CP Relocation 211313 Wet-Pipe Sprinkler Systems

View the file

Other files for this federal contract opportunity

Other files attached to Illinois National Guard Multiple Award Task Order Contract, newest first.
File Type Posted
017823.pdf PDF
072100.pdf PDF
012900-form.pdf PDF
263600.pdf PDF
087100.pdf PDF
078413.pdf PDF
Specs Cover.pdf PDF
221116.pdf PDF
013543.pdf PDF
210500.pdf PDF
230593.pdf PDF
092216.pdf PDF
102800.pdf PDF
088000.pdf PDF
011000.pdf PDF
224000.pdf PDF
265100.pdf PDF
233713.pdf PDF
011400.pdf PDF
221119.pdf PDF
230700.pdf PDF
260526.pdf PDF
017700.pdf PDF
220553.pdf PDF
012900.pdf PDF
061000.pdf PDF
263213.pdf PDF
260529.pdf PDF
000115.pdf PDF
096513.pdf PDF
015000.pdf PDF
233113.pdf PDF
013200.pdf PDF
260500.pdf PDF
017329.pdf PDF
220500.pdf PDF
230500.pdf PDF
001000.pdf PDF
016000.pdf PDF
E-301-Work.pdf PDF
E-101-Work.pdf PDF
FP102-FP102.pdf PDF
C101-C101.pdf PDF
A601-A601.pdf PDF
A102-A102.pdf PDF
E-102-Work.pdf PDF
P101-A101.pdf PDF
H102-A101.pdf PDF
A701-A701.pdf PDF
E-001-Work.pdf PDF
Show all 50

Illinois National Guard Multiple Award Task Order Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DCFT #082207

Hanson #03S1408GGB

211313-1 211313

WET-PIPE SPRINKLER SYSTEMS

DIVISION 21 – FIRE SUPPRESSION

SECTION 211313– WET-PIPE

SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Pipes, fittings, and specialties.

2. Sprinklers.

1.3 DEFINITIONS

A. High-Pressure Sprinkler Piping: Wet-pipe sprinkler system piping designed to operate at working pressure higher than standard 175 psig (1,200 kPa), but not higher than 250 psig (1,725 kPa).

B. Standard-Pressure Sprinkler Piping: Wet-pipe sprinkler system piping designed to operate at working pressure of 175 psig (1,200 kPa) maximum.

1.4 SYSTEM DESCRIPTIONS

A. Wet-Pipe Sprinkler System: Automatic sprinklers are attached to piping containing water and that is connected to water supply through alarm valve. Water discharges immediately from sprinklers when they are opened. Sprinklers open when heat melts fusible link or destroys frangible device. Hose connections are included if indicated.

B. Deluge Sprinkler System: Open sprinklers are attached to piping connected to water supply through deluge valve. Fire-detection system, in same area as sprinklers, opens valve. Water flows into piping system and discharges from attached sprinklers when valve opens.

1.5 PERFORMANCE REQUIREMENTS

A. Standard-Pressure Piping System Component: Listed for 175 psig (1,200 kPa) minimum working pressure.

B. High-Pressure Piping System Component: Listed for 250 psig (1,725 kPa) minimum working pressure.

211313-2 211313

C. Sprinkler system design shall be approved by authorities having jurisdiction:

1. Margin of Safety for Available Water Flow and Pressure: 10 percent, including losses through water-service piping, valves, and backflow preventers.

2. Sprinkler Occupancy Hazard Classifications: Ordinary Hazard, Group 1.

3. Minimum Density for Automatic-Sprinkler Piping Design:

a. Ordinary-Hazard, Group 1 Occupancy: 0.15 gpm over 3,000 sq. ft (567 mm/min.

over 278 sq. m) area.

4. Maximum Protection Area per Sprinkler: 130 sq. ft (12.1 sq. m).

5. Total Combined Hose-Stream Demand Requirement: According to NFPA 13 unless otherwise indicated:

a. Ordinary-Hazard Occupancies: 500 gpm (31.5 L/s) for ninety (90) to one hundred twenty (120) minutes.

1.6 SUBMITTALS

A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. LEED Submittal:

1. Product Data for Credit EQ 4.1: For solvent cements and adhesive primers, including printed statement of VOC content and chemical components.

C. Shop Drawings: For wet-pipe sprinkler systems. Include plans, elevations, sections, details, and attachments to other work:

1. Wiring Diagrams: For power, signal, and control wiring.

D. Delegated-Design Submittal: For sprinkler systems indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional Engineer responsible for their preparation.

E. Qualification Data: For qualified Installer and Professional Engineer.

F. Approved Sprinkler Piping Drawings: Working plans, prepared according to NFPA 13, that have been approved by authorities having jurisdiction, including hydraulic calculations if applicable.

G. Welding certificates.

H. Field Test Reports and Certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA 13. Include "Contractor's Material and Test Certificate for Aboveground Piping."

I. Field quality-control reports.

211313-3 211313

1.7 QUALITY ASSURANCE

A. Installer Qualifications:

1. Installer's responsibilities include designing, fabricating, and installing sprinkler systems and providing professional Engineering services needed to assume Contracting Officering responsibility. Base calculations on results of fire-hydrant flow test:

a. Contracting Officering Responsibility: Preparation of working plans, calculations, and field test reports by a qualified professional Engineer.

B. Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

D. NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing shall comply with the following:

1. NFPA 13, "Installation of Sprinkler Systems."

1.8 PROJECT CONDITIONS

A. Interruption of Existing Sprinkler Service: Do not interrupt sprinkler service to facilities occupied by Engineer or others unless permitted under the following conditions and then only after arranging to provide temporary sprinkler service according to requirements indicated:

1. Notify Engineer no fewer than two (2) days in advance of proposed interruption of sprinkler service.

2. Do not proceed with interruption of sprinkler service without Engineer’s written permission.

1.9 COORDINATION

A. Coordinate layout and installation of sprinklers with existing construction, including light fixtures, HVAC equipment, and partition assemblies.

PART 2 - PRODUCTS

2.1 PIPING MATERIALS

A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, and fitting materials, and for joining methods for specific services, service locations, and pipe sizes.

211313-4 211313

2.2 STEEL PIPE AND FITTINGS

A. Standard Weight, Galvanized and Black Steel Pipe: ASTM A 53/A 53M, Type E, Grade B.

Pipe ends may be factory or field formed to match joining method.

B. Schedule 10, Black-Steel Pipe: ASTM A 135 or ASTM A 795/A 795M, Schedule 10 in NPS 5 (DN 125) and smaller; and NFPA 13-specified wall thickness in NPS 6 to NPS 10 (DN 150 to DN 250), plain end.

C. Galvanized and Black Steel Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M, standard-weight, seamless steel pipe with threaded ends.

D. Galvanized and Uncoated, Steel Couplings: ASTM A 865, threaded.

E. Galvanized and Uncoated, Gray-Iron Threaded Fittings: ASME B16.4, Class 125, standard pattern.

F. Malleable- or Ductile-Iron Unions: UL 860.

G. Cast-Iron Flanges: ASME 16.1, Class 125.

H. Steel Flanges and Flanged Fittings: ASME B16.5, Class 150.

I. Steel Welding Fittings: ASTM A 234/A 234M and ASME B16.9.

J. Grooved-Joint, Steel-Pipe Appurtenances:

K. Manufacturers: Subject to compliance with requirements, the following are provided as examples of the salient characteristics to be found in the submitted product. Manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Anvil International, Inc.

b. Corcoran Piping System Co.

c. National Fittings, Inc.

d. Shurjoint Piping Products.

e. Tyco Fire & Building Products LP.

f. Victaulic Company.

2. Pressure Rating: 250 psig (1,725 kPa) minimum.

3. Galvanized and Uncoated, Grooved-End Fittings for Steel Piping: ASTM A 47/A 47M, malleable-iron casting or ASTM A 536, ductile-iron casting; with dimensions matching steel pipe.

4. Grooved-End-Pipe Couplings for Steel Piping: AWWA C606 and UL 213, rigid pattern, unless otherwise indicated, for steel-pipe dimensions. Include ferrous housing sections, EPDM-rubber gasket, and bolts and nuts.

L. Steel Pressure-Seal Fittings: UL 213, FM-approved, 175-psig (1200-kPa) pressure rating with steel housing, rubber O-rings, and pipe stop; for use with fitting manufacturers' pressure-seal tools:

211313-5 211313

1. Manufacturers: Subject to compliance with requirements, the following are provided as examples of the salient characteristics to be found in the submitted product.

Manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Victaulic Company.

b. Anvil International, Inc.

c. Shurjoint Piping Products.

2.3 PIPING JOINING MATERIALS

A. Pipe-Flange Gasket Materials: AWWA C110, rubber, flat face, 1/8 inch (3.2 mm) thick or ASME B16.21, nonmetallic and asbestos free.

1. Class 125, Cast-Iron Flanges and Class 150, Bronze Flat-Face Flanges: Full-face gaskets.

2. Class 250, Cast-Iron Flanges and Class 300, Steel Raised-Face Flanges: Ring-type gaskets.

B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.

C. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for general-duty brazing unless otherwise indicated.

D. Welding Filler Metals: Comply with AWS D10.12M/D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

2.4 SPRINKLERS

A. Manufacturers [For this project, provide sprinkler heads to match existing heads in the building.]:

1. AFAC Inc.

2. Globe Fire Sprinkler Corporation.

3. Reliable Automatic Sprinkler Co., Inc.

4. Tyco Fire & Building Products LP.

5. Venus Fire Protection Ltd.

6. Victaulic Company.

7. Viking Corporation.

B. General Requirements:

1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

2. Pressure Rating for Automatic Sprinklers: 175 psig (1200 kPa) minimum.

3. Pressure Rating for High-Pressure Automatic Sprinklers: 250 psig (1725 kPa) minimum.

211313-6 211313

C. Automatic Sprinklers with Heat-Responsive Element:

1. Nonresidential Applications: UL 199.

2. Characteristics: Nominal 1/2 in. (12.7 mm) orifice with Discharge Coefficient K of 5.6, and for "Ordinary" temperature classification rating unless otherwise indicated or required by application.

D. Open Sprinklers with Heat-Responsive Element Removed: UL 199.

1. Characteristics:

a. Nominal 1/2 in. (12.7 mm) Orifice: With Discharge Coefficient K between 5.3 and 5.8.

E. Sprinkler Finishes:

1. Chrome plated.

2. Bronze.

3. Painted.

F. Special Coatings:

1. Wax.

2. Lead.

3. Corrosion-resistant paint.

G. Sprinkler Escutcheons: Materials, types, and finishes for the following sprinkler mounting applications. Escutcheons for concealed, flush, and recessed-type sprinklers are specified with sprinklers:

1. Ceiling Mounting: Plastic, white finish, one (1) piece, flat.

2. Sidewall Mounting: Chrome-plated steel, one (1) piece, flat.

2.5 SLEEVES

A. Cast-Iron Wall Pipe Sleeves: Cast or fabricated of cast iron and equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop unless otherwise indicated.

B. Galvanized-Steel-Sheet Sleeves: 0.0239 in. (0.6 mm) minimum thickness; round tube closed with welded longitudinal joint.

C. Molded-PE Sleeves: Reusable, PE, tapered-cup shaped and smooth outer surface with nailing flange for attaching to wooden forms.

D. Molded-PVC Sleeves: Permanent, with nailing flange for attaching to wooden forms.

E. PVC-Pipe Sleeves: ASTM D 1785, Schedule 40.

211313-7 211313

F. Galvanized-Steel-Pipe Sleeves: ASTM A 53/A 53M, Type E, standard weight, zinc coated, plain ends.

G. Stack Sleeve Fittings: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing:

1. Underdeck Clamp: Clamping ring with set-screws.

2.6 SLEEVE SEALS

A. Manufacturers:

1. Advance Products & Systems, Inc.

2. Calpico, Inc.

3. Metraflex, Inc.

4. Pipeline Seal and Insulator, Inc.

B. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve:

1. Sealing Elements: EPDM-rubber or NBR interlocking links shaped to fit surface of pipe.

Include type and number required for pipe material and size of pipe.

2. Pressure Plates: Carbon steel.

3. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of length required to secure pressure plates to sealing elements.

2.7 GROUT

A. Standard: ASTM C 1107, Grade B, posthardening and volume adjusting, dry, hydraulic-cement grout.

B. Characteristics: Nonshrink, and recommended for interior and exterior applications.

C. Design Mix: 5,000 psi (34 MPa), twenty-eight (28) day compressive strength.

D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 WATER-SUPPLY CONNECTIONS

A. Connect sprinkler piping to building's interior fire protection piping.

3.2 PIPING INSTALLATION

A. Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping. Install piping as indicated, as far as practical:

211313-8 211313

1. Deviations from approved working plans for piping require written approval from authorities having jurisdiction. File written approval with Contracting Officer before deviating from approved working plans.

B. Piping Standard: Comply with requirements for installation of sprinkler piping in NFPA 13.

C. Install seismic restraints on piping. Comply with requirements for seismic-restraint device materials and installation in NFPA 13.

D. Use listed fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes.

E. Install unions adjacent to each valve in pipes NPS 2 (DN 50) and smaller.

F. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 (DN 65) and larger end connections.

G. Install sprinkler piping with drains for complete system drainage.

H. Install hangers and supports for sprinkler system piping according to NFPA 13. Comply with requirements for hanger materials in NFPA 13.

I. Fill sprinkler system piping with water.

3.3 JOINT CONSTRUCTION

A. Install couplings, flanges, flanged fittings, unions, nipples, and transition and special fittings that have finish and pressure ratings same as or higher than system's pressure rating for aboveground applications unless otherwise indicated.

B. Install unions adjacent to each valve in pipes NPS 2 (DN 50) and smaller.

C. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 (DN 65) and larger end connections.

D. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

E. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.

F. Flanged Joints: Select appropriate gasket material in size, type, and thickness suitable for water service. Join flanges with gasket and bolts according to ASME B31.9.

G. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.

211313-9 211313

H. Twist-Locked Joints: Insert plain end of steel pipe into plain-end-pipe fitting. Rotate retainer lugs one-quarter turn or tighten retainer pin.

I. Steel-Piping, Pressure-Sealed Joints: Join lightwall steel pipe and steel pressure-seal fittings with tools recommended by fitting manufacturer.

J. Welded Joints: Construct joints according to AWS D10.12M/D10.12, using qualified processes and welding operators according to "Quality Assurance" Article:

1. Shop weld pipe joints where welded piping is indicated. Do not use welded joints for galvanized-steel pipe.

K. Steel-Piping, Cut-Grooved Joints: Cut square-edge groove in end of pipe according to AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe joints.

L. Steel-Piping, Roll-Grooved Joints: Roll rounded-edge groove in end of pipe according to AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe grooved joints.

M. Steel-Piping, Pressure-Sealed Joints: Join Schedule 5 steel pipe and steel pressure-seal fittings with tools recommended by fitting manufacturer.

N. Brazed Joints: Join copper tube and fittings according to CDA's "Copper Tube Handbook," "Brazed Joints" Chapter.

O. Dissimilar-Material Piping Joints: Make joints using adapters compatible with materials of both piping systems.

3.4 SPRINKLER INSTALLATION

A. Install sprinklers in suspended ceilings in center of narrow dimension of acoustical ceiling panels.

B. Install dry-type sprinklers with water supply from heated space. Do not install pendent or sidewall, wet-type sprinklers in areas subject to freezing.

C. Install sprinklers into flexible, sprinkler hose fittings and install hose into bracket on ceiling grid.

3.5 SLEEVE INSTALLATION

A. General Requirements: Install sleeves for pipes and tubes passing through penetrations in floors, partitions, roofs, and walls.

B. Sleeves are not required for core-drilled holes.

C. Permanent sleeves are not required for holes formed by removable PE sleeves.

211313-10 211313

D. Cut sleeves to length for mounting flush with both surfaces unless otherwise indicated.

E. Install sleeves in new partitions, slabs, and walls as they are built.

F. For interior wall penetrations, seal annular space between sleeve and pipe or pipe insulation using joint sealants appropriate for size, depth, and location of joint. Comply with requirements for joint sealants in Division 07 Section "Joint Sealants."

G. Seal space outside of sleeves in concrete slabs and walls with grout.

H. Install sleeves that are large enough to provide 1/4 in. (6.4 mm) annular clear space between sleeve and pipe or pipe insulation unless otherwise indicated:

1. Sleeves for Piping Passing through Gypsum-Board Partitions:

a. Galvanized-steel-pipe sleeves for pipes smaller than NPS 6 (DN 150).

2. Sleeves for Piping Passing through Interior Concrete Walls:

a. Galvanized-steel-pipe sleeves for pipes smaller than NPS 6 (DN 150).

I. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements for firestop materials and installations in Division 07 Section "Penetration Firestopping."

3.6 SLEEVE SEAL INSTALLATION

A. Install sleeve seals in sleeves in exterior concrete walls at water-service piping entries into building.

B. Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble sleeve seal components and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.

3.7 IDENTIFICATION

A. Install labeling and pipe markers on equipment and piping according to requirements in

NFPA 13.

B. Identify system components, wiring, cabling, and terminals. Comply with requirements for identification specified in Division 26 Section "Identification for Electrical Systems."

3.8 FIELD QUALITY CONTROL

A. Perform tests and inspections.

B. Tests and Inspections:

211313-11 211313

1. Leak Test: After installation, charge systems and test for leaks. Repair leaks and retest until no leaks exist.

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

3. Flush, test, and inspect sprinkler systems according to NFPA 13, "Systems Acceptance" Chapter.

4. Energize circuits to electrical equipment and devices.

5. Start and run excess-pressure pumps.

6. Coordinate with fire-alarm tests. Operate as required.

7. Coordinate with fire-pump tests. Operate as required.

8. Verify that equipment hose threads are same as local fire-department equipment.

C. Sprinkler piping system will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

3.9 CLEANING

A. Clean dirt and debris from sprinklers.

B. Remove and replace sprinklers with paint other than factory finish.

3.10 SPRINKLER SCHEDULE

A. Use sprinkler types in subparagraphs below for the following applications:

1. Rooms without Ceilings: Upright sprinklers.

2. Rooms with Suspended Ceilings: Flush sprinklers.

3. Wall Mounting: Sidewall sprinklers.