RFI_24_attach2.pdf

PDF 5 MB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This solicitation notice seeks bids for a repair and renovation project at Mansfield Air National Guard Base in Ohio. The project includes demolition and repair of fire protection, mechanical, plumbing and electrical systems, along with renovation of exterior brick, metal siding, windows and doors. The construction period is 577 calendar days. The bid opening is scheduled for August 23, 2019. The solicitation is set aside for small businesses with a size standard of $36.5 million average annual revenue. The project value is between $10-25 million. The pre-bid conference is July 30, with registration required. Interested bidders must be registered in SAM and view solicitation documents on FBO. The facility is located at the 179th Airlift Wing of the Ohio Air National Guard in Mansfield.

RFI 24 attachment 2

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_14.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
Full_size_drawings_10.pdf PDF
Full_size_drawings_12.pdf PDF
Pre-Bid_sign_in_sheet.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

71QUANTECH

FORM QTC3-NM1

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

PUMP WIRING

DWG. 5

QUANTECH72

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

COMPRESSOR WIRING

FIGURE 16 - COMPRESSOR WIRING

035-21589-106 REV N

LD2120

1 X BF

A

A

2AP 2A 2AL

1AC1AD1AF

X B1

B1

1 1

A

B2

B1

X B1

D 000

E

D 020100

E

22 A

D

EX

21 A

D

EX

2A12

D

EX

22 A 22 A 22 A

2 2 2

F C B2B1 B2

PEPE

L1L2L21

F C B2B1 B2

PEPE

L1L2L21

2 2A

2 A

2 A

2 A

D

EX D

EX D

EX

2 2

2 1A

EX

B

C

A

D

EX

FE BL

FE B

FE BL

FE 2 1

EX

EX

EXEX

EX

EX

1 F

D 000

E

D 020100

E

EX

EX

EXEX

2 BDP ED

2 BDP BL

2 BDP

1 2

73QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

FIGURE 21 - COMPRESSOR WIRING (CONT’D)

LD21210

2A 2A 2A

1AA1AB1AE

A

AA

B2

D

EX1

120A

D

EX

220A

D

EX

12 A 12 A 12 A

2 2 2

1 A

1 A

1 A

1 2A

D

EX D

EX D

EX

1 2

1 1A

EX

B

C

A

B

C

A

B

C

A

1 BDP ED

1 BDP BL

1 BDP

1 B P ED

1 B P BL

1 B P

2 B P ED

2 B P BL

2 B P

8 10 11

QUANTECH74

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

POWER OPTIONS CONNECTION DIAGRAM

FIGURE 17 - POWER OPTIONS CONNECTION DIAGRAM

035-21589-103 REV C

LD13234C

PE

PE PE

TRANSFORMER AND TERMINALS

ARE FOUND ON POWER SIDE

OF DIVIDER PANEL

LA

2L1A 2L1B 2L1C 1L1A

B 1L1C 1L2C 1L3C

2L2A 2L2B 2L2C 1L2A

B

2L3A 2L3B 2L3C 1L3A

B 2L1A 2L2A 2L3A 2L1B 2L2B 2L3B 2L1C 2L2C 2L3C 1L1A 1L2A 1L3A

B B B C C C

1L1C 1L2C 1L3C

A A A

BB B

L3BL2BL1B

A A A

A A A

1L3C1L1C 1L2C

1L1A 1L2A 1L3A 1L1B 1L2B 1L3B

L1 L2 L3

1L2 1L2

1L3 1L3

1L1 1L1

1L1 1L1

1L3 1L3

1L2 1L2

L3L1 L2

-QSD

1L31L1 1L2

-QSD

140CB

R -T3

R R

R2

B B

B2

75QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

FIGURE 23 - POWER OPTIONS CONNECTION DIAGRAM (CONT’D)

LD13234D

B B B

A B

A B

A B

2L1C 2L2C 2L3C

2L1C 2L3C2L2C

2L1A 2L2A 2L3A 2L1B 2L2B 2L3B

L1 L2 L3

2L3 2L3

2L2 2L2

2L1 2L1

305304303

A2A1

22642

21531

-KP2

302301300

A2A1

22642

21531

-KP1

1L1 1L2 1L3

1L1 1L1

1L2 1L2

1L3 1L3

QUANTECH76

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

POWER PANEL

FIGURE 18 - POWER PANEL

035-21589-101 REV H

LD16754

1L1 1L2 1L3

1-XTBF

AV

AG

AJ JMP

1F 1G

2K 2L

2K

Q R

L M

P Q

K L

P

J K

AQ

AE

AB

AA

L M M N N Y Y O G H H I I J

2J 2I 2J

2X 2I 2H

2X

OR

-EHRH1 EXT

-EHRH2 EXT

2AR

(2X)

=1 -F

H P

(2R)

(1M)

O

A A A B B B C C C

SP

SP

SP

1L1 1L2 1L3

1L1 1L2 1L3

1L1 1L2 1L3

=1-F4

1L1 1L1

1L2 1L2 1L3

352A 352B

351A 351B

350A 350B

-F3

1L1 1L2

362A361A360A

=1-F5

CA2KN40

A244342414

43332313 A1

CA2KN40

A244342414

43332313 A1

LC1D09-1811

=1-KF3

LC1D09-1811

=1-KF2

LC1D09-1811

=1-KF1

122B

26D

25D

106 108107

A1

A2

=1-KM3

121B

103 105104

A1

A2

=1-KM2

26C 26D

25C 25D

119B

100 102101

A1

A2

=1-KM1

26B 26C

25B 25C

144A 144

2 2

1 1

2 2

120C

120A 120E

124A 124

125A 125

126A 126

131A 131B

132A

133A

134A

135A 135

149G 149F

1 2 3 4 5

77QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

FIGURE 25 - POWER PANEL (CONT’D)

LD16755

2-XTBF

SP

SP

1E 1F

O O

P

N N M U T T S S R

AL

AM

AP

AH

AW

AC

AD

AF

U V

V W

W

P Q

Q R

R

2G 2H

2F 2G F

E 2D 2E

SP

OR

(2E)

2A(2A)

A AA B BB C C C

2L32L22L1 2L1 2L2 2L3

2L22L1 2L3

2L22L1 2L3

2L22L1 2L3

=2-F4

452A 452B

451A 451B

450A 450B

2L32L22L1

462A461A460A

=2-F5

=2-KT1

220 144

=1-KT1

CA2KN40

A244342414

43332313 A1

LC1D09-1811

=2-KF3

LC1D09-1811

=2-KF2

LC1D09-1811

=2-KF1

222B

28D

27D

206 208207

A1

A2

=2-KM3

221B

203 205204

A1

A2

=2-KM2

28C 28D

27C 27D

219B

200 202201

A1

A2

=2-KM1

28B 28C

27B 27C

2 2

2 2

1 1

220A220C 220 220E

224 224A

225 225A

226 226A

231B 231A

232A

233A

234A

235 235A

244A244

13K 13L

6 7 8 9 10 11

QUANTECH78

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

MICRO PANEL CONNECTIONS

FIGURE 19 - MICRO PANEL CONNECTIONS

035-21589-102 REV M

-XTBC2

TB1

-AMB

R

---> -AMB

---> -AMB

---> -AMB

1E

NB34

NB34

NB19

NB34

NB4

NB34 NB39

NB49NB4

NB41

NB19

NB19NB4NB49

NB49

NB41

231A

1 1B 1C

GNDE

GNDI

123E

123I

2E

2I

LE

LI

5E

5I

5B

32E

32I

31E

31I

30E

30I

29E

29I

28E

28I

27E

27I

26E

26I

25E

25I

-AMB

031-02550-

TB10

TB9

TB8

TB7

129A

128A

122A

127A

119A

123A

121A

118B

118A 118B

120A 127A

229A

218B

228A

222A

227A

219A

223A

221A

1 218A 218B

220A 227A

131A

1 1C 1D

140A 140C

-XP4

19C

13K 18C

-XP4

13I

19B

18B

E

LI

N K

/A M

B :R

E D

E

LI

N K

/A M

B :B

LK

W H

T B

LK

- C O

M

S H

D

J2

S H

D R

E F

-S H

D R

E F

R X

TXS

H

D R

E F

TB

P /N

5-

-1

C O

M H

O T

-ELINK

E

LI

N K

/A M

B :B

LK

E

LI

N K

/A M

B :R

E D

33E

33I

23E

23I

24E

24I

2E

2I

2E

2I

223E

223I

3B

222B

218C

227B220B

229B219B

228B221B

28B 140B

231B

32B27B

31B 15

-XP3

30A121A118A

127A

122A119A

131A 29A

128A

26A129A

25A 15

-XP2

1D

2C 120A

BLK

WHT

-T5

26B 129B 122B

29B 131B 127B

30B 25B 128B

120B

1E

121B 118C

119B10

-XP2

2D

32A 27A 228A

140A 28A 229A

3A 31A 231A

222A

218A

219A

227A 220A

221A10

-XP3

1 2 3 4 5

79QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

FIGURE 27 - MICRO PANEL CONNECTIONS (CONT’D)

-XTBC1

1E

-SF

-S

FE

NB6

NB46

NB19

NB39

NB37

NB6

NB32

NB50

NB19NB37

-SOA

J

-ADIS

- BRN-NEG

BRN-POS

-XP5

BRN-NEG

BRN-POS2

-J6

A-NEG

A-POS

19A 19B

13G 13H

18A 18B

13F 13G

13E 13F

13D 13E

13C 13D

50 18A12

20 51

19A21

-J13

13A

J2

J12

J10

9 5

7 4

7 4

7 4

1 1

1 TB

TB

6 1

J4

J14

J13 J11

J9

J8

J7

J6

J1

TB4TB3TB2

PL1

TB1

J15

-J11

-J9 1211109

-J7 1211109

-F2

3A

5B

5A

-F1

-J6

13A 13B

13H 13J 13I

SFE:BLU41A

40A SFE:BRN

13B SFE:WHT

13C

SFE:BLK14

-T1

40A 41A

NB42

NB42

GND B3

-J14

-J15

S

S

S-S- 987

NB46

-J8

-J10

6 7 8 9 10 11

QUANTECH80

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

DIMENSIONS

FOUR FAN UNITS

DIMENSIONS – QTC3055THE, QTC3060THE, QTC3080THE

NOTE:

Placement on a level surface of free of obstructions (including snow, for winter operation) or air circulation ensures rated performance, reliable patterns and possible diminished performance. Johnson Control’s unit controls will optimize operation without nuisance high-pressure safety cutouts; however, the system designer must consider potential performance degradation. Access to the unit control center assumes the unit is no higher than on spring isolators. Recommended minimum clearances: Side to wall – 6'; rear to wall – 6'; control panel to end wall – 4'0''; top – no obstructions allowed; distance between adjacent units – 10'. No more than one adjacent wall may be higher than the unit.

LD18072

81QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

FOUR FAN UNITS

DIMENSIONS – QTC3070TSE, QTC3075TSE, QTC3085TSE

NOTE:

Placement on a level surface of free of obstructions (including snow, for winter operation) or air circulation ensures rated performance, reliable patterns and possible diminished performance. Johnson Control’s unit controls will optimize operation without nuisance high-pressure safety cutouts; however, the system designer must consider potential performance degradation. Access to the unit control center assumes the unit is no higher than on spring isolators. Recommended minimum clearances: Side to wall – 6'; rear to wall – 6'; control panel to end wall – 4'0'';

top – no obstructions allowed; distance between adjacent units – 10'. No more than one adjacent wall may be higher than the unit.

LD18073

QUANTECH82

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

NOTE:

Placement on a level surface of free of obstructions (including snow, for winter operation) or air circulation ensures rated performance, reliable patterns and possible diminished performance. Johnson Control’s unit controls will optimize operation without nuisance high-pressure safety cutouts; however, the system designer must consider potential performance degradation. Access to the unit control center assumes the unit is no higher than on spring isolators. Recommended minimum clearances: Side to wall – 6'; rear to wall – 6'; control panel to end wall – 4'0'';

top – no obstructions allowed; distance between adjacent units – 10'. No more than one adjacent wall may be higher than the unit.

FIVE FAN UNITS

DIMENSIONS – QTC3095TSE

LD18074

83QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

SIX FAN UNITS

DIMENSIONS – QTC3110TSE, QTC3090THE, QTC3100THE

NOTE:

Placement on a level surface of free of obstructions (including snow, for winter operation) or air circulation ensures rated performance, reliable patterns and possible diminished performance. Johnson Control’s unit controls will optimize operation without nuisance high-pressure safety cutouts; however, the system designer must consider potential performance degradation. Access to the unit control center assumes the unit is no higher than on spring isolators. Recommended minimum clearances: Side to wall – 6'; rear to wall – 6'; control panel to end wall – 4'0'';

top – no obstructions allowed; distance between adjacent units – 10'. No more than one adjacent wall may be higher than the unit.

LD18075

QUANTECH84

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

EIGHT FAN UNITS

DIMENSIONS – QTC3125TSE, QTC3140TSE, QTC3130THE

LD18076

NOTE:

Placement on a level surface of free of obstructions (including snow, for winter operation) or air circulation ensures rated performance, reliable patterns and possible diminished performance. Johnson Control’s unit controls will optimize operation without nuisance high-pressure safety cutouts; however, the system designer must consider potential performance degradation. Access to the unit control center assumes the unit is no higher than on spring isolators. Recommended minimum clearances: Side to wall – 6'; rear to wall – 6'; control panel to end wall – 4'0'';

top – no obstructions allowed; distance between adjacent units – 10'. No more than one adjacent wall may be higher than the unit.

85QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

TEN FAN UNITS

DIMENSIONS – QTC3160TSE, QTC3150THE, QTC3170THE

LD18077

NOTE:

Placement on a level surface of free of obstructions (including snow, for winter operation) or air circulation ensures rated performance, reliable patterns and possible diminished performance. Johnson Control’s unit controls will optimize operation without nuisance high-pressure safety cutouts; however, the system designer must consider potential performance degradation. Access to the unit control center assumes the unit is no higher than on spring isolators. Recommended minimum clearances: Side to wall – 6'; rear to wall – 6'; control panel to end wall – 4'0'';

top – no obstructions allowed; distance between adjacent units – 10'. No more than one adjacent wall may be higher than the unit.

QUANTECH86

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

TWELVE FAN UNITS

DIMENSIONS – QTC3205THE, QTC3225THE

LD21039

NOTE:

Placement on a level surface of free of obstructions (including snow, for winter operation) or air circulation ensures rated performance, reliable patterns and possible diminished performance. Johnson Control’s unit controls will optimize operation without nuisance high-pressure safety cutouts; however, the system designer must consider potential performance degradation. Access to the unit control center assumes the unit is no higher than on spring isolators. Recommended minimum clearances: Side to wall – 6'; rear to wall – 6'; control panel to end wall – 4'0'';

top – no obstructions allowed; distance between adjacent units – 10'. No more than one adjacent wall may be higher than the unit.

87QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

WEIGHT DISTRIBUTION AND ISOLATOR

MOUNTING POSITIONS

General Weights of specific chiller models vary significantly as options are added. As a result, total weights, weights at individual isolator positions, and actual isolator selec-tion at each position cannot be published due to the vast number of possible combinations. This informa-tion will be available when the specific chiller/ option selection is made from the local Quantech technical support. Be aware, weights will change with each op-tion along with possible isolator changes. Weights and isolators may need to be recalculated when the option selections are changed.

Whenever the isolator option is ordered, the isolators will be shipped loose with the chiller. Packed with the isolators and also in the control panel informa-tion packet is a drawing and table specifically for each chiller, based on the option selection. The drawing and table will be similar to the two samples shown below and on the following page. The drawing will show the isolator locations along with the weight in pounds and kilograms at the specific location, isolator position, and location measurements for each isolator.

Sample Isolator Location Drawings See Figure 20 below for sample printouts supplied in the isolator package and in the chiller panel literature packets.

LOCATION

X DISTANCE

INCHES (MM)

Y DISTANCE

INCHES (MM) VENDOR NUMBER

OPERATING WEIGHT

LBS (KG)

R1 19.5 (495.3) 1.36 (34.5) ND-D / Yellow 1092 (495.3) L1 19.5 (495.3) 86.86 (2206.2) ND-D / Yellow 1406 (637.8) R2 96.1 (2440.9) 1.36 (34.5) ND-D / Yellow 1015 (460.4) L2 96.1 (2440.9) 86.86 (2206.2) ND-D / Yellow 1304 (591.5)

UNIT SHIPPING

WEIGHT

(Display on unit data nameplate)

KG LBS.

2032 4480

C on tr ol

P an el

R1 R2

L1 L2

X

Y

Top View

FIGURE 20 - SAMPLE PRINTOUT SUPPLIED IN THE ISOLATOR PACKAGE AND IN THE CHILLER PANEL

LITERATURE PACKET

QUANTECH88

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

CLEARANCES

See Figure 21 below for minimum clearances for all QTC3 units.

NOTES:

1. No obstructions allowed above the unit.

2. Only one adjacent wall may be higher than the unit.

3. Adjacent units should be 10 feet (3 Meters) apart.

FIGURE 21 - UNIT CLEARANCES – ALL MODELS

(1.3 m) (2 m)

(2 m

(2 m

89QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

ISOLATOR LOCATIONS

FOUR FAN ISOLATOR LOCATIONS QTC3055THE, QTC3060THE, QTC3080THE

FOUR FAN ISOLATOR LOCATIONS QTC3070TSE, QTC3075TSE, QTC3085TSE

1.4

1.4

LD18078

LD18079

QUANTECH90

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

FIVE and SIX FAN ISOLATOR LOCATIONS

QTC3095TSE, QTC3110TSE, QTC3090THE, QTC3100THE

LD18080

EIGHT FAN ISOLATOR LOCATIONS QTC3125TSE, QTC3140TSE, QTC3130THE

LD18081

91QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

TEN FAN ISOLATOR LOCATIONS QTC3160TSE, QTC3150THE, QTC3170THE

LD18082

TWELVE FAN ISOLATOR LOCATIONS QTC3205THE, QTC3225THE

LD21040

TOP

VIEW

QUANTECH92

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

ISOLATOR INFORMATION

One Inch Deflection Spring Isolator Cross-reference

CP

MOUNT

TYPE

DIMENSION DATA (INCHES)

W D L B C T H

CP1 3 5/8 7-3/4 6-1/2 4-3/4 1/2 5-5/8

CP2 3 5/8 10-1/2 9-1/4 7-3/4 9/16 6

LD13759A

W"

D"

L"B"

C"

H"

T"

Ø1/2"

5/8"

MODEL NUMBER RATED CAPACITY (LBS) DEFLECTION RATED (IN) COLOR CODE

CP1-1D-85 85 1.360 LT. PURPLE

CP1-1D-120 120 1.200 DK. YELLOW

CP1-1D-175 175 1.170 DK. BLUE

CP1-1D-250 250 1.400 YELLOW

CP1-1D-340 340 1.130 RED

CP1-1D-510 510 1.020 BLACK

CP1-1D-675 675 1.320 DK. PURPLE

CP1-1D-900 900 1.020 DK. GREEN

CP1-1D-1200 1200 0.900 GRAY

CP1-1D-1360 1360 0.770 WHITE

CP1-1D-1785N 1785 0.880 GRAY/RED

MODEL NUMBER RATED CAPACITY (LBS) DEFLECTION RATED (IN) COLOR CODE

CP2-1D-1020 1020 1.020 BLACK

CP2-1D-1350 1350 1.320 DK. PURPLE

CP2-1D-1800 1800 1.020 DK. GREEN

CP2-1D-2400 2400 0.900 GRAY

CP2-1D-2720 2720 0.770 WHITE

CP2-1D-3570N 3570 0.880 GRAY / RED

93QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

ONE INCH DEFLECTION SPRING ISOLATORS

INSTALLATION INSTRUCTIONS

1. Read instructions in their entirety before begin-ning installation.

2. Isolators are shipped fully assembled and are to be positioned in accordance with the submittal draw-ings or as otherwise recommended.

3.

base, ensuring that all isolators centerlines match the equipment mounting holes. The VMC group recommends that the isolator base (“B”) be in-stalled on a level surface. Shim or grout as re-quired, leveling all isolator bases to the same elevation (1/4-inch maximum difference can be tolerated).

4. Bolt or anchor all isolators to supporting structure utilizing base slotted holes (“C”).

5. Place equipment on top of isolators making sure that mounting holes of the equipment line up with isolator positioning pin (“H”).

6. The adjustment process can only begin after the equipment or machine is at its full operating weight.

7. Adjust each isolator in sequence by turning spring adjusting bolt (“D”) one full counterclockwise turn at a time. Repeat this procedure on all isola-tors, one at a time.

8. Continue adjusting each isolator until a minimum of 1/4” clearance is achieved between the lower housing and upper housing. (See drawing below).

9. Fine adjust isolators to level equipment.

10. Installation is complete.

LD13790

QUANTECH94

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

2” DEFLECTION ISOLATOR CROSS-REFERENCE

Y2RS

LD13761A

12"

5"

2-3/4"

12-1/4"

8-3/8"

OPER.

HEIGHT

14"

5/8"

3/8"

Ø3/4"

TYP.(4)

3-1/2"

5/8-11UNC

TYP. (4)

2-3/4"

3/4"

7/8"

1-1/8"

3/8" GAP

5"

1/2" LIMIT

STOP &

NUT

1. All dimensions are in inches, interpret per ANSI Y14.

2.

black), spring-powder coated (color, see table be-low) hardware - zinc-electroplate.

3. Equipment must be bolted or welded to the top plate to meet allowable seismic ratings.

4. All springs are designed for 50% overload capac-ity with exception of the 2D-3280N and 2D-2870.

5. Refer to next page for installation instructions.

6. Consult factory for concrete installation.

MODEL Y2RSI-2D SEISMICALLY RESTRAINED VIBRATION ISOLATOR FOR 2” DEFLECTION

SEISMIC

MOUNT SIZE

RATED LOAD

(LBS)

RATED

DEFLECTION

(IN)

SPRING RATE

(LBS/IN)

SOLID LOAD

(LBS)

COLOR

CODE

ALLOWABLE

G RATING

HORIZONTAL

Y2RSI-2D-150 150 2.4 62 234 WHITE 34.7

Y2RSI-2D-320 320 2.3 140 490 YELLOW 16.3

Y2RSI-2D-460 460 2.3 200 688 GREEN 11.3

Y2RSI-2D-710 710 2.2 330 1072 DK BROWN 7.3

Y2RSI-2D-870 870 1.9 460 1312 RED 6

Y2RSI-2D-1200N 1200 1.9 638 1818 RED/BLACK 4.3

Y2RSI-2D-1450 1450 1.8 900 2450 TAN 3.6

Y2RSI-2D-1690 1690 1.7 1140 2892 PINK 3.1

Y2RSI-2D-2000N 2000 1.7 1318 3342 PINK/BLACK 2.6

Y2RSI-2D-2640N 2640 1.5 1854 4283 PINK/GRAY 2

Y2RSI-2D-2870N 3080 1.5 2004 4629

PINK/GRAY/

ORANGE

1.7

Y2RSI-2D-3280N 3740 1.8 2134 4930

PINK/GRAY/DK

BROWN

1.4

95QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

2” DEFLECTION ISOLATOR INSTALLATION AND ADJUSTMENT

1. Read instructions in their entirety before begin-ning installation.

2. Isolators are shipped fully assembled and are to be positioned in accordance with the submittal draw-ings or as otherwise recommended.

3.

base, ensuring that all isolator centerlines match the equipment mounting holes. The VMC group recommends that the isolator base plates (“B”) be installed on a level surface. Shim or grout as re-quired, leveling all isolator base plates to the same elevation (1/4-inch maximum difference can be tolerated).

4. Bolt or anchor all isolators to supporting structure utilizing base plate thru holes (“C”) or weld base

2" long @ 4" on center around entire base plate or tions.

5. Isolators are shipped to the job site with (2) re-movable spacer shims (“E”) between the top plate and the housing. These shims must be in place when the equipment is positioned over the isola-tors.

6. With all shims (“E”) in place, position equipment on top of plate (“A”) of isolator. Bolt equipment securely to top plate of isolator using a minimum of (2) 5/8 UNC A325 grade 5 SAE bolts or weld equipment or bracket to the top plate (“A”) of iso-

3" on center for a minimum total weld of 10". (All sides of equipment or bracket resting on top plate (“A”) must be welded).

7. The adjustment process can only begin after the equipment or machine is at its full operating weight.

8. Back off each of the (4) limit stop lock nuts (“F”) on isolators 1/2".

9. Adjust each isolator in sequence by turning spring adjusting nuts (“G”) one full clockwise turn at a time. Repeat this procedure on all isolators, one at a time. Check the limit stop lock nuts (“F”) periodically to ensure that clearance between the washer and rubber grommet is maintained. Stop adjustment of isolator only when the top plate (“A”) has risen just above the shim (“E”).

10. Remove all spacer shims (“E”).

11. Fine adjust isolators to level equipment.

12. Adjust all limit stop lock nuts (“F”) per isolator, maintaining a 1/4 to 3/8-inch gap. The limit stop nuts must be kept at this gap to ensure uniform bolt loading during uplift (as the case when equip-ment is drained).

13. Installation is complete.

LD13763B

WASHER

("F")

("B")

GROMMET

("G") ("A")

("C")

("F") ("E")

("E") ("E")

1/4 - 3/8 GAP

CLCL

("C")

EQUIPMENT

("A")

QUANTECH96

ISSUE DATE 12/20/2018SECTION 5 – TECHNICAL DATA

NEOPRENE ISOLATOR CROSS-REFERENCE

LD13760A

RD-Style Isolators

L

AL

DW

BT

HF ø AD THRU

TYP 2 PLACES

MOLDED

DURULENE

CD

W

1. All dimensions are inches, interpreted per ANSI Y14.

2. Refer to next page for installation instructions.

3. Mount molded in weather resistant duralene com-pound as standard. Also available in other materi-als such as natural rubber, extreme high tempera-ture silicone, high-damped silicone, nitrile and

EDPM.

4. AL = Mounting hole center to center spacing.

5. HF = Free height of mount, prior to loading. Op-erating height calculated by the free height less for reference only.

6. Hardware zinc-electroplated.

MOUNT

TYPE

DIMENSION DATA (INCHES)

L W HF AL AD BT CD DW

RD1-WR 3.13 1.75 1.25 2.38 0.34 0.19 5/16-18 UNC X 3/4 1.25

RD2-WR 3.88 2.38 1.75 3.00 0.34 0.22 3/8-16 UNC X 1 1.75

RD3-WR 5.50 3.38 2.88 4.13 0.56 0.25 1/2-13 UNC X 1 2.50

RD4-WR 6.25 4.63 2.75 5.00 0.56 0.38 1/2-13 UNC X 1 3.00

MODEL

NUMBER

RATED

CAPACITY

(LBS)

RATED

DEFLECTION

(IN)

DURO

(± 5)

RD2-LIGHT BLUE-WR 35 0.4 30

RD2-BROWN-WR 45 0.4 40

RD2-BRICK RED-WR 70 0.4 50

RD 2-LIME-WR 120 0.4 60

MODEL

NUMBER

RATED

CAPACITY

(LBS)

RATED

DEFLECTION

(IN)

DURO

(± 5)

RD3-Brown-WR 250 0.5 40 RD3-Brick Red-WR 525 0.5 50

RD3-Lime-WR 750 0.5 60 RD3 Charcoal-WR 1100 0.5 70

MODEL

NUMBER

RATED

CAPACITY

(LBS)

RATED

DEFLECTION

(IN)

DURO

(± 5)

RD2-LIGHT BLUE-WR 135 0.5 30

RD2-BROWN-WR 170 0.5 40

RD2-BRICK RED-WR 240 0.5 50

RD 2-LIME-WR 380 0.5 60

RD2 CHARCOAL-WR 550 0.5 70

MODEL

NUMBER

RATED

CAPACITY

(LBS)

RATED

DEFLECTION

(IN)

DURO

(± 5)

RD4-BROWN-WR 1500 0.5 40

RD4-BRICK RED-WR 2250 0.5 50

RD4-LIME-WR 3000 0.5 60

RD4 CHARCOAL-WR 4000 0.5 70

97QUANTECH

ISSUE DATE 12/20/2018 SECTION 5 – TECHNICAL DATA

INSTALLATION OF NEOPRENE VIBRATION ISOLATORS

LD13762B

D D

TOP BOLT

CL

SECTION D-D

TOP WASHER

("A")

("B")

CL

("C")

("B")

1. Read instructions in their entirety before begin-ning installation.

2. Isolators are shipped fully assembled and are to be positioned in accordance with the submittal draw-ings or as otherwise recommended.

3.

base, ensuring that all isolator centerlines match the equipment mounting holes. The VMC group recommends that the isolator base (“A”) be in-stalled on a level surface. Shim or grout as re-quired, leveling all isolator bases to the same elevation (1/32-inch maximum difference can be tolerated).

4. Bolt or anchor all isolators to supporting structure utilizing base thru holes (“B”).

5. Remove top bolt and top washer. Place equip-ment on top of isolators so that mounting holes in equipment or base line up with threaded hole (“C”).

6. Reinstall top bolt and washer and tighten down.

7. Installation is complete.

QUANTECH98

ISSUE DATE 12/20/2018

THIS PAGE INTENTIONALLY LEFT BLANK

99QUANTECH

ISSUE DATE 12/20/2018

Commissioning of this unit should only be carried out by Johnson Controls Au-thorized personnel.

Commissioning personnel should be thoroughly famil-iar with the information contained in this literature, in addition to this section.

Perform the commissioning using the detailed checks outlined. Refer to Equipment Pre-Startup And Startup Checklist on page 95 as the commissioning procedure is carried out.

PREPARATION – POWER OFF

The following basic checks should be made with the customer power to the unit switched OFF.

Inspection Inspect unit for installation damage. If found, take ac-tion and/or repair as appropriate.

Refrigerant Charge Packaged units are normally shipped as standard with a full refrigerant operating charge. Check that refrig-erant pressure is present in both systems and that no leaks are apparent. If no pressure is present, a leak test must be undertaken, the leak(s) located and repaired.

Remote systems and units are supplied with a nitrogen holding charge. These systems must be evacuated with a suitable vacuum pump/recovery unit as appropriate to below 500 microns.

Do not liquid charge with static water in the cooler.

Care must also be taken to liquid charge slowly to avoid excessive thermal stress at the charging point.

Once the vacuum is broken, charge into the condenser coils with the full operating charge as given in SEC-

TION 5 – TECHNICAL DATA.

Service and Oil Line Valves Open each compressor suction, economizer, and dis-charge service valve. If valves are of the back-seat type, open them fully (counterclockwise) then close one turn of the stem to ensure operating pressure is fed to pressure transducers. Open the liquid line service valve and oil return line ball valve fully in each system.

Compressor Oil To add oil to a circuit – connect a hand oil pump (Part No. 470-10654-000) to the 1/4” oil charging connec-tion on the compressors with a length of clean hose or copper line, but do not tighten the flare nut. Using clean oil of the correct type (“V” oil for Copeland com-pressor and “PVE” oil for Bitzer compressor), pump oil until all air has been purged from the hose then tighten the nut. Stroke the oil pump to add oil to the oil system. Approximately 1.8 to 2.3 gallons is present in the each refrigerant system. Oil levels in the oil equal-izing line sight glass should be between the bottom and the middle of the sight glass with the system OFF.

High oil levels may cause excessive oil carryover in the system. High oil concentration in the system may cause nuisance trips resulting from incorrect readings on the level sensor and temperature sensors. Tempera-ture sensor errors may result in poor liquid control and resultant liquid overfeed and subsequent damage to the compressor. While running, a visible sign of oil splash-ing in the sight glass is normal.

Fans Check that all fans are free to rotate and are not dam-aged. Ensure blades are at the same height when ro-tated. Ensure fan guards are securely fixed.

Isolation / Protection Verify all sources of electrical supply to the unit are taken from a single point of isolation. Check that the maximum recommended fuse sizes given in SECTION 5 – TECHNICAL DATA has not been exceeded.

Control Panel Check the panel to see that it is free of foreign materi-als (wire, metal chips, etc.) and clean out if required.

Power Connections Check that the customer power cables are connected correctly to the terminal blocks or optional circuit breaker. Ensure that connections of power cables with-in the panels to the circuit breaker or terminal blocks are tight.

Grounding Verify that the unit’s protective ground terminal(s) are properly connected to a suitable grounding point. En-sure that all unit internal ground connections are tight.

SECTION 6 – COMMISSIONING

QUANTECH100

ISSUE DATE 12/20/2018SECTION 6 – COMMISSIONING

Supply Voltage Verify that the site voltage supply corresponds to the unit requirement and is within the limits given in SEC-

TION 5 – TECHNICAL DATA.

Water System Verify the chilled liquid system has been installed cor-rectly, and has been commissioned with the correct direction of water flow through the cooler. The inlet should be at the refrigerant piping connection end of the cooler. Purge air from the top of the cooler using the plugged air vent mounted on the extension pipe.

Flow rates and pressure drops must be within the limits given in SECTION 5 – TECHNICAL DATA. Operation outside of these limits is undesirable and could cause damage.

If mains power must be switched OFF for extended maintenance or an extended shutdown period, the com-pressor suction, discharge and economizer service stop valves should be closed (clockwise). If there is a pos-sibility of liquid freezing due to low ambient tempera-tures, the coolers should be drained or power should be applied to the chiller. This will allow the cooler heater to protect the cooler from freezing down to –20 °F. Be-fore placing the unit back in service, valves should be opened and power must be switched ON (if power is removed for more than 8 hours) for at least 8 hours (24 hours if ambient temperature is below 86 °F [30 °C]) before the unit is restarted.

Flow Switch Verify a chilled water flow switch is correctly fitted in the customer’s piping on the cooler outlet, and wired into the control panel correctly using shielded cable.

There should be a straight run of at least 5 pipe diam-eters on either side of the flow switch. The flow switch should be connected to terminals 13 and 14 of XTBC1 on the panel.

Temperature Sensor(s) Ensure the leaving liquid temperature sensor is coated with heat conductive compound (Part No. 013-00890-

000) and is inserted to the bottom of the water out-let sensor well in the cooler. This sensor is part of the pump control freeze protection operation. It provides some freeze protection and must always be fully in-serted in the water outlet sensor well.

PREPARATION – POWER ON

Perform the commissioning using the de-tailed checks outlined. Refer to Equipment Pre-Startup And Startup Checklist on page 95 as the commissioning procedure is carried out.

Apply power to the chiller. Turn on the option panel circuit breaker if supplied.

The machine is now live!

Switch Settings Assure the chiller OFF/ON UNIT switch at the bottom of the keypad is OFF. Place the optional circuit breaker handle on the panel door to ON. The customer’s dis-connection devices can now be set to ON.

Verify the control panel display is illuminated. Assure the system switches under the SYSTEM SWITCHES key are in the OFF position.

Compressor Heaters Verify the compressor heaters are energized. If the am-bient temperature is above 96 °F (36 °C) the compres-sor heaters must be on for at least 8 hours before start-up to ensure all refrigerant liquid is driven out of the compressor and the oil. If the ambient temperature is below 86 °F (30 °C), allow 24 hours.

101QUANTECH

ISSUE DATE 12/20/2018 SECTION 6 – COMMISSIONING

HOW TO COMMISSION THE PUMP VFD

1. Put pump in HAND mode.

LD18418

2. Change parameter 0-20 (default value is option 1601 – “Reference [Unit]”) to option 1850 “Sen-sorless Readout” to display Sensorless flow read-out on top left corner of screen.

LD18419

3. Change parameter 0-22 (default value is option 1610 – “Power [kW]”) to option 1654 “Feedback 1 [unit]” to display Sensorless pressure readout on top right corner of screen.

4. Check with customer regarding new actual flow and head and verify what flow is required. Ramp the pump up or down to achieve requested flow.

Record the VFD sensorless flow and pressure – this will be your new setpoint.

5. Set parameter 20-21 to the Sensorless Pressure readout taken in the previous step.

LD18420

LD18421

LD18422

6. Set parameter 22-89 to the Sensorless Flow read-out taken in the previous step.

LD18423

7. Set parameter 22-87 to a value that is X% of the value in 20-21. This percentage needs to be calcu-lated based on the design flow and the published minimum flow for the unit. This ensures that the drive will not allow the pump to operate below the minimum flow of the chiller. You have now read-justed the quadratic control curve to match actual site conditions.

8. Change parameter 0-20 back to default value of option 1601 – “Reference [Unit]”.

9. Change parameter 0-22 back to default value of option 1610 – “Power [kW]”.

10. Put the VFD back into AUTO mode.

LD18424

QUANTECH102

ISSUE DATE 12/20/2018SECTION 6 – COMMISSIONING

MODEL - QTC3

8. Is ALL power wired to the chiller and meets N.E.C.

and local codes?

a. High voltage

b. Low voltage

c. Check tightness of power wiring inside the pow-er panel on both sides of the motor contactors and overloads

d. Check to ensure BAS control is wired correctly and operational

9. Check for proper size fuses in main and control circuits, and verify overload setting corresponds with RLA and FLA values in electrical tables (see Table 8 and Table)

10. Assure 120VAC (110VAC for 50Hz units) Control Power to TB1 has 15 amp minimum capacity

11. Are all water temp sensors inserted completely into their respective wells and are coated with heat con-ductive compound?

12. Are the evaporator TXV bulbs strapped onto the suction lines at 4 or 8 o'clock positions or suction temp. sensors if EEVs are installed?

13. Do all sides of the unit have the recommended amount of space for air ventilation? Refer to SEC- TION 4 - INSTALLATION (Form QTC3-NM1)

14. Does the cabinet edge clear the insulation of cable at the power entry to avoid slicing the cable?

B. COMPRESSOR HEATER

(Power On - 24 Hours Prior To Start)

Apply 120VAC and verify its value between terminals 5 and 2 of XTBC2. The voltage should be 120VAC (110VAC for 50Hz units) plus or minus 10%

NOTE: Power must be applied 24 hours prior to start-up. Each heater should draw approxi-mately 0.5 to 1A.

A. PRE-STARTUP

Unit Checks (No Power) The following basic checks should be made with the customer power to the unit switched OFF.

1. Inspect the unit for shipping or installation damage

2. Assure that all piping has been completed

3. Visually check for refrigerant piping leaks

4. If available, open suction line ball valve, discharge line ball valve, and liquid line valve for each system

5. At shutdown, the oil level should be between the bottom and middle of the oil equalizing sight glass

6. Are water pumps ON?

a.

pressure drop across the cooler Refer to Op-erating Limitations, SECTION 5 - TECHNICAL DATA (Form QTC3-NM1) b.

operational?

c. Are the chilled water pumps operational?

d

e. Is ALL air purged from the water system?

NOTE: Any air found in the water system MUST be purged before the chiller can start up.

age to the heat exchanger (evaporator)

7. Is the control panel free of foreign material (wires, metal chips and so on)?

The following work must be completed in accordance with installation instructions:

CUSTOMER: ____________________________________

ADDRESS: _____________________________________

PHONE: ________________________________________

JCI TEL NO: _____________________ JCI ORDER NO: __________________ JCI CONTRACT NO: ______________

JOB NAME: ____________________________________

LOCATION: ____________________________________

CUSTOMER ORDER NO: _________________________

CHILLER MODEL NO: ____________________________

The work (as checked below) is in process and will be completed by: _____________ / ____________ / ___________

UNIT SERIAL NO: _______________________________

Month Day Year

STARTUP CHECKLIST

Form QTC3-CL1 (1217)

103QUANTECH

ISSUE DATE 12/20/2018 SECTION 6 – COMMISSIONING

FORM QTC3-CL1

ISSUE DATE: 12/29/2017

SETPOINTS ENTRY LIST

OPTIONS

Display Language

Sys 1 Switch

Sys 2 Switch

Chilled Liquid

Ambient Control*

Local/Remote Mode

Control Mode

Display Units

Lead/Lag Control*

Fan Control*

Manual Override

Current Feedback

Power Fail Restart

Soft Start**

Unit Type**

Refrigerant Type**

Flash Card Update

Remote Temperature Reset

External Evaporator Pump

YORK Hydro Kit Pump

Pump Selection

Data Log to Flashcard

Expansion Valve Type**

COOLING SETPOINTS

Cooling Setpoint

Range

EMS-PWM Max. Setpoint

PROGRAM

Discharge Pressure Cutout

Suction Pressure Cutout

Low Ambient Temp. Cutout

Leaving Liquid Temp. Cutout

Anti-Recycle Time

Fan Control ON Pressure

Fan Differential OFF Pressure

Total # of Compressors

Number of Fans/System*

Unit/Sys Voltage*

Remote Unit ID

* Not on All Models **Viewable Only

C. STARTUP

Panel checks (Power On - Both unit switch Off)

1. Apply 3-phase power and verify its value. Voltage imbalance should be no more than 2% of the aver-age voltage

2. Apply 120VAC (110VAC for 50Hz units) and verify its value on the terminal block in the Power Panel.

Make the measurement between Terminals 5 and 2 of XTBC2. The voltage should be 120VAC plus or minus 10%

3. Program/verify the Cooling Setpoints, Program Setpoints, and Unit Options. Record the values in the Setpoints Entry List table

4. Place the unit into Service Mode and cycle each condenser fan to ensure proper rotation

5. Turn system 2 OFF and leave System 1 running.

Refer to SECTION 8 – UNIT OPERATIONS (Form QTC3-NM1), UNIT KEYS, Option 2 for more infor-mation on System Switches

6. Connect a manifold gauge to system 1 suction and discharge service valves

7. Place the Unit Switch in the control panel to the ON position

NOTE: The chilled liquid setpoint may need to be temporarily lowered to ensure all compres-sors cycle ON.

As each compressor cycles ON, ensure that the dis-charge pressure rises and the suction pressure de-creases. If this does not occur, the compressor being tested is operating in the reverse direction and must be corrected.

8. Verify proper compressor rotation and then turn the Unit Switch to “OFF.”

NOTE: This unit uses scroll compressors which can only operate in one direction. Failure to ob-serve this will lead to compressor failure.

9. Turn system 1 OFF and system 2 ON (two system units only). Refer to SECTION 8 – UNIT OPERA- TIONS (Form QTC3-NM1), UNIT KEYS for more information

10. Place the Unit Switch in the control panel to the ON position

NOTE: The chilled liquid setpoint may need to be temporarily lowered to ensure all compres-sors cycle ON.

As each compressor cycles ON, ensure that the dis-charge pressure rises and the suction pressure de-creases. If this does not occur, the compressor being tested is operating in the reverse direction and must be corrected.

11. Verify proper compressor rotation and then turn the Unit Switch to OFF

QUANTECH104

ISSUE DATE 12/20/2018SECTION 6 – COMMISSIONING

FORM QTC3-CL1

ISSUE DATE: 12/29/2017

D. CHECKING SUPERHEAT AND SUBCOOLING

The subcooling temperature of each system can be calcu-lated by recording the temperature of the liquid line at the outlet of the condenser and subtracting it from the liquid line saturation temperature at the liquid stop valve (liquid line saturation temperature is converted from a temperature/ pressure chart).

Example:

Liquid line pressure = 325 PSIG converted to temp. 101 °F minus liquid line temp. - 83 °F Subcooling = 18 °F

The subcooling should be adjusted to 18 °F (-8 °C) at de-sign conditions.

Record the liquid line pressure and its saturated temperature, liquid line temperature and subcooling below:

SYS 1 SYS 2

Liq Line Press = _______ _______PSIG

Saturated Temp = _______ _______ °F

Liq Line Temp = _______ _______ °F

Subcooling = _______ _______ °F should be checked. The superheat should be checked only after steady state operation of the chiller has been established, the leaving water temperature has been pulled down to the required leaving water temperature, and the unit is running in a fully loaded condition. Correct superheat setting for a system is 10 °F to 15 °F (5.56 °C to

8.33 °C) 18” (46 cm) from the heat exchanger.

Superheat should typically be set for no less than 10 °F with only a single compressor running on a circuit.

The superheat is calculated as the difference between the actual temperature of the returned refrigerant gas in the suction line entering the compressor and the temperature corresponding to the suction pressure as shown in a stan-dard pressure/temperature chart.

Example:

Suction Temp = 46 °F minus Suction Press 105 PSIG converted to Temp - 34 °F Superheat = 12 °F

When adjusting the expansion valve (TXV only), the ad-justing screw should be turned not more than one turn utes) between adjustments for the system and the ther-mal expansion valve to respond and stabilize.

Assure that superheat is set at a minimum of 10 °F (5.56 °C) with a single compressor running on each circuit.

12. Record the suction temperature, suction pressure, saturation temperature, and superheat of each sys-tem below:

SYS 1 SYS 2

Suction Temp = _______ _______ °F

Suction Pressure = _______ _______ PSIG

Saturation Temp = _______ _______ °F

Superheat = _______ _______ °F

E. LEAK CHECKING

sure no leaks If the unit is functioning satisfactorily during the initial operating period with no safeties trip and the compres-sors cycle to control water temperature to the setpoint, the chiller is considered ready to be placed into operation.

105QUANTECH

ISSUE DATE 12/20/2018

SECTION 7 – UNIT CONTROLS

INTRODUCTION

The Quantech Control Center is a microprocessor based control system designed to provide the entire control for the liquid chiller. The control logic embed-ded in the microprocessor based control system will provide control for the chilled liquid temperatures, as well as sequencing, system safeties, displaying status, and daily schedules. The MicroComputer Control Cen-ter consists of four basic components:

1. IPU II and I/O Boards

2. Transformer

3. Display

4. Keypad

The keypad allows programming and accessing set-points, pressures, temperatures, cutouts, daily sched-ule, options, and fault information.

Remote cycling, demand limiting and chilled liquid temperature reset can be accomplished by field sup-plied contacts.

Compressor starting/stopping and loading/unload-ing decisions are performed by the Microprocessor to maintain leaving or return chilled liquid temperature.

These decisions are a function of temperature devia-tion from setpoint.

A Master ON/OFF switch activates or deactivates the unit.

LD19046

IPU II AND I/O BOARDS

The IPU and I/O boards are assembled to function as a single microprocessor controller. The IPU II board contains a microprocessor and is the controller. The I/O board handles all of the chiller I/O (Inputs and Outputs). System inputs from pressure transducers and temperature sensors are connected to the I/O board.

The I/O board constantly scans inputs to monitor the chiller operating conditions. The input values are trans-mitted the IPU II microprocessor board. From this in-formation, the IPU II then issues commands to the I/O board relay outputs to control contactors, solenoids, etc. for Chilled Liquid Temperature Control and to re-act to safety conditions. The I/O board converts logic signals to operate relay outputs to 115VAC levels used by motor contactors, fan contactors, solenoid valves, etc. to control system operation. The low voltage side of all relay coils on the I/O board are powered by +12V.

Keypad commands are actuated upon by the micropro-cessor to change setpoints, cutouts, scheduling, operat-ing requirements, and to provide displays. The keypad and display are connected to the I/O board.

The on-board power supply converts 24VAC from 75VA, 120/24VAC 50/60Hz UL listed class 2 power transformer to +12V, +5V and +3.3V using switching and linear voltage regulators located on the I/O and IPU II boards. These voltages are used to operate integrated circuitry on the board. The 40 character display and unit sensors (transducers and temp sensors) are sup-

QUANTECH106

ISSUE DATE 12/20/2018SECTION 7 – UNIT CONTROLS

plied power for the micro board +5V supply. 24VAC is rectified, but not regulated, to provide unregulated +30VDC to supply all of the digital inputs.

The I/O board contains one green “Power” LED to in-dicate that the board is powered up and one red “Sta-tus” LED to indicate by blinking that the processor is operating. The I/O board also contains two sets of Receiver/Transmit LED’s, one for each available serial communication port. The receive LED’s are green, and the Transmit LED’s are red.

A jumper on the I/O board selects 4 to 20mA or 0 to 10VDC as the input type on the remote temperature reset analog input.

TRANSFORMER

A 75VA, 120/240VAC, 50/60Hz transformer is pro-vided to supply power to the Microprocessor Board, which in turn rectifies, filters, and regulates as neces-sary to supply power to the display, sensors, and trans-ducers.

DISPLAY

The 40 Character Display (2 lines of 20 characters) is a liquid crystal display used for displaying system pa-rameters and operator messages.

When a key is pressed, such as the OPER DATA key, system parameters will be displayed and will remain on the display until another key is pressed. The system

UP)

DOWN) arrow keys. The display will update all information at a rate of about 1 a second.

Display Messages may show characters indicating “greater than” (>) or “less than” (<). These characters indicate the actual values are greater than or less than the limit values which are being displayed.

KEYPAD

The 12 button non-tactile keypad allows the user to retrieve vitals system parameters such as system pres-sures, temperatures, compressor running times and starts, option information on the chiller, and system setpoints. This data is useful for monitoring chiller op-eration, diagnosing potential problems, troubleshoot-ing, and commissioning the chiller.

It is essential the user become familiar with the use of the keypad and display. This will allow the user to make full use of the capabilities and diagnostic features available.

UNIT SWITCH

A unit ON/OFF switch is just underneath the keypad.

This switch allows the operator to turn the entire unit OFF if desired. The switch must be placed in the ON position for the chiller to operate.

BATTERY BACK-UP

The IPU II contains a Real Time Clock integrated cir-cuit chip with an internal battery backup. The purpose of this battery backup is to assure any programmed values (setpoints, clock, cutouts, etc.) are not lost dur-ing a power failure regardless of the time involved in a power cut or shutdown period.

PROGRAMMING # OF COMPRESSORS

The total number of compressors is programmable un-der the PROGRAM key. Dual (2) system chillers can have 4, 5, or 6 compressors.

107QUANTECH

ISSUE DATE 12/20/2018 SECTION 7 – UNIT CONTROLS

STATUS KEY

Unit Status Pressing the STATUS key will enable the operator to determine current chiller operating status. The messag-es displayed will include running status, cooling de-mand, fault status, external cycling device status. The display will be a single message relating to the highest priority message as determined by the microprocessor.

Status messages fall into the categories of General Sta-tus and Fault Status.

The following General, Safety, and Warning messages are displayed when the STATUS key is pressed. Fol-lowing each displayed message is an explanation per-taining to that particular message.

General Status Messages In the case of messages which apply to individual systems, SYS 1 and SYS 2 messages will both be dis-played and may be different. In the case of single sys-tem units, all SYS 2 messages will be blank.

U N I T S W I T C H O F F S H U T D O W N

This message informs the operator that the UNIT switch on the control panel is in the OFF position which will not allow the unit to run.

R E M O T E C O N T R O L L E D S H U T D O W N

The REMOTE CONTROLLED SHUTDOWN mes-sage indicates that either an ISN system or RCC has turned the unit OFF, not allowing it to run.

D A I L Y S C H E D U L E S H U T D O W N

The DAILY SCHEDULE SHUTDOWN message in-dicates that the daily/holiday schedule programmed is keeping the unit from running.

R E M O T E S T O P N O R U N P E R M

REMOTE STOP NO RUN PERM shows that a remote start/stop contact is open in series with the flow switch.

These contacts are connected to Terminals 51 and 13 of XTBC1. A 3-second delay is built into the software to prevent nuisance shutdowns due to erroneous signals on the run permissive input.

F L O W S W I T C H O P E N

FLOW SWITCH OPEN indicates the flow switch con-tacts connected to Terminals 13 and 14 of XTBC1 are open. A 3-second delay is built into software to prevent nuisance shutdowns due to erroneous signals from the flow switch.

S Y S 1 S Y S S W I T C H O F F S Y S 2 S Y S S W I T C H O F F

SYS SWITCH OFF tells that the system switch under OPTIONS is turned OFF. The system will not be al-lowed to run until the switch is turned back ON.

00066VIP

QUANTECH108

ISSUE DATE 12/20/2018SECTION 7 – UNIT CONTROLS

S Y S 1 N O C O O L L O A D S Y S 2 N O C O O L L O A D

This message informs the operator that the chilled liq-uid temperature is below the point (determined by the setpoint and control range) that the microprocessor will bring on a system or that the microprocessor has not loaded the lead system far enough into the loading sequence to be ready to bring the lag system ON. The lag system will display this message until the loading sequence is ready for the lag system to start.

S Y S 1 C O M P S R U N X S Y S 2 C O M P S R U N X

The COMPS RUNNING message indicates that the respective system is running due to demand. The “X” will be replaced with the number of compressors in that system that are running.

S Y S 1 A R T I M E R X X S S Y S 2 A R T I M E R X X S

The anti-recycle timer message shows the amount of time left on the respective systems anti-recycle timer.

This message is displayed when the system is unable to start due the anti-recycle timer being active.

S Y S 1 A C T I M E R X X S S Y S 2 A C T I M E R X X S

The anti-coincidence timer is a software feature that guards against 2 systems starting simultaneously. This assures instantaneous starting current does not become excessively high due to simultaneous starts. The mi-croprocessor limits the time between compressor starts to 1 minute regardless of demand or the anti-recycle timer being timed out. The anti-coincidence timer is only present on two system units.

S Y S 1 D S C H L I M I T I N G S Y S 2 D S C H L I M I T I N G

When this message appears, discharge pressure limit-ing is in effect. The Discharge Pressure Limiting fea-ture is integral to the standard software control; howev-er the discharge transducer is optional on some models.

Therefore, it is important to keep in mind that this con-trol will not function unless the discharge transducer is installed in the system.

The limiting pressure is a factory set limit to keep the system from faulting on the high discharge pressure cutout due to high load or pull down conditions. When the unload point is reached, the microprocessor will automatically unload the affected system by de ener-gizing one compressor. The discharge pressure unload will occur when the discharge pressure gets within 10 PSIG (0.69 barg) of the programmed discharge pres-sure cutout. This will only happen if the system is fully loaded and will shut only one compressor OFF. If the system is not fully loaded, discharge limiting will not go into effect. Reloading the affected system will oc-cur when the discharge pressure drops to 85% of the unload pressure and 10 minutes have elapsed.

S Y S 1 S U C T L I M I T I N G S Y S 2 S U C T L I M I T I N G

When this message appears, suction pressure limiting is in effect. The suction pressure limit is a control point that limits the loading of a system when the suction pressure drops to within 15% above the suction pres-sure cutout. On a standard system programmed for 44 PSIG/3.0 Bar suction pressure cutout, the micropro-cessor would inhibit loading of the affected system with the suction pressure less than or equal to 1.15 * 44 PSIG/3.0 Bar = 50 PSIG/3.5 Bar. The system will be allowed to load after 60 seconds and after the suc-tion pressure rises above the suction pressure load limit point.

S Y S 1 L O A D L I M I T X X % S Y S 2 L O A D L I M I T X X %

This message indicates that load limiting is in effect and the percentage of the limiting in effect. This limit-ing could be due to the load limit/pwm input, ISN or RCC controller sending a load limit command.

M A N U A L O V E R R I D E

If MANUAL OVERRIDE mode is selected, the STA- TUS display will display this message. This will indi-cate that the Daily Schedule is being ignored and the chiller will start-up when chilled liquid temperature allows, Remote Contacts, UNIT switch and SYSTEM switches permitting.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .