RFI_10.pdf

PDF 205 KB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This solicitation requests proposals for repair and renovation work at Mansfield Air National Guard Base in Ohio. The project scope includes fire protection and suppression systems, mechanical, plumbing and electrical work, as well as exterior brick, siding and window replacements. The construction duration is 577 calendar days with award based on lowest price technically acceptable basis. The opportunity is set aside for small businesses with average annual revenue of $36.5 million. The pre-bid conference is scheduled for July 30th and bids are due by August 23rd. Interested parties should register on SAM.gov and monitor the FedBizOpps website for solicitation documents and any amendments. The facility is located at the 179th Airlift Wing of the Ohio Army National Guard.

RFI 10 and response

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_14.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_10.pdf PDF
Full_size_drawings_12.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From: Date:

To: Contracting Officer

1. Solicitation Number:

W91364-19-B-7001

2. Location of Project:

Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy) 19-0018-0001

1. On Sht 132 of 247 (Vol 6 Drawings 8) it shows and API 12 B style of tank; and the written spec Section 33 16 15 (2.1.3 Design) states "The tank shall be of the style shown". Will a flat panel (RTP) bolted tank designed in accordance with AWWA D103-09 be allowed?

2. Reference the Sprinkler system and High Expansion Foam system protecting the Hangar Bay.

2a) Will the sprinkler system piping and heads in this area be exposed below the ceiling of the Hangar Bay or should the piping be installed above the ceiling and utilize pendent sprinklers installed into the Hangar Bay ceiling?

2b) Will the horizontal piping located in the Hangar Bay which supplies the High Expansion Foam Generators be required to be installed above the ceiling of the Hangar Bay?

3. Reference the specification section 213000. This section mentions both Metal Wall panels and Precast Wall Panels for the Pre-Fabricated Fire Pump Building. Which type of Wall Panel will be required for the Pre-Fabricated Fire Pump Building?

4. Reference the Fire Water Storage Tanks. Throughout the Bid Documents the storage capacity of the Fire Water Storage Tanks that is mentioned varies from 51,000, 55,000, 55,936 gallons. What is the correct usable gallons capacity for the Fire Water Storage Tanks ?

5. Will the Altitude valve for the Fire Water Storage Tanks be Hydraulic or Electric with Float?

Please provide model # of basis of design.

6. Specification section 331615 line 3.4 on page 9 indicates that Cathodic Projection shall be provided for the Fire Water Storage. Which type of Cathodic Protection System will be required for this project, Impressed or Sacrificial ?

7. In reference to the Fire Water Storage Tanks:

a) How many Tank Heaters will be required per tank?

b) How many Tank Heater Control panels will be required per tank?

8. Is there a basis of design that was used for the telecommunications cabling and connectivity material?

9. The fiber terminations are they fusion spliced or crimp connectors?

10. Is armored fiber allowed instead of using inner duct?

11. Who is providing the wireless access points? If the government is providing the wireless access points is the contractor installing them?

12. Is the intent that all cabling running in the cable tray on the plan east terminate in the existing comm closet and the cabling running in the cable tray on the plan west terminate in the data cabinet in the Hyro shop?

13. On page T-502 it says the paging adapter, amplifier and power supply are existing. What manufacture is the existing equipment? How many speakers are currently on the existing system? Will the existing system handle the 38 new speakers?

14. What is the manufacturer and catalog number of the existing ceiling system above the hanger floor?

Attachments: Date Response Required:

By: Title:

Requestor's FAX Number: Requestor's Telephone Number:

R E

S P

O N

S E

To: Date:

Response:

See responses below.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

1. On Sht 132 of 247 (Vol 6 Drawings 8) it shows and API 12 B style of tank; and the written spec Section 33 16 15 (2.1.3 Design) states "The tank shall be of the style shown". Will a flat panel (RTP) bolted tank designed in accordance with AWWA D103-09 be allowed?

Bolted steel tanks are acceptable.

2. Reference the Sprinkler system and High Expansion Foam system protecting the Hangar Bay.

2a) Will the sprinkler system piping and heads in this area be exposed below the ceiling of the Hangar Bay or should the piping be installed above the ceiling and utilize pendent sprinklers installed into the Hangar Bay ceiling?

2b) Will the horizontal piping located in the Hangar Bay which supplies the High Expansion Foam Generators be required to be installed above the ceiling of the Hangar Bay ?

2a) All piping to be above ceiling/in truss space as shown on sheet FX301. Keyed note 1 on drawings AC111 and AC112 indicates that ceiling system is to be removed for above ceiling work.

2b) All piping to be above ceiling. Piping and generators are to be seismically braced. See structural drawings for hanging details of HEF Generator.

3. Reference the specification section 213000. This section mentions both Metal Wall panels and Precast Wall Panels for the Pre-Fabricated Fire Pump Building. Which type of Wall Panel will be required for the Pre-Fabricated Fire Pump Building?

Metal Wall Panels.

4. Reference the Fire Water Storage Tanks. Throughout the Bid Documents the storage capacity of the Fire Water Storage Tanks that is mentioned varies from 51,000, 55,000, 55,936 gallons. What is the correct usable gallons capacity for the Fire Water Storage Tanks ?

The project will require 2 tanks each with 55,936 usable gallons.

5. Will the Altitude valve for the Fire Water Storage Tanks be Hydraulic or Electric with Float?Please provide model # of basis of design.

Provide mechanically activated float valve. Typically use Cla-Valve as basis of design. Means, methods and materials will be up to the contractor. Tanks levels will be monitored by Fire Alarm system. Coordinate final design with tank manufacturer.

6. Specification section 331615 line 3.4 on page 9 indicates that Cathodic Projection shall be provided for the Fire Water Storage. Which type of Cathodic Protection System will be required for this project, Impressed or Sacrificial?

X

Cathodic protection is required.

7. In reference to the Fire Water Storage Tanks:

a) How many Tank Heaters will be required per tank?

b) How many Tank Heater Control panels will be required per tank?

Anticipate one heater and one control panel based on size of tanks. Contractor design will verify this concept.

8. Is there a basis of design that was used for the telecommunications cabling and connectivity material?

Refer to specification section 27 10 00 Building Telecommunications Cabling System document issued as part of detail design documentation for cabling and connectivity requirement information.

9. The fiber terminations are they fusion spliced or crimp connectors?

Refer to specification section 27 10 00 Building Telecommunications Cabling System document issued as part of detail design documentation for termination requirement information.

10. Is armored fiber allowed instead of using inner duct?

Refer to specification section 27 10 00 Building Telecommunications Cabling System document and detail design drawings issued as part of detail design documentation for requirement information.

11. Who is providing the wireless access points? If the government is providing the wireless access points is the contractor installing them?

Wireless access points are Owner furnished, contractor installed.

12. Is the intent that all cabling running in the cable tray on the plan east terminate in the existing comm closet and the cabling running in the cable tray on the plan west terminate in the data cabinet in the Hyro shop?

Yes.

13. On page T-502 it says the paging adapter, amplifier and power supply are existing. What manufacture is the existing equipment? How many speakers are currently on the existing system? Will the existing system handle the 38 new speakers?

1. Equipment manufacture information were unavailable at the time of detail design documentation issue. Coordinate with owner.

2. Approximately twenty-nine, refer to design documentation drawing TD110, and field verify.

3. Assume and field verify, existing amplifier meets or exceeds requirements referenced in specification section 27 51 23.10 Intercommunication System. Report discrepancies to Owner prior to the start of installation effort.

14. What is the manufacturer and catalog number of the existing ceiling system above the hanger floor?

Equipment manufacture, and model part number information were unavailable at the time of detail design documentation issue. Note: Ceiling mounted devises shown on drawing TD110, are heat sensors associated with the fire alarm system.