RFI_20.pdf

PDF 166 KB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This document contains a request for information and federal contract opportunity notice. The request for information pertains to project number W91364-19-B-7001 located at the Mansfield Air National Guard base in Mansfield, Ohio. It involves repair and renovation of a maintenance hangar, including demolition, fire protection systems, mechanical, plumbing, electrical, and telecommunications work. Exterior brick and metal siding also require renovation along with window and door replacements. The federal contract opportunity is for project number PBXP 132166 to repair and renovate the same maintenance hangar building. The project includes demolition, fire protection, mechanical, plumbing, electrical, and telecommunications systems work. Exterior renovations and window and door replacements are also included to meet energy efficiency and security standards. The performance period is 577 calendar days with bidding open until August 23, 2019. The solicitation is set aside for small businesses with a NAICS code of 236220 and $36.5 million size standard.

RFI 20 and response

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_14.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_10.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Date:

To: Contracting Officer

1. Solicitation Number:

W91364-19-B-7001

2. Location of Project:

Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

Div 01 General Requirement 1 Insurance

1. We do not see where it states who is to provide Builder’s Risk Insurance. Please advise.

2. Some of the recent RFI’s include changes in specifications and drawing details, will these be put in an addendum/amendment?

Attachments:

Date Response Required:

By:

Title:

Requestor's FAX Number:

Requestor's Telephone Number:

R E

S P

O N

S E

To:

Date:

Response:

1. Not familiar with term “Builder’s insurance”…Bonds and insurance are to be covered by the prime contractor. Performance and Payment bonds are required (see solicitation and applicable provision/clause).

Insurance for liability purposes (while performing on a Government installation) is also a standard requirement. Certificate is required to be provided by prime contractor as part of post-award/notice to proceed documentation requirements.

2. All RFI’s (and any other information) posted to FBO is stated as to whether it is an Addendum or Amendment. There has been multiple

Addendum’s posted (that state what RFI’s are covered for each addendum) and one amendment up to this point (as bid closing date was extended). All information posted is to be considered when bidding project.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

File details come from the government source that posted it. Updated .