This document includes a Request for Information and response regarding a federal contract solicitation for repair and renovation work at Mansfield Air National Guard Base in Ohio. The solicitation requires repair and upgrades to fire protection, mechanical, plumbing and electrical systems as well as exterior brick, siding, windows and doors. The work must meet energy efficiency and security standards and is set aside for small businesses with a revenue size standard of $36.5 million. The pre-bid conference is July 30th and bids are due August 23rd. Interested parties must register in SAM and view documents on FedBizOpps as amendments will only be posted there. The response provides specifications for aluminum sunshades to be installed at window locations as shown on floor plans and elevations.

RFI 08 and responses

View the file

Other files for this federal contract opportunity

Other files attached to Repair Maintenance Hangar, B102, newest first.
File Type Posted
W91364-19-B-7001_0003.pdf PDF
RFI_27a.pdf PDF
RFI_27a_attach1.pdf PDF
RFI_24_attach2.pdf PDF
RFI_34.pdf PDF
RFI_24_attach1.pdf PDF
RFI_15.pdf PDF
RFI_17.pdf PDF
RFI_31.pdf PDF
RFI_26.pdf PDF
RFI_25.pdf PDF
RFI_21.pdf PDF
RFI_18.pdf PDF
RFI_13.pdf PDF
RFI_20.pdf PDF
RFI_16.pdf PDF
RFI_04.pdf PDF
RFI_07.pdf PDF
B102,_site_visit_2.0.pdf PDF
RFI_09.pdf PDF
RFI_09_attachment.pptx PPTX presentation
W91364-19-B-7001_0001.pdf PDF
RFI_06.pdf PDF
RFI_05.pdf PDF
RFI_03.pdf PDF
Full_size_drawings_13.pdf PDF
Full_size_drawings_6b.pdf PDF
Full_size_drawings_17.pdf PDF
Full_size_drawings_4a.pdf PDF
Full_size_drawings_14.pdf PDF
Full_size_drawings_10.pdf PDF
Full_size_drawings_12.pdf PDF
Full_size_drawings_8.pdf PDF
Full_size_drawings_11.pdf PDF
Full_size_drawings_2a.pdf PDF
Full_size_drawings_4b.pdf PDF
Full_size_drawings_6a.pdf PDF
Full_size_drawings_7a.pdf PDF
Pre-Bid_Conference_slides_B102.pptx PPTX presentation
Attach7_Vol_6_Drawings_7.pdf PDF
Attach7_Vol_6_Drawings_8.pdf PDF
Attach8-Temp_Restrooms.pdf PDF
Attach7_Vol_6_Drawings_6.pdf PDF
Attach7_Vol_6_Drawings_13.pdf PDF
Attach7_Vol_6_Drawings_11.pdf PDF
Attach7_Vol_6_Drawings_2.pdf PDF
Attach9-RFI_template.doc DOC document
Attach1-Scope_of_Work-B102.pdf PDF
EXHIBIT_A-CLIN_Pricing_Summary.xlsx XLSX spreadsheet
Attach7_Vol_6_Drawings_3.pdf PDF
Show all 50

Repair Maintenance Hangar, B102 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

R E

Q U

E S

T O

R S

E C

T

IO

N

From: Date:

To: Contracting Officer

1. Solicitation Number:

W91364-19-B-7001

2. Location of Project:

Mansfield Ohio ANG

3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)

Regarding the sunshades:

1. There is no specification. Please provide one.

2. There are no dimensions for the sunshades shown on the drawings. Should we scale the drawings to get the size?

3. The sunshades are shown graphically on the floor plans and reflected ceiling plans but not noted. They are not shown at all on the elevation drawings.

Attachments: Date Response Required:

By: Title:

Requestor's FAX Number: Requestor's Telephone Number:

R E

S P

O N

S E

To: Date:

Response:

1. There is no specification. Please provide one.

See attached page for specification.

2. There are no dimensions for the sunshades shown on the drawings. Should we scale the drawings to get the size?

The sunshades shall extend 2 inches beyond each side of the window frame. Width shall be 3’- 0” measured from exterior face of wall. Depth shall be 8 inches.

3. The sunshades are shown graphically on the floor plans and reflected ceiling plans but not noted. They are not shown at all on the elevation drawings.

The sunshades are shown on the elevations but not keynoted. They are required at all locations shown on the floor plans and reflected ceiling plans.

This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.

This information is a proposed change to the solicitation/contract. An amendment will be issued.

Contracting Officer:

X

SECTION 10 71 10

SUNSHADES

1. General

a. Sunshades shall be provided and installed by the contractor, and shall be a complete ready to install system including fascia channels, tensioning rods, and attachment hardware.

b. Sunshades shall be rated by engineering analysis or testing for 120 MPH wind speeds in accordance with ASCE 7. Provide analysis or testing documentation sealed by a professional engineer.

c. Submit the following

i. Manufacturer’s data sheet including preparation instructions, storage and handling requirements recommendations and installation method.

ii. Shop drawings including system components, dimensions, attachments, and accessories.

iii. Sustainability documentation including percentages by weight of post-consumer and pre-consumer recycled content, location and distance from project of material manufacturer and material point of origin, and a statement indicating cost for each regional material and the fraction by weight that is considered regional.

iv. Two complete sets of color chips representing full range of available colors.

Color shall be selected by the COR.

v. Manufacturer's warranty and certificate certifying products meet or exceed specified requirements.

vi. Manufacturer's maintenance instructions

d. Manufacturer’s and installers shall each have 5 years minimum experience manufacturing and installing similar sun screen systems.

e. All welders shall be AWS certified.

2. Products

a. Frames and blades: Extruded aluminum alloy

b. Metal Components: Aluminum Alloy

c. Frames: 1/8” minimum thickness.

d. Hardware, Anchors, and Fasteners: Stainless steel or hot dip galvanized for corrosion resistance. Provide measures to protect against corrosion of dissimilar metals.

e. Finishes: Two coat minimum fluoropolymer; 70 percent PVDF resin by weight complying with AAMA 2605, 1.2 mils dry film thickness. 20 year coating warranty against peeling, blistering, chips, cracks, or checks.

3. Execution

a. Do not begin installation until substrates have been properly prepared.

b. Prepare surfaces and install sunshades in accordance with manufacturer's instructions and in proper relationship with adjacent construction.

c. Protect installed products until completion of project. Touch-up, repair, or replace damaged products, repairs shall be approved by the COR.