Full_size_drawings_6b.pdf

PDF 4 MB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This solicitation notice seeks bids for a construction project to repair and renovate a maintenance hangar at Mansfield Air National Guard Base in Mansfield, Ohio. Work includes demolition, fire protection and suppression systems, mechanical, plumbing and electrical upgrades, replacement of exterior brick veneer and metal siding, windows and doors. The construction duration is 577 calendar days with bids evaluated without discussions. The project is set aside for small businesses with a NAICS code of 236220 and size standard of $36.5 million average annual revenue. The pre-bid conference is July 30, 2019 and bids are due August 23, 2019. The estimated value is between $10-25 million. Interested bidders must register in the System for Award Management and check the Federal Business Opportunities website for solicitation documents and any amendments.

Full size 6b

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_14.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_10.pdf PDF
Full_size_drawings_12.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2'-1" 26.94

FILENAME: PLOT DATE: PLOT TIME:

C H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_A-123$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

A

B

C

D

2 3 4 5 6 7 8 9 10 11 12

1 12

L

D

B

C

KEY PLAN

A

A

0 8 16 24

1/8"=1'-0"

NN

BLDG TRUE

B

A R

C H

IT

E C

T U

R A

L

S E

C O

N D F

L O

O R P

L A

N

A R

E A C

J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

A-123

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O N

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

P

669816_A-123.dwg

669816

OFFICE

SENIOR TRAINING/

BREAK ROOM

CORRIDOR

HANGAR

BAY

STAIR 1

TRAINING RM

ELEV.

MARKER BOARD. SEE ELEVATION 3/A-404.6.

ROOF PROTECTION MEMBRANE5.

UNDER COUNTER REFRIGERATOR, AND SINK.

BREAK ROOM DAY KITCHEN WITH MICROWAVE, 4.

FOLDING PARTITION WITH TRACK OVERHEAD.3.

CARREL. (N.I.C.)2.

FIRST FLOOR ROOF OUTLINE. SEE DRAWING A-130.1.

SHEET KEYNOTES

133B

B

A

GENERAL SHEET NOTES

SECOND FLOOR PLAN - AREA C

1/8"=1'-0"

10'-0"

15'-1"

10'-0"

ROOM

CONFERENCE

MEETING /

7'-9" 33'-4" 9'-10" 15'-2"

.9

OFFICE

TYP

110B

VESTIBULE

STAIR 2

A-401

12'-0" 12'-5"

6'-4"

1'-2" 6'-4"

W5

W4

W5W5

W3W6W6

A-401

SIM

A-402

B

B

BB

B

B

DD

W8

C C

C

C

D

C

CC

D

C

B

A-301

C

A-301

DISCIPLINE.

COORDINATE CONSTRUCTION WITH EACH

ELECTRICAL AND TELECOM DRAWINGS.

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, G.

FUNCTIONALITY OF ALL EQUIPMENT.

EQUIPMENT AND CERTIFY TO THE GOVERNMENT

PROPER OPERATION OF EQUIPMENT, TEST

THE EQUIPMENT, PROVIDE ALL CONNECTIONS FOR

CONTRACTOR TO RECEIVE EQUIPMENT, PLACE

SEE Q-SERIES SHEETS FOR GFCI EQUIPMENT. F.

SEE SHEETS AD110 AND AD201 FOR DEMOLITION.E.

SEE SHEET A-603 FOR INTERIOR FINISH SCHEDULE.D.

UNLESS NOTED OTHERWISE.

PARTITIONS TO NEW. ALL PARTITIONS ARE TYPE B,

WHERE INDICATED, UPGRADE EXISTING

SEE SHEET A-602 FOR PARTITION TYPE DETAILS. C.

SEE SHEET A-601 FOR DOOR SCHEDULE.B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

DEVICES, MILLWORK AND TOILET ACCESSORIES.

WITHIN STUD WALL THICKNESS AT ALL MOUNTED

PROVIDE WOOD BLOCKING OR METAL STRAPPING J.

COLUMNS.

RE-FINISH ALL EXPOSED SIDES OF EXISTING I.

REMAIN AFTER DEMOLITION.

PATCH AND REPAIR BUILDING ELEMENTS TO H.

A-404

A-404

W5 W4W4

W7

A-517

A-517

TYP.

4'-0" 5'-4" 7'-4" 5'-4" 8'-8" 10'-0"

05 FEBRUARY 2019

FILENAME: PLOT DATE: PLOT TIME:

C H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_A-130$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

L

A

1 12

B

C

D

E

F

G

H

J

K

2 11

1 122 113 4 5 6 7 8 9 10

1 12

A

L

KEY PLAN

D

A B

C

0 16 32 48

1/16"=1'-0"

NN

BLDG TRUE

A R

C H

IT

E C

T U

R

L

R O

O F P

L

N

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

A-130

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O N

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

669816_A-130.dwg

ROOF PLAN

1/16" = 1'-0"

S L

O P

E

E X

IS

T

GENERAL NOTES

SHEET KEYNOTES

SLOPE

EXIST.

SLOPE

EXIST.

S L

O P

E

E X

IS

T

DRAWING SHEET S-130.

EXISTING STEEL FRAME. SEE STRUCTURAL 10.

LADDER AND CAGE.9.

PATCH AND REPAIR ROOF EDGE.8.

ROOF HATCH7.

AND PATCH AND REPAIR ROOF.

PROVIDE ROOF DECK, STRUCTURE, INSULATION 6.

DRAWING M-130.

MECHANICAL EQUIPMENT, FOR DETAILS SEE 5.

EXISTING LOW SLOPE ROOF.4.

ENTRANCE CANOPY, SEE 3/A-311.3.

EXISTING HANGER BAY ROOF (N.I.C.).2.

METAL GUTTER.1.

MEMBRANE.

NEW CONSTRUCTION PENETRATES EXISTING

CAUSED DURING CONSTRUCTION, AND WHERE

EXISTING CONSTRUCTION IS REMOVED, DAMAGE IS

PATCH AND REPAIR ROOF MEMBRANE WHERE D.

EXISTING ROOFING MEMBRANES.

EXERCISE CAUTION TO PRESERVE AND PROTECT C.

DISCIPLINE.

COORDINATE CONSTRUCTION WITH EACH

ELECTRICAL AND TELECOM DRAWINGS.

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

197'-7"

23'-1" 23'-2"

151'-4"

A

A-301

A

A-301

C

A-301

S L

O P

E

10 10

FILENAME: PLOT DATE: PLOT TIME:

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_AC111$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

E

F

G

1 2

H

J

K

L

0 8 16 24

1/8"=1'-0"

1 12

L

D

B

C

KEY PLAN

N

A

A

N

BLDG TRUE

A R

C H

IT

E C

T U

R A

L

F

IR

S T F

L O

O R

R E

F L E

C T

E D C

E

IL

IN

G P

L A

N

A R

E A A

J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

AC111

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O

669816_AC111.dwg

669816REFLECTED CEILING PLAN - AREA A

1/8" = 1'-0"

GENERAL NOTES

SHEET KEYNOTES

PAINT EXPOSED DUCTWORK.3.

PAINT EXISTING STRUCTURE.2.

SYSTEM, AND DEVICES.

ABOVE CEILING WORK, RE-INSTALL CEILING

ALL CEILING SUPPORTED SYSTEMS. EXECUTE

REMOVE EXISTING METAL CEILING SYSTEM, AND 1.

MATCH LINE SEE SHEET AC113

M A

T C

H L

IN

E S

E E S

H E

E T A

C

LEGEND

AT 8'-6" ABOVE FINISHED FLOOR

SUSPENDED ACOUSTIC CEILING

COMBO EXIT SIGN

EXIT LIGHTS

2'x4' RECESSED LED LIGHT

RECESSED CAN CEILING LIGHTS

CEILING DIFFUSER

FAN COIL UNIT

SPRINKLER

SPEAKER

WHEEL & TIRE

SHOP CHIEF

OFFICE

HYDRO SHOP

WHEEL & TIRE

SHOP

HANGAR BAY

S

GYPSUM WALLBOARD CEILING

9'-0" AFF, TYP

DEVICES, MILLWORK AND TOILET ACCESSORIES.

WITHIN STUD WALL THICKNESS AT ALL MOUNTED

PROVIDE WOOD BLOCKING OR METAL STRAPPING J.

COLUMNS.

RE-FINISH ALL EXPOSED SIDES OF EXISTING I.

REMAIN AFTER DEMOLITION.

PATCH AND REPAIR BUILDING ELEMENTS TO H.

DISCIPLINE.

COORDINATE CONSTRUCTION WITH EACH

ELECTRICAL AND TELECOM DRAWINGS.

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, G.

FUNCTIONALITY OF ALL EQUIPMENT.

EQUIPMENT AND CERTIFY TO THE GOVERNMENT

PROPER OPERATION OF EQUIPMENT, TEST

THE EQUIPMENT, PROVIDE ALL CONNECTIONS FOR

CONTRACTOR TO RECEIVE EQUIPMENT, PLACE

SEE Q-SERIES SHEETS FOR GFCI EQUIPMENT. F.

SEE SHEETS AD110 AND AD201 FOR DEMOLITION.E.

SEE SHEET A-603 FOR INTERIOR FINISH SCHEDULE.D.

UNLESS NOTED OTHERWISE.

PARTITIONS TO NEW. ALL PARTITIONS ARE TYPE B,

WHERE INDICATED, UPGRADE EXISTING

SEE SHEET A-602 FOR PARTITION TYPE DETAILS. C.

SEE SHEET A-601 FOR DOOR SCHEDULE.B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

TYP.

8'-0"

X'-XX" CEILING HEIGHT A.F.F.

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_AC112$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

D

E

F

G

11 12

H

J

K

L

1 12

L

D

B

C

KEY PLAN

A

A

0 8 16 24

1/8"=1'-0"

NN

BLDG TRUE

C H

IT

E C

T U

R A

L

F

IR

S T F

L O

O R

R E

F L E

C T

E D C

E

IL

IN

G P

L A

N

A R

E A B

J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

AC112

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O

669816_AC112.dwg

669816REFLECTED CEILING PLAN - AREA B

1/8" = 1'-0"

MATCH LINE SEE SHEET AC113

M A

T C

H L

IN

E S

E E S

H E

E T A

C

STRUCTURAL

SHEET METAL

SHOP

LOX SHOP

E&E SHOP

OFFICE

SHOP CHIEF

SHEET METAL

STRUCTURAL

VESTIBULE

E&E SHOP

CHIEF OFFICE

9'-0" A.F.F. TYP

GENERAL NOTES

SHEET KEYNOTES

PAINT EXISTING STRUCTURE.2.

CEILING SYSTEM.

EXECUTE ABOVE CEILING WORK, RE-INSTALL

REMOVE EXISTING METAL CEILING SYSTEM. 1.

LEGEND

AT 8'-6" ABOVE FINISHED FLOOR

2'x4' RECESSED LED LIGHT

RECESSED CAN CEILING LIGHTS

CEILING DIFFUSER

FAN COIL UNIT

SPRINKLER

SPEAKERS

GYPSUM WALLBOARD CEILING

DEVICES, MILLWORK AND TOILET ACCESSORIES.

WITHIN STUD WALL THICKNESS AT ALL MOUNTED

PROVIDE WOOD BLOCKING OR METAL STRAPPING J.

COLUMNS.

RE-FINISH ALL EXPOSED SIDES OF EXISTING I.

REMAIN AFTER DEMOLITION.

PATCH AND REPAIR BUILDING ELEMENTS TO H.

DISCIPLINE.

COORDINATE CONSTRUCTION WITH EACH

ELECTRICAL AND TELECOM DRAWINGS.

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, G.

FUNCTIONALITY OF ALL EQUIPMENT.

EQUIPMENT AND CERTIFY TO THE GOVERNMENT

PROPER OPERATION OF EQUIPMENT, TEST

THE EQUIPMENT, PROVIDE ALL CONNECTIONS FOR

CONTRACTOR TO RECEIVE EQUIPMENT, PLACE

SEE Q-SERIES SHEETS FOR GFCI EQUIPMENT. F.

SEE SHEETS AD110 AND AD201 FOR DEMOLITION.E.

SEE SHEET A-603 FOR INTERIOR FINISH SCHEDULE.D.

UNLESS NOTED OTHERWISE.

PARTITIONS TO NEW. ALL PARTITIONS ARE TYPE B,

WHERE INDICATED, UPGRADE EXISTING

SEE SHEET A-602 FOR PARTITION TYPE DETAILS. C.

SEE SHEET A-601 FOR DOOR SCHEDULE.B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_AC113$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

A

B

C

D

2 3 4 5 6 7 8 9 10 11 12

1 12

L

D

B

C

KEY PLAN

A

A

0 8 16 24

1/8"=1'-0"

NN

BLDG TRUE

C H

IT

E C

T U

R A

L

F

IR

S T F

L O

O R

R E

F L E

C T

E D C

E

IL

IN

G P

L A

N

A R

E A C

J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

AC113

AS SHOWN

P

E A

R S

O

669816_AC113.dwg

REFLECTED CEILING PLAN - AREA C

1/8" = 1'-0"

SHEET KEYNOTES

MATCH LINE SEE SHEET AC112MATCH LINE SEE SHEET AC111

GENERAL SHEET NOTES

CENTER 2'x4' LIGHT IN SPACE.5.

PAINT BOTTOM OF STAIR ABOVE.4.

GYPSUM WALL BOARD HEADER.3.

GYPSUM WALL BOARD CEILING.2.

DEVICES.

CEILING WORK. REINSTALL CEILING SYSTEM AND

CEILING SUPPORTED SYSTEMS. EXECUTE ABOVE

REMOVE EXISTING METAL CEILING SYSTEM AND ALL 1.

ELEV.

SHOP

ISO / DOCK

VESTIBULE

CORRIDOR

COMM

DOCK CKT

SHOP

SHEET METAL

STRUCTURAL

CEILING DIFFUSER

FAN COIL UNIT

SPRINKLER

SPEAKER

LEGEND

AT 9'-0" ABOVE FINISHED FLOOR

2'x4' RECESSED LED LIGHT

RECESSED CAN CEILING LIGHTS

ROOM

MECHANICAL

ROOM

ELECTRICAL

TNB

SUPPLY /

ROOM

EQUIPMENT

FIRE

ROOM

STORAGE

RESTROOM

WOMENS

UP

STORAGE

ISO CAGE

LOBBY

ENTRY

CORRIDOR

STAIR 2

130 129 128

STAIR 1

STENCIL

SHOP

OFFICE

UP

VESTIBULE

JANITOR

CORRIDOR

SHOWERS

WOMENS

LOCKERS

WOMENS

ROOM

HEATER

WATER

SHOWERS

MENS

LOCKERS

MENS

RESTROOM

MENS

HYDRO SHOP

CHIEF OFFICE

HANGAR BAY

139HYDRO SHOP

TUG PORT

GYPSUM WALLBOARD CEILING

S

9'-0" A.F.F. TYP

DISCIPLINE.

COORDINATE CONSTRUCTION WITH EACH

ELECTRICAL AND TELECOM DRAWINGS.

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, G.

FUNCTIONALITY OF ALL EQUIPMENT.

EQUIPMENT AND CERTIFY TO THE GOVERNMENT

PROPER OPERATION OF EQUIPMENT, TEST

THE EQUIPMENT, PROVIDE ALL CONNECTIONS FOR

CONTRACTOR TO RECEIVE EQUIPMENT, PLACE

SEE Q-SERIES SHEETS FOR GFCI EQUIPMENT. F.

SEE SHEETS AD110 AND AD201 FOR DEMOLITION.E.

SEE SHEET A-603 FOR INTERIOR FINISH SCHEDULE.D.

UNLESS NOTED OTHERWISE.

PARTITIONS TO NEW. ALL PARTITIONS ARE TYPE B,

WHERE INDICATED, UPGRADE EXISTING

SEE SHEET A-602 FOR PARTITION TYPE DETAILS. C.

SEE SHEET A-601 FOR DOOR SCHEDULE.B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

DEVICES, MILLWORK AND TOILET ACCESSORIES.

WITHIN STUD WALL THICKNESS AT ALL MOUNTED

PROVIDE WOOD BLOCKING OR METAL STRAPPING J.

COLUMNS.

RE-FINISH ALL EXPOSED SIDES OF EXISTING I.

REMAIN AFTER DEMOLITION.

PATCH AND REPAIR BUILDING ELEMENTS TO H.

VEST.

78 B D

E S

IG

N S

U B

M

IT

T A

L

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_AC123$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

A

B

C

D

2 3 4 5 6 7 8 9 10 11 12

1 12

L

D

B

C

KEY PLAN

A

A

0 8 16 24

1/8"=1'-0"

NN

BLDG TRUE

B

A R

C H

IT

E C

T U

R A

L

S E

C O

N D F

L O

O R

R E

F L E

C T

E D C

E

IL

IN

G P

L A

N

A R

E A C

J B

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

AC123

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O N

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

669816_AC123.dwg

OFFICE

SENIOR

SECOND FLOOR REFLECTED CEILING PLAN

1/8" = 1'-0"

N

BREAK ROOM

TRAINING/

HANGER BAY

STAIR 1

ROOM

TRAINING

ELEV.

STAIR 2

111133 201

SHEET KEYNOTES

COORIDOR

MEETING /

CONFERENCE

ROOM

CEILING DIFFUSER

FAN COIL UNIT

SPRINKLER

SPEAKER

LEGEND

AT 9'-0" ABOVE FINISHED FLOOR

2'x4' RECESSED LED LIGHT

RECESSED CAN CEILING LIGHTS

139 OFFICE

VESTIBULE

S

9'-0" A.F.F. TYP

GENERAL SHEET NOTES

DISCIPLINE.

COORDINATE CONSTRUCTION WITH EACH

ELECTRICAL AND TELECOM DRAWINGS.

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, G.

FUNCTIONALITY OF ALL EQUIPMENT.

EQUIPMENT AND CERTIFY TO THE GOVERNMENT

PROPER OPERATION OF EQUIPMENT, TEST

THE EQUIPMENT, PROVIDE ALL CONNECTIONS FOR

CONTRACTOR TO RECEIVE EQUIPMENT, PLACE

SEE Q-SERIES SHEETS FOR GFCI EQUIPMENT. F.

SEE SHEETS AD110 AND AD201 FOR DEMOLITION.E.

SEE SHEET A-603 FOR INTERIOR FINISH SCHEDULE.D.

UNLESS NOTED OTHERWISE.

PARTITIONS TO NEW. ALL PARTITIONS ARE TYPE B,

WHERE INDICATED, UPGRADE EXISTING

SEE SHEET A-602 FOR PARTITION TYPE DETAILS. C.

SEE SHEET A-601 FOR DOOR SCHEDULE.B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

DEVICES, MILLWORK AND TOILET ACCESSORIES.

WITHIN STUD WALL THICKNESS AT ALL MOUNTED

PROVIDE WOOD BLOCKING OR METAL STRAPPING J.

COLUMNS.

RE-FINISH ALL EXPOSED SIDES OF EXISTING I.

REMAIN AFTER DEMOLITION.

PATCH AND REPAIR BUILDING ELEMENTS TO H.

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_A-201$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

1 122 113 4 5 6 7 8 9 10

EL 12'-8"

2nd FLOOR

EL 26'-10"

ROOF

C

A-301

B

A-301

A-310

A-515

A-515

A R

C H

IT

E C

T U

R A

L

S O

U T

H

B U

IL

D

IN

G E

L E

V A

T

IO

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

S

A-201

D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O N

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

669816_A-201.dwg

SHEET KEYNOTESGENERAL SHEET NOTES

PREFINISHED METAL GUTTER, SEE DETAIL 1/A-515.10.

ENTRANCE CANOPY. SEE 3/A-311.9.

SCHEDULE ON DRAWING A-602.

TRANSLUCENT PANEL, TYPICAL, SEE WINDOW 8.

LOUVER, SEE LOUVER SCHEDULE ON DRAWING A-602.7.

UNDERGROUND COLLECTION SYSTEM.

DOWNSPOUT, TYPICAL. TIE INTO EXISTING 6.

DRAWINGS.

LIGHT FIXTURE, TYPICAL, SEE ELECTRICAL 5.

SCHEDULE ON DRAWING A-602.

INSULATED WINDOW, TYPICAL, SEE WINDOW 4.

SEE DOOR SCHEDULE ON DRAWING A-601.3.

BRICK VENEER, FULL HEIGHT, TYPICAL.2.

PENETRATIONS.

EXISTING METAL SIDING. CLEAN & RE-SEAL ALL 1.

A-110

SOUTH ELEVATION

1/8"=1'-0"

EL 0+00

FIN FLOOR

EL 56'-8"

H PT ROOF

EL 12'-6"

ROOF

W2

W4

337 6

L1

TYP

W5 W5

W4

W5 TYP

W1TYP

W4 W4W5

MECHANICAL EQUIPMENT, SEE M-130.20

EXISTING STEEL FRAME. SEE S-130.19.

SUN SCREEN. TYP.18.

EXISTING SHEET METAL WORK - CLEAN.17.

D.S. & SPLASH BLOCK.16.

SHAFT - RE-PAINT.

HEIGHT AS REQUIRED FOR HEIGHT OF ELEVATOR

RE-INSTALL LADDER & SAFETY CAGE - ADJUST 15.

ROOF LEVEL OF ELEVATOR SHAFT - RE-PAINT.

EXTEND EXISTING LADDER DOWN TO 12" ABOVE 14.

METAL SIDING & TRIM.13.

OF ELEVATOR SHAFT.

EXTEND EXISTING METAL SIDING DOWN TO HEIGHT 12.

METAL FASCIA, SEE DETAIL 1/A-515.11.

TYP

BRICK A

BRICK B

AFTER DEMOLITION.

PATCH AND REPAIR BUILDING ELEMENTS TO REMAIN E.

CONSTRUCTION WITH EACH DISCIPLINE.

ELECTRICAL AND TELECOM DRAWINGS. COORDINATE

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, D.

SEE SHEETS AD110 AND AD201 FOR DEMOLITION.C.

SEE SHEET A-601 FOR DOOR SCHEDULE.B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

PAINT -

METAL WALL PANELS, HARDWARE, ASSOCIATED TRIM AND

ALUM. WINDOW FRAMES -

BRICK B -

BRICK A -

SHERWIN WILLIAMS - OHIO AIR BROWN.

OR MATCHING EQUAL.

BELDON BRICK PRODUCT NUMBER 8632,

OR MATCHING EQUAL.

BELDON BRICK PRODUCT NUMBER 8621,

COLOR LEGEND

DARK BRONZE ANODIZED LOUVERS.

ABL K J H G F E D C

C H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_A-202$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

A R

C H

IT

E C

T U

R A

L

W E

S T

B U

IL

D

IN

G E

L E

V A

T

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

A-202

P

E A

R S

O

669816_A-202.dwg

SHEET KEYNOTESGENERAL SHEET NOTES

EXISTING HANGAR BAY ROOF (NIC)9.

INSULATED METAL WALL PANEL, TYPICAL.8.

SCHEDULE ON DRAWING A-602.

INSULATED WINDOW, TYPICAL, SEE WINDOW 7.

A-602.

LOUVER, SEE LOUVER SCHEDULE ON DRAWING 6.

UNDERGROUND COLLECTION SYSTEM.

DOWNSPOUT, TYPICAL. TIE INTO EXISTING 5.

DRAWINGS.

LIGHT FIXTURE, TYPICAL, SEE ELECTRICAL 4.

ON DRAWING A-601.

INSULATED DOOR, TYPICAL, SEE DOOR SCHEDULE 3.

BRICK VENEER, FULL HEIGHT, TYPICAL.2.

CLEAN & RE-SEAL PENETRATIONS.1.

A-110

WEST ELEVATION

1/8"=1'-0"

EL 0+00

FIN FLOOR

EL 56'-8"

H PT ROOF

EL 12'-6"

ROOF

5 5 5 5 5 5 5 5 5

L233

5 8

777777

W1 W1 W1 W1 W1 W1 2

MECHANICAL EQUIPMENT. SEE M-130.13.

LADDER. SEE A-201.12.

METAL FASCIA. SEE DETAIL 1/A-515.11.

GUTTER, DOWNSPOUT & SPLASHBLOCK.10.

BRICK A

BRICK B •SEE SHEET A-201

AFTER DEMOLITION.

PATCH AND REPAIR BUILDING ELEMENTS TO REMAIN E.

CONSTRUCTION WITH EACH DISCIPLINE.

ELECTRICAL AND TELECOM DRAWINGS. COORDINATE

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, D.

SEE SHEETS AD110 AND AD201 FOR DEMOLITION.C.

SEE SHEET A-601 FOR DOOR SCHEDULE.B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

81 B D

E S

IG

N S

U B

M

IT

T A

L

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/AR/Dlv/669816_A-203$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

Ohio Air National Guard

179th Airlift Wing

112 211 345678910

A R

C H

IT

E C

T U

R A

L

N O

R T

H

B U

IL

D

IN

G E

L E

V A

T

A U

D R

Y

FEB 2019

G T M

A L

IN

G J R

IG

G

IN

A-203

D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O

669816_A-203.dwg

SHEET KEYNOTESGENERAL SHEET NOTES

LOUVERS, SEE S-201 AND M-110.8.

BOLLARD.7.

EXISTING MEGA DOOR, (N.I.C.).6.

DRAWINGS.

LIGHT FIXTURE, TYPICAL, SEE ELECTRICAL 5.

SEE DOOR SCHEDULE ON DRAWING A-601.4.

DRAWING A-601.

ROLL-UP DOOR, TYPICAL, SEE DOOR SCHEDULE ON 3.

BRICK VENEER, FULL HEIGHT, TYPICAL.2.

AND RE-SEAL PENETRATIONS.

EXISTING METAL WALL PANEL, TYPICAL. CLEAN 1.

A-110

NORTH ELEVATION

1/8"=1'-0"

EL 0+00

FIN FLOOR

EL 56'-8"

H PT ROOF

EL 12'-8"

ROOF

TYP.

7TYP.

BRICK A

BRICK B •SEE SHEET A-201

AFTER DEMOLITION.

PATCH AND REPAIR BUILDING ELEMENTS TO REMAIN E.

CONSTRUCTION WITH EACH DISCIPLINE.

ELECTRICAL AND TELECOM DRAWINGS. COORDINATE

SEE FIRE PROTECTION, PLUMBING, MECHANICAL, D.

SEE SHEETS AD110 AND AD201 FOR DEMOLITION.C.

SEE SHEET A-601 FOR DOOR SCHEDULE.B.

GENERAL NOTES, LEGENDS AND SYMBOLS.

SEE SHEET A-001 FOR ABBREVIATIONS AND A-002 A.

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P D

File details come from the government source that posted it. Updated .