RFI_02.pdf

PDF 170 KB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This document contains a Request for Information and details regarding a related federal contract opportunity for repair and renovation work at the Mansfield Air National Guard Base in Ohio. The solicitation seeks bids for Project No. PBXP 132166 to repair and renovate fire protection and suppression systems, mechanical, plumbing, electrical, and telecommunications, along with exterior brick veneer, metal siding, windows, and doors. The construction duration is 577 calendar days with no additive bid items or options. Bids will be evaluated without discussions and awarded in accordance with FAR 14.101. The opportunity is set aside for small businesses with a size standard of $36.5 million average annual revenue. The estimated value is between $10-25 million. A pre-bid conference is scheduled for July 30, 2019, and bids are due August 23, 2019. The solicitation and plans are available through the Federal Business Opportunities website. The contracting agency is the Department of the Army Ohio Army National Guard located at the 179th Airlift Wing in Mansfield, Ohio.

RFI 2 and response

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_14.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach6-Vol_5_Specs.pdf PDF
Attach7_Vol_6_Drawings_12.pdf PDF
W91364-19-B-7001.pdf PDF
Attach7_Vol_6_Drawings_1b.pdf PDF
Attach7_Vol_6_Drawings_9.pdf PDF
EXHIBIT_B-Sealed_Bid_Checklist,_Reminders.pdf PDF
Attach7_Vol_6_Drawings_5.pdf PDF
Attach3-Vol_2_Specs.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From:

Date: 8/1/19

To: Contracting Officer

1. Solicitation Number:

W91364-19-B-7001

2. Location of Project:

Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

1. Specification section 21 13 20.00 20 paragraph 1.4 states that the Air National Guard Fire Protection Engineer delegates the review and approval of submittals to the Quality Control representative’s US registered fire protection engineer. Specification section 01 45 00.00 10 does not seem to include the requirement for a US registered fire protection engineer in the CQC organization. Is the CQC organization required to have a US registered fire protection engineer? If yes, please confirm the responsibilities of that individual. If the CQC organization is not required to have a US registered fire protection engineer, does the Air National Guard fire protection engineer delegate submittal review and approval to the QFPE indicated in specification section 21 13 20.00 20 paragraph 3.6.2.1?

Attachments:

Date Response Required:

By:Christopher Born, P.E.

Title: Director, Fire Protection Engineering Clark Nexsen, Inc.

Requestor's FAX Number: 757-455-5638

Requestor's Telephone Number: 757-961-7933

R E

S P

O N

S E

To:

Date:

Response:

The fire protection engineer is not listed in the QC matrix of Div

01 45 00 because their role is different than other QC personnel, and their involvement is specifically required by code. Also, in some cases

Government agencies have their own FPEs to review the fire protection submittals. For this project, the government does not have a designated

FPE for construction so the contractor is required to provide an FPE to perform all duties identified in the fire protection specifications.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

File details come from the government source that posted it. Updated .