RFI_09.pdf

PDF 307 KB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This document contains a Request for Information and the related federal contract opportunity notice. The Request for Information seeks design details for a temporary restroom and shower facility to support 60 people minimum and 160 people maximum on weekends. It requests the number of stalls, a site plan showing utility connections, the electrical service tie-in point, who will pay utilities, whether to remove topsoil, and if signage is needed. The response clarifies that prefabricated facilities are acceptable, overhead power is available but not water or sewer, and the contractor must service the facilities including waste disposal. An aerial map shows the proposed area and nearby lift station.

The federal contract opportunity notice is for repair and renovation work at a National Guard maintenance hangar. The solicitation seeks bids for fire, mechanical, plumbing and electrical systems work, along with exterior and window replacement. The construction period is 577 days with inspection and no optional items. The opportunity is set aside for small businesses with a NAICS code of 236220. The pre-bid meeting is July 30th and bids are due August 23rd. Interested parties must register in SAM and access plans through FedBizOpps.

RFI 09 and response

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_14.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_10.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Date:

To: Contracting Officer

1. Solicitation Number:

W91364-19-B-7001

2. Location of Project:

Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

Regarding the temporary restroom / shower facility, Attachment 8 generally describes the facility and indicates how many people the restroom / shower facility is to service but no design has been done by the DOR. Since this is a design-bid-build project the DOR needs to design the restroom facility.

We need to know the following information:

1. We need to know how many toilet/sink/shower stalls to provide that will be “adequate to “support a minimum of 60 people and a surge capacity of 160, one weekend a month”.

2. We need a specific location shown on a civil drawing for the new facility showing the water and sanitary services required to service the new facility including tie-in points to the existing utilities. Also need to show any required walkways, lighting, etc. that may be required to support the new facilities for ADA or other reasons.

3. We need to know where the tie-in point is located to provide electrical service to the new facility.

4. Need to know who is paying for the utilities.

5. If the facility is to be located in a grassed area, need to know if the government wants us to strip the topsoil off the area and install new gravel under the new facility.

6. Need to know if any temporary signage is required and what the extent of the signage is.

Attachments:

Date Response Required:

ASAP

By:

Title:

Requestor's FAX Number:

Requestor's Telephone Number:

R E

S P

O N

S E

To:

Date:

Response:

Our market research found Commercial Off The Shelf products available similar to those used for disaster response and temporary construction sites. The Government does not dictate means and methods however, there was no intent for construction of facilities.

1. Refer to response to RFI 7.

2. Overhead electrical for temporary connection is available. Water and sanitary sewer is not available. Contractor is to be responsible for servicing the restroom/showers, to include cleaning, toiletries, water (and supply tank), and sanitary waste collection and disposal.

Proposed area is on asphalt pavement and has lighting.

3. Please see response to question 2.

4. Electrical utilities for the temporary facilities shall be provided by the base. Sanitary lift station is also within the vicinity of the overhead power line proposed for this project. An aerial map has been provided.

5. Facility is to be located on asphalt.

6. No temporary signage will be required for the temporary facility or facilities in regards to the shower/restrooms.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

File details come from the government source that posted it. Updated .