Attch 22 A 011 EQUIPMENT SCHEDULE METALS TECH and SHOPS.pdf
PDF 105 KB Posted
- Attached to
- F-22 Low Observable Component Repair Facility (LOCRF) Federal contract opportunity
- Solicitation number
- W9123621R2023
About this file
This equipment schedule and federal contract opportunity document provide details for a low observable component repair facility project. The project involves construction of a 6,735 square meter facility at Langley Air Force Base in Virginia to provide maintenance capacity for 38 additional F-22A aircraft relocated from Tyndall Air Force Base. The facility will include three low observable critical repair bays, one wash rack bay, shops, administration spaces, and building systems support. Site utilities must support F-22A maintenance requirements. Construction is expected to last 730 calendar days. The facility design must comply with DoD anti-terrorism standards and integrate sustainable practices.
View the file
Other files for this federal contract opportunity
Show all 50
F-22 Low Observable Component Repair Facility (LOCRF) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT SHEET NOTES
1. THE GOVERNMENT FURNISHED EQUIPMENT GFE LIST IDENTIFIES ITEMS
PROVIDE BY THE GOVERNMENT.
2. GF/GI IDENTIFIES GOVERNMENT FURNISHED/GOVERNMENT INSTALLED
EQUIPMENT. CONTRACTOR TO COORDINATE WITH THE GOVERNMENT TO
MAKE SURE THAT THIS WORK IS PERFORMED WITHOUT INTERFERENCE OF
OTHER WORK. CONTRACTOR TO PROVIDE FOR ANY AND ALL ELECTRICAL
OR MECHANICAL CONNECTIONS NECESSARY FOR OPERATION OF THE
EQUIPMENT AS SCHEDULED. SEE ENGINEERING DRAWINGS FOR FURTHER
INFORMATION.
3. GF/CI IDENTIFIES GOVERNMENT FURNISHED/CONTRACTOR INSTALLED
EQUIPMENT. CONTRACTOR TO COORDINATE WITH ALL OTHER TRADES TO
MAKE SURE THE INSTALLED EQUIPMENT IS FULLY CONNECTED AND
OPERATIONAL. AFTER INSTALLATION EQUIPMENT SHALL BE TESTED TO
MAKE SURE ALL THE NECESSARY CONNECTIONS ARE MADE AND THE
EQUIPMENT IS FULLY OPERATIONAL. CONTRACTOR TO PROVIDE ALL
NECESSARY ELECTRICAL, PLUMBING AND MECHANICAL CONNECTIONS TO
GF EQUIPMENT INCLUSIVE OF LABOR AND MATERIAL NECESSARY FOR A
FULL FUNCTIONAL CONNECTION.
4. GF/CI EQUIPMENT NECESSARY CONNECTIONS SHALL BE VERIFIED BY THE
CONTRACTOR BEFORE ANY WORK AND INSTALLATION TAKES PLACE.
GENERAL SHEET NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
1/19/2022 4:10:04 PM
A-011
E Q
U
IP
M E
N T
S C
H E
D U
L E
M
E T
A L
S T
E C
H
S H
O P
S
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
M
F
E S
T G
E R
R T
O M
E I
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
METALS SHOP EQUIPMENT SCHEDULE
EQUIPMENT NAME EQUIPMENT SIZE FOOTPRINT CLEARANCE REQUIRED POWER REQUIREMENT AMPS HVAC REQUIREMENTS PROCUREMENT & INSTALLATION NOTES
MANUAL HARDINGE METAL LATHE 6'x3'x6' 12'x9' 3 PHASE / 460V 30 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
LARGE CLAUSING MILL 6'x6'x8' 12'x12' 1 PHASE / 460V / AIR SUPPLY 13 HOSE AND REEL (100 PSI) GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
MILLER DYNASTY WELDER #1 2'x4'x6' 13'x8' TABLE/FUME EXTRACTOR INCLUDED 460V / 3 PHASE 88 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A - TABLE/FUME
EXTRACTOR IS GF/CI PHASE B
MILLERMATIC 221 MIG WELDER 2'x4'x6' 5'x7' FUME EXTRACTOR INCLUDED 1 PHASE / 110V / 30A 20 GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE C (INCLUDING FUME
EXTRACTOR)
ASSORTED CTK'S / CONSUMABLES / LOCKERS / BOXES N/A 30'x50' APPROXIMATE N/A N/A GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
HASS TL2 CNC LATHE 6'x9'x6' 15'x12' 3 PHASE / 220V / AIR SUPPLY 25 HOSE AND REEL (100 PSI) GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
HAAS VF2 CNC MILL 9'x9'x10' 15'x15' 3 PHASE / 240V / AIR SUPPLY 70 HOSE AND REEL (100 PSI) GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
HAAS VF4 CNC MILL CUTTER 14'x9'x10' 20'x15' 3 PHASE / 360V-480V / AIR SUPPLY 35 HOSE AND REEL (100 PSI) GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
OMAX WATERJET CUTTER 24'x12'x10' 30'x20' W/FORKLIFT ACCESS 3 PHASE / 480V / WATER DRAINAGE / AIR 6.5 HOSE AND REEL (100 PSI). WATER FAUCET BEHIND MACHINE GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
SMALL CLAUSING MILL 5'x6'x8' 12'x12' 240/480 SINGLE PHASE / AIR SUPPLY 11.7 HOSE AND REEL (100 PSI) GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
SMALL CLAUSING LATHE 6'x4'x6' 12'x10' 3 PHASE / 230V 32 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
LARGE CLAUSING LATHE 9'x4'x6' 15'x10' 3 PHASE / 460V 30 GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
LARGE VERTICAL BAND SAW 6'x4'x7' 12'x10' 3 PHASE / 460V 5.6 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
SMALL HORIZONTAL METAL SAW 6'x3'x3' 12'x15' 3 PHASE / 460V 5.4 GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
LARGE POWER PRESS 6'x3'x8' 12'x9' 3 PHASE / 460V 15.6 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
LARGE ARBOR PRESS 1'x2'x6' 4'x4' NONE N/A GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE C
DEBURR SHAKER MACHINE 3'x2'x4' 7'x4' 3 PHASE / 230V 8.4 GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
STANDUP DRILL PRESS 2'x3'x7' 8'x4' 1 PHASE / 230V 11.5 GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
HEAT TREATING OVEN 3'x5'x8' 9'x12' 3 PHASE / 230V 100 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
BELT SANDER / BURR KING 3'x2'x5' 9'x8' 1 PHASE / 110V / 30A 13.4 GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE C
LARGE GRINDER / WIRE WHEEL 3'x2'x5' 9'x8' 3 PHASE / 220V 3.6 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
LARGE POWER SHEER 14'x7'x8' 20'x25' 3 PHASE 460V 3.6 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
LARGE HAND BREAK 10'x2'x4' 16'x12' NONE N/A GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
SMALL FOOT SHEAR 5'x6'x4' 11'x12' NONE N/A GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
S/M TABLE WITH BREAK, ROLLER 6'x12'x5' 12'x18' 110V / AIR / REELS N/A HOSE AND REEL (100 PSI) GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
MILLER DYNASTY WELDER #2 15'x8' TABLE / FUMER INC 10'x8' 1 OR 3 PHASE / 110V 88 GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE C
LARGE ACCORN WELD TABLE 5'x8'x4' 6'x10' 110V / AIR / REELS N/A GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
METAL IRON WORKER 5'x3'x6' 11'x9' 3 PHASE 460V 6.6 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
BALDOR GRINDER 3'x2'x5' 8'x4' 230V / 3 PHASE 5.9 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
BALDOR BUFFING WHEEL 8'x9' 8'x9' 2 PHASE / 230V 4.8 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
THOMAS CUTTING SAW 2'x2'x5' 7'x7' 230V SINGLE PHASE 11 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
TURRET SHEET METAL PUNCH 2'x3'x6' 8'x9' 110V / AIR / REELS N/A HOSE AND REEL (100 PSI) GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
SNAP-ON SAND BLASTER 4'x3'x6' 10'x9' 110V / AIR 2.2 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
CHOP SAW LARGE YELLOW 5'x4'x5' 11'x10' 230V / SINGLE PHASE 19 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
TABLE/SENSITIVE DRILL PRESS / HARDNESS TESTER 8'x7' 110V 110V 1.2 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
MILLER XMT 450 WELDER 3'x3'x5' 9'x9' 3 PHASE / 460V 67 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
HYPERTHERM PLASMA CUTTER 2'x2'x4' 3'x3' 1 PHASE / 230V 65 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
OXY-ACEYTYLENE RIG 3'x2'x5' 4'x4' 110V / AIR / REELS N/A HOSE AND REEL (100 PSI) GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE C
MILLER MINI MIG WELDER 2'x3'x5' 3'x4' 110V / 220V PLUGS 30 GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE C
MACHINE ACCY TOOL BOXES 3'x5' NONE 110V / AIR / REELS N/A HOSE AND REEL (100 PSI) GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
SHEET METAL RACK 12'x21' NONE 110V / AIR / REELS N/A HOSE AND REEL (100 PSI) GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
SOUND STOCK METAL RACK 16'x5' NONE NONE N/A GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
LONG METAL RACK 5'x20' NONE 110V / AIR / REELS N/A HOSE AND REEL (100 PSI) GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
MACHINE SHOP TABLE 5'x8'x4' NONE NONE N/A GF/GI - (GOVERNMENT FURNISHED / GOVERNMENT INSTALLED) - PHASE B
WELD SHOP TIG TABLE 12'x6' NONE 110V / AIR / REELS N/A HOSE AND REEL (100 PSI) GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
MILLER 252 MIG WELDER 4'x3'x6' 11'x10' 230V SINGLE PHASE 42 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
KALAMAZOO BELT SANDER 4'x3'x6' 8'x9' 230V SINGLE PHASE 19 GF/CI - (GOVERNMENT FURNISHED / CONTRACTOR INSTALLED) - PHASE A
LOW OBSERVABLE EQUIPMENT SCHEDULE
ROOM NO. ROOM NAME EQUIPMENT NAME MANUFACTURER / MODEL NO. EQUIPMENT SIZE POWER REQUIREMENTS HVAC REQUIREMENT PLUMBING REQUIREMENT COMMENTS PROCUREMENT & INSTALLATION NOTES
143 DAMAGE REMOVAL / PREP AREA SANDING BOOTH DUSTRON SERIES FILTER 1/DB-24-36-2X15 7'-6" H x 8' L x 24' W 3 PHASE / 460/480V STANDARD (FLA OF 18) 208/230V (FLA GOES TO 36) ALSO
AVAILABLE WITH A SMALL SURCHARGE IF USER REQUIRES. ALSO NEEDED IS 120V
SINGLE PHASE FOR THE BOOTH LIGHTS (WHICH ARE PRE-WIRED)
NONE - SELF CONTAINED,
RECIRCULATING WITH FILTERS
80-110PSI COMPRESSED AIR
SERVICE DROP
GFCI, NEW UNITS. CONTRACTOR TO
PROVIDE FINAL CONNECTION FOR
ELECTRICAL. ERECTED WITHIN THE SPACE.
142 BONDING / LAYUP AREA INDUSTRIAL WALK-IN OVEN BENKO SAHARA INDUSTRIAL OVENS
CUSTOM BUILT TO CLIENT SPECIFICATION
7' H x 16' D x 7' W 3 PHASE / 240 OR 480V STANDARD. ALTERNATE VOLTAGES AVAILABLE NONE NONE ASSUME GOVERNMENT WILL FURNISH
AN ELECTRIC OVEN. NO GAS OR
EXHAUST REQUIRED.
GFCI, NEW UNITS. CONTRACTOR TO
PROVIDE FINAL CONNECTION FOR
ELECTRICAL. SINGLE UNIT, INSTALLED
CONSTRUCTED.
141 PANEL SPRAY ROOM PAINT SPRAY BOOTH SPRAY TECH JUNAIR JA509 5 SERIES
INCLUDING PACKAGED HVAC SYSTEM
SHOWN AS BASIS OF DESIGN ONLY
"13'-7"" H x 24'-5"" L x 19' W
CONFIGURATION OF PACKAGED HVAC
EQUIPMENT TO BE PROVIDED BY THE
GOVERNMENT
TBD - SEE NEEDS LIST. SINGLE POINT OF CONNECTION FOR SPRAY BOOTH /
MAKEUP AIR UNIT / CHILLER / EXHAUST FAN PACKAGE
DEDICATED HVAC SYSTEM
DESIGNED AND SUPPLIED BY THE
SPRAY BOOTH VENDOR
BREATHING AIR SERVICE DROP,
COMPRESSED AIR SERVICE DROP,
NATURAL GAS: 1.5m BTU/HR @
8-14"WC
115-227V; 16.26-7.44FLAMPS (GQT OF 12)
FOR 3-TUBE, HIGH OUTPUT T-5 LIGHT
FIXTURE. 115-277; 7.2-3.6FLAMPS
(QUANTITY OF 8) FOR 4-TUBE LIGHT
FIXTURE
CFCI
117 LAUNDRY / RESPIRATOR ROOM RESPIRATOR WASHER AMERICAN AIRWORKS / GS2400 66" H x 26.5" D x 26" W 400#
5FT CORD. NEMA 5-15P 15A 120VAC / 1 PH / 60HZ / 9A 'CONNECT TO 20A BREAKER' NONE 40-75 PSI HW/CW FLOOR SINK, INDIRECT DRAIN TO SANITARY
GFCI, NEW UNITS. CONTRACTOR TO
PROVIDE FINAL CONNECTION FOR
ELECTRICAL AND PLUMBING. SINGLE UNIT,
INSTALLED CONSTRUCTED.
130 HAZMAT STG./DISPENSARY MOBILE STORAGE N/A 8'-10 1/2" W X 27' - 11 1/4" L NONE NONE NONE MECHANICALLY-ASSISTED WITH
SURFACE MOUNTED TRACKS. REFER TO
SPECIFICATION 10 56 26.13 MOBILE
STORAGE SHELVING
(MECHANICALLY-ASSISTED) FOR
ADDITIONAL INFORMATION.
CFCI
130 HAZMAT STG./DISPENSARY FLAM LOCKERS N/A 3'W X 5'L X 6'H NONE NONE NONE GFGI
130 HAZMAT STG./DISPENSARY CORROSIVE LOCKER N/A 3'W X 5'L X 5'H NONE NONE NONE GFGI
A
M E
N D
M E
N T
-2
-2
-2
-2
FOR INFORMATION ONLY:
THIS NOTE IS RELATED TO THE SMALL PARTS PAINT BOOTH IN ROOM 141. IT IS THE INTENT
OF THE GOVERNMENT TO HAVE THE SMALL PARTS PAINT BOOTH IN ROOM 141 PROVIDED
AND INSTALLED BY THE CONTRACTOR.
| Sheets |
| A-011 - EQUIPMENT SCHEDULE - METALS TECH & SHOPS |