CP Relocation 013200 Progress Schedules and Reports

View the file

Other files for this federal contract opportunity

Other files attached to Illinois National Guard Multiple Award Task Order Contract, newest first.
File Type Posted
221119.pdf PDF
230700.pdf PDF
260526.pdf PDF
017700.pdf PDF
220553.pdf PDF
012900.pdf PDF
061000.pdf PDF
263213.pdf PDF
260529.pdf PDF
000115.pdf PDF
096513.pdf PDF
015000.pdf PDF
233113.pdf PDF
260500.pdf PDF
017329.pdf PDF
220500.pdf PDF
230500.pdf PDF
001000.pdf PDF
016000.pdf PDF
262416.pdf PDF
095113.pdf PDF
013300-PFOIL Form 341.pdf PDF
010000.pdf PDF
262726.pdf PDF
123200.pdf PDF
260519.pdf PDF
220523.pdf PDF
014219.pdf PDF
024119.pdf PDF
262913.pdf PDF
017300.pdf PDF
262813.pdf PDF
099123.pdf PDF
260553.pdf PDF
017823.pdf PDF
072100.pdf PDF
P101-A101.pdf PDF
H102-A101.pdf PDF
A701-A701.pdf PDF
E-001-Work.pdf PDF
P102-A101.pdf PDF
A101-A101.pdf PDF
V101-A101.pdf PDF
P601-P601.pdf PDF
V102-A101.pdf PDF
FP101-A101.pdf PDF
V601-A101.pdf PDF
E-201-Work.pdf PDF
E-301-Work.pdf PDF
E-101-Work.pdf PDF
Show all 50

Illinois National Guard Multiple Award Task Order Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DCFT #082207

Hanson #03S1408GGB

013200-1 013200

PROGRESS SCHEDULES AND

REPORTS

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 013200 – PROGRESS SCHEDULES AND

REPORTS

PART 1 – GENERAL

1.1 PROGRESS SCHEDULE

A. An AF Form 3064, Contract Progress Schedule, shall be provided by the Contractor to the Contracting Officer within five (5) calendar days of receipt of Notice To Proceed (NTP). A courtesy copy shall also be provided to the COTR and A&E. Revise progress schedule as required and directed by the Contracting Officer. An initial Schedule of Values will also be submitted with the initial Progress Schedule.

B. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. No less than 30 percent of the required work shall be scheduled to be complete in the first half of the construction period, and not more than 5 percent of the required work shall be scheduled to be completed within the last 10 percent of the construction period.

C. Construction time includes typical inclement weather, completion of punch list items, inspection for final certification, and final cleaning.

1.2 PROGRESS REPORTS

A. An AF Form 3065, Contract Progress Report, shall be provided by the Contractor to the Contracting Officer on the 15th and last day of each month.

B. Progress reports are required of both the Contractor and the COTR covering the period from Notice to Proceed through final inspection.

1.3 SUPPLEMENTS

A. The supplements listed below, provided by Government, are part of this Specification:

1. AF Form 3064—Contract Progress Schedule.

2. AF Form 3065—Contract Progress Report.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION OF 013200