This document includes a request for information and a related federal contract solicitation notice. The request for information seeks clarification on containment trenches and compressed air regulators specified for a project located at the Mansfield Air National Guard Base in Mansfield, Ohio. The solicitation notice is for project number PBXP 132166 to repair and renovate a maintenance hangar at the Mansfield Air National Guard Base, including fire protection, mechanical, plumbing and electrical systems work, as well as exterior renovations. The contract duration is 577 calendar days with no additive bid items or options. The solicitation is set aside for small businesses with a revenue size standard of $36.5 million. The pre-bid conference is July 30, 2019 and bids are due August 23, 2019. The solicitation and plans are available on FedBizOpps and questions should be directed to the listed contracting officer.
RFI 26 and response
View the file
Other files for this federal contract opportunity
Show all 50
Repair Maintenance Hangar, B102 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From: Date:
To: Contracting Officer
1. Solicitation Number:
W91364-19-B-7001
2. Location of Project:
Mansfield Ohio ANG
1. 3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy) 19-0016-003
1. Is there a speck make/model # for the containment trenches out in the hanger area?
Shown on drawing S‐101‐103 Note #8. Detail on S‐501 Detail #10 doesn’t mention either.
Is there a basis of design?
2. Per spec 22.13.1 Compressed air regulator requires a brass body unit. Is there a basis of design manufacturer/model #.
Attachments: Date Response Required:
By: Title:
Requestor's FAX Number: Requestor's Telephone Number:
R E
S P
O N
S E
To: Date:
Response:
1. Is there a speck make/model # for the containment trenches out in the hanger area?
Shown on drawing S‐101‐103 Note #8. Detail on S‐501 Detail #10 doesn’t mention either.
Is there a basis of design?
There is no specific basis of design identified. A traffic rated FRP trench drain unit that’s intended to be cast into fresh concrete is acceptable. The drain should be 6”‐8” wide.
2. Per spec 22.13.1 Compressed air regulator requires a brass body unit. Is there a basis of design manufacturer/model #.
There is no basis of design identified. Part 2.13.1 of 22 00 00 states brass body or equal. A pressure regulator body constructed of zinc or aluminum die castings that is rated for the service is acceptable.
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.
Contracting Officer:
X