This document contains a request for information and related federal contract opportunity notice. The request for information seeks clarification on equipment installation and specifications for project number PBXP 132166 to repair and renovate maintenance hangar B102 at Mansfield Air National Guard Base in Mansfield, Ohio. The renovation includes fire protection and suppression systems, mechanical, plumbing and electrical work, as well as exterior brick and metal siding replacement and window and door upgrades. The related federal contract opportunity is solicitation number W9136419B7001 for the same repair and maintenance hangar project. Interested bidders must register in SAM and attend the pre-bid conference on July 30, 2019. Bids are due August 23, 2019. The project is set aside for small businesses with a NAICS code of 236220 and size standard of $36.5 million average annual revenue. The magnitude is estimated between $10-25 million.

RFI 14 and response

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_10.pdf PDF
Full_size_drawings_12.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Date:

To: Contracting Officer

1. Solicitation Number:

W91364-19-B-7001

2. Location of Project:

Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

Regarding the equipment:

1. General Note 4 on Drawing Q-110 says that the equipment is GFGI. However, notes found on the floor plans and reflected ceiling plans indicate that the equipment is GFCI. Please clarify who is installing the equipment.

2. The equipment notes found on the architectural floor plans and reflected ceiling plans say that the contractor is to “receive equipment, place the equipment, provide all connections for proper operation of equipment, test equipment, and certify to the government functionality of all equipment.”

a. Is it new equipment or used equipment?

b. Will we be receiving the equipment at Building 102 or some other location.

c. Do we have to put it together? How many pieces is each piece of equipment broken down into?

d. Are all of the “connections for proper operation” shown on the electrical, plumbing, etc.

plans? If not, for each piece of equipment please tell us what other connections are required that are not specifically shown in our plans. The power requirements and utility connections shown on the equipment schedules on Drawings Q-601 and Q-602 seem very incomplete. Are all utility connections shown here?

e. Please provide photos or catalog cut sheets of each piece of equipment that shows the general configuration and weight of each piece of equipment.

f. For some of the equipment we have no idea what this equipment is or how it operates.

How are we to test it and ensure the proper operation and certify its functionality? How do we know it operated properly to begin with (if it is used equipment)?

3. On the equipment schedules shown on Drawings Q-601 and Q-602, the “power requirements” are shown to be “Provided by ANG”. Does this mean the ANG provided the power requirements to the DOR or is the ANG providing power for the items?

Attachments:

Date Response Required:

By:

Title:

Requestor's FAX Number:

Requestor's Telephone Number:

R E

S P

O N

S E

To: Date:

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

See responses below.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

1. General Note 4 on Drawing Q-110 says that the equipment is GFGI. However, notes found on the floor plans and reflected ceiling plans indicate that the equipment is GFCI. Please clarify who is installing the equipment.

The user equipment is GFGI. The industrial chiller required for the aircraft hydraulic test stand is an exception. The industrial chiller is currently installed at Bldg 414 and this chiller is GFCI. Refer to specification 01 11 00, section 1.8.

2. The equipment notes found on the architectural floor plans and reflected ceiling plans say that the contractor is to “receive equipment, place the equipment, provide all connections for proper operation of equipment, test equipment, and certify to the government functionality of all equipment.”

This is a note that should have been removed from the final set of drawings. User equipment is GFGI, not GFCI.

g. Is it new equipment or used equipment?

Most of the equipment is used, being moved from other facilities. Some equipment will be new.

h. Will we be receiving the equipment at Building 102 or some other location?

Equipment is GFGI.

i. Do we have to put it together? How many pieces is each piece of equipment broken down into?

No, equipment is GFGI.

j. Are all of the “connections for proper operation” shown on the electrical, plumbing, etc.

plans? If not, for each piece of equipment please tell us what other connections are required that are not specifically shown in our plans. The power requirements and utility connections shown on the equipment schedules on Drawings Q-601 and Q-602 seem very incomplete.

Are all utility connections shown here?

Provided utilities (power, air, etc.) as shown on mechanical, plumbing, and electrical, etc.

drawings. To clarify, on Q-601-602, the column listed as “POWER REQUIREMENTS (PROVIDED BY ANG) are the power requirements information we received from ANG, not that these power connections are provided by ANG or Government. These schedules are for informational purposes only.

xx

k. Please provide photos or catalog cut sheets of each piece of equipment that shows the general configuration and weight of each piece of equipment.

Equipment is GFGI.

l. For some of the equipment we have no idea what this equipment is or how it operates. How are we to test it and ensure the proper operation and certify its functionality? How do we know it operated properly to begin with (if it is used equipment)?

See question #2 above.

3. On the equipment schedules shown on Drawings Q-601 and Q-602, the “power requirements” are shown to be “Provided by ANG”. Does this mean the ANG provided the power requirements to the DOR or is the ANG providing power for the items?

See question #2j above.