This solicitation requests bids for repair and renovation work on a maintenance hangar at Mansfield Air National Guard Base in Ohio. The project includes demolition, as well as work on fire protection/suppression systems, mechanical, plumbing, electrical, and telecommunications. Exterior brick veneer and metal siding will be renovated, along with replacement of windows and doors to meet energy efficiency and security standards. The construction duration is 577 calendar days with no additive bid items or options. The solicitation is set aside for small businesses with a size standard of $36.5 million average annual revenue. The estimated value is between $10-25 million. The pre-bid conference is July 30 and bids are due August 23. The solicitation is available on FedBizOpps and issued by the Department of the Army Ohio Army National Guard.

RFI 04 and responses

View the file

Other files

File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_27a_attach2.pdf PDF
RFI_35.pdf PDF
RFI_27a.pdf PDF
RFI_27a_attach1.pdf PDF
RFI_32.pdf PDF
W91364-19-B-7001_0002.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_29.pdf PDF
RFI_24_attach2.pdf PDF
RFI_24.pdf PDF
RFI_15.pdf PDF
RFI_30.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_25.pdf PDF
RFI_26.pdf PDF
RFI_21.pdf PDF
RFI_19.pdf PDF
RFI_33.pdf PDF
RFI_31.pdf PDF
RFI_17.pdf PDF
RFI_14.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_22.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_20.pdf PDF
RFI_16.pdf PDF
RFI_08.pdf PDF
RFI_09_attachment.pptx PPTX presentation
RFI_07.pdf PDF
B102,_site_visit_2.0.pdf PDF
RFI_09.pdf PDF
RFI_12.pdf PDF
W91364-19-B-7001_0001.pdf PDF
RFI_05.pdf PDF
RFI_06.pdf PDF
RFI_03.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_15.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_10.pdf PDF
Full_size_drawings_3.pdf PDF
Full_size_drawings_2b.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Poettker Construction Company

Date:

8/5/19

To: Contracting Officer

Gordon Strom

1. Solicitation Number:

W91364-19-R-7009

2. Location of Project:

Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

1. Is wood blocking required at the gutter edge, roof edge? Example, see 2‐A516.

2. Regarding sheet A201, sheet note 12 says to extend metal siding down to Elevator, is this type of metal still available? Can the new metal panels used for the Elevator be used for this patch?

3. Are there any Plumbing demo sheets? It appears concrete floor removal and replacement will be needed per sheets P401, P402, and P403 for the new waste lines. Please advise.

4. Regarding sheet AD110 note B6, cut slab for trench drains, I don’t see these on the Plumbing drawings or where they drain too, please advise.

5. Regarding Sheet S103, should note 16 read, see 5‐S512 instead of 5‐ S511?

6. Regarding Sheet S103 note 7, recessed walk off mat see detail 3‐S502, this detail doesn’t show a recess in the concrete floor, I can’t find a spec section for the mats to see if they are in fact recessed or surface mounted, please advise.

7. Is there any chance the bid date could get extended, still trying to find qualified and interested subs.

8. Can another walkthrough be set up?

Attachments:

Date Response Required:

By:

Title:

Requestor's FAX Number:

618-526-7213

Requestor's Telephone Number:

R E

S P

O N

S E

To: Date:

Response:

1. Is wood blocking required at the gutter edge, roof edge? Example, see 2‐A516.

Note that 2/A‐516 is noted on the east and west elevator walls on section A/A‐402, these details apply at the north and south walls, and are similar at the east and west walls with a ledger angle supporting the deck and no joists framing into the wall, see the attached sketch for additional details. Also note the ledger angle and anchor requirements for this detail, and on attached details 1 & 4/S‐512.

2. Regarding sheet A201, sheet note 12 says to extend metal siding down to Elevator, is this type of metal still available? Can the new metal panels used for the Elevator be used for this patch?

The existing metal siding is to remain, the term “extend” may be misleading, the intent is to cut the existing siding for installation of the new elevator area and flash the existing siding to the new construction.

3. Are there any Plumbing demo sheets? It appears concrete floor removal and replacement will be needed per sheets P401, P402, and P403 for the new waste lines. Please advise.

Conc slab demo is required for new plumbing install. See drawing AD110, keynote B5 for extent of floor slab demo.

4. Regarding sheet AD110 note B6, cut slab for trench drains, I don’t see these on the Plumbing drawings or where they drain too, please advise.

This is a trench only with no drain, a safeguard against the potential for spills in the hangar bay to leak under the doors. More information is provided on drawings S101‐S103.

5. Regarding Sheet S103, should note 16 read, see 5‐S512 instead of 5‐ S511?

Correct, note 16 should read 5/S‐512, and not 5/S‐511.

6. Regarding Sheet S103 note 7, recessed walk off mat see detail 3‐S502, this detail doesn’t show a recess in the concrete floor, I can’t find a spec section for the mats to see if they are in fact recessed or surface mounted, please advise.

The walk off mats are recessed. Drawing S‐502 is incorrectly labeled S‐501 (so there are two S‐501s in the drawing set). Detail 1 on the second S‐501 sheet shows the recessed slab.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

X

(2) P.T. 2 X NAILERS

P.T. 2 X 8 W/

1/2" DIA

ANCHOR BOLT

@ 2'-0" O.C.

L 3 X 3 1.4" LEDGER W/3/16" DIA POST

INSTALLED ANCHORS, 4"MIN. EMBED @2'-0"

O.C. MAX.RFI 004 A-516)

DECK PERP.

TO WALL AT

EAST & WEST

ELEVATOR

WALLS

T.O. CMU

T.O. WALL EL. VARIES FOR

1/4:12 ROOF SLOPE