012900.pdf

PDF 13 KB Posted

Attached to
Illinois National Guard Multiple Award Task Order Contract
Solicitation number
W91SMC-09-R-0017
Issued by

About this file

CP Relocation 012900 Measurement and Payment

View the file

Other files

File Type Posted
262416.pdf PDF
016000.pdf PDF
001000.pdf PDF
095113.pdf PDF
099123.pdf PDF
211313.pdf PDF
230500.pdf PDF
011400.pdf PDF
233713.pdf PDF
262813.pdf PDF
265100.pdf PDF
017823.pdf PDF
260553.pdf PDF
260548.pdf PDF
079200.pdf PDF
260526.pdf PDF
221119.pdf PDF
230700.pdf PDF
220700.pdf PDF
014213.pdf PDF
092900.pdf PDF
012900-form.pdf PDF
072100.pdf PDF
017700.pdf PDF
087100.pdf PDF
263600.pdf PDF
260536.pdf PDF
260533.pdf PDF
233300.pdf PDF
012300.pdf PDF
013113.pdf PDF
220529.pdf PDF
220553.pdf PDF
013300.pdf PDF
014000.pdf PDF
Specs Cover.pdf PDF
078413.pdf PDF
221116.pdf PDF
263213.pdf PDF
061000.pdf PDF
015000.pdf PDF
000115.pdf PDF
260529.pdf PDF
096513.pdf PDF
233113.pdf PDF
013543.pdf PDF
210500.pdf PDF
013200.pdf PDF
101400.pdf PDF
081416.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DCFT #082207

Hanson #03S1408GGB

012900-1 012900

MEASUREMENT AND PAYMENT

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 012900 – MEASUREMENT AND

PAYMENT

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 ADMINISTRATIVE SUBMITTALS

A. Schedule of Values.

B. Application for Payment.

C. Final Application for Payment.

1.3 SCHEDULE OF VALUES

A. Submit Schedule of Values (AIA G703 or equal is suggested) with each request for payment, and with the mid-month Progress Report. Also submit a copy on a CD, in a spreadsheet format compatible with Excel 2007 or lower version.

B. Break down by Division 01 through 49 with appropriate subdivision of each Specification and subcontractors. List Profit, Overhead, Bonds and Insurance Premiums, Mobilization, Demobilization, and Contract Closeout as subdivisions of Division 01.

C. An unbalanced schedule will not be acceptable.

D. Summation of the complete schedule of values representing all Work shall equal the Contract Price.

1.4 APPLICATION FOR PAYMENT

A. Refer to FAR 52.232-5, “Payments Under Fixed Price Construction Contracts.”

B. Progress payments will be made monthly.

C. Submit invoice in the format shown at the end of this section.

D. The date for Contractor’s submission of monthly Application for Payment shall be no sooner than the last day of each month, and no later than the 5th day of each month.

DCFT #082207

Hanson #03S1408GGB

012900-2 012900

MEASUREMENT AND PAYMENT

1.5 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS

A. Payment will not be made for following:

1. Loading, hauling, and disposing of rejected material.

2. Quantities of material wasted or disposed of in manner not called for under Contract

Documents.

3. Rejected loads of material, including material rejected after it has been placed by reason of failure of Contractor to conform to provisions of Contract Documents.

4. Material not unloaded from transporting vehicle.

5. Defective Work not accepted by Contracting Officer.

6. Material remaining on hand after completion of Work

1.6 PARTIAL PAYMENT FOR STORED MATERIALS AND EQUIPMENT

Refer to FAR 52.232-5, “Payments Under Fixed Price Construction Contracts.”

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION OF 012900