RFI_08.pdf
PDF 147 KB Posted
- Attached to
- Repair Maintenance Hangar, B102 Federal contract opportunity
- Solicitation number
- W9136419B7001
About this file
This document includes a Request for Information and response regarding a federal contract solicitation for repair and renovation work at Mansfield Air National Guard Base in Ohio. The solicitation requires repair and upgrades to fire protection, mechanical, plumbing and electrical systems as well as exterior brick, siding, windows and doors. The work must meet energy efficiency and security standards and is set aside for small businesses with a revenue size standard of $36.5 million. The pre-bid conference is July 30th and bids are due August 23rd. Interested parties must register in SAM and view documents on FedBizOpps as amendments will only be posted there. The response provides specifications for aluminum sunshades to be installed at window locations as shown on floor plans and elevations.
RFI 08 and responses
View the file
Other files for this federal contract opportunity
Show all 50
Repair Maintenance Hangar, B102 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From: Date:
To: Contracting Officer
1. Solicitation Number:
W91364-19-B-7001
2. Location of Project:
Mansfield Ohio ANG
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
Regarding the sunshades:
1. There is no specification. Please provide one.
2. There are no dimensions for the sunshades shown on the drawings. Should we scale the drawings to get the size?
3. The sunshades are shown graphically on the floor plans and reflected ceiling plans but not noted. They are not shown at all on the elevation drawings.
Attachments: Date Response Required:
By: Title:
Requestor's FAX Number: Requestor's Telephone Number:
R E
S P
O N
S E
To: Date:
Response:
1. There is no specification. Please provide one.
See attached page for specification.
2. There are no dimensions for the sunshades shown on the drawings. Should we scale the drawings to get the size?
The sunshades shall extend 2 inches beyond each side of the window frame. Width shall be 3’- 0” measured from exterior face of wall. Depth shall be 8 inches.
3. The sunshades are shown graphically on the floor plans and reflected ceiling plans but not noted. They are not shown at all on the elevation drawings.
The sunshades are shown on the elevations but not keynoted. They are required at all locations shown on the floor plans and reflected ceiling plans.
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.
Contracting Officer:
X
SECTION 10 71 10
SUNSHADES
1. General
a. Sunshades shall be provided and installed by the contractor, and shall be a complete ready to install system including fascia channels, tensioning rods, and attachment hardware.
b. Sunshades shall be rated by engineering analysis or testing for 120 MPH wind speeds in accordance with ASCE 7. Provide analysis or testing documentation sealed by a professional engineer.
c. Submit the following
i. Manufacturer’s data sheet including preparation instructions, storage and handling requirements recommendations and installation method.
ii. Shop drawings including system components, dimensions, attachments, and accessories.
iii. Sustainability documentation including percentages by weight of post-consumer and pre-consumer recycled content, location and distance from project of material manufacturer and material point of origin, and a statement indicating cost for each regional material and the fraction by weight that is considered regional.
iv. Two complete sets of color chips representing full range of available colors.
Color shall be selected by the COR.
v. Manufacturer's warranty and certificate certifying products meet or exceed specified requirements.
vi. Manufacturer's maintenance instructions
d. Manufacturer’s and installers shall each have 5 years minimum experience manufacturing and installing similar sun screen systems.
e. All welders shall be AWS certified.
2. Products
a. Frames and blades: Extruded aluminum alloy
b. Metal Components: Aluminum Alloy
c. Frames: 1/8” minimum thickness.
d. Hardware, Anchors, and Fasteners: Stainless steel or hot dip galvanized for corrosion resistance. Provide measures to protect against corrosion of dissimilar metals.
e. Finishes: Two coat minimum fluoropolymer; 70 percent PVDF resin by weight complying with AAMA 2605, 1.2 mils dry film thickness. 20 year coating warranty against peeling, blistering, chips, cracks, or checks.
3. Execution
a. Do not begin installation until substrates have been properly prepared.
b. Prepare surfaces and install sunshades in accordance with manufacturer's instructions and in proper relationship with adjacent construction.
c. Protect installed products until completion of project. Touch-up, repair, or replace damaged products, repairs shall be approved by the COR.