About this file

This solicitation is for the construction of a Low Observable Component Repair Facility to support additional F-22A aircraft at Joint Base Langley-Eustis in Hampton, Virginia. The project includes building a 6,735 square meter facility with four high bays - three for corrosion control maintenance and one wash rack bay. Support spaces such as offices, restrooms, and mechanical/electrical rooms will also be constructed. The facility must provide secure and climate controlled spaces for specialized F-22A maintenance and repair work. Construction is expected to last 730 calendar days and comply with DoD anti-terrorism requirements and sustainable design standards. The Department of the Army Corps of Engineers is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to F-22 Low Observable Component Repair Facility (LOCRF), newest first.
File Type Posted
Attachment 8 - Revised Bid Schedule.pdf PDF
W9123621R2023 Amendment 13.pdf PDF
Attch 40 06 61 16 AMENDMENT 09 FEB 22.pdf PDF
Attch 41 Copy of GFE Equipment List_mjm edits 2020.09.24.xlsx XLSX spreadsheet
Attch 38 LOCRF DRAWINGS AMENDMENT 09FEB2022.pdf PDF
Attch 38 08 81 00 Glazing.pdf PDF
Attachment 8 - Revised CLIN Schedule.pdf PDF
Attch 35 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT.pdf PDF
Attch 25 01 11 00 Appendix to 01 11 00 Government Furnished Equipment.pdf PDF
Attch 24 P 601 PLUMBING SCHEDULES.pdf PDF
Attch 23 A 533 ROOF DETAILS.pdf PDF
Attch 22 A 011 EQUIPMENT SCHEDULE METALS TECH and SHOPS.pdf PDF
Attch 37 33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATION.pdf PDF
Attch 34 13 34 19 METAL BUILDING SYSTEMS.pdf PDF
Attch 28 03 45 00 PRECAST ARCHITECTURAL CONCRETE.pdf PDF
Attch 36 32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS.pdf PDF
Attch 33 10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED).pdf PDF
Attch 32 09 97 13.27 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES.pdf PDF
Attch 31 09 90 00 PAINTS AND COATINGS.pdf PDF
Attch 30 08 34 16 CORROSION CONTROL HANGAR DOORS.pdf PDF
Attch 27 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
Attch 26 01 14 00 WORK RESTRICTIONS.pdf PDF
W9123621R2023 Amendment 10.pdf PDF
Site Visit 10 January.pdf PDF
W9123621R2023 Amendment 9.pdf PDF
Attachment 16 LOCRF RTA DWGS PART 2 OF 3.pdf PDF
Attachment 15 LOCRF RTA DWGS PART 1 OF 3.pdf PDF
Attch 13- LOCRF 20Oct21 Blended Drawings Part 3 of 3.pdf PDF
Attch 10- LOCRF 20Oct21 Blended Drawings Part 1 of 3.pdf PDF
Attch 11- LOCRF 20Oct21 Blended Drawings Part 2 of 3.pdf PDF
W9123621R2023 Amendment 8.pdf PDF
W9123621R2023 Amendment 7.pdf PDF
W9123621R2023 Amendment 6.pdf PDF
W9123621R2023 LOCRF Amend 5.pdf PDF
W9123621R2023 Amendment 4.pdf PDF
A.07.24 - Amendment 3.pdf PDF
A.07.24 - Amendment 2.pdf PDF
Attch 12 - LOCRF 100 Specification Part 1 of 1.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Solicitation W9123621R2023.pdf PDF
Attch 11 - LOCRF 100 Dwgs Part 2 of 2.pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Attch 10 - LOCRF 100 Dwgs Part 1 of 2.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Attachment 9 - Langley Environmental Management Special Conditions.pdf PDF
Show all 50

F-22 Low Observable Component Repair Facility (LOCRF) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SID Digital Binder RTA Submittal December 22, 2021

Solicitation Number:

W91236-21-R-2023

F22 Formal Training Unit (FTU) Joint Base Langley-Eustis (JBLE)

Low Observable Composite Repair Facility (LOCRF)

DESIGN SUBMITTAL

STRUCTURAL INTERIOR DESIGN - SID

LOW OBSERVABLE COMPOSITE REPAIR FACILITY (LOCRF)

JOINT BASE LANGLEY-EUTIS - HAMPTON, VA

PROJECT NO:

P2 NO:

22 DECEMBER 2021

DESIGN SUBMITTAL

STRUCTURAL INTERIOR DESIGN - SID

LOW OBSERVABLE COMPOSITE REPAIR FACILITY (LOCRF)

JOINT BASE LANGLEY-EUSTIS - HAMPTON, VA

PROJECT NO:

P2 NO:

TABLE OF CONTENTS

TAB 01 - NARRATIVE OF SID OBJECTIVES

TAB 02- INTERIOR COLOR - SAMPLE BOARDS

TAB 03 - INTERIOR FINISH SCHEDULES - LEGENDS

TAB 04 - DRAWINGS

01. Floor Plans

02. Furniture Footprint Plans

03. Interior Signage Plans, Schedules and Details

04. Interior Elevations, Sections. Details

TAB 01 - NARRATIVE OF SID OBJECTIVES

TAB 01 - NARRATIVE OF SID OBJECTIVES

NARRATIVE OF STRUCTURAL

INTERIOR DESIGN OBJECTIVE

LOW OBSERVABLE COMPOSITE REPAIR FACILITY (LOCRF)

JOINT BASE LANGLEY-EUSTIS - HAMPTON, VA

The objective is to integrate the user’s functional and aesthetic values that focus on quality materials that are specific and illustrated products. Interior finishes prioritize all codes of health, safety, and welfare of the facility’s users, by exceeding or meeting project’s requirement of durability and ease of maintenance.

A timeless, neutral palette of colors allows accent patterns and colors to come together to promote a healthy and productive environment. This concept will allow the environment’s aesthetics to be ageless while providing the opportunity to re- evaluate and modify the theme and personality of the space when needed or desired. Color and finishes were selected in such a way as to represent an essentially neutral scheme, but pattern, texture and the correct mix of selected colors raise the level of quality and style representative of the building’s function and users.

The interior environment will provide long-term value and performance for all occupants. This binder contains the schedules, samples, and documentation of the interior finish schemes for this 100% submittal.

TAB 02 - INTERIOR COLOR - SAMPLE BOARDS

TAB 02 - INTERIOR COLOR - SAMPLE BOARDS

P - 1

PAINT 01

EP-1

EPOXY FLOOR - RESINOUS

P - 5

PAINT 05

RB-1

RUBBER BASE

VT-1

VINYL TILE

VT-2

VINYL TILE - ACCENT

CG-1

CORNER GUARD

P - 3

PAINT 03

EPYB

EPOXY BASE

P - 2

PAINT 02

EPP-1

EPOXY PAINT - WALLS

P - 6

PAINT 06

P - 4

PAINT 04

WOM-1

WALK OFF MAT - ENTRY

PT-1

PORCELAIN TILE - FLOOR

PT-3

PORCELAIN TILE - ACCENT

SSM-1

SOLID SURFACE

ACT-1

ACOUSTICAL CEILING TILE

PTB-1

PORCELAIN TILE BASE

GR-2

GROUT - BREAK ROOM

TP-1

TOILET PARTITION

PT-2

PORCELAIN TILE - WALLS

PLAM-1

PLASTIC LAMINATE

PT-4

PORCELAIN TILE

SSM-2

SOLID SURFACE - SILLS

GR-1

GROUT - RESTROOMS

WS-1

WINDOW SHADE

TAB 03 - INTERIOR FINISH SCHEDULES - LEGENDS TAB 04 - DRAWINGS

GENERAL SHEET NOTES

GENERAL MATERIAL FINISH NOTES

A. PAINT ALL WALLS P-1 U.N.O.

B. APPLY HOLLOW METAL DOOR FRAMES TO MATCH ADJACENT WALL COLOR, UNLESS OTHERWISE NOTED.

C. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

D. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

E. ALIGN ALL PORCELAIN TILE FLOOR GROUT JOINTS WITH BASE OR WALL TILE GROUT JOINTS.

F. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

G. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

H. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

I. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

J. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

K. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

L. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

M. TEST ALL FLOOR SLAB FOR MOISTURE CONTENT AND VERIFY THAT SLAB IS READY TO ACCEPT THE NEW

FINISH ON THE SLAB PER PRODUCT MANUFACTURER RECOMENDATIONS.

FINISH MATERIAL

ABBREVIATIONS

ACT ACOUSTIC CEILING TILE

AWP ACOUSTIC WALL PANEL

CG CORNER GUARD

CON CONCRETE

CPT CARPET TILE

EPY EPOXY

EXP EXPOSED

GR GROUT

LVT LUXURY VINYL TILE

P PAINT

PLAM PLASTIC LAMINATE

PT PORCELAIN TILE

RB RUBBER BASE

RSS RUBBER STAIR STRIP

RST RUBBER STAIR TREAD

RT RUBBER TILE

SC SEALED CONCRETE WITH HARDENER

SDT STATIC DISSIPATIVE TILE

SIGN SIGNAGE

SSM SOLID SURFACE MATERIAL

TP TOILET PARTITION

TS TRANSITION

VT VINYL TILE

WOM WALK OFF MAT

WS WINDOW SHADE

COVE CAP STRIP

STANDARD DIVIDER STRIP

WALL AS SCHEDULED

CONCRETE SUBFLOOR

1/8” TO 3/8” EPOXY FLOORING &

BASE WITH 3/4”-1” RADIUS

4"

EPOXY FLOOR AS SCHEDULED

CONCRETE FLOOR,

SEE STRUCTURAL

5 COATS FLOOR COATING

SYSTEM,

2"

JOINT THICKNESS

2"

CHEMICAL RESISTANT

SEALANT

BACKER ROD AND

SEALANT

VINYL COMPOSITION

TILE

TILE OR CARPET, TYP.

CONCRETE SLAB

CONT. ALUMINUM

TRANSITION PROFILE, TYP.

TS-3

SEALED CONCRETE, TYP.

CONCRETE SLAB

CONT. ALUMINUM

TRANSITION PROFILE,

TYP., TS-2

VINYL COMPOSITION

TILE, TYP.

COVE TERMINATION STRIP

MASONRY WALL AS SCHEDULED

ISOLATED CAST IN PLACE CONCRETE

SEALANT JOINT OVER BACKER ROD

ON COMPRESSIBLE EXPANSION

MATERIAL AT ISOLATED SLAB

5 PART RESINOUS EPOXY FLOORING

STRUCTURAL

JOINT, SEE

STAINELSS STEEL EDGE

PROTECTION PROFILE

PORCELAIN TILE PT-2

PORCELAIN TILE PT-2

PORCELAIN TILE PT-3

SCHEDULED PARTITION TYPE

STAINELSS STEEL EDGE

PROTECTION PROFILE

RECESSED METAL GRATE

ON ANCHORS (WOM)

ALIGN

1/ 2"

(S E

E S

2A

FIRST FLOOR

FINISH FLOOR PER

SCHEDULED

1 1/2"

1/ 2"

EPY-1

SC-1

TILE PER SCHEDULE

SEALED CONCRETE

CONT. ALUMINUM

TRANSITON PER

SCHEDULE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:32 PM

I-601

R O

O M

F

IN

IS

H

S C

H E

D U

L E

L

E G

E N

D A

N D

N O

T E

S

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

INTERIOR FINISH LEGEND (BASIS OF DESIGN)

CODE TYPE SPECIFICATION SIZE COMMENTS

ACT-1 ACOUSTICAL CEILING TILE 09 51 00 24" X 24" 9/16" GRID

CG-1 CORNER GUARD 10 26 00 16 GAUGE SEE FINISH PLANS FOR LOCATIONS. SEE ARCHITECTURAL FLOOR PLANS FOR ADDITIONAL LOCATIONS

EP-1 EPOXY FLOOR - RESINOUS 09 67 23.16 - PROVIDE 4" HIGH INTEGRAL BASE - AIRCRAFT HANGAR FLOORS. SEE SHEET A-802 FOR HANGAR FLOOR

MARKINGS

EPP-1 EPOXY PAINT - WALLS 09 90 00 - -

EPYB EPOXY BASE 09 67 23.16 4"H INTEGRAL BASE

GR-1 GROUT 09 30 10 1/8" RESTROOMS

GR-2 GROUT 09 30 10 1/8" BREAK ROOM BACKSPLASH

P-1 PAINT - GENERAL 09 90 00 - -

P-2 PAINT - DOORS FRAMES 09 90 00 - -

P-3 PAINT - METAL DOORS 09 90 00 - -

P-4 PAINT - ACCENT 09 90 00 - -

P-5 PAINT - ACCENT 09 90 00 - EXPOSED COLUMNS

P-6 PAINT - GPY. CEILING 09 90 00 - -

PLAM-1 PLASTIC LAMINATE 06 41 16.00 10 - CASEWORK

PT-1 PORCELAIN TILE FLOOR 09 30 10 24" X 36" INSTALL WITH 1/8" GROUT JOINTS, GR-1

PT-2 PORCELAIN TILE WALLS 09 30 10 12" x 24" INSTALL WITH 1/8" GROUT JOINTS, GR-1

PT-3 PORCELAIN TILE - ACCENT 09 30 10 1" x 3" INSTALL WITH 1/8" GROUT JOINTS, GR-1

PT-4 PORCELAIN TILE - BACKSPLASH 09 30 10 3" X 12" INSTALL WITH 1/8" GROUT JOINTS, GR-2

PTB-1 PORCELAIN TILE BASE 09 30 10 4" X24" FIELD CUT TILES COVER TOP EDGE WITH TS-1

RB-1 RUBBER BASE - COVE 09 65 00 4"H FOR RESILIENT TILE & CONCRETE AREAS. SPECIFY IN CONTINUOUS ROLLS.

SC-1 SEALED CONCRETE WITH HARDENER 03 30 00 - -

SIGN SIGNAGE 10 14 00.20 - -

SSM-1 SOLID SURFACE 06 61 16 2CM BREAK ROOM COUNTERTOP

SSM-2 SOLID SURFACE 06 61 16 1/2" THICK WINDOW SILLS

TP-1 TOILET PARTITION 10 21 13 - -

TS-1 TRANSITION STRIP - TILE CORNER EDGE TRIM 09 30 10 - TILE WALLS - OUTSIDE CORNERS AND PTB-1 TOPS

TS-2 TRANSITION - VT TO CONCRETE 09 65 00 - -

TS-3 TRANSITION - VT TO TILE 09 30 10 - -

TS-4 TRANSITION - TILE TO CONCRETE 09 30 10 - -

VT-1 VINYL TILE 09 65 00 24" X 24" -

VT-2 VINYL TILE - ACCENT 09 65 00 24" X 24" SEE SHEET I101A FOR LOCATIONS

WOM-1 WALK OFF MAT - ENTRY MOUNTED 12 48 13 - SEE I101A FOR MAT SIZES

WS-1 WINDOW SHADE 12 24 13 .022 THICK EVERY EXTERIOR WINDOW

INTERIOR FINISH SCHEDULE

ROOM NUMBER ROOM NAME

FLOOR FINISH WALL FINISH CEILING

FINISH COMMENTSFLOOR BASE NORTH EAST SOUTH WEST

100 VEST VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6 SEE SHEET I101A FOR WOM-1 LOCATIONS

101 ADMIN HALLWAY VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 SEE SHEET I101A FOR WOM-1 LOCATIONS

102 COMPUTER ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

103 LO/CRF STAFF VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

104 TELEPHONE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

105 TELEPHONE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

106 FABRICATIONS FLIGHT VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

107 CONFERENCE ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

108 AIR SHOWER VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6

109 STORAGE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

110 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

111 ELEC SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

112 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 GYP/P-6

113 WOMEN RR PT-1 N/A PT-2/PT-3/P-1 PT-2/PT-3/P-1 PT-2/PT-3/P-1 PT-2/PT-3/P-1 GYP/P-6

114 MEN RR PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6

115 BREAK ROOM VT-1, VT-2 RB-1 P-1 P-1/PT-4 P-1 P-1 ACT-1 PT-4 BACKSPLASH, SEE SHEET A402, SEE SHEET I101A FOR

VT-2 LOCATIONS

116 AIR SHOWER VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6

117 LAUNDRY / RESPIRATOR ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6

118 WOMEN DIRTY LOCKER ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6

119 WOMEN SHWR PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6

120 WOMEN CLEAN LOCKER ROOM PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6

121 MEN DIRTY LOCKER ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6

122 MEN SHWR PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6

123 MEN CLEAN LOCKER ROOM PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6

124A LO HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

124B LO HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

124C LO HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

124D LO HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

125 FILTER ROOM EPY-1 RB-1 P-1 P-1 P-1 P-1 EXP

126 LO BAY 1 EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP

127 OPEN STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6

128 LO BAY 2 EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP

129 FILTER ROOM EPY-1 RB-1 P-1 P-1 P-1 P-1 EXP

130 HAZMAT STG/DISPENSARY SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

131 LO BAY 3 EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP

132 FILTER ROOM EPY-1 RB-1 P-1 P-1 P-1 P-1 EXP

133 MECHANICAL SC-1 N/A P-1 P-1 P-1 P-1 EXP

134 ELECTRIC SC-1 N/A P-1 P-1 P-1 P-1 EXP

135 FIRE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

136 LO UNISEX RR PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6

137 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP

138 LO UNISEX RR PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6

139 LO COMM SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

140 HOPPER SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP

141 PANEL SPRAY ROOM EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP

142 BONDING/LAYUP AREA EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP

143 DAMAGE REMOVAL/PREPARATION AREA EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP

144 HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

145 UNISEX RR PT-1 PTB-1 EPP-1 EPP-1 EPP-1 EPP-1 GYP/P-6

146 UNISEX RR PT-1 PTB-1 EPP-1 EPP-1 EPP-1 EPP-1 GYP/P-6

147 JAN. SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

148 METALS TECH STAFF SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

149 Room WOM-1

149A METALS TECH SHOP - MACHINE SC-1 N/A P-1 P-1 P-1 P-1 EXP

149B METALS TECH SHOP - WELD CON N/A - - - - EXP

149C CTK SC-1 N/A P-1 P-1 P-1 P-1 EXP COMPOUND CEILNG AT CAGE

150 HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6

150A MEN SHOWER/ LOCKER PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6

150B WOMEN SHOWER/ LOCKER PT-1 N/A PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 PT-2/PT-3 GYP/P-6

151 MECH ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

152 HALLWAY SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

153 ELECTRIC SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

154 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

155 RR PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6

156 OFFICE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

157 STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

158 WASHRACK EPY-1 EPYB EPP-1 EPP-1 EPP-1 EPP-1 EXP

159 Room VT-2

SCALE: 3" = 1'-0"

D6

FLOORING - EPOXY BASE

SCALE: = 1'-0"

0 2 42

1/2"

SCALE: 3" = 1'-0"

A6

FLOOR COATING AT CONTROL JOINT

SCALE: 1/2" = 1'-0"

F6

TS-3 VT/ TILE TRANSITION

SCALE: 1/2" = 1'-0"

A8

TS-2 VT/ SEALED CONCRETE TRANSITION

SCALE: 3" = 1'-0"

C9

EPOXY FLOOR JOINT

SCALE: 3" = 1'-0"

D9

WALL TILE TRANSITION DETAIL

SCALE: 3" = 1'-0"

E6

WOM DETAIL

SCALE: 3" = 1'-0"

E7

TS-5 EPOXY/SC TRANSITION

SCALE: 3" = 1'-0"

D7

TS-4 TILE / SC TRANSITION

NOTE: SEE STRUCTURAL INTERIOR DESIGN (SID) BINDER FOR FURTHER INFORMATION ON COLOR AND PATTERN.

SCALE: = 1'-0"3"

21 Dec 2021

TAB 04 - DRAWINGS

124B

124C

151 156 157

149C

149A

150A150B

124A

142143

117118

123115

149B

FLOOR FINISH LEGEND

CON

EPY-1

PT-1

SC-1

VT-1

124D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:29 PM

I-101

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

O

V E

R A

L L

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

SCALE: 1" = 20'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - OVERALL

ROOM NO. SCHEDULE

ROOM NO. ROOM NAME

141 PANEL SPRAY ROOM

142 BONDING/LAYUP AREA

143 DAMAGE REMOVAL/PREPARATION AREA

144 HALLWAY

145 UNISEX RR

146 UNISEX RR

147 JAN.

148 METALS TECH STAFF

149 Room

149A METALS TECH SHOP - MACHINE

149B METALS TECH SHOP - WELD

149C CTK

150 HALLWAY

150A MEN SHOWER/ LOCKER

150B WOMEN SHOWER/ LOCKER

151 MECH ROOM

152 HALLWAY

153 ELECTRIC

154 COMM

155 RR

156 OFFICE

157 STORAGE

158 WASHRACK

159 Room

ROOM NO. SCHEDULE

ROOM NO. ROOM NAME

122 MEN SHWR

123 MEN CLEAN LOCKER ROOM

124A LO HALLWAY

124B LO HALLWAY

124C LO HALLWAY

124D LO HALLWAY

125 FILTER ROOM

126 LO BAY 1

127 OPEN STORAGE

128 LO BAY 2

129 FILTER ROOM

130 HAZMAT STG/DISPENSARY

131 LO BAY 3

132 FILTER ROOM

133 MECHANICAL

134 ELECTRIC

135 FIRE

136 LO UNISEX RR

137 JAN

138 LO UNISEX RR

139 LO COMM

140 HOPPER

ROOM NO. SCHEDULE

ROOM NO. ROOM NAME

100 VEST

101 ADMIN HALLWAY

102 COMPUTER ROOM

103 LO/CRF STAFF

104 TELEPHONE

105 TELEPHONE

106 FABRICATIONS FLIGHT

107 CONFERENCE ROOM

108 AIR SHOWER

109 STORAGE

110 COMM

111 ELEC

112 JAN

113 WOMEN RR

114 MEN RR

115 BREAK ROOM

116 AIR SHOWER

117 LAUNDRY / RESPIRATOR ROOM

118 WOMEN DIRTY LOCKER ROOM

119 WOMEN SHWR

120 WOMEN CLEAN LOCKER ROOM

121 MEN DIRTY LOCKER ROOM

N

KEY PLAN

0 40' 60'20'

SCALE: 1"= 20'

2198 SF

LO HALLWAY

124A

1955 SF

PANEL SPRAY ROOM

1956 SF

BONDING/LAYUP AREA

1938 SF

DAMAGE

REMOVAL/PREPARATION

AREA

47 SF

AIR SHOWER

342 SF

LAUNDRY / RESPIRATOR

ROOM

269 SF

WOMEN DIRTY LOCKER ROOM

231 SF

WOMEN CLEAN LOCKER ROOM

120 164 SF

WOMEN SHWR

531 SF

MEN DIRTY LOCKER ROOM

376 SF

MEN SHWR

251 SF

WOMEN RR

305 SF

MEN RR

472 SF

MEN CLEAN LOCKER ROOM

591 SF

BREAK ROOM

43 SF

TELEPHONE

768 SF

COMPUTER ROOM

348 SF

LO/CRF STAFF

429 SF

CONFERENCE ROOM

348 SF

FABRICATIONS FLIGHT

43 SF

TELEPHONE

985 SF

ADMIN HALLWAY

112 SF

VEST

114 SF

COMM

99 SF

ELEC

53 SF

JAN

67 SF

AIR SHOWER

46 SF

STORAGE

FLOOR FINISH LEGEND

EPY-1

PT-1

SC-1

VT-1

VT-2

WOM-1

MATCHLINE

SEE A1/I101B

M A

T C

H

LI

N E

S E

E A

1/ I1

E

MATCHLINE

SEE A1/I101C

1'

6'

/2

1'

1' - 4" 10' - 0"

6'

WALK OFF MAT, AS

SCHEDULED

WOM-1

WALK OFF MAT,

AS SCHEDULED

CG1

CG1

CG1

CG1

CG1

CG1

CG1 CG1

CG1 CG1

2198 SF

LO HALLWAY

124A

TS-2

TS-2

TS-2

CG1

CG1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1

TS-1 TS-1

TS-1

TS-1

TS-1

TS-1

TS-3

TS-3

TS-3

TS-2

TS-2

4' - 0"

VT-2

ALIGN FULL TILES WITH DOOR

4'

4'

CG1 CG1

P-4

P-4

TS-5 TS-5 TS-5 TS-5 TS-5 TS-5 TS-5

TS-5

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

C. PAINT ALL WALLS P-1 U.N.O.

D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

S. WINDOW SILLS TO BE SSM-2.

T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:01 PM

I101A

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A A

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA A

N

KEY PLAN

SCALE: = 1'-0"

0 8 168

1/8"

5636 SF

LO BAY 1

652 SF

FILTER ROOM

1844 SF

OPEN STORAGE

5658 SF

LO BAY 2

652 SF

FILTER ROOM

1556 SF

LO HALLWAY

124B

FLOOR FINISH LEGEND

EPY-1

SC-1

VT-1

WOM-1

MATCHLINE

SEE A1/I101A

M A

T C

H

LI

N E

S E

E A

1/ I1

C

MATCHLINE

SEE A1/I101ECG1CG1 CG1CG1 CG1

TS-5

TS-5

TS-5

TS-5

TS-5

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

C. PAINT ALL WALLS P-1 U.N.O.

D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

S. WINDOW SILLS TO BE SSM-2.

T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:03 PM

I101B

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A B

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA B

N

KEY PLAN

SCALE: = 1'-0"

0 8 168

1029 SF

HAZMAT STG/DISPENSARY

1955 SF

LO HALLWAY

124C

652 SF

FILTER ROOM

5635 SF

LO BAY 3

2198 SF

LO HALLWAY

124A

FLOOR FINISH LEGEND

CON

EPY-1

SC-1

MATCHLINE

SEE A1/I101E

M A

T C

H

LI

N E

S E

E A

1/ I1

B

M A

T C

H

LI

N E

S E

E A

1/ I1

D

CG1

CG1

TS-5 TS-5

TS-5

TS-5

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

C. PAINT ALL WALLS P-1 U.N.O.

D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

S. WINDOW SILLS TO BE SSM-2.

T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:05 PM

I101C

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A C

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA C N

KEY PLAN

SCALE: = 1'-0"

0 8 168

5983 SF

WASHRACK

263 SF

MECH ROOM

224 SF

OFFICE

246 SF

STORAGE

155 SF

HALLWAY

4154 SF

METALS TECH SHOP - WELD

149B

FLOOR FINISH LEGEND

CON

EPY-1

PT-1

SC-1

VT-1

MATCHLINE

SEE A1/I101E

M A

T C

H

LI

N E

S E

E A

1/ I1

C

60 SF

RR

80 SF

COMM

81 SF

ELECTRIC

5209 SF

METALS TECH SHOP -

MACHINE

149A

CG1 TS-2

P-4 P-4 P-4

P-4

TS-5 TS-5

TS-4

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

C. PAINT ALL WALLS P-1 U.N.O.

D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

S. WINDOW SILLS TO BE SSM-2.

T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:08 PM

I101D

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A D

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA D

N

KEY PLAN

SCALE: = 1'-0"

0 8 168

541 SF

CTK

149C

5209 SF

METALS TECH SHOP -

MACHINE

149A

808 SF

METALS TECH STAFF

29 SF

JAN.

56 SF

UNISEX RR

145249 SF

MEN SHOWER/ LOCKER

150A

187 SF

WOMEN SHOWER/ LOCKER

150B

690 SF

ELECTRIC

3306 SF

MECHANICAL

61 SF

LO UNISEX RR

62 SF

LO UNISEX RR

265 SF

HOPPER

165 SF

HALLWAY

113 SF

LO COMM

697 SF

FIRE

29 SF

JAN

56 SF

UNISEX RR

FLOOR FINISH LEGEND

EPY-1

PT-1

SC-1

431 SF

LO HALLWAY

124D

MATCHLINE

SEE A1/I101C

M A

T C

H

LI

N E

S E

E A

1/ I1

A

MATCHLINE

SEE A1/I101D

156 SF

HALLWAY

CG1

TS-4

TS-4

TS-4 TS-4

TS-4

TS-1

TS-1TS-1

TS-1

CG1

TS-5

P-4

CG1

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

A. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

B. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

C. PAINT ALL WALLS P-1 U.N.O.

D. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

E. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

F. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

G. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

H. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

I. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

J. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

K. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

L. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

M. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

N. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

O. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

P. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

Q. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

R. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

S. WINDOW SILLS TO BE SSM-2.

T. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

U. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:11 PM

I101E

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A E

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA E

N

KEY PLAN

SCALE: = 1'-0"

0 8 168

2198 SF

LO HALLWAY

124A

1955 SF

PANEL SPRAY ROOM

1956 SF

BONDING/LAYUP AREA

1938 SF

DAMAGE

REMOVAL/PREPARATION

AREA

47 SF

AIR SHOWER

342 SF

LAUNDRY /

RESPIRATOR ROOM

269 SF

WOMEN DIRTY

LOCKER ROOM

164 SF

WOMEN SHWR

531 SF

MEN DIRTY LOCKER

ROOM

376 SF

MEN SHWR

251 SF

WOMEN RR

305 SF

MEN RR

472 SF

MEN CLEAN LOCKER

ROOM

591 SF

BREAK ROOM

43 SF

TELEPHONE

768 SF

COMPUTER ROOM

348 SF

LO/CRF STAFF

429 SF

CONFERENCE ROOM

348 SF

FABRICATIONS FLIGHT

43 SF

TELEPHONE

985 SF

ADMIN HALLWAY

112 SF

VEST

114 SF

COMM

99 SF

ELEC

53 SF

JAN

67 SF

AIR SHOWER

46 SF

STORAGE

B 038 B 039B 036B 035B 033 B 034B 023

B 016B 015

A 013

A 011

B 010

B 009

B 012

B 007

A 005

D 004

D 003

F 001

B 002

B 024

F 014

B 008

A 006

B 037

D 029

D 030

D 031

D 028

D 027

D 026

D 032

D 025

SEE A1/I831B

S E

E A

1/ I8

E

SEE A1/I831E

E 078

E 077

C 083

B 088B 087

K 094

I 095

I 097I 096

GENERAL SHEET NOTES

SIGNAGE PLAN GENERAL NOTES

A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.

B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE

DOOR, UNLESS OTHERWISE NOTED.

C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND

PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY

SPECIFIED TO USE FOR COMPARISON.

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:14 PM

I831A

P A

R T

IA

L

F

IR

S T

F L

O O

R I

N T

E R

IO

R

S

IG

N A

G E

P L

A N

A

R E

A A

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

SCALE: = 1'-0"

0 8 168

1/8"

N

KEY PLAN

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA A

5636 SF

LO BAY 1

652 SF

FILTER ROOM

1844 SF

OPEN STORAGE

5658 SF

LO BAY 2

652 SF

FILTER ROOM

1556 SF

LO HALLWAY

124B

B 016B 015

B 017 B 022

B 021

B 019

F 014

B 018

F 020

B 040

SEE A1/I831A

S E

E A

1/ I8

C

E 072

E 071

E 073

E 074

G 092

GENERAL SHEET NOTES

SIGNAGE PLAN GENERAL NOTES

A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.

B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE

DOOR, UNLESS OTHERWISE NOTED.

C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND

PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY

SPECIFIED TO USE FOR COMPARISON.

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:16 PM

I831B

P A

R T

IA

L

F

IR

S T

F L

O O

R I

N T

E R

IO

R

S

IG

N A

G E

P L

A N

A

R E

A B

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

N

KEY PLAN

SCALE: = 1'-0"

0 8 168

1/8"

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA B

5658 SF

LO BAY 2

652 SF

FILTER ROOM

1029 SF

HAZMAT

STG/DISPENSARY

1955 SF

LO HALLWAY

124C

652 SF

FILTER ROOM

5635 SF

LO BAY 3

2198 SF

LO HALLWAY

124A

B 022

B 021

B 041

B 044

B 045

B 042

F 043

B 040

S E

E A

1/ I8

B

S E

E A

1/ I8

D

SEE A1/I831E

E 073

E 074 E 075E 076G 090

G 092

G 093

G 091

I 098

GENERAL SHEET NOTES

SIGNAGE PLAN GENERAL NOTES

A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.

B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE

DOOR, UNLESS OTHERWISE NOTED.

C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND

PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY

SPECIFIED TO USE FOR COMPARISON.

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:19 PM

I831C

P A

R T

IA

L

F

IR

S T

F L

O O

R I

N T

E R

IO

R

S

IG

N A

G E

P L

A N

A

R E

A C

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

N

KEY PLAN

SCALE: = 1'-0"

0 8 168

1/8"

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA C

5983 SF

WASHRACK

263 SF

MECH ROOM

151 224 SF

OFFICE

246 SF

STORAGE

5209 SF

METALS TECH SHOP -

MACHINE

149A

155 SF

HALLWAY

4154 SF

METALS TECH SHOP -

WELD

149B

80 SF

COMM

81 SF

ELECTRIC

60 SF

RR

B 055

B 060

B 059 A 058

F 057

B 053

F 052

B 054

S E

E A

1/ I8

C

SEE A1/I831E

E 075

E 079

E 080

E 081 E 082

D 89

I 100

GENERAL SHEET NOTES

SIGNAGE PLAN GENERAL NOTES

A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.

B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE

DOOR, UNLESS OTHERWISE NOTED.

C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND

PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY

SPECIFIED TO USE FOR COMPARISON.

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:21 PM

I831D

P A

R T

IA

L

F

IR

S T

F L

O O

R I

N T

E R

IO

R

S

IG

N A

G E

P L

A N

A

R E

A D

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

N

KEY PLAN

SCALE: = 1'-0"

0 8 168

1/8"

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA D

541 SF

CTK

149C

808 SF

METALS TECH STAFF

29 SF

JAN.

56 SF

UNISEX RR

249 SF

MEN SHOWER/

LOCKER

150A

187 SF

WOMEN SHOWER/

LOCKER

150B

690 SF

ELECTRIC

3306 SF

MECHANICAL

61 SF

LO UNISEX RR

62 SF

LO UNISEX RR

265 SF

HOPPER

165 SF

HALLWAY

113 SF

LO COMM

697 SF

FIRE

29 SF

JAN

56 SF

UNISEX RR

156 SF

HALLWAY

431 SF

LO HALLWAY

124D

B 039

B 070

A 064

F 066

B 067

B 047

B 049

F 051

B 046

D 048

D 050

D 063

D 065

B 062

F 061

D 069 D 068

S E

E A

1/ I8

A

SEE A1/I831DSEE A1/I831C

E 077

B 084 B 086 B 085

I 099

I 101

I 102

GENERAL SHEET NOTES

SIGNAGE PLAN GENERAL NOTES

A. REFERENCE SHEET I611 FOR SIGNAGE SCHEDULE AND DETAIL INFORMATION.

B. ALL SIGNAGE SHALL BE LOCATED OUTSIDE THE RESPECTIVE ROOM, ON THE STRIKE/LATCH SIDE OF THE

DOOR, UNLESS OTHERWISE NOTED.

C. A MANUFACTURER IS REFERENCED IN THE FINISH LEGEND, SHEET I601, TO ESTABLISH COLORS AND

PATTERNS ONLY AND IS NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATIVE SELECTIONS ARE SUBMITTED, THE SUBMITTAL SHALL INCLUDE THE FINISHES ORIGINALLY

SPECIFIED TO USE FOR COMPARISON.

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:23 PM

I831E

P A

R T

IA

L

F

IR

S T

F L

O O

R I

N T

E R

IO

R

S

IG

N A

G E

P L

A N

A

R E

A E

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

N

KEY PLAN

SCALE: = 1'-0"

0 8 168

1/8"

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA E

GENERAL SIGN

PLACEMENT

DIRECTIONAL SIGNAGE

PLACEMENT

C E

N T

E R

L I N

E O

F S

IG

N

5'

6" 6"1' - 6"

WALL

CORRIDOR

5'

DOOR FRAME OR

ENTRY TO ROOM

3' - 6"

3'

CENTER DIRECTORY ON WALL

DIRECTORY

PLACEMENT

5'

T.O. SIGN

5'-0" A.F.F.

T.O. SIGN

5'-0" A.F.F.

T.O. SIGN

5'-0" A.F.F.

9"

1/4" 8 1/2" 1/4"

6" 3"

9"

1 1/2" TACTILE ROOM NUMBER

W/ BRAILLE

PRINTED PAPER INSERT

W/ ROOM DESCRIPTION

3/4" PRINTED MESSAGE

HELVETICA NEUE 55

ROMAN

REMOVABLE END CAPS

TYPE A - ROOM IDENTIFICATION SIGN

9"

1/4" 8 1/2" 1/4"

6" 3"

9"

1 1/2" TACTILE ROOM

NUMBER

W/ BRAILLE

3/4" PRINTED

MESSAGE

REMOVABLE END

CAPS

TYPE B - PERMANENT ROOM

IDENTIFICATION SIGN

1/4" 8 1/2" 1/4"

9"

3" 8"

3"

1'

OPTIONAL 1 1/2" TACTILE

ROOM NUMBER

W/ BRAILLE HELVETICA

NEUE 55 ROMAN

6" SYMBOL

1" TACTILE

ROOM DESCRIPTION

W/ BRAILLE HELVETICA

NEUE 55 ROMAN

TYPE D - ACCESSIBLE RESTROOM IDENTIFICATION SIGNS

T.O. SIGN

5'-0" A.F.F.

1/4" 8 1/2" 1/4"

9"

3"

TYPE F - TACTILE EXIT SIGN

3/4" TACTILE TEXT

W/ BRAILLE

T.O. SIGN

5'-0" A.F.F.

1 1/2" PRINTED MESSAGE

WHITE BACKGROUND

RED AND BLACK

DECAL SYMBOL

1/2" PRINTED MESSAGE

TYPE J - EXTERIOR NO SMOKING SIGN

1/

4"

1/ 2"

1/ 4"

1/4" 1' - 2 1/2" 1/4"

1' - 3"

TYPE C - INTERIOR RECYCLING SIGN

1/4" 8 1/2" 1/4"

9"

T.O. SIGN

5'-0" A.F.F.

WHITE

BACKGROUND

1" PRINTED

MESSAGE

GREEN DECAL

SYMBOL

MEN

BRAILLE

UNISEX

BRAILLE

T.O. SIGN

5'-0" A.F.F.

TYPE E - EMERGENCY EYEWASH SIGN

3/4" TACTILE TEXT

W/ BRAILLE HELVETICA

NEUE 55 ROMAN

EMERGENCY

EYEWASH

1/4" 8 1/2" 1/4"

9"

1/4" 8 1/2" 1/4"

9"

1/4" 8 1/2" 1/4"

9"

0' - 9"

0' - 0 1/4" 0' - 8 1/2"

1/4" 8 1/2" 1/4"

9"

3" 8"

3"

1'

1/4" 8 1/2" 1/4"

9"

3" 8"

3"

1'

T.O. SIGN

5'-0" A.F.F.

TYPE G - HAZMAT WARNING SIGN

3/4" TACTILE TEXT

W/ BRAILLE HELVETICA

NEUE 55 ROMAN

DO NOT OPEN

HAZMAT CONTAINERS

0' - 9"

0' - 0 1/4" 0' - 8 1/2"

T.O. SIGN

5'-0" A.F.F.

9"

1/4" 8 1/2" 1/4"

6" 3"

9"

1 1/2" TACTILE ROOM

NUMBER

W/ BRAILLE

3/4" PRINTED

MESSAGE

REMOVABLE END

CAPS

TYPE X- EXTERIOR ROOM

IDENTIFICATION SIGN

1/

4" 1'

/4

"1'

1' - 0"

11 1/2"

REPLACEABLE EVACUATION

MAP; CONTRACTOR TO

PROVIDE IN ACCORDANCE

WITH NFPA 101

1" MESSAGE

TEXT HELVETICA

NEUE 55 ROMAN

TYPE I - EVACUATION MAP SIGN

T.O. SIGN

5'-0" A.F.F.

TYPE K - BUILDING DIRECTORY

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

A

W -2

-R

-2

BIM 360://3012011031_F22 LOW OBSERVABLE FACILITY LOCRF/3012011031_LOCRF_A_R19.rvt

12/20/2021 7:06:36 PM

I-611

S

IG

N A

G E

S C

H E

D U

L E

E

L E

V A

T

IO

N S

A N

D N

O T

E S

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

F

O R

E T

B .F

O R

E T

S G

R O

E T

H E

-2

-2

L O

W O

B S

E R

V A

B L

E C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

L

O C

R F

SCALE: 1/2" = 1'-0"

C7

SIGN PLACEMENT

SIGNAGE SCHEDULE

TAG SIGN TYPE ROOM NO. ROOM NAME MESSAGE LINE 1 MESSAGE LINE 2 MESSAGE LINE 3 COMMENTS

001 F 100 VEST EXIT - -

002 B 115 BREAK ROOM BREAK ROOM -

003 D 114 MEN RR MEN - -

004 D 113 WOMEN RR WOMEN - -

005 A 102 COMPUTER ROOM COMPUTER ROOM -

006 A 103 LO/CRF STAFF COMPUTER ROOM -

007 B 104 TELEPHONE - - -

008 B 112 JAN JANITOR - -

009 B 111 ELEC ELECTRICAL ROOM -

010 B 105 TELEPHONE - - -

011 A 106 FABRICATIONS FLIGHT - - -

012 B 110 COMM COMM ROOM -

013 A 107 CONFERENCE ROOM CONFERENCE ROOM -

014 F 101 ADMIN HALLWAY EXIT - -

015 B 108 AIR SHOWER AIR SHOWER - -

016 B 124A LO HALLWAY - - -

017 B 125 FILTER ROOM - - -

018 B 126 LO BAY 1 - - -

019 B 127 OPEN STORAGE STORAGE - -

020 F 127 OPEN STORAGE EXIT - -

021 B 128 LO BAY 2 - - -

022 B 129 FILTER ROOM - - -

023 B 117 LAUNDRY / RESPIRATOR ROOM AIR SHOWER - -

024 B 116 AIR SHOWER AIR SHOWER - -

025 D 118 WOMEN DIRTY LOCKER ROOM WOMEN DIRTY LOCKERS - -

026 D 120 WOMEN CLEAN LOCKER ROOM WOMEN CLEAN LOCKERS - -

027 D 119 WOMEN SHWR WOMENS SHOWER - -

028 D 120 WOMEN CLEAN LOCKER ROOM WOMEN CLEAN LOCKERS - -

029 D 123 MEN CLEAN LOCKER ROOM MEN CLEAN LOCKERS - -

030 D 122 MEN SHWR MENS SHOWER - -

031 D 122 MEN SHWR MENS SHOWER - -

032 D 121 MEN DIRTY LOCKER ROOM MEN DIRTY LOCKERS - -

033 B 143 DAMAGE REMOVAL/PREPARATION AREA - - -

034 B 143 DAMAGE REMOVAL/PREPARATION AREA - - -

035 B 142 BONDING/LAYUP AREA - - -

036 B 142 BONDING/LAYUP AREA - - -

037 B 141 PANEL SPRAY ROOM - - -

038 B 141 PANEL SPRAY ROOM - - -

039 B 140 HOPPER - - -

040 B 128 LO BAY 2 - - -

041 B 130 HAZMAT STG/DISPENSARY - - -

042 B 130 HAZMAT STG/DISPENSARY - - -

043 F 124C LO HALLWAY EXIT - -

044 B 131 LO BAY 3 - - -

045 B 132 FILTER ROOM - - -

046 B 140 HOPPER - - -

047 B 139 LO COMM - - -

048 D 138 LO UNISEX RR UNISEX - -

049 B 137 JAN JANITOR - -

050 D 136 LO UNISEX RR UNISEX - -

051 F 124D LO HALLWAY EXIT - -

052 F 149B METALS TECH SHOP - WELD EXIT - -

053 B 149A METALS TECH SHOP - MACHINE - - -

054 B 152 HALLWAY - - -

055 B 157 STORAGE - - -

057 F 152 HALLWAY EXIT - -

058 A 156 OFFICE - - -

059 B 153 ELECTRIC - - -

060 B 154 COMM - - -

061 F 149A METALS TECH SHOP - MACHINE EXIT - -

062 B 144 HALLWAY - - -

063 D 146 UNISEX RR UNISEX - -

064 A 148 METALS TECH STAFF - - -

065 D 145 UNISEX RR UNISEX - -

066 F 144 HALLWAY EXIT - -

067 B 147 JAN. - - -

068 D 150A MEN SHOWER/ LOCKER MEN SHOWER / LOCKERS - -

069 D 150B WOMEN SHOWER/ LOCKER WOMEN SHOWER / LOCKERS - -

070 B 134 ELECTRIC - - -

071 E 126 LO BAY 1 EXIT - -

072 E 126 LO BAY 1 - - -

073 E 128 LO BAY 2 - - -

074 E 128 LO BAY 2 - - -

075 E 131 LO BAY 3 - - -

076 E 131 LO BAY 3 - - -

077 E 141 PANEL SPRAY ROOM - - -

078 E 142 BONDING/LAYUP AREA - - -

079 E 149A METALS TECH SHOP - MACHINE - - -

080 E 149B METALS TECH SHOP - WELD - - -

081 E 158 WASHRACK - - -

082 E 158 WASHRACK - - -

083 C 115 BREAK ROOM BREAKROOM - -

084 B 133 MECHANICAL - - - EXTERIOR SIGN

085 B 134 ELECTRIC - - - EXTERIOR SIGN

086 B 135 FIRE - - - EXTERIOR SIGN

087 B 142 BONDING/LAYUP AREA - - -

088 B 142 BONDING/LAYUP AREA - - -

89 D 155 RR UNISEX - -

090 G 130 HAZMAT STG/DISPENSARY DO NOT OPEN HAZMAT CONTAINERS -

091 G 130 HAZMAT STG/DISPENSARY DO NOT OPEN HAZMAT CONTAINERS -

092 G 130 HAZMAT STG/DISPENSARY DO NOT OPEN HAZMAT CONTAINERS -

093 G 130 HAZMAT STG/DISPENSARY DO NOT OPEN HAZMAT CONTAINERS -

094 K 101 ADMIN HALLWAY BUILDING DIRECTORY - SEE NOTE

095 I 101 ADMIN HALLWAY EVACUATION SIGN - - SEE NOTE

096 I 124A LO HALLWAY EVACUATION SIGN - - SEE NOTE

097 I 124A LO HALLWAY EVACUATION SIGN - - SEE NOTE

098 I 124C LO HALLWAY EVACUATION SIGN - - SEE NOTE

099 I 124D LO HALLWAY EVACUATION SIGN - - SEE NOTE

100 I 152 HALLWAY EVACUATION SIGN - - SEE NOTE

101 I 144 HALLWAY EVACUATION SIGN - - SEE NOTE

102 I 149A METALS TECH SHOP - MACHINE EVACUATION SIGN - - SEE NOTE

SCALE: = 1'-0"1 1/2"

01 1

SCALE: = 1'-0"

0 2 42

1/2"

NOTES:

A. COORDINATE SIGN SCHEDULE WITH OWNER AND MANUFACTURER. CONTRACTING OFFICER OR USER REPRESTENTATIVE TO APPROVE SIGNAGE PACKAGE PRIOR TO ORDER.

B. COORDINATE ALL OTHER REQUIRED SIGNS INCLUDING FIRE PROTECTION, LIFE SAFETY AND OPERATIONAL SIGNAGE.

C. COORDINATE SIGNAGE WITH SHEET A-802.

D. REFERENCE SIGNAGE SPECIFICATIONS FOR ADDITIONAL DETAILS.

Cover Page
General Description
Table of Contents
Tab 01 - Narrative of SID Objectives
Narrative of Structural Interior Design Objective
Tab 02 - Interior Sample Boards
Interior Sample Board 1
Interior Sample Board 2
Tab 03 - Interior Finish Schedules
I601 - Room Finish Schedule, Legend, and Notes
Tab 04 - Drawings
I101 - FIRST FLOOR INTERIOR FINISH PLAN - OVERALL
I101A - FIRST FLOOR INTERIOR FINISH PLAN - AREA A
I101B - FIRST FLOOR INTERIOR FINISH PLAN - AREA B
I101C - FIRST FLOOR INTERIOR FINISH PLAN - AREA C
I101D - FIRST FLOOR INTERIOR FINISH PLAN - AREA D
I101E - FIRST FLOOR INTERIOR FINISH PLAN - AREA E
I831A - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA A
I831B - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA B
I831C - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA C
I831D - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA D
I831E - PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA E
I611 - SIGNAGE SCHEDULE, ELEVATIONS, AND NOTES

File details come from the government source that posted it. Updated .