RFI_19.pdf
PDF 2 MB Posted
- Attached to
- Repair Maintenance Hangar, B102 Federal contract opportunity
- Solicitation number
- W9136419B7001
About this file
This document contains a request for information and federal contract opportunity notice for repair and renovation work at an Air National Guard base in Mansfield, Ohio. The solicitation seeks bids for demolition, fire protection, mechanical, plumbing and electrical systems work, along with exterior brick, siding and window replacements. The construction period is 577 calendar days with no optional items. Bids will be evaluated without discussion and awarded to the responsible bidder. The small business set-aside has a NAICS code of 236220 and $36.5 million size standard. A pre-bid conference is scheduled for July 30th and bids are due August 23rd. Interested contractors must register in the System for Award Management and view solicitation documents through the Federal Business Opportunities website. The official plans and specifications are only located on the government website.
RFI 19 and response
View the file
Other files for this federal contract opportunity
Show all 50
Repair Maintenance Hangar, B102 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From: Date:
To: Contracting Officer
1. Solicitation Number:
W91364-19-B-7001
2. Location of Project:
Mansfield Ohio ANG
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
Attachments: Date Response Required:
By: Title:
Requestor's FAX Number: Requestor's Telephone Number:
kfortney Typewritten Text
1. Are all circuit breakers being primary injection tested including small panel breakers or is there a cut point as far as amperage? 100 amps and above?
2. Is the testing only on new electrical equipment and not on existing equipment?
3. I see there is a lightning protection spec but I cannot find anything referenced in the drawings. Please clarify.
R E
S P
O N
S E
To: Date:
Response:
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.
Contracting Officer:
X lcopping Text Box
1. Are all circuit breakers being primary injection tested including small panel breakers or is there a cut point as far as amperage? 100 amps and above?
Per spec 26 24 13 Perform primary current injection tests on the entire current circuit in each section of assembly in the switchboard only.
2. Is the testing only on new electrical equipment and not on existing equipment?
Testing is for new electrical equipment.
3. I see there is a lightning protection spec but I cannot find anything referenced in the drawings. Please clarify.
As per spec 26 41 00, the existing LPS and grounding systems are to be inspected and document deficiencies. Refer to this spec for details of the inspection and documentation requirements.