011000.pdf

PDF 16 KB Posted

Attached to
Illinois National Guard Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
W91SMC-09-R-0017
Issued by
Department of the Army Illinois Army National Guard

About this file

CP Rleocation 011000 Summary

View the file

Other files for this federal contract opportunity

Other files attached to Illinois National Guard Multiple Award Task Order Contract, newest first.
File Type Posted
013300-PFOIL Form 341.pdf PDF
010000.pdf PDF
262726.pdf PDF
123200.pdf PDF
260519.pdf PDF
220523.pdf PDF
014219.pdf PDF
024119.pdf PDF
262913.pdf PDF
017300.pdf PDF
262813.pdf PDF
099123.pdf PDF
260553.pdf PDF
221119.pdf PDF
230700.pdf PDF
260526.pdf PDF
017700.pdf PDF
220553.pdf PDF
012900.pdf PDF
061000.pdf PDF
263213.pdf PDF
260529.pdf PDF
000115.pdf PDF
096513.pdf PDF
015000.pdf PDF
233113.pdf PDF
013200.pdf PDF
260500.pdf PDF
017329.pdf PDF
220500.pdf PDF
230500.pdf PDF
001000.pdf PDF
016000.pdf PDF
262416.pdf PDF
095113.pdf PDF
017823.pdf PDF
P102-A101.pdf PDF
A101-A101.pdf PDF
V101-A101.pdf PDF
P601-P601.pdf PDF
V102-A101.pdf PDF
FP101-A101.pdf PDF
V601-A101.pdf PDF
E-201-Work.pdf PDF
P101-A101.pdf PDF
H102-A101.pdf PDF
A701-A701.pdf PDF
E-001-Work.pdf PDF
E-301-Work.pdf PDF
E-101-Work.pdf PDF
Show all 50

Illinois National Guard Multiple Award Task Order Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DCFT #082207

Hanson #03S1408GGB

011000-1 011000

SUMMARY

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: The objective of this project is to relocate the existing 183rd FW Command Post (CP), currently located in the P-16 Squadron Operations building, to the P-48 Composite Support Facility. The relocated CP will occupy approximately 1,280 square feet on the first floor of P-48 in an area currently occupied by a corridor with lockers, an ATSO and a computer Classroom. The CP will consist of an Operations Floor/Emergency Action Cell area, featuring a Battlecab, Console room and Emergency Action Cell area, and a separate Administration area. Entrance to the CP will be strictly limited and will utilize an entrapment/standoff area. An adjacent corridor housing lockers will be converted for use as the entrapment/standoff area. The entrapment area will open into the Administration area.

Entrance into the Emergency Action Cell area will be via a secure door from the Console area.

The existing suspended acoustical ceilings will be used to accommodate required cabling. The Administration area will also contain a single, unisex latrine and small kitchenette area. The CP will have a stand-alone emergency generator and battery back-up power. The CP’s heating, ventilation and air conditioning (HVAC) needs will be met via the building’s primary HVAC system. Existing and new interior partition walls will have adequate sound attenuation, extend to the underside of the structure above, and will have all pipe and duct penetrations properly sealed. Two existing windows located on an exterior wall will be blocked-in for security purposes. The windows will remain as “false” windows to maintain the exterior appearance of the building. An existing exterior door with sidelite located in the Administration area will remain and function as an emergency exit door only. The door hardware will be modified to prevent access from the exterior and the sidelite and transom glazing will be removed and the openings in-filled with a solid, secure panel. An existing interior door from the building corridor to the Console Room/EA Cell area will be removed and the wall in-filled. The emergency generator serving the CP will be located directly outside of the CP at a standoff distance of approximately 35 feet to comply with AT/FP requirements. The work will include other related modifications and additions to the existing mechanical and electrical systems:

1. Project Location: Illinois Air National Guard, Abtaham Lincoln Capital Airport, Springfield, Illinois.

2. Owner: Illinois Air National Guard, 183rd Fighter Wing.

B. Architect/Engineer: The Contract Documents were prepared for Project by Hanson Professional Services Inc., 1525 South Sixth Street, Springfield, Illinois.

C. Contracting Officer (KO): A KO will be appointed by the Government.

011000-2 011000

D. Contracting Officer’s Technical Representative (COTR): A COTR will be appointed from the

183 CES.

E. The Work consists of:

1. Selective demolition.

2. Renovation of selected 1st floor spaces as described in 1.2.A, above.

3. Addition of a new, unisex latrine.

4. Selective plumbing, heating, ventilating and air conditioning improvements.

5. Selective lighting, power, and telecomm improvements.

6. Miscellaneous repairs and improvements to the facility.

F. The Work includes:

1. General construction, electrical, mechanical, plumbing, fire protection and incidental site work as shown on the contract documents.

1.3 CONTRACT

A. Project will be constructed under a general construction contract.

1.4 USE OF PREMISES

A. General: The Illinois National Guard site at the Springfield Capital Airport is a secure site.

Contractor shall limit their use of the premises as directed by the Contracting Officer.

1.5 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the 49-division format and CSI/CSC's "MasterFormat (2004)" numbering system:

1. Section Identification: The Specifications use section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of sections in the Contract Documents.

B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate.

Words implied, but not stated, shall be inferred, as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

011000-3 011000

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted:

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

C. Name Brand or Equal: Name brands listed throughout the Specifications are for establishment of minimum quality standards and salient characteristics of products. Equivalent products from other manufacturers will be considered, but must be called out on the Material Submittal form as “Or Equal”.

END OF SECTION 011000

File details come from the government source that posted it. Updated .