RFI_29.pdf

PDF 92 KB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This request for information and federal contract opportunity notice concerns repairs and renovations to Building 102 at Mansfield Air National Guard Base in Ohio. The project includes fire protection, mechanical, plumbing and electrical systems work along with exterior brick, siding and window replacements. The construction duration is 577 days with award determined by lowest price from responsible small businesses. The pre-bid conference is July 30th and bids are due August 23rd. The NAICS code is 236220 with $36.5 million size standard. The project value is estimated between $10-25 million. The solicitation is available on FedBizOpps and questions should be directed to the email provided.

RFI 29 and response

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_14.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_10.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From: Date:

To:

1. Solicitation Number:

W91364-19-B-7001

2. Location of Project:

Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

Attachments: Date Response Required:

By: Title:

Requestor's FAX Number: Requestor's Telephone Number:

Bill Typewritten Text Per P-402 drawing 3" SS line from EDF-1 connects to the existing 4" SS,but on CU-103 the 3" SS connects to an TY fitting coming off an new 4" SS extending from existing 4"SS north to last TY connecting the new sanitary lines from the Work Shops. Which Is Correct?

R E

S P

O N

S E

To: Date:

Response:

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

X athomp14 Text Box Response: CU-103 is correct. The new 4" SS parallel to the building is intended to collect flows from EDF-1, FD-1 and FCO-1.