RFI_24.pdf

PDF 2 MB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This document provides details for a federal contract solicitation to repair and renovate a maintenance hangar at Mansfield Air National Guard Base in Ohio. The solicitation is for project number PBXP 132166 and includes repair and renovation of fire protection and suppression systems, mechanical, plumbing, and electrical work. Exterior brick veneer and metal siding also require renovation along with replacement of windows and doors to meet energy efficiency and security goals. The construction period is 577 calendar days from notice to proceed. The solicitation is set aside 100% for small businesses with a North American Industry Classification code of 236220 and $36.5 million average annual revenue size standard. The pre-bid conference is July 30, 2019 and bids are due August 23, 2019. The solicitation and plans are available on the Federal Business Opportunities website. The facility is located at the 179th Airlift Wing, Ohio Air National Guard in Mansfield, Ohio.

RFI 24 and response (attachments included and also follow)

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
W91364-19-B-7001_0003.pdf PDF
RFI_27a.pdf PDF
RFI_27a_attach1.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_15.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_21.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_20.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
B102,_site_visit_2.0.pdf PDF
RFI_09.pdf PDF
RFI_09_attachment.pptx PPTX presentation
W91364-19-B-7001_0001.pdf PDF
RFI_06.pdf PDF
RFI_05.pdf PDF
RFI_03.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
Full_size_drawings_10.pdf PDF
Full_size_drawings_12.pdf PDF
Full_size_drawings_8.pdf PDF
Full_size_drawings_11.pdf PDF
Full_size_drawings_2a.pdf PDF
Full_size_drawings_4b.pdf PDF
Full_size_drawings_6a.pdf PDF
Full_size_drawings_7a.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From: Date:

To: Contracting Officer

1. Solicitation Number:

W91364-19-B-7001

2. Location of Project:

Mansfield Ohio ANG

1. M‐401, note 7; Is the Government provided Chilled Water System equipment (relocated from another building on base) relocated to the Mechanical room by the Government or by the Mech contractor?

2. Are detailed shop drawings available for our use to bid the installation of this equipment?

3. Can a site visit be scheduled for the Mech contractor to review this equipment and mechanical room?

4. In specification section 086045/2.5.2/c: Grid Size is listed as 12” x 24”. However, drawing A‐201 and A‐602 show a nominal grid of 24”x 12”. Which grid is to be used?

5. On drawing A‐602, the W5 panel is called out as 14’‐4” long. The center section is drawn differently from the ends. What is this center section and how long is it?

6. In specification section 086045 it calls for U‐factor of 0.14 and Solar heat gain coefficient of 0.16 (2.5.3) with light transmission of 9% (2.5.2/a) with condensation index rating of 80 (2.5.4). All of this is achievable with a thermally‐broken grid core. However, in 2.3.2 it calls for a Non combustible grid core, which would require an aluminum grid core. If thermally‐broken, all above are accurate. If aluminum grid core is required solar heat gain number, U‐factor and condensation factors are affected. Should the panels have a thermally‐ broken or aluminum grid core?

7. In specification section 086045/1.6 is calls out for the warranty to include a manufacturer’s warranty for installation. As manufacturer is a material supplier workmanship and installation would not be covered in the ten year warranty covering items 1.6/a.b.c. and d. Is this acceptable?

8. In specification section 086045/2.6/j it calls out for exposed aluminum to be from manufacturer’s standard range, which would involve a selection from 13 standard colors with a finish per AAMA 2604. Is this acceptable?

9. In specification section 086045/l – Design Criteria it discusses Blast Loads. As drawing S‐001 calls out for the building to be a low occupancy building, would the panels not be exempt from UFC4‐010‐01 min. standards? If not exempt, please provide charge weight and stand‐off distance.

10. Will the existing AFFF Foam currently stored in the Hangar Bladder Tank be disposed of off‐site, or will the Base like to keep the AFFF Foam? If the Base would like to keep will they be providing the storage containers?

Attachments: Date Response Required:

By: Title:

Requestor's FAX Number: Requestor's Telephone Number:

R E

S P

O N

S E

To: Date:

Response:

See Responses Below

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

X

1. M‐401, note 7; Is the Government provided Chilled Water System equipment (relocated from another building on base) relocated to the Mechanical room by the Government or by the Mech contractor?

Govt will deliver to the building, Contractor will move into the mech room and install.

2. Are detailed shop drawings available for our use to bid the installation of this equipment?

This equipment is part of a separate project to support the Hydraulic Test Stand in its current location in an adjacent building. Contact Contracting Officer for shop/installation drawings for this equipment.

3. Can a site visit be scheduled for the Mech contractor to review this equipment and mechanical room?

Detailed drawings and O&M manual are attached. Project is for the relocation and install of equipment as GFCI. The

Government does not intend to extend bid period or provide additional site visits until after contract award. Two separate opportunities for site visits were provide previously.

4. In specification section 086045/2.5.2/c: Grid Size is listed as 12” x 24”. However, drawing A‐201 and A‐602 show a nominal grid of 24”x 12”. Which grid is to be used?

The grid size on the drawings shows and calls out the same dimensions as the grid size indicated in the specifications.

The drawings are clear as to the orientation of the panels.

5. On drawing A‐602, the W5 panel is called out as 14’‐4” long. The center section is drawn differently from the ends.

What is this center section and how long is it?

The width of the center section is allowed to vary depending on widths manufacturer’s proprietary standard components – overall width is 14’‐4”, subtraction of (4) NOM. frame widths, less (8) NOM. 12” wide panels results in the center section width.

6. In specification section 086045 it calls for U‐factor of 0.14 and Solar heat gain coefficient of 0.16 (2.5.3) with light transmission of 9% (2.5.2/a) with condensation index rating of 80 (2.5.4). All of this is achievable with a thermally‐ broken grid core. However, in 2.3.2 it calls for a Non combustible grid core, which would require an aluminum grid core. If thermally‐broken, all above are accurate. If aluminum grid core is required solar heat gain number, U‐factor and condensation factors are affected. Should the panels have a thermally‐ broken or aluminum grid core?

The panels should have a thermally broken grid core.

7. In specification section 086045/1.6 is calls out for the warranty to include a manufacturer’s warranty for installation.

As manufacturer is a material supplier workmanship and installation would not be covered in the ten year warranty covering items 1.6/a.b.c. and d. Is this acceptable?

Specification submittal section requires the submittal of the warranty, so acceptance of final terms will be by submittal reviewer; however, the intent is to warranty the completed installation. The manufacturer is required to warranty the product, installer warranty the installation.

8. In specification section 086045/2.6/j it calls out for exposed aluminum to be from manufacturer’s standard range, which would involve a selection from 13 standard colors with a finish per AAMA 2604. Is this acceptable?

If the selected manufacturer provides the product in only 13 standard colors, a final selection will be made from one of those colors.

9. In specification section 086045/l – Design Criteria it discusses Blast Loads. As drawing S‐001 calls out for the building to be a low occupancy building, would the panels not be exempt from UFC4‐010‐01 min. standards? If not exempt, please provide charge weight and stand‐off distance.

The translucent panels are not required to be designed for blast resistance.

10. Will the existing AFFF Foam currently stored in the Hangar Bladder Tank be disposed of off‐site, or will the Base like to keep the AFFF Foam? If the Base would like to keep will they be providing the storage containers?

AFFF has been removed from the system and the suppression system for the hangar bay has been disabled/ inoperable in anticipation of this project..

Design Conditions Datasheet

MLP Effective Date:10/1/2018 Mansfield ANG

Generated on 2018-10-17 E.2.0.12053.0-D.66.0040(REV. v8_09.idd) Datasheet Spec

Unit Folder: CH-1 Software Version: YW18.05 Page_1_of_2

Unit Tag Qty Model No Net Cooling

Capacity (ton.R) Nominal Voltage Refrigerant Type

CH-1 1 QTC3060THE46XFBSDTX 61.41 460-3-60.0 R410A

PIN:

QTC3060THE 46XFBSDTXA XXBLXCXX44 XE1XXXHXXX XAXGXXXXXX AXXXBXXXT5

....5...10 ....5...20 ....5...30 ....5...40 ....5...50 ....5...60 ....5...70 ....5...80 ....5...90

Evaporator Data Evaporator Data (Cont.) Performance Data EWT (°F) 54.00 Fluid Volume (USGAL) 5.389 EER (Btu/W ∙h) 10.28

LWT (°F) 44.00 Min. Flow Rate (USGPM) 60.23 NPLV.IP (Btu/W ∙h) 15.56

Design Flow Rate (USGPM) 151.0 Max. Flow Rate (USGPM) 324.9

Evap. Press. Drop (ft H2O) 11.0

Fluid Propylene

Glycol (%) 25 Condenser Data Physical Data

Strainer Press. Drop (ft H2O) 2.25 Ambient Temp. Design (°F) 95.0 Rigging Wt. (lb) 4645

Ext. Kit Press. Drop (ft H2O) 0.000 Altitude (ft) 0.000 Operating Wt. (lb) 4689

Total Press. Drop (ft H2O) 13.2 Compressor Type Scroll - Hermetic Refrigerant Charge (lb) 86

Fouling Factor (h.ft².F/Btu) 0.000100

Electrical Data Circuit 1 2 3 4

Compressor RLA 24 / 24 / 24 27 / 27

Fan QTY/FLA (each) 2 / 4 2 / 4

High LRA Current 145 / 145 / 145 180 / 180

Single Point Min. Circuit Ampacity 161

Recommended Fuse/CB Rating 175

Max. Inverse Time CB Rating 175

Max. Dual Element Fuse Size (A) 175 Operating Condition Electrical Data Unit Short Circuit Withstand (STD) 5 [kA] Compressor kW 64.97

Wires Per Phase 1 Total Fan kW 6.720

Wire Range (Lug Size) #6 AWG - 350 kcmil Total kW 71.69

Starter Type Across The Line Total kW with Hydrokit

Power 75.42

Notes:

Certified in accordance with the AHRI Air-Cooled Water-Chilling Packages Certification Program, which is based on AHRI Standard 550/590 (I-P) and AHRI Standard 551/591 (SI). Certified units may be found in the AHRI Directory at www.ahridirectory.org.

Unit contains freeze protection fluids in the evaporator with a leaving chilled fluid temperature above 32 DEG F [0 DEG C] and is certified when rated per the Standard with water. Auxiliary components included in total KW - Oil heaters, Chiller controls. Auxiliary power is already included in the compressor and fan power

Compliant with the requirements of the LEED Energy and Atmosphere Enhanced Refrigerant Management Credit (EAc4).

Design Conditions Datasheet

MLP Effective Date:10/1/2018 Mansfield ANG

Generated on 2018-10-17 E.2.0.12053.0-D.66.0040(REV. v8_09.idd) Datasheet Spec

Unit Folder: CH-1 Software Version: YW18.05 Page_2_of_2

Part Load Rating Data

Stage Ambient (°F) Capacity (ton.R) Total kW Unit Efficiency 1 95.0 61.41 71.69 10.28

2 87.4 53.64 53.42 12.05

3 76.2 42.16 35.61 14.21

4 64.3 29.98 21.12 17.03

5 55.0 13.86 8.985 18.52

Sound Power Levels (In Accordance with AHRI 370)

Stage Ambient

(°F)

63 Hz

(dB)

125 Hz

(dB)

250 Hz

(dB)

500 Hz

(dB)

1 kHz

(dB)

2 kHz

(dB)

4 kHz

(dB)

8 kHz

(dB)

LWA

1 95.0 96 95 91 91 88 86 81 77 93

2 87.4 96 95 91 91 88 85 81 77 93

3 76.2 96 95 91 91 87 85 81 77 93

4 64.3 93 92 88 88 85 82 78 74 90

5 55.0 90 89 85 85 82 79 75 71 87

Note: Unit is equipped with Low Sound Fans.

Performance at AHRI Conditions

Evaporator Data Condenser Data Performance Data EWT (°F) 54.00 Ambient Temp. (°F) 95.0 EER (Btu/W ∙h) 10.38

LWT (°F) 44.00 Altitude (ft) 0.000 IPLV.IP (Btu/W ∙h) 15.60

Flow Rate (USGPM) 148.5 Net Cooling Capacity

(ton.R) 62.20

Pressure Drop (ft H2O) 8.63

Fluid Water

Fouling Factor (h.ft².F/Btu) 0.000100

Fluid Volume (USGAL) 1.424

Note: Unit rated at design condition capacity.

Pump Curve

Report

Project Name Unit Tag Date Chiller Type Mansfield ANG CH-1 2018-10-17 Air Cooled Scroll Chillers

PIN Version QTC3060THE46XFBSDTXAXXBLXCXX44XE1XXXHXXXXAXGXXXXXXAXXXBXXXT5 E.2.0.12053.0-D.66.0040

MLP Effective Date:10/1/2018 Mansfield ANG

Generated on 2018-10-17 E.2.0.12053.0-D.66.0040(REV. v8_09.idd) Pump Curve Specification

Unit Folder: CH-1 Software Version: YW18.05 Page_1_of_1

QTC3060THE Hydro Kit Data Flow 151.0 USGPM Impeller Diameter 5.4 in Efficiency 74 %

Head 19.7 ft H2O NPSHR 4.95 ft H2O Pump QTY 1

Hydrokit Hydrokit T

Hydrokit Performance Data PUMP Motor Size/Speed 2950 RPM Chiller Internal PD 19.7 ft H2O Head Safety Factor -0.0489 ft H2O

Pump Motor HP 5 hp Total Head Required 19.7 ft H2O Pump Type VSD Single Pump

(Full Feat) revans@northrich.com Rectangle revans@northrich.com Rectangle

Submittal Ref. #: 697911.1 rev1

Design envelope close coupled vertical in-line pump

Model: Series Design Envelope Sensorless 4380 1506-005.0

Project name: Mansfield Air Nat Guard

Location: Manfield OH Representative: Northrich Company

Date submitted: 10/18/2018 4:19:50 PM Phone number: (216) 581-4750

Engineer: e-mail: revans@northrich.com

Contractor: Submitted by: Robert Evans

Application design data

Tag number: PP-1 Pipe orientation: Single

Suction pressure: 0 ftService: Process Pump

Location: Fluid: Water:

Quantity: 1 Operating temperature: 60 F

Viscosity: 31 SSUDuty flow per pump: 60 USgpm

Specific gravity: 1.0000Duty head: 55 psig

Safety factor % head: 0 %Environment: Indoors

Total dissolved solids: 0 ppm

Materials of construction

Construction: BF Impeller: Bronze (BS1400 Grade LG1)

Rating: ANSI-125 Shaft sleeve: 316 SS

Connections: Inlet: 1.5 in, Outlet: 1.5 in Casing gasket: Confined Non-Asbestos Fiber

Casing (volute): Cast Iron (BS1452 GR220) Flush line: Braided Stainless Steel

Stub Shaft: Stainless Steel

Mechanical seal data

Seal type: Inside Single Spring Rotating face: Resin Bonded Carbon Manufacturer code: C-ssc L EPSS 2A Stationary seat: Sintered Silicon Carbide Springs: Stainless Steel Secondary seal: EPDM

Rotating hardware: Stainless Steel

Motor electrical data

Factory ChoiceSupplier: Insulation class: Class F Insulation

Size: 5 hp Inverter motor type: Inverter Duty

Frame number: 184JM Efficiency: NEMA Prem (12.12)

Enclosure: TEFC Operating speed @ 100% flow: 3399 rpm Motor Electrics: 460/3/60 Operating speed @ 50% flow: 2411 rpm

IVS102 controller data

Sensorless control: Yes-Quadratic press control Communication port: RS 485

BMS protocol: BACnet Native Analog inputs: 2 (current or voltage)

Enclosure: UL Type 12

Digital inputs:

Analog outputs: 1 (current)

Fused disconnect switch: None 4 (programmable)

Control orientation: L1 Digital outputs: 2 (programmable)

Expansion card: None Cooling: Fan cooled through back channel

BHP at 50% load/flow and 55% of design head:

0.93 hp Ambient temperature: 14F to 113F (up to 3280ft elevation)

Meets ASHRAE 90.1: No EMI/RFI control: Integrated filter to meet EN61800-3 Min. maintained sys. pressure: 22 psig Harmonic suppression: Integrated DC link reactor**

*If minimum maintained system pressure is not known, default is 40% of design head.

** The IVS 102 control is a low harmonic control with a built-in DC link reactor equivalent in performance to a 5% AC line reactor. This does not guarantee performance to any system wide harmonic specification or the costs to meet a system wide specification. If supplied with the system electrical details, Armstrong will run a computer simulation of the system wide harmonics. If system harmonic levels are exceeded, Armstrong can also recommend additional harmonic mitigation and the cost for such mitigation.

www.armstrongfluidtechnology.com 10/22/2018, Ref. # 697911.1 rev1 Page 1 of 4

Operating limits (temperature - pressure)

Maximum pressure: 175 psi

Maximum temperature: 250 F

Pump casings are hydrostatically tested to 150% of maximum pump working pressure rating.

Performance curve

--- Admin Data --- Tag Num: PP-1 Service: Process Pump Location:

--- Motor Data --- Motor Size: 5 hp

--- Design Duty Point --- Flow: 60 usgpm Head: 55 psi Impeller: 6.19 in

--- Performance Data ---

• NPSHR: 2.8934 psi

• Eff. @ Design: 51.84 %

• BHP @ Design: 3.71 hp

• Mtr Capability @ Rated Spd: 4.75 hp

• %Mtr Safety: 27.99%

• BEP @ Design Imp.:

53.19 % @ 75.5 usgpm

• %max imp. range: 100.00 %

• Outlet Velocity: 9.46 ft/s

• VFD Op.Speed: 3399 rpm

• VFD Setting: 57.8 Hz

Series 4380 Design Envelope: 1506-005.0 @ 57.8 Hz

Integrated Intelligent Variable Speed with Sensorless Control

0 20 40 60 80 100 120 140 160

Flow (usgpm)

Head

(psi)

6.19 in

4.50 in

System

6.19 in

5 hp

49%

46%

Water:, spgr= 1.0000

PT13-3-0 (3.30.1.14)

ANSI/HI 14.6.3.4.1

--- Admin Data --- Tag Num: PP-1 Service: Process Pump Location:

--- Motor Data --- Motor Size: 5 hp

--- Design Duty Point --- Flow: 60 usgpm Head: 55 psi Impeller: 6.19 in

--- Control Data ---

1. Hmax @ 57.8 Hz:

• 60 @ 55, 3.71 hp

2. Control (QPC) @ 53.4 Hz:

• 52.9 @ 47.7, 2.87 hp

3. Control (QPC) @ 49.0 Hz:

• 45.5 @ 40.9, 2.15 hp

4. Control (QPC) @ 44.4 Hz:

• 37 @ 34.6, 1.53 hp

5. Control (QPC) @ 39.9 Hz:

• 27.7 @ 29, 1.03 hp

6. Index @ 35.5 Hz:

• 15 @ 24.1, 0.61 hp

7. Hmin: 22 psi 33.5 Hz:

• Setting= 40.00% Hmax

Series 4380 Design Envelope: 1506-005.0

Integrated Intelligent Variable Speed with Sensorless Control

0 20 40 60 80 100 120 140 160

Flow (usgpm)

Head

(psi)

63.0 Hz

35.5 Hz

33.5 Hz

18.0 Hz

System

Avg.Load (QPC)

57.8 Hz

5 hp

Index Flow (25.0% Duty Flow)

Water:, spgr= 1.0000

PT13-3-0 (3.30.1.14)

ANSI/HI 14.6.3.4.1

www.armstrongfluidtechnology.com 10/22/2018, Ref. # 697911.1 rev1 Page 2 of 4

Design envelope pumping unit capability

Operating point Flow Head Efficiency

Full capability at 100% design flow 60 USgpm 67.3 psi 50.80 %

Design point 60 USgpm 55 psig 51.84 %

50% average flow (with default load profile) 30 usgpm 30.3 psi 46.46 %

Dimensional data (not for construction)

Top viewSide view

Weight: 267 lb

• Not to scale

• R = minimum lifting clearance required above motor

• Units of measure : inches [millimeters]

• Coupling guard and flush line (not shown) are supplied

• Tolerance of ± 0.125 inch (± 3 mm) should be used

• For certified dimensions, please contact your Armstrong representative

• Pump equipped with casing drain plug and ¼ inch NPT suction and discharge gauge ports

Connection details

Connection Size Rating OD Bolt quantity* BCD Bolt size

Inlet 1.5 5ANSI-125 4 0.53.88

Outlet 1.5 5ANSI-125 4 0.53.88

*Equally spaced straddling centreline

Special instructions

The program has defaulted to a NEMA Premium Efficiency motor supplied with NEMA MG-1 Part 31.4.4.2 insulation standards for inverter-fed polyphase motors.

OSHPD Seismic Certification OSP-0422-10 UL STD 778 & CSA STD C22.2 no.108 certified

Selected options Environmental Application: Indoors www.armstrongfluidtechnology.com 10/22/2018, Ref. # 697911.1 rev1 Page 3 of 4

Project # : 697911.1 rev1 Submittal

Product: Expansion

Model: Expansion Equipment

Project Number: 697911.1.1 Representative: Northrich Company

9545 Midwest Ave, St A Cleveland, Ohio 44125

Name: Mansfield Air Nat Guard Reference: 697911.1.1

Phone: (216) 581-4750, Fax: (216) 581-4701

Date:

Location: Manfield OH

Order No: 10/18/2018 Engineer:

Submitted by: Robert Evans Date: 10/22/2018 Contractor:

Approved by: Date:

SYSTEM DATA

Tag Num : Service :

Location : Qty : 1 Selection Method : Manual

Application: Heating

This has been a Manual Selection, so no data is available.

Expansion Tank Tank Model :35-L : 1Tank Qty

:10.0 us galTank Volume Max. Working Pres. : 125 psi

• Not for Domestic Potable Water Systems.Charge Pressure: 26.8 ft

• Designed and constructed per ASME, Section VIII, Division 1.

Standard factory charge is 12 psi (83 kPa) unless otherwise specified. • California Code Sight-glass available upon request.

• Allow a minimum of 18" (457 mm) clearance for system piping.

Shell : Carbon Steel WORKING TEMPERATURE : 240°F (115°C)

Bladder : Heavy Duty Butyl WORKING PRESSURE :125 psi (862 kPa) www.armstrongfluidtechnology.com 10/22/2018, Ref. # 697911.1 rev1 Page 4 of 4

S. A. Armstrong Limited 23 Bertrand Avenue Toronto, Ontario Canada, M1L 2P3 T: (416) 755-2291 F (Main): (416) 759-9101

Armstrong Pumps Inc.

93 East Avenue North Tonawanda, New York U.S.A. 14120-6594 T: (716) 693-8813 F: (716) 693-8970

Armstrong Holden Brooke Pullen Wenlock Way Manchester United Kingdom, M12 5JL T: +44 (0) 161 223 2223 F: +44 (0) 161 220 9660 © S.A. Armstrong Limited 2010

For Armstrong locations worldwide, please visit www.armstrongintegrated.com

SUBMITTAL

JOB:

ENGINEER:

CONTRACTOR:

REPRESENTATIVE:

ORDER NO:

SUBMITTED BY:

APPROVED BY:

DATE:

DATE:

DATE:

MAXIMUM OPERATING CONDITIONS

Working Temperature 240°F (115°C) Working Pressure 125 psi (862 kPa)

FILE NO: 37.521

DATE: Feb. 18, 2010

SUPERSEDES: 37.521

DATE: Feb. 04, 2009

L Series - Pre-Charged (ASME) Expansion Tank

MODEL NO. ORDERED: _____________ QTY.: ________

TAG NO.: _______________

CHARGE PRESSURE: ______________ psi/kPa

Standard factory charge is 12 psi (83 kPa) unless otherwise specified.

MATERIALS OF CONSTRUCTION

Shell Carbon Steel Bladder Heavy Duty Butyl

Not for Domestic Potable Water Systems.

Designed and constructed per ASME, Section VIII, Division 1.

California Code Sight-glass available upon request.

Allow a minimum of 18” (457 mm) clearance for system

Model Tank

Volume

Maximum Acceptance

Volume A B

System Connection

NPT

Shipping Weight gal. in. (mm) in. (mm) in. (mm) lbs. (kg)

35-L 10 (38) 10 (38) 12 (305) 25 (635) 0.75 (19) 40 (18) 50-L 13 (49) 13 (49) 14 (356) 25 (635) 0.75 (19) 50 (23) 85-L 23 (87) 23 (87) 16 (406) 37 (940) 1.00 (19) 90 (41) 130-L 35 (132) 35 (132) 20 (508) 37 (940) 1.00 (19) 125 (57) gal. (L) (L)

TYPICAL SPECIFICATION

Furnish and install, as shown on the plans, Armstrong Model ______-L ASME pre-charged Bladder Expansion Tank, stamped 125 psi (862 kPa) working pressure.

Each tank will be supplied with a heavy duty butyl replaceable bladder. Tank shall be supplied with a ring base, lifting rings, and NPT system connection. An air charging valve connection (standard tire valve) shall be provided to facilitate adjusting pre-charge pressure to meet actual system conditions.