Attch 12- LOCRF 20Oct21 Blended Specifications.pdf
PDF 34 MB Posted
- Attached to
- F-22 Low Observable Component Repair Facility (LOCRF) Federal contract opportunity
- Solicitation number
- W9123621R2023
About this file
This solicitation is for the construction of a Low Observable Component Repair Facility to support additional F-22A aircraft relocated to Langley Air Force Base in Virginia. The facility will include three corrosion control hangar bays, one wash rack bay, shops, administration spaces, restrooms, and building systems support totaling 6,735 square meters. Construction will provide a compacted fill foundation, concrete slab, structural steel frame, concrete masonry unit facade, and standing seam metal roof. Each hangar bay will include appropriate air filtration systems. Utilities, site improvements, pavements, security features, and supporting work will be provided to create a complete and usable facility. The facility must withstand seismic and wind code requirements and be designed as permanent construction. Sustainable practices will be integrated according to Department of Defense standards. The project will comply with anti-terrorism requirements and accommodate 300 tons of air conditioning. The expected construction duration is 730 calendar days. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Norfolk.
View the file
Other files for this federal contract opportunity
Show all 50
F-22 Low Observable Component Repair Facility (LOCRF) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RoseborS Text Box “Blended Set, 21Oct21. Includes documents changed in Fall 2021 blended with any unchanged Mar2021 RTA documents. Not for Construction.”
LOW OBSERVABLE COMPOSITE REPAIR FACILITY
Langley Air Force Base
W91236-XX-X-XXXX
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
-Appendix to 00 01 15 SHEET INDEX
00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
-Appendix to 01 11 00 GFE LIST
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
-Appendix to 01 33 29 AF SUST SCORESHEET
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 43 39 MOCKUP PANEL
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE
(RMS CM)
01 45 35 SPECIAL INSPECTIONS
-Appendix 1 - to 01 45 35 SCHEDULE OF SPECIAL
INSPECTIONS
-Appendix 2 – to 01 45 35 STATEMENT OF SPECIAL
INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 13.00 22 EROSION AND SEDIMENT CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
-Appendix to 01 57 19 JBLE-LANGLEY
ENVIRONMENTAL SPECIAL CONDITIONS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
-Appendix to 01 91 00.15 10 CONSTRUCTION PHASE
COMMISSIONING PLAN
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 42 91 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
-Appendix to 02 81 00 HAZMAT REPORT
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
03 45 33 PRECAST STRUCTURAL CONCRETE
Highlight
00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 17 00 BENTONITE WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
07 71 00 ROOF SPECIALTIES
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 34 16 CORROSION CONTROL HANGAR DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
-Appendix to 08 71 00 HARDWARE SET
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
PROJECT TABLE OF CONTENTS Page 3
09 65 00 RESILIENT FLOORING
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED)
DIVISION 11 - EQUIPMENT
11 51 00 INSULATED PAINT BOOTH
11 52 00 SMALL PARTS PAINT BOOTH
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
-Appendix to 21 13 25 AMRS METER
SPECIFICATIONS
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 HVAC CONTROLS CONFIGURATION AND GENERAL REQUIREMENTS
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 30 00 HVAC AIR DISTRIBUTION
RoseborS Highlight
11 52 00 SMALL PARTS PAINT BOOTH
RoseborS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
PROJECT TABLE OF CONTENTS Page 4
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 51 43 CENTRAL VACUUM DUST COLLECTION SYSTEM
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS
23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED HVAC CONTROL SYSTEMS
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED FIRE ALARM CONTROL
SYSTEMS
DIVISION 26 - ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
-Appendix to 26 24 13 AMRS METER SPECIFICATIONS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 36 23.00 20 GENERATOR QUICK CONNECT DOUBLE-THROW SAFETY SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 TELEVISION DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 40 10 AUDIO-VISUAL GENERAL
27 40 90.01 AUDIO-VISUAL PERFORMANCE VERIFICATION
27 41 06 AUDIO-VISUAL POWER DISTRIBUTION AND MANAGEMENT EQUIPMENT
27 41 10 MICROPHONES, CONFERENCING SYSTEM, AND AUDIO SOURCE
EQUIPMENT
27 41 11 AUTOMATED MIXING, PROCESSING AND AMPLIFICATION EQUIPMENT
27 41 13 REINFORCEMENT AND PROGRAM AUDIO LOUDSPEAKERS
27 41 23 VIDEO DISPLAY EQUIPMENT
27 41 31 AUDIO-VISUAL CONTROL SYSTEMS AND PROGRAMMING
27 41 32 AUDIO-VISUAL NETWORK EQUIPMENT
27 41 40 AUDIO-VISUAL CABLING AND CONNECTORS.
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
-Appendix to 31 00 00 GEOTECH REPORT
31 05 19 GEOTEXTILE
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE FOR RIGID PAVING
32 11 23 AGGREGATE BASE COURSES
RoseborS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
PROJECT TABLE OF CONTENTS Page 5
32 12 13 BITUMINOUS TACK COAT
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR SITE FACILITIES
INCLUDING SIGNAGE
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY
PAVEMENTS
32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 16 15 WATER STORAGE STEEL TANKS
33 30 00 SANITARY SEWERAGE
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
33 16 15 WATER STORAGE STEEL TANKS
LOW OBSERVABLE COMPOSITE REPAIR FACILITY W91236-21-R-2023
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as listed in the Appendix at the end of this specification section.
1.3 SUPPLEMENTARY DATA
These supplementary Data may not be a part of the contract but are included for information.
1.3.1 Boring Logs
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
Subsurface data, not specified or indicated, have been obtained by the Government at this station.
1.3.2 Subsurface Data
The soils report is included as part of the solicitation.
-- End of Document --
DOCUMENT 00 01 15 Page 1
LIST OF DRAWINGS INDEX
SHEET NUMBER SHEET NAME
00. GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
G-003 CODE COMPLIANCE SUMMARY
G-004 CODE COMPLIANCE SUMMARY
G-005 CODE COMPLIANCE SITE PLAN
G-006 FIRST FLOOR LIFE SAFETY PLAN - OVERALL
PH101 PHASE 1 SITE DIAGRAM
PH102 PHASE 2 SITE DIAGRAM
PH103 PHASE 3 SITE DIAGRAM
02. SURVEY / MAPPING
VF001 LEGENDS AND NOTES
VF100 EXISTING CONDITIONS PLAN
VF101 EXISTING CONDITIONS PLAN
VF102 EXISTING CONDITIONS PLAN
VF103 EXISTING CONDITIONS PLAN
VF104 EXISTING CONDITIONS PLAN
VF105 EXISTING CONDITIONS PLAN
VF106 EXISTING CONDITIONS PLAN
VF107 EXISTING CONDITIONS PLAN
04.CIVIL
C-001 LEGEND AND GENERAL NOTES
C-002 CONSTRUCTION ACCESS PLAN
C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL
C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL
C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN INITIAL
C-006 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN FINAL
C-007 EROSION AND SEDIMENT CONTROL - PHASE 2A PLAN INITIAL
C-008 EROSION AND SEDIMENT CONTROL - PHASE 2A PLAN FINAL
C-009 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN INITIAL
C-010 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN FINAL
CD001 DEMOLITION LEGEND & NOTES
CD100 EXISTING CONDITIONS - OVERALL
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CD103 DEMOLITION PLAN
CD104 DEMOLITION PLAN
CD105 DEMOLITION PLAN
CD106 DEMOLITION PLAN
CD107 DEMOLITION PLAN
CS001 SITE LAYOUT LEGEND & CONTROL POINTS
CS101 SITE LAYOUT PLAN
CS102 SITE LAYOUT PLAN
CS103 SITE LAYOUT PLAN
CS104 SITE LAYOUT PLAN
CS105 SITE LAYOUT PLAN
CS106 SITE LAYOUT PLAN
CS107 SITE LAYOUT PLAN
CG001 GRADING LEGEND & NOTES
CG002 STORM SCHEDULES & NOTES
CG101 GRADING & DRAINAGE PLAN
CG102 GRADING & DRAINAGE PLAN
CG103 GRADING & DRAINAGE PLAN
CG104 GRADING & DRAINAGE PLAN
CG105 GRADING & DRAINAGE PLAN
CG106 GRADING & DRAINAGE PLAN
CG107 GRADING & DRAINAGE PLAN
CG201 STORM SEWER PROFILES
CG202 STORM SEWER PROFILES
CG203 STORM SEWER PROFILES
CG204 STORM SEWER PROFILES
CG205 STORM SEWER PROFILES
CG206 STORM SEWER PROFILES
CG700 POST DEVELOPMENT DRAINAGE AREAS
CG701 STORMWATER MANAGEMENT CALCULATIONS
CG702 STORMWATER MANAGEMENT CALCULATIONS
CG703 STORMWATER MANAGEMENT CALCULATIONS
CU001 UTILITY LEGEND, CONTROL POINTS & SCHEDULES
CU101 UTILITY PLAN
CU102 UTILITY PLAN
CU103 UTILITY PLAN
CU104 UTILITY PLAN
CU105 UTILITY PLAN
CU106 UTILITY PLAN
CU107 UTILITY PLAN
CU201 SANITARY FORCE MAIN PROFILE
CU202 SANITARY FORCE MAIN PROFILE
CU203 SANITARY FORCE MAIN PROFILE
CU204 SANITARY FORCE MAIN PROFILE
CU205 SANITARY FORCE MAIN PROFILE
CU206 SANITARY SEWER PROFILE
CU207 8" DOMESTIC WATER PROFILE
CU208 8" DOMESTIC WATER PROFILE
CU209 8" DOMESTIC WATER PROFILE
CU210 12" FIRE WATER PROFILE
CU211 HEF MAIN PROFILE
C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-505 EROSION AND SEDIMENT CONTROL DETAILS
C-506 DETAILS
C-507 DETAILS
C-508 DETAILS
C-509 DETAILS
C-510 DETAILS
C-511 DETAILS
C-512 DETAILS
C-513 DETAILS
C-514 DETAILS
C-515 DETAILS
C-516 DETAILS
C-517 DETAILS
CP100 AIRFIELD PHASING PLAN
CP101 APRON AND TOWWAY GEOMETRY PLAN
CP201 APRON AND TOWWAY JOINT LAYOUT PLAN
CP301 APRON AND TOWWAY SPOT ELEVATION PLAN
CP401 APRON AND TOWWAY TYPICAL SECTIONS
CP501 APRON AND TOWWAY JOINT DETAILS
CP502 APRON AND TOWWAY JOINT DETAILS
CP503 APRON AND TOWWAY JOINT DETAILS
CM101 APRON AND TOWWAY MARKING PLAN
CM501 APRON AND TOWWAY MARKING DETAILS
5.0 LANDSCAPE
L-101 LANDSCAPE PLAN
L-102 LANDSCAPE PLAN
L-103 LANDSCAPE PLAN
L-104 LANDSCAPE PLAN
L-105 LANDSCAPE PLAN
L-501 LANDSCAPE DETAILS
06. STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 WIND PRESSURE CHARTS & DIAGRAMS
S-101 FOUNDATION PLAN - OVERALL
S101A FOUNDATION PLAN - AREA A
S101B FOUNDATION PLAN - AREA B
S101C FOUNDATION PLAN - AREA C
S101D FOUNDATION PLAN - AREA D
S101E FOUNDATION PLAN - AREA E
S-102 SLAB PLAN - OVERALL
S102A SLAB PLAN - AREA A
S102B SLAB PLAN - AREA B
S102C SLAB PLAN - AREA C
S102D SLAB PLAN - AREA D
S102E SLAB PLAN - AREA E
S-103 ROOF FRAMING PLAN - OVERALL
S103A ROOF FRAMING PLAN - AREA A
S103B ROOF FRAMING PLAN - AREA B
S103C ROOF FRAMING PLAN - AREA C
S103D ROOF FRAMING PLAN - AREA D
S103E ROOF FRAMING PLAN - AREA E
S-104 LINTEL PLAN
S-201 ENTRY TOWER FRAMING ELEVATIONS
S-202 DUCT TOWER FRAMING ELEVATIONS
S-301 FOUNDATION SECTIONS - I
S-302 FOUNDATION SECTIONS - II
S-303 PEMB FOUNDATION SECTIONS & DETAILS
S-311 HANGAR SECTION - LO BAY
S-312 HANGAR SECTION - WASH RACK
S-321 ROOF FRAMING SECTIONS - I
S-322 ROOF FRAMING SECTIONS - II
S-323 ROOF FRAMING SECTIONS - III
S-324 ENTRY TOWER SECTIONS & DETAILS
S-325 MISC. SECTIONS & DETAILS
S-326 CHILLER ENCLOSURE FRAMING DETAILS
S-331 SITE SECTIONS & DETAILS - I
S-332 SITE SECTIONS & DETAILS - II
S-401 ENLARGED PLANS - I
S-402 ENLARGED PLANS - II
S-501 CONCRETE DETAILS - I
S-502 CONCRETE DETAILS - II
S-503 CONCRETE DETAILS - III
S-504 CONCRETE DETAILS - IV
S-511 ROOF FRAMING DETAILS - I
S-512 ROOF FRAMING DETAILS - II
S-513 ROOF FRAMING DETAILS - III
S-514 MASONRY DETAILS - I
S-515 MASONRY DETAILS - II
S-516 MASONRY DETAILS - III
S-601 SCHEDULES - GENERAL
S-700 H.E.F. DISCHARGE TANK PLAN
S-701 STORAGE TANK DETAILS
S-702 STORAGE TANK STRUCTURAL DETAILS
S-901 3D PERSPECTIVE VIEWS
07. ARCHITECTURAL
A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
A-002 ABA ACCESSIBILITY GUIDELINES
A-003 ABA PLAN
A-004 SECURE AREAS PARTIAL PLANS
A-005 AIRCRAFT CLEARANCE REQUIREMENT PLAN & SECTIONS
A-006 PARTITION TYPES
A-007 PARTITION TYPES
A-008 PARTITION HEAD CONDITIONS
A-009 PENETRATION DETAILS
A-010 PENETRATION DETAILS
A-011 EQUIPMENT SCHEDULE - METALS TECH & SHOPS
A-020 BLDG 330 COMM ROOM - DEMO & NEW
AS101 ARCHITECTURAL SITE PLAN
AS501 ARCHITECTURAL SITE PLAN DETAILS - CHILLER
AS502 ARCHITECTURAL SITE PLAN DETAILS - DUMPSTER ENCLOSURE
A-101 FIRST FLOOR PLAN - OVERALL
A101A FIRST FLOOR PLAN - AREA A
A101B FIRST FLOOR PLAN - AREA B
A101C FIRST FLOOR PLAN - AREA C
A101D FIRST FLOOR PLAN - AREA D
A101E FIRST FLOOR PLAN - AREA E
A-102 ROOF PLAN - OVERALL
A102A ROOF PLAN - AREA A
A102B ROOF PLAN - AREA B
A102C ROOF PLAN - AREA C
A102D ROOF PLAN - AREA D
A102E ROOF PLAN - AREA E
A-111 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL
A111A FIRST FLOOR REFLECTED CEILING PLAN - AREA A
A111B FIRST FLOOR REFLECTED CEILING PLAN - AREA B
A111C FIRST FLOOR REFLECTED CEILING PLAN - AREA C
A111D FIRST FLOOR REFLECTED CEILING PLAN - AREA D
A111E FIRST FLOOR REFLECTED CEILING PLAN - AREA E
A-141 AIR BARRIER PLAN & SECTIONS
A-201 BUILDING ELEVATIONS
A-202 BUILDING ELEVATIONS
A-203 PARTIAL BUILDING ELEVATIONS
A-204 PARTIAL BUILDING ELEVATIONS
A-205 PARTIAL BUILDING ELEVATIONS
A-206 PARTIAL BUILDING ELEVATIONS
A-207 PARTIAL BUILDING ELEVATIONS
A-301 BUILDING SECTION
A-302 BUILDING SECTION
A-303 BUILDING SECTION
A-304 BUILDING SECTION
A-305 BUILDING SECTIONS
A-311 EXTERIOR WALL SECTIONS
A-312 EXTERIOR WALL SECTIONS
A-313 EXTERIOR WALL SECTIONS
A-314 EXTERIOR WALL SECTIONS
A-401 ENLARGED PLANS
A-402 ENLARGED PLANS & CASEWORK ELEVATIONS & SECTIONS
A-403 ENLARGED PLANS - AIR SHOWERS
A-404 RESTROOM ELEVATIONS
A-405 LOCKERS/SHOWERS ELEVATIONS
A-406 TOWER - ENLARGED PLANS
A-501 PLAN DETAILS
A-511 CEILING & EXPANSION JOINT DETAILS
A-521 SECTION DETAILS - CTK ENCLOSURE
A-522 SECTION DETAILS
A-531 ROOF DETAILS
A-532 ROOF DETAILS
A-533 ROOF DETAILS
A-534 ROOF DETAILS
A-541 BUILDING ELEVATION DETAILS
A-542 BUILDING ELEVATION DETAILS
A-551 EXTERIOR DOOR DETAILS
A-552 INTERIOR DOOR DETAILS
A-553 SPECIALTY DOOR DETAILS
A-554 OVERHEAD DOOR DETAILS
A-561 WINDOW & FRAME TYPES
A-562 WINDOW DETAILS
A-563 WINDOW DETAILS
A-564 LOUVER DETAILS
A-601 DOOR FRAMES & TYPES
A-602 DOOR SCHEDULE
A-701 LO BAY BOOTH FITOUT
A-702 SMALL PARTS PAINT BOOTH FITOUT
A-801 EXTERIOR SIGNAGE
A-802 STRIPING PLAN - OVERALL
08. INTERIOR DESIGN
I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL
I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A
I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B
I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C
I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D
I101E FIRST FLOOR INTERIOR FINISH PLAN - AREA E
I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES
I-611 SIGNAGE SCHEDULE, ELEVATIONS AND NOTES
I831A PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA A
I831B PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA B
I831C PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA C
I831D PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA D
I831E PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA E
08. INTERIORS
IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL
IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A
IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B
IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C
IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D
IF101E FIRST FLOOR INTERIOR FURNITURE PLAN - AREA E
10. FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL
FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A
FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B
FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C
FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D
FA101E FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA E
FA501 FIRE ALARM DETAILS
FA502 FIRE ALARM DETAILS
FA601 FIRE ALARM SEQUENCE OF OPERATIONS
FA701 FIRE ALARM RISER DIAGRAMS
10. FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL
FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A
FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B
FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C
FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D
FX101E FIRST FLOOR FIRE SUPPRESSION PLAN - AREA E
FX401 FIRE PROTECTION ENLARGED PLANS
FX402 FIRE PROTECTION SECTIONS
FX501 FIRE PROTECTION DETAILS
FX901 FIRE PROTECTION ISOMETRICS
11. PLUMBING
P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
P-101 UNDERFLOOR PLUMBING PLAN - OVERALL
P101A UNDERFLOOR PLUMBING PLAN - AREA A
P101B UNDERFLOOR PLUMBING PLAN - AREA B
P101C UNDERFLOOR PLUMBING PLAN - AREA C
P101D UNDERFLOOR PLUMBING PLAN - AREA D
P101E UNDERFLOOR PLUMBING PLAN - AREA E
P-110 FIRST FLOOR PLUMBING PLAN - OVERALL
P110A FIRST FLOOR PLUMBING PLAN - AREA A
P110B FIRST FLOOR PLUMBING PLAN - AREA B
P110C FIRST FLOOR PLUMBING PLAN - AREA C
P110D FIRST FLOOR PLUMBING PLAN - AREA D
P110E FIRST FLOOR PLUMBING PLAN - AREA E
P-401 ENLARGED PLANS - PLUMBING
P-402 ENLARGED PLANS - PLUMBING
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-602 PLUMBING SCHEDULES
P-701 HIGH EXPANSION FOAM CONTAINMENT DIAGRAMS
P-702 WASTE AND VENT RISER DIAGRAM
P-703 DOMESTIC WATER RISER DIAGRAM
13. MECHANICAL
M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
MP101 FIRST FLOOR PIPING PLAN - OVERALL
MP101A FIRST FLOOR PIPING PLAN - AREA A
MP101B FIRST FLOOR PIPING PLAN - AREA B
MP101C FIRST FLOOR PIPING PLAN - AREA C
MP101D FIRST FLOOR PIPING PLAN - AREA D
MP101E FIRST FLOOR PIPING PLAN - AREA E
MH101 FIRST FLOOR VENTILATION PLAN - OVERALL
MH101A FIRST FLOOR VENTILATION PLAN - AREA A
MH101B FIRST FLOOR VENTILATION PLAN - AREA B
MH101C FIRST FLOOR VENTILATION PLAN - AREA C
MH101D FIRST FLOOR VENTILATION PLAN - AREA D
MH101E FIRST FLOOR VENTILATION PLAN - AREA E
MH103 BUILDING 330 VENTILATION PLANS
M-140 MECHANICAL ROOF PLAN
M-301 LO BAY SECTION N-S
M-302 LO BAY SECTION E-W
M-303 SECTIONS - AIR HANDLING EQUIPMENT
M-304 SECTIONS
M-305 MECHANICAL ROOM SECTIONS
M-306 SECTION - AHU-2 & AHU-3
M-307 SECTION - LO HALLWAY
M-308 SECTION-WASHRACK
M-401 ENLARGED PLAN - MECHANICAL ROOM EQUIPMENT LAYOUT
M-402 ENLARGED PLAN - MECHANICAL ROOM PIPING
M-403 ENLARGED PLAN - MECHANICAL ROOM VENTILATION
M-501 DETAILS - HEATING
M-502 DETAILS - VENTILATION
M-503 DETAILS - HEATING
M-601 SCHEDULES - HEATING/COOLING
M-602 SCHEDULES - HEATING/COOLING
M-603 SCHEDULES - VENTILATION
M-604 SCHEDULES - VENTILATION
M-701 DIAGRAMS - HEATING/COOLING
M-702 DIAGRAMS - WATER-COOLED CHILLER PIPING
M-703 DIAGRAM - LO BAY AND PAINT BOOTH AIRFLOW
M-704 DIAGRAMS - AIR-COOLED CHILLER PIPING
M-801 CONTROL SEQUENCES
M-802 CONTROL SEQUENCES
M-803 CONTROL SEQUENCES
M-804 CONTROL SEQUENCES
M-805 CONTROL SEQUENCES
M-806 CONTROL SEQUENCES
M-807 CONTROL SEQUENCES
M-808 CONTROL SEQUENCES
M-809 CONTROL SEQUENCES
M-810 CONTROL SEQUENCES
M-811 CONTROL SEQUENCES
M-812 CONTROL SEQUENCES
M-813 CONTROL SEQUENCES
M-814 CONTROL SEQUENCES
M-815 CONTROL SEQUENCES
14. ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
E-002 HAZARDOUS CLASSIFICATION PLAN
ES100 ELECTRICAL SITE PLAN - OVERALL
ED101 ELECTRICAL DEMOLITION SITE PLAN - PARTIAL
ED102 ELECTRICAL DEMOLITION SITE PLAN - PARTIAL
ES101 ELECTRICAL SITE PLAN - PARTIAL
ES102 ELECTRICAL SITE PLAN - PARTIAL
ES501 ELECTRICAL SITE DETAILS
ES502 ELECTRICAL SITE DETAILS
ES601 ELECTRICAL SITE ONE-LINE DIAGRAM
EL100 OVERALL LIGHTING PLAN
EL101A LIGHTING PLAN - AREA A
EL101B LIGHTING PLAN - AREA B
EL101C LIGHTING PLAN - AREA C
EL101D LIGHTING PLAN - AREA D
EL101E LIGHTING PLAN - AREA E
EL102 LIGHTING PLAN - ROOF
EL501 LIGHTING CONTROL DETAILS
EL502 LIGHTING CONTROLS DETAILS
EL601 LUMINAIRE SCHEDULE
EL602 LUMINAIRE DETAILS
EL603 LUMINAIRE DETAILS
EP100 OVERALL POWER PLAN
EP101A POWER PLAN - AREA A
EP101B POWER PLAN - AREA B
EP101C POWER PLAN - AREA C
EP101D POWER PLAN - AREA D
EP101E POWER PLAN - AREA E
EP102 POWER PLAN - ROOF
EP103 BLDG 330 - LIGHTING AND POWER PLAN
EP401 ENLARGED POWER PLAN - ELECTRICAL ROOMS
EP402 ENLARGED POWER PLAN - MECHANICAL ROOM
EP501 POWER DETAILS
EP502 POWER DETAILS
EP503 POWER DETAILS
EP601 POWER RISER DIAGRAM
EP701 PANELBOARD SCHEDULES
EP702 PANELBOARD SCHEDULES
EP703 PANELBOARD SCHEDULES
EP704 PANELBOARD SCHEDULES
EP705 PANELBOARD SCHEDULES
EP706 PANELBOARD SCHEDULES
EP707 PANELBOARD SCHEDULES
EP708 PANELBOARD SCHEDULES
EP709 MECHANICAL EQUIPMENT SCHEDULE
EP710 EQUIPMENT SCHEDULE
EG101 GROUNDING PLAN
EG102 LIGHTNING PROTECTION PLAN
EG103 CATHODIC PROTECTION PLAN
EG104 CATHODIC PROTECTION PLAN
EG501 LIGHTNING PROTECTION DETAILS
EG502 LIGHTNING PROTECTION DETAILS
EG601 GROUNDING RISER DIAGRAM
16. TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
T-002 TELECOMMUNICATIONS DIAMOND PLAN
TS100 TELECOMMUNICATIONS SITE PLAN - OVERALL
TD101 TELECOMMUNICATIONS DEMOLITIONS SITE PLAN - PARTIAL
TD102 TELECOMMUNICATIONS DEMOLITIONS SITE PLAN - PARTIAL
TS101 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS102 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS103 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS104 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS105 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS501 TELECOMMUNICATIONS SITE DETAILS
T-100 OVERALL TELECOMMUNICATIONS PLAN
T101A TELECOMMUNICATIONS PLAN - AREA A
T101B TELECOMMUNICATIONS PLAN - AREA B
T101C TELECOMMUNICATIONS PLAN - AREA C
T101D TELECOMMUNICATIONS PLAN - AREA D
T101E TELECOMMUNICATIONS PLAN - AREA E
T-102 BLDG 330 - TELECOMMUNICATIONS PLAN
T-401 ENLARGED TELECOMMUNICATIONS PLANS
T-501 TELECOMMUNICATION DETAILS
T-502 TELECOMMUNICATION DETAILS
T-503 TELECOMMUNICATION DETAILS
T-601 TELECOMMUNICATIONS RISER DIAGRAMS
T-602 TELECOMMUNICATION DETAIL
X-001 SECURITY LEGEND AND ABBREVIATIONS
X-100 OVERALL SECURITY SYSTEMS PLAN
X101A SECURITY SYSTEMS PLAN - AREA A
X101B SECURITY SYSTEMS PLAN - AREA B
X101C SECURITY SYSTEMS PLAN - AREA C
X101D SECURITY SYSTEMS PLAN - AREA D
X101E SECURITY SYSTEMS PLAN - AREA E
X-501 SECURITY SYSTEMS DETAILS
X-601 SECURITY SYSTEMS RISER DIAGRAM
17. AUDIO VISUAL
TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
TA100 OVERALL AUDIO VISUAL PLAN
TA101A AUDIO VISUAL PLAN - AREA A
TA501 AUDIO VISUAL DETAILS
TA601 AUDIO VISUAL SIGNAL FLOWS
LOW OBSERVABLE COMPOSITE REPAIR FACILITY W91236-XX-X-XXXX
00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
OFFEROR’S NAME:
CONTRACT LINE ITEM SCHEDULE
CLIN Description Unit Unit
Amount
Base Proposal
0001 All work, labor, materials, and equipment required to the
Low Observable Composite Repair Facility (LOCRF), including all building related construction within the 5’ line, complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
LS
0002 All work, labor, materials, and equipment required to construct the LOCRF site improvements, including all construction outside of the 5’ line, complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
0003 All work, labor, materials, and equipment by Dominion
Energy required to construct electrical service to the new LOCRF facility, including the 35kV pad-mounted switch, building pad-mounted transformer, 35kV conductors and terminations, and the connection to the existing JBLE
34.5kV electrical distribution system, complete as prescribed in the in the construction documents excluding work described in all other CLINs. Source of funding is
MILCON.
0004 All work, labor, materials, and equipment required to construct natural gas service to the new LOCRF facility by
Virginia Natural Gas, including the distribution system to the new facility, the meter, the regulator and all connection fees, complete as prescribed in the in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
0005 All work, labor, materials, and equipment required to construct the High Expansion Foam (HEF) Containment Tank, complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
PerrotS 02 QC Review Comment
PerrotS 02 QC Review Comment HEF tank becomes part of CLIN 0002
PerrotS
DRAFT - Bid schedule to be updated with RTA/Final documents.
CLIN Description Unit Unit
Amount
0006 Provide unit price for all work, labor, materials, and equipment required to dispose and replace any unsatisfactory soils, complete as prescribed in the construction documents, excluding work described in all other CLINs. Source of funding is MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.
For bidding purposes Offeror shall assume 1,190 cy.
Unit Price for each cubic yard (cy).
1,190 cy
Total Base LS
0007 Bid Option 1
All work, labor, materials, and equipment required to furnish and install Audio-Visual (AV) Equipment complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is NON-
MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-
7.
BID OPTION 2
All work, labor, materials, and equipment required to furnish and install Fixtures, Furniture and Equipment
(FF&E) complete as prescribed in the construction documents excluding work described in all other CLINs.
Source of funding is NON-MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.
0009 BID OPTION 3
All work, labor, materials, and equipment required to dispose and replace any other-than-clean soil complete as prescribed in the construction documents, including but not limited to specification section 01 57 19 Temporary
Environmental Controls 01 57 19 ATTACHMENT JBLE-Langley
Environmental Special Conditions para 1.1.2.2, excluding work described in all other CLINs. Source of funding is
MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-
7.
For bidding purposes Offeror shall assume 1 lot equals
250CY and a total quantity of 1 Lot.
Unit Price for each Lot
1 Lot $
0010 BID OPTION 4
Provide unit price for all work, labor, materials, and equipment required to decrease period of performance (PoP) by 110 calendar days, excluding work described in all other CLINs. Source of funding is MILCON. Source of funding is MILCON. Option to be exercised upon initial award in accordance with FAR 52.217-7.
CLIN Description Unit Unit
Amount
BID OPTION 5
All work, labor, materials, and equipment required to construct Offsite Communications improvements, from connection point at HH179E (including structure HH179E) to and including interior improvements in Building 330, with exception of 12 Strand Single Mode Fiber Option cable from
LOCRF to telcon room inside Bldg 330 (12 Strand FO Cable is base bid), complete as prescribed in the in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
TOTAL (BASE PLUS OPTIONS) LS
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item
(CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes demolition of pavements, utilities and miscellaneous site features. Construction of the single-story Low Observable Composite Repair Facility (LOCRF), pavements, utilities and incidental related work.
1.1.2 Location
The work is located along the flightline in the vicinity of the Langley AFB Fire and Emergency Facility at Langley Air Force Base/Joint Base Langley-Eustis (JBLE), approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.3 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.
Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
SECTION 01 11 00 Page 1
1.3.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.4 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Pursuant to Contract Clause FAR 52.245-1 Government Property, the Government will furnish the following materials and equipment for installation by the Contractor:
This list is appended to this section.
Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.
Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.
1.4.1 Delivery Schedule
Notify the Contracting Officer in writing at least 120 calendar days in advance of the date on which the materials and equipment are required.
Pick up materials and equipment no later than 30 calendar days after such date.
1.4.2 Delivery Location
The materials and equipment are located within 15 miles of the jobsite.
1.5 OPEN COMPETITION OF PRODUCTS
During design products are identified and validated to meet the necessary technical requirements of the project, and are indicated as "Basis of Design" within the design documents. This does not limit the provision of the products as other products that meet the stated technical requirements are also acceptable. Products listed herein are not intended to be proprietary unless specifically indicated. Alternate products will be evaluated and may be accepted on the basis of compliance with the salient and performance characteristics of this specification.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
Government Furnished Equipment List -- End of Section --
SECTION 01 11 00 Page 2
Government Furnished Equipment List
Item No. Description
1 Manual Hardinge Metal Lathe
2 Miller Dynasty Welder #1 (Table Only)
3 HAAS VF2 CNC Mill
4 Small Clausing Mill
5 Small Clausing Lathe
6 Large Vertical Band Saw
7 Large Power Press
8 Heat Treating Oven
9 Large Grinder/Wire Wheel
10 Large Power Sheer
11 Large Hand Break
12 S/M Table w/ Break, Roller
13 Large Accorn Weld Table
14 Metal Iron Worker
15 Baldor Grinder
16 Baldor Buffing Wheel
17 Thomas Cutting Saw
18 Turret Sheet Metal Punch
19 Snap-On Sand Blaster
20 Chop Saw Large Yellow
21 Table/Sensitive Drill Press/Hardness Tester 22 Miller XMT 450 Welder
23 Hypertherm Plasma Cutter
24 Machine Accy Tool Boxes
25 Sheet Metal Rack
26 Sound Stock Metal Rack
27 Long Metals Rack
28 Weld Shop Tig Table
29 Miller 252 Mig Welder
30 Kalamazoo Belt Sander
31 Sanding Booth Dustron Series Filter 1/DB-24-36-2x15 32 Industrial Walk-In Oven Benko Sahara Industrial Oven 33 Paint Spray Booth Spray Tech Junair JA509 5 Series 34 Respirator washer American Airworks / GS2400
Government Furnished / Contractor Installed Equipment
Respirator washer American Airworks / GS2400
Item No. Nomenclature
1 Large Clausing Mill
2 Miller Dynasty Welder #1 (Fume Extractor)
3 Millermatic 211 Mig Welder
4 Assorted CTK's / Consumables / Lockers / Boxes 5 HAAS TL2 CNC Lathe
6 HAAS VF4 CNC Mill
7 OMAX Waterjet Cutter
8 Large Clausing Lathe
9 Small Horizontal Metal Saw
10 Large Arbor Press
11 Deburr Shaker Machine
12 Belt Sander/Burr King
13 Small Foot Sheer
14 Miller Dynasty Welder #2
15 Oxy-Aceytylene Rig
16 Miller Mini Mig Welder
17 Machine Shop Table
18 Flammible Lockers 19 Corrosive Locker
Government Furnished / Government Installed Equipment
20 Paint Spray Booth Spray Tech Junair JA509 5 Series
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G, RO
1.2 DEFINITIONS
a. Site Security Team (SST): Team of Government representatives responsible for security and inspection of construction activity.
Personnel include the Accrediting Official, Site Security Manager and Construction Surveillance Technician(s).
b. Accrediting Official (AO): US Government employee responsible for all security issues and final security measures acceptance and direction.
c. Site Security Manager (SSM): US Government employee who is on site Point of Contact (POC) for all security matters on the construction site. Responsible for the development and implementation of the Construction Security Plan (CSP) and all coordination with the Accrediting Officer (AO).
d. Construction Surveillance Technician (CST): US Government employees responsible for on-site monitoring of all work activities. CST reports directly to the SSM.
e. Construction Security Plan (CSP): US Government document indicating overarching guidance for all active and passive security measures in effect for this project. The restrictions within this plan is generally, but not necessarily inclusively, outlined within this specification.
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. The Airfieldwill remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
See specification Section 01 35 13 Special Project Procedures for additional information and restrictions.
SECTION 01 14 00 Page 1
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.4.2 Working Hours
Regular working hours may consist of a 10 hour period between 7 a.m. and 5:00 p.m., Monday through Friday, and 7 a.m. to 3:30 p.m. on Saturday, excluding Government holidays.
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 30 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.4.4 Occupied Buildings
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
1.4.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
SECTION 01 14 00 Page 2
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
1.5 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:
All work for this project, including access to the SSA,is under the supervision of the Government and the SST. The Government will facilitate coordination between the Contractor and the SST to communicate schedules, inspections and document control. The SST will provide oversight for all security issues during construction and will ensure the requirements of this specification and the CSP are met.
1.5.1 Construction Monitoring
a. All work activities pertaining to the Secure Area and adjacent general construction will require special monitoring and coordination with the SST. Contractor will cooperate and work closely with the SST to ensure all security requirements are met.
b. CST's will monitor all construction activities. Reasonable accommodations shall be made to allow CST's to access, inspect and witness activities at the discretion of the Government.
c. Construction Contractor's NAS Baseline will provide a detailed construction and commissioning schedule with clear milestones to coordinate inspection requirements as identified by the SST.
d. The Contractor's three week look ahead schedule, provided at each QC meeting, will identify upcoming activities requiring security inspection and coordination.
e. The Government will require 24 hour notification prior to any change in schedule or additional inspection requests. Requests for change will require approval of the SSM prior to occurring.
f. Contractor will establish normal operating hours for construction with regards to a normal 5 day work week as previously outlined.
Any extended hours or weekend work will require coordination and approval with both the Contracting Officer and the SSM.
1.5.2 Construction Material Acquisition
a. Unless noted otherwise, all material will be acquired by the Contractor per the FAR requirements.
All construction materials will be ordered through US companies.
1.5.2.1 Secure Storage Area (SSA)
Contractor will provide an SSA. The SSA will be located within the Construction Laydown Area as indicated in the construction drawings. The
SECTION 01 14 00 Page 3 designated area must be large enough to accommodate storage, sorting, testing and inspection of construction materials that are stored on site.
The SSA shall be a fenced, secured area with vehicle and personnel gates that are capable of being locked.
Access to/from and activities within the SSA will be conducted by the contractor with prior approval and under the direct supervision of the SST. All material stored at the SSA will be logged by the contractor and coordinated with the CSP.
1.5.3 Site Security
a. The contractor is responsible for the security of the project, including the laydown area, the SSA and the construction site.
The contractor will be required to provide screened fencing and a locked gate for any area associated with the secured area construction
b. The SST will have 24 hour unrestricted access to the on-site construction offices, laydown area, SSA and construction site to conduct security inspections. Contractor will provide the SST with keys for all locks and locked spaces related to the construction site.
c. Personnel observed working during non-duty hours without prior SST approval will be subject to removal by the SST in coordination with Base Security. Any rework resulting from unauthorized work will be done at no additional cost to the Government.
1.5.4 CONSTRUCTION WORKFORCE
The Workforce will be comprised of US citizens or individuals who have been lawfully admitted for permanent residence as defined in 8 U.S.C 1101(a)(20).
1.5.5 PERSONNEL IDENTIFICATION
The Contractor will be required to provide all persons on site with a project specific identification badge. The badges must be serialized and documented in a control log. At the start of the project, the printed badges and control log will be handed over to the SST personnel on site for distribution and control. The badge must be worn on the person's chest and remain visible at all times. Any person observed on site without appropriate badges will be removed from the project site in coordination with Base Security.
1.5.5.1 BADGING SYSTEM
a. Permanent Site Personnel - General Construction Site
b. U.S. TOP SECRET Personnel - Green site badge with photo
c. U.S. SECRET Personnel - Blue site badge with photo
d. Vetted Local Nationals - Red site badge with photo
e. Cleared Photographer with Camera - Yellow site badge with words "Camera"
SECTION 01 14 00 Page 4
1.5.6 ON-SITE PHOTOGRAPHY
The Contractor will not be allowed to take photographs at any time on this project site. Photographs may be provided by the Government at the AO's discretion.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 5
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
08/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
View Location Map; G,AE
Progress and Completion Pictures; G, AE
SD-04 Samples
Color Boards; G,RO
1.3 COLOR BOARDS FOR AIR FORCE PROJECTS
Submit five sets of color boards within 90 calendar days after Contract Award. Each set of boards must include samples of colors and finishes of interior surfaces, such as walls, floors, and ceilings. Present the samples on 8 by 10-1/2 inches boards (modules) with a maximum spread of 24 by 31-1/2 inches for foldouts. Design modules to fit in a standard loose-leaf, three-ring binder. Where special finishes such as architectural concrete, carpet, or prefinished textured metal panels are required, submit samples not less than 12 inches square with the board.
If more space is needed, more than one board per set may be submitted.
Certify that the color samples have been reviewed in detail, and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated. Submittal of color samples does not relieve the Contractor of the responsibility to submit samples required elsewhere herein.
SECTION 01 30 00 Page 1
1.4 VIEW LOCATION MAP
Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.
1.5 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Include aerial photographs. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.
1.6 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of…
This is the start of the file's text. The full file is on GovTribe.