Attachment 19 LOCRF RTA SID PACKAGE.pdf
PDF 4 MB Posted
- Attached to
- F-22 Low Observable Component Repair Facility (LOCRF) Federal contract opportunity
- Solicitation number
- W9123621R2023
About this file
This solicitation is for the construction of a Low Observable Component Repair Facility to support additional F-22A aircraft at Joint Base Langley-Eustis in Hampton, Virginia. The project includes building a 6,735 square meter facility with four high bays - three for corrosion control maintenance and one wash rack bay. Support spaces such as offices, restrooms, and mechanical/electrical rooms will also be constructed. The facility must provide secure and climate controlled spaces for specialized F-22A maintenance and repair work. Construction is expected to last 730 calendar days and comply with DoD anti-terrorism requirements and sustainable design standards. The Department of the Army Corps of Engineers is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 50
F-22 Low Observable Component Repair Facility (LOCRF) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SID Digital Binder RTA Submittal December 22, 2021
Solicitation Number:
W91236-21-R-2023
F22 Formal Training Unit (FTU) Joint Base Langley-Eustis (JBLE)
Low Observable Composite Repair Facility (LOCRF)
DESIGN SUBMITTAL
STRUCTURAL INTERIOR DESIGN - SID
LOW OBSERVABLE COMPOSITE REPAIR FACILITY (LOCRF)
JOINT BASE LANGLEY-EUTIS - HAMPTON, VA
PROJECT NO:
P2 NO:
22 DECEMBER 2021
DESIGN SUBMITTAL
STRUCTURAL INTERIOR DESIGN - SID
LOW OBSERVABLE COMPOSITE REPAIR FACILITY (LOCRF)
JOINT BASE LANGLEY-EUSTIS - HAMPTON, VA
PROJECT NO:
P2 NO:
TABLE OF CONTENTS
TAB 01 - NARRATIVE OF SID OBJECTIVES
TAB 02- INTERIOR COLOR - SAMPLE BOARDS
TAB 03 - INTERIOR FINISH SCHEDULES - LEGENDS
TAB 04 - DRAWINGS
01. Floor Plans
02. Furniture Footprint Plans
03. Interior Signage Plans, Schedules and Details
04. Interior Elevations, Sections. Details
TAB 01 - NARRATIVE OF SID OBJECTIVES
TAB 01 - NARRATIVE OF SID OBJECTIVES
NARRATIVE OF STRUCTURAL
INTERIOR DESIGN OBJECTIVE
LOW OBSERVABLE COMPOSITE REPAIR FACILITY (LOCRF)
JOINT BASE LANGLEY-EUSTIS - HAMPTON, VA
The objective is to integrate the user’s functional and aesthetic values that focus on quality materials that are specific and illustrated products. Interior finishes prioritize all codes of health, safety, and welfare of the facility’s users, by exceeding or meeting project’s requirement of durability and ease of maintenance.
A timeless, neutral palette of colors allows accent patterns and colors to come together to promote a healthy and productive environment. This concept will allow the environment’s aesthetics to be ageless while providing the opportunity to re- evaluate and modify the theme and personality of the space when needed or desired. Color and finishes were selected in such a way as to represent an essentially neutral scheme, but pattern, texture and the correct mix of selected colors raise the level of quality and style representative of the building’s function and users.
The interior environment will provide long-term value and performance for all occupants. This binder contains the schedules, samples, and documentation of the interior finish schemes for this 100% submittal.
TAB 02 - INTERIOR COLOR - SAMPLE BOARDS
TAB 02 - INTERIOR COLOR - SAMPLE BOARDS
P - 1
PAINT 01
EP-1
EPOXY FLOOR - RESINOUS
P - 5
PAINT 05
RB-1
RUBBER BASE
VT-1
VINYL TILE
VT-2
VINYL TILE - ACCENT
CG-1
CORNER GUARD
P - 3
PAINT 03
EPYB
EPOXY BASE
P - 2
PAINT 02
EPP-1
EPOXY PAINT - WALLS
P - 6
PAINT 06
P - 4
PAINT 04
WOM-1
WALK OFF MAT - ENTRY
PT-1
PORCELAIN TILE - FLOOR
PT-3
PORCELAIN TILE - ACCENT
SSM-1
SOLID SURFACE
ACT-1
ACOUSTICAL CEILING TILE
PTB-1
PORCELAIN TILE BASE
GR-2
GROUT - BREAK ROOM
TP-1
TOILET PARTITION
PT-2
PORCELAIN TILE - WALLS
PLAM-1
PLASTIC LAMINATE
PT-4
PORCELAIN TILE
SSM-2
SOLID SURFACE - SILLS
GR-1
GROUT - RESTROOMS
WS-1
WINDOW SHADE
TAB 03 - INTERIOR FINISH SCHEDULES - LEGENDS TAB 04 - DRAWINGS
GENERAL SHEET NOTES
GENERAL MATERIAL FINISH NOTES
A. PAINT ALL WALLS P-1 U.N.O.
B. APPLY HOLLOW METAL DOOR FRAMES TO MATCH ADJACENT WALL COLOR, UNLESS OTHERWISE NOTED.
C. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
D. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
E. ALIGN ALL PORCELAIN TILE FLOOR GROUT JOINTS WITH BASE OR WALL TILE GROUT JOINTS.
F. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
G. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
H. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
I. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
J. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
K. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
L. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
M. TEST ALL FLOOR SLAB FOR MOISTURE CONTENT AND VERIFY THAT SLAB IS READY TO ACCEPT THE NEW
FINISH ON THE SLAB PER PRODUCT MANUFACTURER RECOMENDATIONS.
FINISH MATERIAL
ABBREVIATIONS
ACT ACOUSTIC CEILING TILE
AWP ACOUSTIC WALL PANEL
CG CORNER GUARD
CON CONCRETE
CPT CARPET TILE
EPY EPOXY
EXP EXPOSED
GR GROUT
LVT LUXURY VINYL TILE
P PAINT
PLAM PLASTIC LAMINATE
PT PORCELAIN TILE
RB RUBBER BASE
RSS RUBBER STAIR STRIP
RST RUBBER STAIR TREAD
RT RUBBER TILE
SC SEALED CONCRETE WITH HARDENER
SDT STATIC DISSIPATIVE TILE
SIGN SIGNAGE
SSM SOLID SURFACE MATERIAL
TP TOILET PARTITION
TS TRANSITION
VT VINYL TILE
WOM WALK OFF MAT
WS WINDOW SHADE
COVE CAP STRIP
STANDARD DIVIDER STRIP
WALL AS SCHEDULED
CONCRETE SUBFLOOR
1/8” TO 3/8” EPOXY FLOORING &
BASE WITH 3/4”-1” RADIUS
4"
EPOXY FLOOR AS SCHEDULED
CONCRETE FLOOR,
SEE STRUCTURAL
5 COATS FLOOR COATING
SYSTEM,
2"
JOINT THICKNESS
2"
CHEMICAL RESISTANT
SEALANT
BACKER ROD AND
SEALANT
VINYL COMPOSITION
TILE
TILE OR CARPET, TYP.
CONCRETE SLAB
CONT. ALUMINUM
TRANSITION PROFILE, TYP.
TS-3
SEALED CONCRETE, TYP.
CONCRETE SLAB
CONT. ALUMINUM
TRANSITION PROFILE,
TYP., TS-2
VINYL COMPOSITION
TILE, TYP.
COVE TERMINATION STRIP
MASONRY WALL AS SCHEDULED
ISOLATED CAST IN PLACE CONCRETE
SEALANT JOINT OVER BACKER ROD
ON COMPRESSIBLE EXPANSION
MATERIAL AT ISOLATED SLAB
5 PART RESINOUS EPOXY FLOORING
STRUCTURAL
JOINT, SEE
STAINELSS STEEL EDGE
PROTECTION PROFILE
PORCELAIN TILE PT-2
PORCELAIN TILE PT-2
PORCELAIN TILE PT-3
SCHEDULED PARTITION TYPE
STAINELSS STEEL EDGE
PROTECTION PROFILE
RECESSED METAL GRATE
ON ANCHORS (WOM)
ALIGN
1/ 2"
(S E
E S
2A
FIRST FLOOR
FINISH FLOOR PER
SCHEDULED
1 1/2"
1/ 2"
EPY-1
SC-1
TILE PER SCHEDULE
SEALED CONCRETE
CONT. ALUMINUM
TRANSITON PER
SCHEDULE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:32 PM
I-601
R O
O M
F
IN
IS
H
S C
H E
D U
L E
L
E G
E N
D A
N D
N O
T E
S
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
INTERIOR FINISH LEGEND (BASIS OF DESIGN)
CODE TYPE SPECIFICATION SIZE COMMENTS
ACT-1 ACOUSTICAL CEILING TILE 09 51 00 24" X 24" 9/16" GRID
CG-1 CORNER GUARD 10 26 00 16 GAUGE SEE FINISH PLANS FOR LOCATIONS. SEE ARCHITECTURAL FLOOR PLANS FOR ADDITIONAL LOCATIONS
EP-1 EPOXY FLOOR - RESINOUS 09 67 23.16 - PROVIDE 4" HIGH INTEGRAL BASE - AIRCRAFT HANGAR FLOORS. SEE SHEET A-802 FOR HANGAR FLOOR
MARKINGS
EPP-1 EPOXY PAINT - WALLS 09 90 00 - -
EPYB EPOXY BASE 09 67 23.16 4"H INTEGRAL BASE
GR-1 GROUT 09 30 10 1/8" RESTROOMS
GR-2 GROUT 09 30 10 1/8" BREAK ROOM BACKSPLASH
P-1 PAINT - GENERAL 09 90 00 - -
P-2 PAINT - DOORS FRAMES 09 90 00 - -
P-3 PAINT - METAL DOORS 09 90 00 - -
P-4 PAINT - ACCENT 09 90 00 - -
P-5 PAINT - ACCENT 09 90 00 - EXPOSED COLUMNS
P-6 PAINT - GPY. CEILING 09 90 00 - -
PLAM-1 PLASTIC LAMINATE 06 41 16.00 10 - CASEWORK
PT-1 PORCELAIN TILE FLOOR 09 30 10 24" X 36" INSTALL WITH 1/8" GROUT JOINTS, GR-1
PT-2 PORCELAIN TILE WALLS 09 30 10 12" x 24" INSTALL WITH 1/8" GROUT JOINTS, GR-1
PT-3 PORCELAIN TILE - ACCENT 09 30 10 1" x 3" INSTALL WITH 1/8" GROUT JOINTS, GR-1
PT-4 PORCELAIN TILE - BACKSPLASH 09 30 10 3" X 12" INSTALL WITH 1/8" GROUT JOINTS, GR-2
PTB-1 PORCELAIN TILE BASE 09 30 10 4" X24" FIELD CUT TILES COVER TOP EDGE WITH TS-1
RB-1 RUBBER BASE - COVE 09 65 00 4"H FOR RESILIENT TILE & CONCRETE AREAS. SPECIFY IN CONTINUOUS ROLLS.
SC-1 SEALED CONCRETE WITH HARDENER 03 30 00 - -
SIGN SIGNAGE 10 14 00.20 - -
SSM-1 SOLID SURFACE 06 61 16 2CM BREAK ROOM COUNTERTOP
SSM-2 SOLID SURFACE 06 61 16 1/2" THICK WINDOW SILLS
TP-1 TOILET PARTITION 10 21 13 - -
TS-1 TRANSITION STRIP - TILE CORNER EDGE TRIM 09 30 10 - TILE WALLS - OUTSIDE CORNERS AND PTB-1 TOPS
TS-2 TRANSITION - VT TO CONCRETE 09 65 00 - -
TS-3 TRANSITION - VT TO TILE 09 30 10 - -
TS-4 TRANSITION - TILE TO CONCRETE 09 30 10 - -
VT-1 VINYL TILE 09 65 00 24" X 24" -
VT-2 VINYL TILE - ACCENT 09 65 00 24" X 24" SEE SHEET I101A FOR LOCATIONS
WOM-1 WALK OFF MAT - ENTRY MOUNTED 12 48 13 - SEE I101A FOR MAT SIZES
WS-1 WINDOW SHADE 12 24 13 .022 THICK EVERY EXTERIOR WINDOW
INTERIOR FINISH SCHEDULE
ROOM NUMBER ROOM NAME
FLOOR FINISH WALL FINISH CEILING
FINISH COMMENTSFLOOR BASE NORTH EAST SOUTH WEST
100 VEST VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6 SEE SHEET I101A FOR WOM-1 LOCATIONS
101 ADMIN HALLWAY VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 SEE SHEET I101A FOR WOM-1 LOCATIONS
102 COMPUTER ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
103 LO/CRF STAFF VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
104 TELEPHONE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
105 TELEPHONE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
106 FABRICATIONS FLIGHT VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
107 CONFERENCE ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
108 AIR SHOWER VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6
109 STORAGE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
110 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
111 ELEC SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
112 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 GYP/P-6
113 WOMEN RR PT-1 N/A PT-2/PT-3/P-1 PT-2/PT-3/P-1 PT-2/PT-3/P-1 PT-2/PT-3/P-1 GYP/P-6
114 MEN RR PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6
115 BREAK ROOM VT-1, VT-2 RB-1 P-1 P-1/PT-4 P-1 P-1 ACT-1 PT-4 BACKSPLASH, SEE SHEET A402, SEE SHEET I101A FOR
VT-2 LOCATIONS
116 AIR SHOWER VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6
117 LAUNDRY / RESPIRATOR ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6
118 WOMEN DIRTY LOCKER ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6
119 WOMEN SHWR PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6
120 WOMEN CLEAN LOCKER ROOM PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6
121 MEN DIRTY LOCKER ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6
122 MEN SHWR PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6
123 MEN CLEAN LOCKER ROOM PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6
124A LO HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
124B LO HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
124C LO HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
124D LO HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
125 FILTER ROOM EPY-1 RB-1 P-1 P-1 P-1 P-1 EXP
126 LO BAY 1 EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP
127 OPEN STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6
128 LO BAY 2 EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP
129 FILTER ROOM EPY-1 RB-1 P-1 P-1 P-1 P-1 EXP
130 HAZMAT STG/DISPENSARY SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
131 LO BAY 3 EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP
132 FILTER ROOM EPY-1 RB-1 P-1 P-1 P-1 P-1 EXP
133 MECHANICAL SC-1 N/A P-1 P-1 P-1 P-1 EXP
134 ELECTRIC SC-1 N/A P-1 P-1 P-1 P-1 EXP
135 FIRE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
136 LO UNISEX RR PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6
137 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP
138 LO UNISEX RR PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6
139 LO COMM SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
140 HOPPER SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP
141 PANEL SPRAY ROOM EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP
142 BONDING/LAYUP AREA EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP
143 DAMAGE REMOVAL/PREPARATION AREA EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP
144 HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
145 UNISEX RR PT-1 PTB-1 EPP-1 EPP-1 EPP-1 EPP-1 GYP/P-6
146 UNISEX RR PT-1 PTB-1 EPP-1 EPP-1 EPP-1 EPP-1 GYP/P-6
147 JAN. SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
148 METALS TECH STAFF SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
149 Room WOM-1
149A METALS TECH SHOP - MACHINE SC-1 N/A P-1 P-1 P-1 P-1 EXP
149B METALS TECH SHOP - WELD CON N/A - - - - EXP
149C CTK SC-1 N/A P-1 P-1 P-1 P-1 EXP COMPOUND CEILNG AT CAGE
150 HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6
150A MEN SHOWER/ LOCKER PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6
150B WOMEN SHOWER/ LOCKER PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6
151 MECH ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
152 HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
153 ELECTRIC SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
154 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
155 RR PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6
156 OFFICE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
157 STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
158 WASHRACK EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP
159 Room VT-2
SCALE: 3" = 1'-0"
D6
FLOORING - EPOXY BASE
SCALE: = 1'-0"
0 2 42
1/2"
SCALE: 3" = 1'-0"
A6
FLOOR COATING AT CONTROL JOINT
SCALE: 1/2" = 1'-0"
F6
TS-3 VT/ TILE TRANSITION
SCALE: 1/2" = 1'-0"
A8
TS-2 VT/ SEALED CONCRETE TRANSITION
SCALE: 3" = 1'-0"
C9
EPOXY FLOOR JOINT
SCALE: 3" = 1'-0"
D9
WALL TILE TRANSITION DETAIL
SCALE: 3" = 1'-0"
E6
WOM DETAIL
SCALE: 3" = 1'-0"
E7
TS-5 EPOXY/SC TRANSITION
SCALE: 3" = 1'-0"
D7
TS-4 TILE / SC TRANSITION
NOTE: SEE STRUCTURAL INTERIOR DESIGN (SID) BINDER FOR FURTHER INFORMATION ON COLOR AND PATTERN.
SCALE: = 1'-0"3"
21 Dec 2021
TAB 04 - DRAWINGS
124B
124C
151 156 157
149C
149A
150A150B
124A
142143
117118
123115
149B
FLOOR FINISH LEGEND
CON
EPY-1
PT-1
SC-1
VT-1
124D
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:29 PM
I-101
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
O
V E
R A
L L
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: 1" = 20'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - OVERALL
ROOM NO. SCHEDULE
ROOM NO. ROOM NAME
141 PANEL SPRAY ROOM
142 BONDING/LAYUP AREA
143 DAMAGE REMOVAL/PREPARATION AREA
144 HALLWAY
145 UNISEX RR
146 UNISEX RR
147 JAN.
148 METALS TECH STAFF
149 Room
149A METALS TECH SHOP - MACHINE
149B METALS TECH SHOP - WELD
149C CTK
150 HALLWAY
150A MEN SHOWER/ LOCKER
150B WOMEN SHOWER/ LOCKER
151 MECH ROOM
152 HALLWAY
153 ELECTRIC
154 COMM
155 RR
156 OFFICE
157 STORAGE
158 WASHRACK
159 Room
ROOM NO. SCHEDULE
ROOM NO. ROOM NAME
122 MEN SHWR
123 MEN CLEAN LOCKER ROOM
124A LO HALLWAY
124B LO HALLWAY
124C LO HALLWAY
124D LO HALLWAY
125 FILTER ROOM
126 LO BAY 1
127 OPEN STORAGE
128 LO BAY 2
129 FILTER ROOM
130 HAZMAT STG/DISPENSARY
131 LO BAY 3
132 FILTER ROOM
133 MECHANICAL
134 ELECTRIC
135 FIRE
136 LO UNISEX RR
137 JAN
138 LO UNISEX RR
139 LO COMM
140 HOPPER
ROOM NO. SCHEDULE
ROOM NO. ROOM NAME
100 VEST
101 ADMIN HALLWAY
102 COMPUTER ROOM
103 LO/CRF STAFF
104 TELEPHONE
105 TELEPHONE
106 FABRICATIONS FLIGHT
107 CONFERENCE ROOM
108 AIR SHOWER
109 STORAGE
110 COMM
111 ELEC
112 JAN
113 WOMEN RR
114 MEN RR
115 BREAK ROOM
116 AIR SHOWER
117 LAUNDRY / RESPIRATOR ROOM
118 WOMEN DIRTY LOCKER ROOM
119 WOMEN SHWR
120 WOMEN CLEAN LOCKER ROOM
121 MEN DIRTY LOCKER ROOM
N
KEY PLAN
0 40' 60'20'
SCALE: 1"= 20'
2198 SF
LO HALLWAY
124A
1955 SF
PANEL SPRAY ROOM
1956 SF
BONDING/LAYUP AREA
1938 SF
DAMAGE
REMOVAL/PREPARATION
AREA
47 SF
AIR SHOWER
342 SF
LAUNDRY / RESPIRATOR
ROOM
269 SF
WOMEN DIRTY LOCKER ROOM
231 SF
WOMEN CLEAN LOCKER ROOM
120 164 SF
WOMEN SHWR
531 SF
MEN DIRTY LOCKER ROOM
376 SF
MEN SHWR
251 SF
WOMEN RR
305 SF
MEN RR
472 SF
MEN CLEAN LOCKER ROOM
591 SF
BREAK ROOM
43 SF
TELEPHONE
768 SF
COMPUTER ROOM
348 SF
LO/CRF STAFF
429 SF
CONFERENCE ROOM
348 SF
FABRICATIONS FLIGHT
43 SF
TELEPHONE
985 SF
ADMIN HALLWAY
112 SF
VEST
114 SF
COMM
99 SF
ELEC
53 SF
JAN
67 SF
AIR SHOWER
46 SF
STORAGE
FLOOR FINISH LEGEND
EPY-1
PT-1
SC-1
VT-1
VT-2
WOM-1
MATCHLINE
SEE A1/I101B
M A
T C
H
LI
N E
S E
E A
1/ I1
E
MATCHLINE
SEE A1/I101C
1'
6'
/2
1'
1' - 4" 10' - 0"
6'
WALK OFF MAT, AS
SCHEDULED
WOM-1
WALK OFF MAT,
AS SCHEDULED
CG1
CG1
CG1
CG1
CG1
CG1
CG1 CG1
CG1 CG1
2198 SF
LO HALLWAY
124A
TS-2
TS-2
TS-2
CG1
CG1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1
TS-1 TS-1
TS-1
TS-1
TS-1
TS-1
TS-3
TS-3
TS-3
TS-2
TS-2
4' - 0"
VT-2
ALIGN FULL TILES WITH DOOR
4'
4'
CG1 CG1
P-4
P-4
TS-5 TS-5 TS-5 TS-5 TS-5 TS-5 TS-5
TS-5
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
C. PAINT ALL WALLS P-1 U.N.O.
D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
S. WINDOW SILLS TO BE SSM-2.
T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:01 PM
I101A
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A A
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA A
N
KEY PLAN
SCALE: = 1'-0"
0 8 168
1/8"
5636 SF
LO BAY 1
652 SF
FILTER ROOM
1844 SF
OPEN STORAGE
5658 SF
LO BAY 2
652 SF
FILTER ROOM
1556 SF
LO HALLWAY
124B
FLOOR FINISH LEGEND
EPY-1
SC-1
VT-1
WOM-1
MATCHLINE
SEE A1/I101A
M A
T C
H
LI
N E
S E
E A
1/ I1
C
MATCHLINE
SEE A1/I101ECG1CG1 CG1CG1 CG1
TS-5
TS-5
TS-5
TS-5
TS-5
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
C. PAINT ALL WALLS P-1 U.N.O.
D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
S. WINDOW SILLS TO BE SSM-2.
T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:03 PM
I101B
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A B
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA B
N
KEY PLAN
SCALE: = 1'-0"
0 8 168
1029 SF
HAZMAT STG/DISPENSARY
1955 SF
LO HALLWAY
124C
652 SF
FILTER ROOM
5635 SF
LO BAY 3
2198 SF
LO HALLWAY
124A
FLOOR FINISH LEGEND
CON
EPY-1
SC-1
MATCHLINE
SEE A1/I101E
M A
T C
H
LI
N E
S E
E A
1/ I1
B
M A
T C
H
LI
N E
S E
E A
1/ I1
D
CG1
CG1
TS-5 TS-5
TS-5
TS-5
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
C. PAINT ALL WALLS P-1 U.N.O.
D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
S. WINDOW SILLS TO BE SSM-2.
T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:05 PM
I101C
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A C
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA C N
KEY PLAN
SCALE: = 1'-0"
0 8 168
5983 SF
WASHRACK
263 SF
MECH ROOM
224 SF
OFFICE
246 SF
STORAGE
155 SF
HALLWAY
4154 SF
METALS TECH SHOP - WELD
149B
FLOOR FINISH LEGEND
CON
EPY-1
PT-1
SC-1
VT-1
MATCHLINE
SEE A1/I101E
M A
T C
H
LI
N E
S E
E A
1/ I1
C
60 SF
RR
80 SF
COMM
81 SF
ELECTRIC
5209 SF
METALS TECH SHOP -
MACHINE
149A
CG1 TS-2
P-4 P-4 P-4
P-4
TS-5 TS-5
TS-4
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
C. PAINT ALL WALLS P-1 U.N.O.
D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
S. WINDOW SILLS TO BE SSM-2.
T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:08 PM
I101D
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A D
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA D
N
KEY PLAN
SCALE: = 1'-0"
0 8 168
541 SF
CTK
149C
5209 SF
METALS TECH SHOP -
MACHINE
149A
808 SF
METALS TECH STAFF
29 SF
JAN.
56 SF
UNISEX RR
145249 SF
MEN SHOWER/ LOCKER
150A
187 SF
WOMEN SHOWER/ LOCKER
150B
690 SF
ELECTRIC
3306 SF
MECHANICAL
61 SF
LO UNISEX RR
62 SF
LO UNISEX RR
265 SF
HOPPER
165 SF
HALLWAY
113 SF
LO COMM
697 SF
FIRE
29 SF
JAN
56 SF
UNISEX RR
FLOOR FINISH LEGEND
EPY-1
PT-1
SC-1
431 SF
LO HALLWAY
124D
MATCHLINE
SEE A1/I101C
M A
T C
H
LI
N E
S E
E A
1/ I1
A
MATCHLINE
SEE A1/I101D
156 SF
HALLWAY
CG1
TS-4
TS-4
TS-4 TS-4
TS-4
TS-1
TS-1TS-1
TS-1
CG1
TS-5
P-4
CG1
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
C. PAINT ALL WALLS P-1 U.N.O.
D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
S. WINDOW SILLS TO BE SSM-2.
T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:11 PM
I101E
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A E
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA E
N
KEY PLAN
SCALE: = 1'-0"
0 8 168
2198 SF
LO HALLWAY
124A
1955 SF
PANEL SPRAY ROOM
1956 SF
BONDING/LAYUP AREA
1938 SF
DAMAGE
REMOVAL/PREPARATION
AREA
47 SF
AIR SHOWER
342 SF
LAUNDRY /
RESPIRATOR ROOM
269 SF
WOMEN DIRTY
LOCKER ROOM
164 SF
WOMEN SHWR
531 SF
MEN DIRTY LOCKER
ROOM
376 SF
MEN SHWR
251 SF
WOMEN RR
305 SF
MEN RR
472 SF
MEN CLEAN LOCKER
ROOM
591 SF
BREAK ROOM
43 SF
TELEPHONE
768 SF
COMPUTER ROOM
348 SF
LO/CRF STAFF
429 SF
CONFERENCE ROOM
348 SF
FABRICATIONS FLIGHT
43 SF
TELEPHONE
985 SF
ADMIN HALLWAY
112 SF
VEST
114 SF
COMM
99 SF
ELEC
53 SF
JAN
67 SF
AIR SHOWER
46 SF
STORAGE
B 038 B 039B 036B 035B 033 B 034B 023
B 016B 015
A 013
A 011
B 010
B 009
B 012
B 007
A 005
D 004
D 003
F 001
B 002
B 024
F 014
B 008
A 006
B 037
D 029
D 030
D 031
D 028
D 027
D 026
D 032
D 025
SEE A1/I831B
S E
E A
1/ I8
E
SEE A1/I831E
E 078
E 077
C 083
B 088B 087
K 094
I 095
I 097I 096
GENERAL SHEET NOTES
SIGNAGE PLAN GENERAL NOTES
A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.
B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE
DOOR, UNLESS OTHERWISE NOTED.
C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND
PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY
SPECIFIED TO USE FOR COMPARISON.
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:14 PM
I831A
P A
R T
IA
L
F
IR
S T
F L
O O
R I
N T
E R
IO
R
S
IG
N A
G E
P L
A N
A
R E
A A
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: = 1'-0"
0 8 168
1/8"
N
KEY PLAN
SCALE: 1/8" = 1'-0"
A1
PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA A
5636 SF
LO BAY 1
652 SF
FILTER ROOM
1844 SF
OPEN STORAGE
5658 SF
LO BAY 2
652 SF
FILTER ROOM
1556 SF
LO HALLWAY
124B
B 016B 015
B 017 B 022
B 021
B 019
F 014
B 018
F 020
B 040
SEE A1/I831A
S E
E A
1/ I8
C
E 072
E 071
E 073
E 074
G 092
GENERAL SHEET NOTES
SIGNAGE PLAN GENERAL NOTES
A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.
B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE
DOOR, UNLESS OTHERWISE NOTED.
C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND
PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY
SPECIFIED TO USE FOR COMPARISON.
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:16 PM
I831B
P A
R T
IA
L
F
IR
S T
F L
O O
R I
N T
E R
IO
R
S
IG
N A
G E
P L
A N
A
R E
A B
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
N
KEY PLAN
SCALE: = 1'-0"
0 8 168
1/8"
SCALE: 1/8" = 1'-0"
A1
PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA B
5658 SF
LO BAY 2
652 SF
FILTER ROOM
1029 SF
HAZMAT
STG/DISPENSARY
1955 SF
LO HALLWAY
124C
652 SF
FILTER ROOM
5635 SF
LO BAY 3
2198 SF
LO HALLWAY
124A
B 022
B 021
B 041
B 044
B 045
B 042
F 043
B 040
S E
E A
1/ I8
B
S E
E A
1/ I8
D
SEE A1/I831E
E 073
E 074 E 075E 076G 090
G 092
G 093
G 091
I 098
GENERAL SHEET NOTES
SIGNAGE PLAN GENERAL NOTES
A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.
B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE
DOOR, UNLESS OTHERWISE NOTED.
C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND
PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY
SPECIFIED TO USE FOR COMPARISON.
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:19 PM
I831C
P A
R T
IA
L
F
IR
S T
F L
O O
R I
N T
E R
IO
R
S
IG
N A
G E
P L
A N
A
R E
A C
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
N
KEY PLAN
SCALE: = 1'-0"
0 8 168
1/8"
SCALE: 1/8" = 1'-0"
A1
PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA C
5983 SF
WASHRACK
263 SF
MECH ROOM
151 224 SF
OFFICE
246 SF
STORAGE
5209 SF
METALS TECH SHOP -
MACHINE
149A
155 SF
HALLWAY
4154 SF
METALS TECH SHOP -
WELD
149B
80 SF
COMM
81 SF
ELECTRIC
60 SF
RR
B 055
B 060
B 059 A 058
F 057
B 053
F 052
B 054
S E
E A
1/ I8
C
SEE A1/I831E
E 075
E 079
E 080
E 081 E 082
D 89
I 100
GENERAL SHEET NOTES
SIGNAGE PLAN GENERAL NOTES
A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.
B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE
DOOR, UNLESS OTHERWISE NOTED.
C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND
PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY
SPECIFIED TO USE FOR COMPARISON.
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:21 PM
I831D
P A
R T
IA
L
F
IR
S T
F L
O O
R I
N T
E R
IO
R
S
IG
N A
G E
P L
A N
A
R E
A D
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
N
KEY PLAN
SCALE: = 1'-0"
0 8 168
1/8"
SCALE: 1/8" = 1'-0"
A1
PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA D
541 SF
CTK
149C
808 SF
METALS TECH STAFF
29 SF
JAN.
56 SF
UNISEX RR
249 SF
MEN SHOWER/
LOCKER
150A
187 SF
WOMEN SHOWER/
LOCKER
150B
690 SF
ELECTRIC
3306 SF
MECHANICAL
61 SF
LO UNISEX RR
62 SF
LO UNISEX RR
265 SF
HOPPER
165 SF
HALLWAY
113 SF
LO COMM
697 SF
FIRE
29 SF
JAN
56 SF
UNISEX RR
156 SF
HALLWAY
431 SF
LO HALLWAY
124D
B 039
B 070
A 064
F 066
B 067
B 047
B 049
F 051
B 046
D 048
D 050
D 063
D 065
B 062
F 061
D 069 D 068
S E
E A
1/ I8
A
SEE A1/I831DSEE A1/I831C
E 077
B 084 B 086 B 085
I 099
I 101
I 102
GENERAL SHEET NOTES
SIGNAGE PLAN GENERAL NOTES
A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.
B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE
DOOR, UNLESS OTHERWISE NOTED.
C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND
PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY
SPECIFIED TO USE FOR COMPARISON.
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:23 PM
I831E
P A
R T
IA
L
F
IR
S T
F L
O O
R I
N T
E R
IO
R
S
IG
N A
G E
P L
A N
A
R E
A E
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
N
KEY PLAN
SCALE: = 1'-0"
0 8 168
1/8"
SCALE: 1/8" = 1'-0"
A1
PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA E
GENERAL SIGN
PLACEMENT
DIRECTIONAL SIGNAGE
PLACEMENT
C E
N T
E R
L I N
E O
F S
IG
N
5'
6" 6"1' - 6"
WALL
CORRIDOR
5'
DOOR FRAME OR
ENTRY TO ROOM
3' - 6"
3'
CENTER DIRECTORY ON WALL
DIRECTORY
PLACEMENT
5'
T.O. SIGN
5'-0" A.F.F.
T.O. SIGN
5'-0" A.F.F.
T.O. SIGN
5'-0" A.F.F.
9"
1/4" 8 1/2" 1/4"
6" 3"
9"
1 1/2" TACTILE ROOM NUMBER
W/ BRAILLE
PRINTED PAPER INSERT
W/ ROOM DESCRIPTION
3/4" PRINTED MESSAGE
HELVETICA NEUE 55
ROMAN
REMOVABLE END CAPS
TYPE A - ROOM IDENTIFICATION SIGN
9"
1/4" 8 1/2" 1/4"
6" 3"
9"
1 1/2" TACTILE ROOM
NUMBER
W/ BRAILLE
3/4" PRINTED
MESSAGE
REMOVABLE END
CAPS
TYPE B - PERMANENT ROOM
IDENTIFICATION SIGN
1/4" 8 1/2" 1/4"
9"
3" 8"
3"
1'
OPTIONAL 1 1/2" TACTILE
ROOM NUMBER
W/ BRAILLE HELVETICA
NEUE 55 ROMAN
6" SYMBOL
1" TACTILE
ROOM DESCRIPTION
W/ BRAILLE HELVETICA
NEUE 55 ROMAN
TYPE D - ACCESSIBLE RESTROOM IDENTIFICATION SIGNS
T.O. SIGN
5'-0" A.F.F.
1/4" 8 1/2" 1/4"
9"
3"
TYPE F - TACTILE EXIT SIGN
3/4" TACTILE TEXT
W/ BRAILLE
T.O. SIGN
5'-0" A.F.F.
1 1/2" PRINTED MESSAGE
WHITE BACKGROUND
RED AND BLACK
DECAL SYMBOL
1/2" PRINTED MESSAGE
TYPE J - EXTERIOR NO SMOKING SIGN
1/
4"
1/ 2"
1/ 4"
1/4" 1' - 2 1/2" 1/4"
1' - 3"
TYPE C - INTERIOR RECYCLING SIGN
1/4" 8 1/2" 1/4"
9"
T.O. SIGN
5'-0" A.F.F.
WHITE
BACKGROUND
1" PRINTED
MESSAGE
GREEN DECAL
SYMBOL
MEN
BRAILLE
UNISEX
BRAILLE
T.O. SIGN
5'-0" A.F.F.
TYPE E - EMERGENCY EYEWASH SIGN
3/4" TACTILE TEXT
W/ BRAILLE HELVETICA
NEUE 55 ROMAN
EMERGENCY
EYEWASH
1/4" 8 1/2" 1/4"
9"
1/4" 8 1/2" 1/4"
9"
1/4" 8 1/2" 1/4"
9"
0' - 9"
0' - 0 1/4" 0' - 8 1/2"
1/4" 8 1/2" 1/4"
9"
3" 8"
3"
1'
1/4" 8 1/2" 1/4"
9"
3" 8"
3"
1'
T.O. SIGN
5'-0" A.F.F.
TYPE G - HAZMAT WARNING SIGN
3/4" TACTILE TEXT
W/ BRAILLE HELVETICA
NEUE 55 ROMAN
DO NOT OPEN
HAZMAT CONTAINERS
0' - 9"
0' - 0 1/4" 0' - 8 1/2"
T.O. SIGN
5'-0" A.F.F.
9"
1/4" 8 1/2" 1/4"
6" 3"
9"
1 1/2" TACTILE ROOM
NUMBER
W/ BRAILLE
3/4" PRINTED
MESSAGE
REMOVABLE END
CAPS
TYPE X- EXTERIOR ROOM
IDENTIFICATION SIGN
1/
4" 1'
/4
"1'
1' - 0"
11 1/2"
REPLACEABLE EVACUATION
MAP; CONTRACTOR TO
PROVIDE IN ACCORDANCE
WITH NFPA 101
1" MESSAGE
TEXT HELVETICA
NEUE 55 ROMAN
TYPE I - EVACUATION MAP SIGN
T.O. SIGN
5'-0" A.F.F.
TYPE K - BUILDING DIRECTORY
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
A
W -2
-R
-2
BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt
12/20/2021 7:06:36 PM
I-611
S
IG
N A
G E
S C
H E
D U
L E
E
L E
V A
T
IO
N S
A N
D N
O T
E S
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
F
O R
E T
B .F
O R
E T
S G
R O
E T
H E
-2
-2
L O
W O
B S
E R
V A
B L
E C
O M
P O
S
IT
E R
E P
A
IR
F A
C
IL
IT
Y
L
O C
R F
SCALE: 1/2" = 1'-0"
C7
SIGN PLACEMENT
SIGNAGE SCHEDULE
TAG SIGN TYPE ROOM NO. ROOM NAME MESSAGE LINE 1 MESSAGE LINE 2 MESSAGE LINE 3 COMMENTS
001 F 100 VEST EXIT - -
002 B 115 BREAK ROOM BREAK ROOM -
003 D 114 MEN RR MEN - -
004 D 113 WOMEN RR WOMEN - -
005 A 102 COMPUTER ROOM COMPUTER ROOM -
006 A 103 LO/CRF STAFF COMPUTER ROOM -
007 B 104 TELEPHONE - - -
008 B 112 JAN JANITOR - -
009 B 111 ELEC ELECTRICAL ROOM -
010 B 105 TELEPHONE - - -
011 A 106 FABRICATIONS FLIGHT - - -
012 B 110 COMM COMM ROOM -
013 A 107 CONFERENCE ROOM CONFERENCE ROOM -
014 F 101 ADMIN HALLWAY EXIT - -
015 B 108 AIR SHOWER AIR SHOWER - -
016 B 124A LO HALLWAY - - -
017 B 125 FILTER ROOM - - -
018 B 126 LO BAY 1 - - -
019 B 127 OPEN STORAGE STORAGE - -
020 F 127 OPEN STORAGE EXIT - -
021 B 128 LO BAY 2 - - -
022 B 129 FILTER ROOM - - -
023 B 117 LAUNDRY / RESPIRATOR ROOM AIR SHOWER - -
024 B 116 AIR SHOWER AIR SHOWER - -
025 D 118 WOMEN DIRTY LOCKER ROOM WOMEN DIRTY LOCKERS - -
026 D 120 WOMEN CLEAN LOCKER ROOM WOMEN CLEAN LOCKERS - -
027 D 119 WOMEN SHWR WOMENS SHOWER - -
028 D 120 WOMEN CLEAN LOCKER ROOM WOMEN CLEAN LOCKERS - -
029 D 123 MEN CLEAN LOCKER ROOM MEN CLEAN LOCKERS - -
030 D 122 MEN SHWR MENS SHOWER - -
031 D 122 MEN SHWR MENS SHOWER - -
032 D 121 MEN DIRTY LOCKER ROOM MEN DIRTY LOCKERS - -
033 B 143 DAMAGE REMOVAL/PREPARATION AREA - - -
034 B 143 DAMAGE REMOVAL/PREPARATION AREA - - -
035 B 142 BONDING/LAYUP AREA - - -
036 B 142 BONDING/LAYUP AREA - - -
037 B 141 PANEL SPRAY ROOM - - -
038 B 141 PANEL SPRAY ROOM - - -
039 B 140 HOPPER - - -
040 B 128 LO BAY 2 - - -
041 B 130 HAZMAT STG/DISPENSARY - - -
042 B 130 HAZMAT STG/DISPENSARY - - -
043 F 124C LO HALLWAY EXIT - -
044 B 131 LO BAY 3 - - -
045 B 132 FILTER ROOM - - -
046 B 140 HOPPER - - -
047 B 139 LO COMM - - -
048 D 138 LO UNISEX RR UNISEX - -
049 B 137 JAN JANITOR - -
050 D 136 LO UNISEX RR UNISEX - -
051 F 124D LO HALLWAY EXIT - -
052 F 149B METALS TECH SHOP - WELD EXIT - -
053 B 149A METALS TECH SHOP - MACHINE - - -
054 B 152 HALLWAY - - -
055 B 157 STORAGE - - -
057 F 152 HALLWAY EXIT - -
058 A 156 OFFICE - - -
059 B 153 ELECTRIC - - -
060 B 154 COMM - - -
061 F 149A METALS TECH SHOP - MACHINE EXIT - -
062 B 144 HALLWAY - - -
063 D 146 UNISEX RR UNISEX - -
064 A 148 METALS TECH STAFF - - -
065 D 145 UNISEX RR UNISEX - -
066 F 144 HALLWAY EXIT - -
067 B 147 JAN. - - -
068 D 150A MEN SHOWER/ LOCKER MEN SHOWER / LOCKERS - -
069 D 150B WOMEN SHOWER/ LOCKER WOMEN SHOWER / LOCKERS - -
070 B 134 ELECTRIC - - -
071 E 126 LO BAY 1 EXIT - -
072 E 126 LO BAY 1 - - -
073 E 128 LO BAY 2 - - -
074 E 128 LO BAY 2 - - -
075 E 131 LO BAY 3 - - -
076 E 131 LO BAY 3 - - -
077 E 141 PANEL SPRAY ROOM - - -
078 E 142 BONDING/LAYUP AREA - - -
079 E 149A METALS TECH SHOP - MACHINE - - -
080 E 149B METALS TECH SHOP - WELD - - -
081 E 158 WASHRACK - - -
082 E 158 WASHRACK - - -
083 C 115 BREAK ROOM BREAKROOM - -
084 B 133 MECHANICAL - - - EXTERIOR SIGN
085 B 134 ELECTRIC - - - EXTERIOR SIGN
086 B 135 FIRE - - - EXTERIOR SIGN
087 B 142 BONDING/LAYUP AREA - - -
088 B 142 BONDING/LAYUP AREA - - -
89 D 155 RR UNISEX - -
090 G 130 HAZMAT STG/DISPENSARY DO NOT OPEN HAZMAT CONTAINERS -
091 G 130 HAZMAT STG/DISPENSARY DO NOT OPEN HAZMAT CONTAINERS -
092 G 130 HAZMAT STG/DISPENSARY DO NOT OPEN HAZMAT CONTAINERS -
093 G 130 HAZMAT STG/DISPENSARY DO NOT OPEN HAZMAT CONTAINERS -
094 K 101 ADMIN HALLWAY BUILDING DIRECTORY - SEE NOTE
095 I 101 ADMIN HALLWAY EVACUATION SIGN - - SEE NOTE
096 I 124A LO HALLWAY EVACUATION SIGN - - SEE NOTE
097 I 124A LO HALLWAY EVACUATION SIGN - - SEE NOTE
098 I 124C LO HALLWAY EVACUATION SIGN - - SEE NOTE
099 I 124D LO HALLWAY EVACUATION SIGN - - SEE NOTE
100 I 152 HALLWAY EVACUATION SIGN - - SEE NOTE
101 I 144 HALLWAY EVACUATION SIGN - - SEE NOTE
102 I 149A METALS TECH SHOP - MACHINE EVACUATION SIGN - - SEE NOTE
SCALE: = 1'-0"1 1/2"
01 1
SCALE: = 1'-0"
0 2 42
1/2"
NOTES:
A. COORDINATE SIGN SCHEDULE WITH OWNER AND MANUFACTURER. CONTRACTING OFFICER OR USER REPRESTENTATIVE TO APPROVE SIGNAGE PACKAGE PRIOR TO ORDER.
B. COORDINATE ALL OTHER REQUIRED SIGNS INCLUDING FIRE PROTECTION, LIFE SAFETY AND OPERATIONAL SIGNAGE.
C. COORDINATE SIGNAGE WITH SHEET A-802.
D. REFERENCE SIGNAGE SPECIFICATIONS FOR ADDITIONAL DETAILS.
| Cover Page |
| General Description |
| Table of Contents |
| Tab 01 - Narrative of SID Objectives |
| Narrative of Structural Interior Design Objective |
| Tab 02 - Interior Sample Boards |
| Interior Sample Board 1 |
| Interior Sample Board 2 |
| Tab 03 - Interior Finish Schedules |
| I601 - Room Finish Schedule, Legend, and Notes |
| Tab 04 - Drawings |
| I101 - FIRST FLOOR INTERIOR FINISH PLAN - OVERALL |
| I101A - FIRST FLOOR INTERIOR FINISH PLAN - AREA A |
| I101B - FIRST FLOOR INTERIOR FINISH PLAN - AREA B |
| I101C - FIRST FLOOR INTERIOR FINISH PLAN - AREA C |
| I101D - FIRST FLOOR INTERIOR FINISH PLAN - AREA D |
| I101E - FIRST FLOOR INTERIOR FINISH PLAN - AREA E |
| I831A - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA A |
| I831B - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA B |
| I831C - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA C |
| I831D - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA D |
| I831E - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA E |
| I611 - SIGNAGE SCHEDULE, ELEVATIONS, AND NOTES |
File details come from the government source that posted it. Updated .