Full_size_drawings_3.pdf

PDF 6 MB Posted

Attached to
Repair Maintenance Hangar, B102 Federal contract opportunity
Solicitation number
W9136419B7001
Issued by
Department of the Army Ohio Army National Guard

About this file

This federal solicitation is seeking bids for Project No: PBXP 132166 to repair and renovate a maintenance hangar building at Mansfield Air National Guard Base in Mansfield, Ohio. The scope of work includes demolition, as well as upgrades to fire protection/suppression systems, mechanical, plumbing, electrical, telecommunications, exterior brick veneer and metal siding. The construction duration is 577 calendar days with no additive bid items or options. Bids will be evaluated without discussions and the award will be made to the responsible bidder providing the best value in accordance with FAR 14.101(e). This solicitation is set aside for small businesses with a NAICS code of 236220 and size standard of $36,500,000 average annual revenue. The estimated value is between $10,000,000 to $25,000,000. A pre-bid conference will be held on July 30, 2019 and bids are due on August 23, 2019. Interested contractors must register in SAM and check the FedBizOpps website periodically for any amendments. The facility is located at the 179th Airlift Wing, Ohio Air National Guard in Mansfield, Ohio.

Full size 3

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
Abstract_B102_signed.pdf PDF
W91364-19-B-7001_0003.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_36.pdf PDF
RFI_28.pdf PDF
RFI_23.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_27.pdf PDF
RFI_10.pdf PDF
RFI_14.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
RFI_06.pdf PDF
RFI_02.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
RFI_01.pdf PDF
Full_size_drawings_7b.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Pre-Bid_sign_in_sheet.pdf PDF
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach4-Vol_3_Specs.pdf PDF
Attach7_Vol_6_Drawings_4.pdf PDF
Attach2-Vol_1_BOD_1a.pdf PDF
Attach7_Vol_6_Drawings_10.pdf PDF
Attach7_Vol_6_Drawings_1a.pdf PDF
Attach5-Vol_4_Specs.pdf PDF
Attach6-Vol_5_Specs.pdf PDF
Attach7_Vol_6_Drawings_12.pdf PDF
W91364-19-B-7001.pdf PDF
Attach7_Vol_6_Drawings_1b.pdf PDF
Attach7_Vol_6_Drawings_9.pdf PDF
EXHIBIT_B-Sealed_Bid_Checklist,_Reminders.pdf PDF
Attach7_Vol_6_Drawings_5.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

L

A

1 12

B

C

D

E

F

G

H

J

K

2 11

1 122 113 4 5 6 7 8 9 10

1 12

A

L

KEY PLAN

D

A B

C

0 16 32 48

1/16"=1'-0"

NN

BLDG TRUE

FILENAME: PLOT DATE: PLOT TIME:

C H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/ME/Dlv/669816_MD110$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

D E

M O

L

IT

IO

N

M E

C H

A N

IC

A L

F

IR

S T F

L O

O R P

L A

N

D

M A

G L E

Y

FEB 2019

M

W

IL

S O

N M

D R

A G

O N

MD110

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O

669816_MD110.dwg

669816

GENERAL NOTES

OF THE GOVERNMENT.

PER DOT REQUIREMENTS AND REMAIN PROPERTY

PRESSURE CONTAINERS SUITABLE FOR SHIPPING

RECOVERED REFRIGERANTS SHALL BE BOTTLED IN

MANAGEMENT FOR REFRIGERANT SALVAGING.

COMPLIANCE WITH AFPAM 32-F039 REFRIGERATION

FOLLOW ANGETL 15-01-00 AND ANGETL 01-1-1 IN B.

ABBREVIATIONS, ETC.

SEE SHEET M-001 FOR GENERAL NOTES, SYMBOLS, A.

MECHANICAL FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

DEMOLITION KEYNOTES

DEMOLISH 3" CW TO EXTENT SHOWN AND CAP.19.

3/4" CA DROP TO REMAIN, TYPICAL.18.

CA HOSE REEL TO REMAIN, TYPICAL.17.

3/4" CA PIPE TO REMAIN, TYPICAL.16

3" CW TO REMAIN.15.

STRUCTURAL REPAIR WORK.

CONCRETE AND FLOOR PATCHING WITH

ALL FLOOR DRAINS. COORDINATE FILLING WITH

FIXTURES DOWN BELOW GRADE AND CAP. REMOVE

DEMOLISH ALL SANITARY SEWER (SS) PIPING FROM 14.

TO GOVERNMENT.

HOT WATER HEATER. TURN WATER HEATER OVER

RESTROOMS BACK TO ELECTRIC TANK STORAGE

DEMOLISH ALL DOMESTIC HW PIPING IN 13.

CW MAIN.

TO PLUMBING FIXTURES IN RESTROOMS BACK TO 3"

DEMOLISH ALL DOMESTIC CW PIPING DISTRIBUTION 12.

REPAIR WORK.

CONTROLS; COORDINATE WITH ARCHITECTURAL

ELECTRICAL ROOM AND ALL ASSOCIATED

DEMOLISH PROPELLER WALL EXHAUST FAN AT 11.

ARCHITECTURAL REPAIR WORK; (TYP. 20).

DOORDINATE WALL PATCHING WITH

DEMOLISH CONDENSATE PIPE FROM FCU; 10.

DIFFUSERS/GRILLES, ETC. (TYP. 20).

CONTROLS, PIPING, DUCTWORK,

ABOVE CEILING, INCLUDING ALL ASSOCIATED

DEMOLISH ALL FAN COIL UNITS(FCU) LOCATED 9.

ASSOICATED APPURTENANCES.

DEMOLISH ALL HEATING/ CHILLED WATER PIPE AND 8.

REPAIR WORK (TYP. 20).

WALL LOUVER FROM FCU WITH ARCHITECTURAL

COORDINATE DEMOLITION OF OA DUCT AND INTAKE 7.

AND CONDENSATE PIPE.

DEMOLISH ALL ABANDONED LOW PRESSURE STEAM 6.

INDOOR HEAT PUMP TO REMAIN.5.

OUTDOOR HEAT PUMP TO REMAIN.4.

DEMOLISH INDOOR HEAT PUMPS UNITS, (TYP.3).3.

DEMOLISH OUTDOOR HEAT PUMP UNITS, (TYP.3).2.

ASSOCIATED DUCTWORK, GRILLES, CONTROLS, ETC.

DEMOLISH WALL MOUNTED EXHAUST FAN AND ALL 1.

MD401

MOUNTED HIGH

12 14

LEGEND

TO BE REMOVED.

EXISTING MECHANICAL/PLUMBING EQUIPMENT

EXISTING MECHANICAL/PLUMBING EQUIPMENT.

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

P

FILENAME: PLOT DATE: PLOT TIME:

C H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/ME/Dlv/669816_MD120$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

L

A

B

C

D

E

F

G

H

J

K

1 122 113 4 5 6 7 8 9 10

1 12

A

L

KEY PLAN

D

A B

C

0 16 32 48

1/16"=1'-0"

NN

BLDG TRUE

A

B

1 122 113 4 5 6 7 8 9 10

D E

M O

L

IT

IO

N

M E

C H

A N

IC

A L

S E

C O

N D F

L O

O R

A N

D L

O W R

O O

F P

L A

N D

M A

G L E

Y

FEB 2019

M

W

IL

S O

N M

D R

A G

O N

MD120

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O

669816_MD120.dwg

GENERAL NOTES

MECHANICAL SECOND FLOOR AND LOW ROOF DEMOLITION PLAN

1/16" = 1'-0"

DEMOLITION KEYNOTES

LEGEND

ABBREVIATIONS, ETC.

SEE SHEET M-001 FOR GENERAL NOTES, SYMBOLS, A.

TO BE REMOVED.

EXISTING MECHANICAL/PLUMBING EQUIPMENT

EXISTING MECHANICAL/PLUMBING EQUIPMENT.

ON M-130.

SHOWN. COORDINATE WITH NEW CONSTRUCTION

ELBOW JUST SOUTH OF COLUMN G TO MAU AS

DEMOLISH 4" NG AND 2 1/2" NG ON ROOF FROM 18.

5" NG ON ROOF TO REMAIN.17.

REMAIN.

IR HEATER HORIZONTAL VENT TERMINAL TO 16.

BAS.

DEMOLISHED; IR HEATERS TO BE CONTROLLED BY

IR HEATER SYSTEM CONTROL PANEL TO BE 15.

REMAIN.

BLOWER FOR IR HEATER VENT PIPE / DUCT TO 14.

IR HEATER VENT PIPE/DUCT TO REMAIN.13.

REMAIN.

NATURAL GAS SUPPLY PIPE TO IR HEATERS TO 12.

INFRARED HEATER TO REMAIN.11.

TERMINATING AT MITERED DISCHARGE TO REMAIN.

40x40 EXHAUST DUCT THROUGH BARREL ROOF 10.

DEMOLISH NATURAL GAS SERVICE PIPE TO MAU 9.

ARCHITECTURAL WORK.

MEZZANINE; COORDINATE WALL REPAIR WITH

DEMOLISH CONDENSATE DRAIN PIPE FOR AHU ON 8.

WALL REPAIR WITH ARCHITECTURAL WORK.

PREVIOUSLY DEMOLISHED MAU; COORDINATE

DEMOLISH REMAINING SUPPLY DUCT FROM 7.

STRUCTURE TO REMAIN.

CONTROLS. STRUCTURAL STEEL SUPPORT

DEMOLISH ROOFTOP MAU AND ASSOCIATED 6.

OF 36"Ø DUCT.

DEMOLISH RECTANGULAR DUCTWORK UPSTREAM 5.

ASSOCIATED APPURTENANCES.

ASSOCIATED CONTROLS, PIPING, DUCTWORK AND

DEMOLISH AHU ON MEZZANINE INCLUDING ALL 4.

SUPPLY DUCTWORK TO REMAIN.3.

LOW WALL INTAKES TO REMAIN.

EXHAUST DUCTWORK AND ASSOCIATED DROPS/ 2.

CONTROLS.

DEMOLISH EXHAUST FAN AND ASSOCIATED 1.10

7 7

TYP.10

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

FD

FCO

FD

MECH.

FILENAME: PLOT DATE: PLOT TIME:

C H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/ME/Dlv/669816_MD401$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

T

T

1 12

L

D

B

C

KEY PLAN

A

A

0 4 8 12

1/4"=1'-0"

NN

BLDG TRUE

D E

M O

L

IT

IO

N

M E

C H

A N

IC

A L

E N

L A

R G

E D M

E C

H A

N

IC

A L R

O O

M P

L

M A

G L E

Y

FEB 2019

M

W

IL

S O

N M

D R

A G

O N

MD401

AS SHOWN

B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O

669816_MD401.dwg

ENLARGED MECHANICAL ROOM DEMOLITION PLAN

1/4" = 1'-0"

LEGEND

EXISTING MECHANICAL / PLUMBING TO BE REMOVED

MECHANICAL / PLUMBING EQUIPMENT

TO REMAIN

4" SS BELOW GRADE

B

A

CONTROLS AND APPURTENANCES.

DEMOLISH HOT WATER UNIT HEATER, ASSOCIATED 8.

VALVE AND CAP.

AND ASSOCIATED APPURTENANCES TO BALL

DEMOLISH HVAC SYSTEM MAKE-UP WATER PIPING 7.

APPURTENANCES.

DEMOLISH HWS/HWR PIPING AND ASSOCIATED 6.

DEMOLISH HVAC CONTROLS / CONTROL PANEL.5.

ASSOCIATED APPURTENANCES.

DEMOLISH HEATING / CHILLED WATER PIPING AND 4.

COOLED CHILLER.

DEMOLISH REMOTE EVAPORATOR FOR AIR 3.

DEMOLISH AIR SEPARATOR.2.

ASSOCIATED EQUIPMENT PAD.

ASSOCIATED APPURTENANCES. DEMOLISH

CONTROLS, CHILLED WATER PIPING, AND

DEMOLISH AIR COOLED CHILLER, ASSOCIATED 1.

SHEET KEYNOTESGENERAL SHEET NOTES

DEMOLISH 3" PIPE COLUMN SUPPORT.16.

APPURTENANCES.

DEMOLISH REFRIGERANT PIPING AND ASSOCIATED 15.

DEMOLISH EXPANSION TANK.14.

DEMOLISH CHEMICAL SHOT FEEDER.13.

CHILLER.

DEMOLISH REMOTE PANEL FOR AIR COOLED 12.

CHILLED WATER.

AND HOUSEKEEPING PADS FOR HVAC HEATING /

DEMOLISH END SUCTION CENTRIFUGAL PUMPS 11.

OVER TO GOVERNMENT.

ARCHITECTURAL REPAIR WORK. TURN BOILER

APPURTENANCES. COORDINATE WITH

AND FLUE, ASSOCIATED HOT WATER PIPING AND

DEMOLISH BOILER COMBUSTION AIR DUCT/PIPE 10.

APPURTENANCES.

DEMOLISH HWS/HWR PIPING AND ASSOCIATED 9.

PROPELLER WALL EXHAUST FAN TO REMAIN.25.

3" CW SERVICE TO REMAIN.24.

FOR BUILDING CW SERVICE (ABOVE).

(BELOW); 3" RPZ-BFP, WATER METER AND BYPASS

6" APZ-BFP FOR FIRE PROTECTION SYSTEM 23.

6" CW SERVICE FOR BUILDING.22.

CONTRACTOR.

SYSTEM TO BE DEMOLISHED BY FIRE PROTECTION

AFFF SOLUTION TANK FOR FIRE PROTECTION 21.

FIRE PROTECTION CONTRACTOR.

FIRE SPRINKLER PIPING TO BE DEMOLISHED BY 20.

2" COMPRESSED AIR PIPE TO REMAIN.19.

REFRIGERATED AIR DRYER TO REMAIN.18.

REMAIN.

AIR COMPRESSOR WITH INTERGRAL TANK TO 17.

ARCHITECTURAL REPAIR WORK.

CONTROLS. COORDINATE WALL REPAIR WITH

DEMOLISH EXHAUST FAN AND ASSOCIATED 30.

VALVE IN VERTICAL TO BOILER.

DEMOLISH NG PIPE DOWNSTREAM OF ISOLATION 29.

5" NG UP TO ROOF TO REMAIN.28.

TO REMAIN.

GAS METER, REGULATOR AND ISOLATION VALVES 27.

WALL REPAIR WITH ARCHITECTURAL.

M-113 FOR NEW CONSTRUCTION. COORDINATE

AIR) AND ASSOCIATED MOTORIZED DAMPER; SEE

VENTILATION INTAKE AND 60x24 COMBUSTION

DEMOLISH WALL INTAKE LOUVERS (60x36 26.

OF THE GOVERNMENT.

PER DOT REQUIREMENTS AND REMAIN PROPERTY

PRESSURE CONTAINERS SUITABLE FOR SHIPPING

RECOVERED REFRIGERANTS SHALL BE BOTTLED IN

MANAGEMENT FOR REFRIGERANT SALVAGING.

COMPLIANCE WITH AFPAM 32-F039 REFRIGERATION

FOLLOW ANGETL 15-01-00 AND ANGETL 01-1-1 IN B.

ABBREV, ETC.

SEE SHEET M-001 FOR GENERAL NOTES, SYMBOLS, A.

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/EL/Dlv/669816_ED123$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

D E

M O

L

IT

IO

N

E L E

C T

R

IC

A L

S E

C O

N D F

L O

O R P

L A

N A

R E

B A

N D

E R

S O

N

FEB 2019

R L N

Y H

A R

T L

H C

O P

P L

IN

G E

R

ED123

AS SHOWN

20 B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O N

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

669816_ED123.dwg

ELECTRICAL SECOND FLOOR DEMOLITION PLAN

1/8" = 1'-0"

ROOF OUTLINE

LEGEND

REMOVED BY OTHERS

EXISTING WALL OR STRUCTURE TO BE

EXISTING WALL OR STRUCTURE

GENERAL NOTES

DRAWING ED110.

FLOOR/MEZZANINE DEMOLITION REFER TO

FOR FIRST FLOOR AND SOME SECOND G.

REFER TO DRAWING AD110.

FOR ANCILLARY ARCHITECTURAL DEMOLITION F.

DISCIPLINES.

COORDINATE DEMOLITION WITH ALL OTHER E.

NOTED.

NOT TO BE DEMOLISHED UNLESS OTHERWISE

THE EQUIPMENT, LIGHTING, IN THE HANGAR ARE D.

AND THE INTERIOR MEZZANINE.

THE EXTERIOR LOW ROOF ON THE SOUTH END,

ANCILLARY AREAS SURROUNDING THE HANGAR,

THE MAJORITY OF THE DEMOLITION IS IN THE C.

DRAWING REFER TO DRAWING ED601.

FOR ELECTRICAL SINGLE LINE DEMOLITION B.

TO DRAWINGS E-001 AND E-002.

FOR LEGEND, NOTES, AND ABBREVIATIONS REFER A.

SHEET KEYNOTES

CORRIDORS.

PANEL IN INTERIOR MEZZANINE ROOMS/

ASSOCIATED CONDUIT, WIRING, BACK TO SOURCE

DEMOLISH ALL 120VAC RECEPTACLES AND 2.

PANEL H1 IN MAIN ELECTRICAL ROOM 127.

ROOMS/CORRIDORS. ALL LIGHTING IS FED FROM

TO SOURCE PANEL IN THE INTERIOR MEZZANINE

ASSOCIATED CONDUIT, WIRING, SWITCHES, BACK

DEMOLISH ALL CEILING LIGHTING AND 1.

TYP

TYP

1 12

A

L

KEY PLAN

D

A B

C

0 8 16 24

1/8"=1'-0"

NN

BLDG TRUE

H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/EL/Dlv/669816_ED401$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

D E

M O

L

IT

IO

E L E

C T

R

IC

A L

E N

L A

R G

E D P

L A

N S

D B A

N D

E R

S O

N

FEB 2019

R L N

Y H

A R

T L

H C

O P

P L

IN

G E

R

ED401

AS SHOWN

21 B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O N

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

669816_ED401.dwg

N N

GENERAL NOTES

REFER TO DRAWING AD110.

FOR ANCILLARY ARCHITECTURAL DEMOLITION H.

DISCIPLINES.

COORDINATE DEMOLITION WITH ALL OTHER G.

DEMOLITION.

PANELS AND ASSOCIATED BREAKERS BEFORE

ED110 FOR MORE DEMO. CONFIRM SOURCE

DEMOLITION BACKGROUND. REFER TO DRAWING

SOURCE PANELS ARE IDENTIFIED ON THE 1997 F.

NOTED.

ARE NOT TO BE DEMOLISHED UNLESS OTHERWISE

THE EQUIPMENT, LIGHTING, ETC. IN THE HANGAR E.

AND THE INTERIOR MEZZANINE.

THE EXTERIOR LOW ROOF ON THE SOUTH END,

ANCILLARY AREAS SURROUNDING THE HANGAR,

THE MAJORITY OF THE DEMOLITION IS IN THE D.

KEYNOTES FOR ITEMS TO DEMOLISH.

EQUIPMENT SHALL BE DEMOLISHED. SEE

AND EQUIPMENT HAVE CHANGED. NOT ALL

EXISTING 1997 UPGRADE. SOME BUILDING AREAS

THE DEMOLITION BACKGROUND IS FROM AN C.

ED601.

FOR SINGLE LINE DEMOLITION REFER TO DRAWING B.

TO DRAWINGS E-001 AND E-002.

FOR LEGEND, NOTES, AND ABBREVIATIONS REFER A.

SHEET KEYNOTES

ASSOCIATED CIRCUITS.

DEMOLISH THE 28V DC POWER SUPPLY AND 17.

REPLACED WITH A NEW PANEL.

WIRING AND CONDUIT. PANEL DL WILL BE

TRANSFORMER AND ASSOCIATED BRANCH CIRCUIT

TRANSFORMER TO PANEL DL. DEMO PANEL DL,

TRANSFORMER. ALSO RETAIN WIRING FROM THE

RETAIN MAIN FEEDER TO THE 208/120V 16.

& PHOTO CELL.

SWITCHES TO HIGH BAY LIGHTS, EXTERIOR LIGHTS,

HIGH BAY LIGHTING. RETAIN WIRING AND

DEMO EXISTING LIGHTING CONTACTOR PANEL FOR 15.

NEW PANEL

AND WIRING. PANEL H1 WILL BE REPLACED WITH

REMAINING CIRCUITS AND ASSOCIATED CONDUIT

WIRING TO THE HIGH BAY LIGHTING. DEMO THE

RETAIN MAIN FEEDER AND BRANCH CIRCUIT 14.

DEMO EXISTING 500KV TRANSFORMER.13.

AND CONDUIT FOR INSTALLATION OF A NEW PFC.

REMOVE EXISTING PFC BUT RETAIN ALL CABLE 12.

HEATING/CHILLED WATER.

END SUCTION CENTRIFUGAL PUMPS FOR HVAC 11.

WALL INTAKE MOTORIZED DAMPER.10.

AIR COMPRESSOR SYSTEM TO BE DEMOLISHED.9.

REFRIGERATED AIR DRYER TO BE DEMOLISHED.8.

EXHAUST FAN.7.

PUMP. EQUIPMENT IS NOT SHOWN ON DRAWING.

STARTERS, FOR EXISTING FIRE PUMP AND JOCKEY

DEMOLISH WIRING, CONDUIT, ASSOCIATED 6.

LOCHINVAR HOT WATER BOILER.5.

TO SOURCE PANEL.

ASSOCIATED CONDUIT, WIRING, SWITCHES, BACK

DEMOLISH ALL 120VAC RECEPTACLES AND 4.

FROM PANEL H1 IN MAIN ELECTRICAL ROOM 127.

BACK TO SOURCE PANEL. ALL LIGHTING IS FED

ASSOCIATED CONDUIT, WIRING, SWITCHES, ETC.,

DEMOLISH ALL CEILING LIGHTING, EXIT SIGNS AND 3.

DEMOLISHED.

INDICATED EQUIPMENT HAS BEEN PREVIOUSLY 2.

SWITCH, STARTER, BACK TO SOURCE PANEL.

ASSOCIATED WIRING, CONDUIT, DISCONNECT

POWER TO INDICATED EQUIPMENT, REMOVE ALL

DEMOLISH INDICATED ITEM(S). DISCONNECT 1.

3 4

TYP TYP

3 4

TYP TYP

TANK

SOLUTION

AFFF

2 2

ACPC-1 1

7 1

BOILER ROOM (129) FLOOR PLAN

NTS

ELECTRICAL ROOM (127) FLOOR PLAN

SERVICE TRANSFORMERS PLAN DETAIL

800A

LA

UTILITY POLE

TO FUSE CUTOUT ON

AND CONCRETE PAD

500KVA TRANSFORMER

12.47KV - 480/277V

PAD MOUNTED

N

G

METER

STATE

SOLID

277V-120V

LSIG LSIG LSIG

LOCATED IN ELECTRICAL ROOM 127

800A, 480/277V, 4W

EXISTING MDP

SPARE

1#2G IN 3"C, AND 1-3"C

3#2EPR, 15KV,

AND 1-3"C SPARE

3"C( 4-350KCMIL XHHW, 1#1 G)

2 SETS OF

LSIG LSIG LSIG LSIG LSIG LSIG LSIG LSIG LSIG LSIG LSIG

65,000 A/C RS SYM

800A-5A

"C

(3 /0

A W

G

G

-1 /2 "C

(4

K C

M

IL

G

LSIG LSIG LSIG LSIG LSIG LSIG

"C

(3

G

30A

CRANE

OVERHEAD

HANGAR

PANEL

CONTROL

SYSTEM

POWER

400HZ

RM

PFC

"C

(4

A W

G

G

EAST

CONTACTOR

INTERLOCKING

-1 /2 "C

(4 /0

A W

G

G

EAST

CONTACTOR

INTERLOCKING

-1 /2 "C

(4 /0

A W

G

G

SPARE SPARE SPACE

RM 127

3-PH

260/3P

MTS

400HZ

BUILDING

CORNER OF

ON SOUTH

OUTLET

OUTPUT

400HZ

GFCI

RM

PFC

IN HANGAR

BOX

CONTROL

TERMINAL

MDP

FROM

INPUT

480V 3-PH

BEING SERVICED

FOR AIRCRAFT

PLUG SUITABLE

CABLE WITH

AIRCRAFT

80' LONG

FAULT PROTECTION

SOLID STATE WITH GROUND

225A 50A70A125A25A25A25A25A20A 250A 40A100A60A60A20A150A150A20A20A 150A

FILENAME: PLOT DATE: PLOT TIME:

C H

M H

IL

L

A

L L R

IG

H T S R

E S

E R

V E

D

C H

M H

IL

L A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F C

H

M H

IL

L

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

R E

P A

IR

M

X H

A N

G A

R

M A

N S

F

IE

L D L

A H

M A

N G B

A S

E

A

IR

N

A T

IO

N A

L G

U A

R D

M A

N S

F

IE

L D

O H

IO

of pw://projectwise.ch2m.com:DEN001/Documents/669816&space;-&space;Repair&space;MX&space;Hangar/WIP/MX&space;Hangar&space;CAD/EL/Dlv/669816_ED601$PWURL

T

A Y

L O

R S

T R

E E

T S

U

IT

E

D A

Y T

O N

O H

IO

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V

D E

M O

L

IT

IO

N

E L E

C T

R

IC

A L

S

IN

G L E

L

IN

E

B A

N D

E R

S O

N

FEB 2019

R L N

Y H

A R

T L

H C

O P

P L

IN

G E

R

ED601

AS SHOWN

22 B D

E S

IG

N S

U B

M

IT

T A

L

D R P

E A

R S

O N

-0

-1

IS

S U

E D F

O R C

O N

S T

R U

C T

IO

N D

P

669816_ED601.dwg

ELECTRICAL SINGLE LINE DIAGRAM DEMOLITION

GENERAL NOTES

EQUIPMENT.

UPDATE PANEL SCHEDULES FOR DEMOLISHED E.

ALL OTHER DISCIPLINES PRIOR TO DEMOLITION.

FIELD VERIFY DEMOLITION AND COORDINATE WITH D.

OR AS NOTED.

ITEMS NOT INDICATED TO DEMOLISH, RETAIN AS IS C.

AND ALL OTHER DISCIPLINES.

COORDINATE WORK WITH EXISTING CONDITIONS B.

ABBREVIATIONS, AND NOTES.

REFER TO DRAWING E-001 AND E-002 FOR LEGEND, A.

SHEET KEYNOTES

NOT USED.2.

CONDUIT, BACK TO SOURCE PANEL.

ASSOCIATED WIRING, DISCONNECT SWITCH,

TO INDICATED EQUIPMENT, REMOVE ALL

DEMOLISH INDICATED ITEM(S). DISCONNECT POWER 1.

CONVERTER WILL BE INSTALLED LATER.

ALL CONDUIT AND CABLE. A NEW 400 Hz FREQUENCY

DEMOLISH 400 Hz FREQUENCY CONVERTER, RETAIN 7.

CABLING.

RETAIN EXISTING MEDIUM VOLTAGE CONDUIT AND 6.

ROOM 127. RETAIN TRANSFER SWITCH AS IS.

CONDUIT AND CABLE BACK TO TRANSFER SWITCH IN

DEMOLISH PANEL HF ALONG WITH ASSOCIATED 5.

DISCONNECTS, BACK TO SOURCE PANEL.

DEMOLISH ANY EXISTING CONDUIT, WIRING,

EQUIPMENT HAS BEEN DEMOLISHED IN THE PAST. 4.

CONDUIT, BACK TO SOURCE PANEL DL.

ASSOCIATED WIRING, DISCONNECT SWITCH,

POWER TO ALL THAT PANEL DL FEEDS, REMOVE ALL

28V DC UNIT. RETAIN PANEL DL. DISCONNECT

EQUIPMENT: L1, L2, L3, L4, L5, L6, L7, L9, L10, L11, LB,

PANEL DL FEEDS THE FOLLOWING PANELS OR 3.

400A

DL

RM

/4 "C

(3

G

480V-208/120V

150KVA

ROOM 101

EF-1

5.6A

/4 "C

(3

G

LOW ROOF

MAU-1

20A

/4 "C

(3

G

LOW ROOF

MAU-2

20A

/4 "C

(3

G

LOW ROOF

MAU-3

20A

/4 "C

(3

G

LOW ROOF

MAU-4

20A

"C (3

G

OUTSIDE

ACPC-1

110A

225A

H1

RM

-1 /2 "C

(3 /0

A W

G

G

PANEL

LIGHTING

PANEL

CONTROL

COMPRESSOR

RM

25HP

"C

(4

A W

G

G

/4 "C

(3

G

ROOM 129

PUMP-P1

10A

/4 "C

(3

G

ROOM 129

PUMP-P2

10A

/4 "C

(3

G

ROOM 101

EF-2

5.6A

100A

C1

RM

"C

(3

A W

G

G

-1 /4 "C

(4

A W

G

G

ON MEZ.

480V-208/120V

30KVA

45A

GROUND

ISOLATED

100A

C2

RM

"C

(3

A W

G

G

-1 /4 "C

(4

A W

G

G

RM 101

480V-208/120V

30KVA

45A

GROUND

ISOLATED

225A

HF

RM

RATED

400HZ

400 HZ SINGLE LINE DIAGRAM DEMO

4 4 41 1 1 1 1 1

1 1

1 1

3 10 10 10 10 75 5 5 3

LEGEND

EXISTING TO BE REMOVED

RETAIN

RETAIN

File details come from the government source that posted it. Updated .