERALL

TD101 TELECOMMUNICATIONS DEMOLITIONS SITE PLAN - PARTIAL

TD102 TELECOMMUNICATIONS DEMOLITIONS SITE PLAN - PARTIAL

TS101 TELECOMMUNICATIONS SITE PLAN - PARTIAL

TS102 TELECOMMUNICATIONS SITE PLAN - PARTIAL

TS103 TELECOMMUNICATIONS SITE PLAN - PARTIAL

TS104 TELECOMMUNICATIONS SITE PLAN - PARTIAL

TS105 TELECOMMUNICATIONS SITE PLAN - PARTIAL

TS106 TELECOMMUNICATIONS SITE PLAN - PARTIAL

TS501 TELECOMMUNICATIONS SITE DETAILS

T-100 OVERALL TELECOMMUNICATIONS PLAN

T101A TELECOMMUNICATIONS PLAN - AREA A

T101B TELECOMMUNICATIONS PLAN - AREA B

T101C TELECOMMUNICATIONS PLAN - AREA C

T101D TELECOMMUNICATIONS PLAN - AREA D

T101E TELECOMMUNICATIONS PLAN - AREA E

T-102 BLDG 330 - TELECOMMUNICATIONS PLAN

T-401 ENLARGED TELECOMMUNICATIONS PLANS

T-501 TELECOMMUNICATION DETAILS

T-502 TELECOMMUNICATION DETAILS

T-503 TELECOMMUNICATION DETAILS

T-601 TELECOMMUNICATIONS RISER DIAGRAMS

T-602 TELECOMMUNICATION DETAIL

X-001 SECURITY LEGEND AND ABBREVIATIONS

X-100 OVERALL SECURITY SYSTEMS PLAN

X101A SECURITY SYSTEMS PLAN - AREA A

X101B SECURITY SYSTEMS PLAN - AREA B

X101C SECURITY SYSTEMS PLAN - AREA C

X101D SECURITY SYSTEMS PLAN - AREA D

X101E SECURITY SYSTEMS PLAN - AREA E

X-501 SECURITY SYSTEMS DETAILS

X-601 SECURITY SYSTEMS RISER DIAGRAM

17. AUDIO VISUAL

TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TA100 OVERALL AUDIO VISUAL PLAN

TA101A AUDIO VISUAL PLAN - AREA A

TA501 AUDIO VISUAL DETAILS

TA601 AUDIO VISUAL SIGNAL FLOWS

LOW OBSERVABLE COMPOSITE REPAIR FACILITY W91236-21-R-2023

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes demolition of pavements, utilities and miscellaneous site features. Construction of the single-story Low Observable Composite Repair Facility (LOCRF), pavements, utilities and incidental related work.

1.1.2 Location

The work is located along the flightline in the vicinity of the Langley AFB Fire and Emergency Facility at Langley Air Force Base/Joint Base Langley-Eustis (JBLE), approximately as indicated. The exact location will be shown by the Contracting Officer.

1.2 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.3 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

SECTION 01 11 00 Page 1

1.3.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.4 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

Pursuant to Contract Clause FAR 52.245-1 Government Property, the Government will furnish the following materials and equipment for installation by the Contractor:

This list is appended to this section.

Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.

Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.

1.4.1 Delivery Schedule

Notify the Contracting Officer in writing at least 120 calendar days in advance of the date on which the materials and equipment are required.

Pick up materials and equipment no later than 30 calendar days after such date.

1.4.2 Delivery Location

The materials and equipment are located within 15 miles of the jobsite.

1.5 OPEN COMPETITION OF PRODUCTS

During design products are identified and validated to meet the necessary technical requirements of the project, and are indicated as "Basis of Design" within the design documents. This does not limit the provision of the products as other products that meet the stated technical requirements are also acceptable. Products listed herein are not intended to be proprietary unless specifically indicated. Alternate products will be evaluated and may be accepted on the basis of compliance with the salient and performance characteristics of this specification.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

Government Furnished Equipment List -- End of Section --

SECTION 01 11 00 Page 2

Government Furnished Equipment List

RoseborS Text Box Appendix to 01 11 00

Item No. Description

1 Manual Hardinge Metal Lathe

2 Miller Dynasty Welder #1 (Table Only)

3 HAAS VF2 CNC Mill

4 Small Clausing Mill

5 Small Clausing Lathe

6 Large Vertical Band Saw

7 Large Power Press

8 Heat Treating Oven

9 Large Grinder/Wire Wheel

10 Large Power Sheer

11 Large Hand Break

12 S/M Table w/ Break, Roller

13 Large Accorn Weld Table

14 Metal Iron Worker

15 Baldor Grinder

16 Baldor Buffing Wheel

17 Thomas Cutting Saw

18 Turret Sheet Metal Punch

19 Snap-On Sand Blaster

20 Chop Saw Large Yellow

21 Table/Sensitive Drill Press/Hardness Tester 22 Miller XMT 450 Welder

23 Hypertherm Plasma Cutter

24 Machine Accy Tool Boxes

25 Sheet Metal Rack

26 Sound Stock Metal Rack

27 Long Metals Rack

28 Weld Shop Tig Table

29 Miller 252 Mig Welder

30 Kalamazoo Belt Sander

31 Sanding Booth Dustron Series Filter 1/DB-24-36-2x15 32 Industrial Walk-In Oven Benko Sahara Industrial Oven 33 Paint Spray Booth Spray Tech Junair JA509 5 Series 34 Respirator washer American Airworks / GS2400

Government Furnished / Contractor Installed Equipment

Respirator washer American Airworks / GS2400

Item No. Nomenclature

1 Large Clausing Mill

2 Miller Dynasty Welder #1 (Fume Extractor)

3 Millermatic 211 Mig Welder

4 Assorted CTK's / Consumables / Lockers / Boxes 5 HAAS TL2 CNC Lathe

6 HAAS VF4 CNC Mill

7 OMAX Waterjet Cutter

8 Large Clausing Lathe

9 Small Horizontal Metal Saw

10 Large Arbor Press

11 Deburr Shaker Machine

12 Belt Sander/Burr King

13 Small Foot Sheer

14 Miller Dynasty Welder #2

15 Oxy-Aceytylene Rig

16 Miller Mini Mig Welder

17 Machine Shop Table

18 Flammible Lockers 19 Corrosive Locker

Government Furnished / Government Installed Equipment

20 Paint Spray Booth Spray Tech Junair JA509 5 Series

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G, RO

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. The Airfield will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

See specification Section 01 35 13 Special Project Procedures for additional information and restrictions.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

SECTION 01 14 00 Page 1

1.3.2 Working Hours

Regular working hours may consist of a 10 hour period between 7 a.m. and 5:00 p.m., Monday through Friday, and 7 a.m. to 3:30 p.m. on Saturday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 30 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Occupied Buildings

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

1.4 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:

1.4.1 ON-SITE PHOTOGRAPHY

Photos shall be limited to the facility pre-existing conditions, construction and grounds within the limits of disturbance for project related activities only. This includes monthly progress photos and documentation of the site. Photo distribution and access shall be on a need to know basis within the contractor's project team and the Government. Pictures of the airfield and aircraft are expressly prohibited unless otherwise authorized and approved by the COR and shall not be assumed to be authorized for normal construction.

The Contractor will not be allowed to take photographs at any time on this project site. Photographs may be provided by the Government at the

SECTION 01 14 00 Page 2

AO's discretion.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 3

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

08/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

View Location Map; G,AE

Progress and Completion Pictures; G, AE

SD-04 Samples

Color Boards; G,RO

1.3 COLOR BOARDS FOR AIR FORCE PROJECTS

Submit five sets of color boards within 90 calendar days after Contract Award. Each set of boards must include samples of colors and finishes of interior surfaces, such as walls, floors, and ceilings. Present the samples on 8 by 10-1/2 inches boards (modules) with a maximum spread of 24 by 31-1/2 inches for foldouts. Design modules to fit in a standard loose-leaf, three-ring binder. Where special finishes such as architectural concrete, carpet, or prefinished textured metal panels are required, submit samples not less than 12 inches square with the board.

If more space is needed, more than one board per set may be submitted.

Certify that the color samples have been reviewed in detail, and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated. Submittal of color samples does not relieve the Contractor of the responsibility to submit samples required elsewhere herein.

SECTION 01 30 00 Page 1

1.4 VIEW LOCATION MAP

Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.

1.5 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Include aerial photographs. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.

1.6 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by Virginia law.

1.7 SUPERVISION

1.7.1 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.

1.7.2 Superintendent Qualifications

The project superintendent must have a minimum of 15 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

For routine projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00.00 10 QUALITY CONTROL, the superintendent must have qualifications in accordance with that section.

SECTION 01 30 00 Page 2

1.7.2.1 Duties

The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project.

The superintendent is required to attend partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.

1.7.3 Project Manager

Assign a Project Manager with the responsibility for the overall management of the project. The Contracting Officer may request proof of the Project Manager's qualifications at any point in the project if the performance of the Project Manager is in question.

1.7.3.1 Project Manager Qualifications

The Project Manager must have a minimum 10 years experience as a Project Manager or Superintendent on projects of similar size and complexity.

1.7.4 Non-Compliance Actions

The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion.

Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.

1.8 PRECONSTRUCTION MEETING CONFERENCE

After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule of prices or earned value report, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expectations of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work must also attend.

1.9 FACILITY TURNOVER PLANNING MEETINGS

Meet with the Government to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start the turnover process at the Pre-Construction Conference meeting with a discussion of the Turnover process and convene at regularly scheduled Turnover Meetings. Include the following in the facility Turnover effort:

1.9.1 Turnover Checklist

a. Contracting Officer's Representative (COR) will provide the Contractor a copy of the Turnover Checklist template prior to 75 percent completion.

b. Prior to 75 percent completion add/delete critical activities to the

SECTION 01 30 00 Page 3

Turnover Checklist template as necessary to match the project scope, and schedule critical activities and insert planned completion dates in the Turnover checklist for each critical activity. Present the Turnover Checklist to COR and review during a regularly scheduled QC Meeting.

1.9.2 Meetings

a. Upon Government acceptance of the Turnover Checklist, the Project Superintendent is required to lead regular Turnover Meetings beginning at approximately 75 percent project completion, or three to six months prior to Beneficial Occupancy Date (BOD), whichever comes first.

b. The Contracting Officer will determine the frequency of the meetings, which is expected to increase as the project completion draws nearer.

c. Using the Turnover Checklist as a Plan of Action and Milestones (POAM) and basis for discussion, review upcoming critical activities and strategies to ensure work is completed on time.

d. Coordinate with the COR any upcoming activities that require Government involvement.

e. Maintain the Turnover Checklist by documenting the actual completion dates as work is completed and update the Turnover Checklist with revised planned completion dates as necessary to match progress.

Distribute copies of the current Turnover Checklist to attendees at each Turnover Meeting.

1.10 PARTNERING

To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership within the Project Team whose members are from the Government, the Contractor and their Subcontractors. Key personnel from the Supported Command, the End User (who will occupy the facility), the Government Design and Construction team and Subject Matter Experts, the Installation, the Contractor and Subcontractors, and the Designer of Record will be invited to participate in the Partnering process. The Partnership will draw on the strength of each organization in an effort to achieve a project that is without any safety mishaps, conforms to the Contract, and stays within budget and on schedule.

The Contracting Officer will provide Information on the Partnering Process and a list of key and optional personnel who should attend the Partnering meeting.

1.10.1 Formal Partnering

Provide and host the Partnering sessions with key personnel of the Project Team, including Contractor personnel and Government personnel. Pay all costs associated with the Partnering effort including the third-party independent Formal PartneringFacilitator, the meeting room, and other incidental items. In exception, each participant bears their own costs for meals, lodging, and transportation associated with the Partnering sessions.

Before a Partnering session, coordinate with the Facilitator all requirements for incidental items (such as audio-visual equipment, easels, flipchart paper, colored markers, note paper, pens/pencils, colored flash

SECTION 01 30 00 Page 4 cards), and have these items available at the Partnering session. Provide copies of documents for distribution to all attendees. Provide a Facilitator experienced in conducting Partnering Workshops, and who is acceptable to both the Government and the Contractor. The Facilitator is responsible for leading the team in a timely manner and making sure that issues are identified and resolved. A list of Partnering Facilitators is available from the Contracting Officer.

a. Schedule the Initial Partnering Session for duration of one day minimum.

Locate this session at a place off the construction site, as agreed to by the Contracting Officer and the Contractor. It may take place concurrently with the Pre-Construction Meeting.

b. Schedule follow-on Partnering Session(s) for a maximum of 4 hours.

Schedule them at no more than 3 to six month intervals. Participants are encouraged to utilize electronic means to expedite meetings.

Meetings may be held at a location off-Base, at the project site, or in a Government Facility on Base. Follow-on meetings may be held concurrently with other scheduled meetings. Attendees need only be those required to resolve current issues. Recommend using the same Facilitator from the Initial Partnering session to achieve best results and for continuity.

1.11 ELECTRONIC MAIL (E-MAIL) ADDRESS

Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.

It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 30 00 Page 5

SECTION 01 32 01.00 10

PROJECT SCHEDULE

02/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AACE INTERNATIONAL (AACE)

AACE 29R-03 (2011) Forensic Schedule Analysis

AACE 52R-06 (2006) Time Impact Analysis - As Applied in Construction

U.S. ARMY CORPS OF ENGINEERS (USACE)

ER 1-1-11 (1995) Administration -- Progress, Schedules, and Network Analysis Systems

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required Submittals…