RFI_09.pdf
PDF 307 KB Posted
- Attached to
- Repair Maintenance Hangar, B102 Federal contract opportunity
- Solicitation number
- W9136419B7001
About this file
This document contains a Request for Information and the related federal contract opportunity notice. The Request for Information seeks design details for a temporary restroom and shower facility to support 60 people minimum and 160 people maximum on weekends. It requests the number of stalls, a site plan showing utility connections, the electrical service tie-in point, who will pay utilities, whether to remove topsoil, and if signage is needed. The response clarifies that prefabricated facilities are acceptable, overhead power is available but not water or sewer, and the contractor must service the facilities including waste disposal. An aerial map shows the proposed area and nearby lift station.
The federal contract opportunity notice is for repair and renovation work at a National Guard maintenance hangar. The solicitation seeks bids for fire, mechanical, plumbing and electrical systems work, along with exterior and window replacement. The construction period is 577 days with inspection and no optional items. The opportunity is set aside for small businesses with a NAICS code of 236220. The pre-bid meeting is July 30th and bids are due August 23rd. Interested parties must register in SAM and access plans through FedBizOpps.
RFI 09 and response
View the file
Other files for this federal contract opportunity
Show all 50
Repair Maintenance Hangar, B102 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From:
Date:
To: Contracting Officer
1. Solicitation Number:
W91364-19-B-7001
2. Location of Project:
Mansfield Ohio ANG
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
Regarding the temporary restroom / shower facility, Attachment 8 generally describes the facility and indicates how many people the restroom / shower facility is to service but no design has been done by the DOR. Since this is a design-bid-build project the DOR needs to design the restroom facility.
We need to know the following information:
1. We need to know how many toilet/sink/shower stalls to provide that will be “adequate to “support a minimum of 60 people and a surge capacity of 160, one weekend a month”.
2. We need a specific location shown on a civil drawing for the new facility showing the water and sanitary services required to service the new facility including tie-in points to the existing utilities. Also need to show any required walkways, lighting, etc. that may be required to support the new facilities for ADA or other reasons.
3. We need to know where the tie-in point is located to provide electrical service to the new facility.
4. Need to know who is paying for the utilities.
5. If the facility is to be located in a grassed area, need to know if the government wants us to strip the topsoil off the area and install new gravel under the new facility.
6. Need to know if any temporary signage is required and what the extent of the signage is.
Attachments:
Date Response Required:
ASAP
By:
Title:
Requestor's FAX Number:
Requestor's Telephone Number:
R E
S P
O N
S E
To:
Date:
Response:
Our market research found Commercial Off The Shelf products available similar to those used for disaster response and temporary construction sites. The Government does not dictate means and methods however, there was no intent for construction of facilities.
1. Refer to response to RFI 7.
2. Overhead electrical for temporary connection is available. Water and sanitary sewer is not available. Contractor is to be responsible for servicing the restroom/showers, to include cleaning, toiletries, water (and supply tank), and sanitary waste collection and disposal.
Proposed area is on asphalt pavement and has lighting.
3. Please see response to question 2.
4. Electrical utilities for the temporary facilities shall be provided by the base. Sanitary lift station is also within the vicinity of the overhead power line proposed for this project. An aerial map has been provided.
5. Facility is to be located on asphalt.
6. No temporary signage will be required for the temporary facility or facilities in regards to the shower/restrooms.
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.
Contracting Officer: