W912QR22R0028_CUI_Pre bid contractors site visit requested photos - 1 Dec 2022.pdf

PDF 3 MB Posted

Attached to
Renovation of WPAFB Air Force Materiel Command Headquarters; Phase 1
Solicitation number
W912QR22R0028
Issued by

About this file

This document provides details for a federal contract opportunity to renovate the Air Force Materiel Command Headquarters building at Wright-Patterson Air Force Base in Ohio. The U.S. Army Corps of Engineers intends to issue a request for proposal for a fully designed building renovation as Phase 1 of a 3-phase project. Scope of work includes repair, renovation and modernization of over 60,000 square feet, replacing HVAC, electrical, plumbing and telecommunications systems. Exterior work includes new windows, doors, waterproofing and site improvements. The firm-fixed-price contract is estimated between $100-250 million with a 1095 calendar day period of performance. Proposals will be evaluated using a best value tradeoff process considering past performance and price/cost factors. The solicitation is anticipated for release on November 10, 2022 via SAM.gov and the point of contact is the named contracting specialist.

View the file

Other files

File Type Posted
W912QR22R0028_CUI_CF_Plans-0004.pdf PDF
W912QR22R0028_CUI_CF_Specs-0004.pdf PDF
W912QR22R0028_CUI_CF_Plans-0003.pdf PDF
W912QR22R0028_CUI_CF_Specs-0003.pdf PDF
W912QR22R0028_CUI_CF_CIDV2_FFE-0003.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol2-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol7-0002.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol4-0002.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol3-0002.pdf PDF
W912QR22R0028_CUI_CF_CIDV2_FFE-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol5-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol4-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol3-0002.pdf PDF
W912QR22R0028_CUI_CF_CIDV1_SID-0002.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol5-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol1-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol6-0002.pdf PDF
W912QR22R0028_CUI_Site Visit Attendee list - AFMC HQ Project 1 DEC 22.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol1-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol2-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol8-0002.pdf PDF
W912QR22R0028_AFMC_Phase 1_CID_V2_FFE-0001.pdf PDF
JA - AFMC HQ - Reno Trane Chillers - SAM Redacted.pdf PDF
W912QR22R0028_Plans_PH1_Vol8-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol2-0000.pdf PDF
JA - AFMC HQ Reno - FFE Basis of Design - SAM Redacted.pdf PDF
W912QR22R0028_Specs_PH1_Vol1-0000.pdf PDF
REDACTED - SPE - Signed Class JA for Basis of Design Items.pdf PDF
JA - AFMC HQ Reno - Fire Alarm System - Brand Name - SAM Redacted.pdf PDF
W912QR22R0028_Specs_PH1_Vol2-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol7-0000.pdf PDF
JA - AFMC HQ Reno - Integrated Sec Platform - Brand Name - SAM Redacted.pdf PDF
W912QR22R0028_Plans_PH1_Vol1-0000.pdf PDF
W912QR22R0028_Specs_PH1_Vol5-0000.pdf PDF
W912QR22R0028_Specs_PH1_Vol4-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol4-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol5-0000.pdf PDF
JA - AFMC HQ Reno - Brand Name Siemens Talon or Johnson Controls - SAM Redacted.pdf PDF
W912QR22R0028_Plans_PH1_Vol6-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol3-0000.pdf PDF
W912QR22R0028_Specs_PH1_Vol3-0000.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled by: USACE-LRL-ED-MA CUI Category(ies):

LDC or Distribution Statement: N/A POC: Blake Gevedon Contracting Specialist william.b.gevedon@usace.army.mi 502.315.6791

Materials shall be submitted to potential offerors currently certified in the Joint Certification Program (JCP) only.

Entrapment area, pix 1 of 11. N view.

Entrapment area, pix 2 of 11. N/E view.

Entrapment area, pix 3 of 11. E/NE view.

Entrapment area, pix 4 of 11. E view.

Entrapment area, pix 5 of 11. E/SE view.

Entrapment area, pix 6 of 11. S/E view.

Entrapment area, pix 7 of 11. S view.

Entrapment area, pix 8 of 11. S/W view.

Entrapment area, pix 9 of 11. W/SW view.

Entrapment area, pix 10 of 11. W view.

Entrapment area, pix 11 of 11. N/W view.

Common basement corridor existing finishes

Rm N015 Elect. Equip., pix 1 of 9.

Rm N015 Elect. Equip., pix 2 of 9. View N wall.

Rm N015 Elect. Equip., pix 3 of 9. N. wall Continued.

O/H conduits.

Rm N015 Elect. Equip., pix 4 of 9. N wall cont., moving W.

Rm N015 Elect. Equip., pix 5 of 9. N wall cont., moving W.

Rm N015 Elect. Equip., pix 6 of 9. N wall cont. or N/W of the Rm. Last of this bank of equip.

Rm N015 Elect. Equip., pix 7 of 9. N wall showing a better view of the O/H Conduits/Junction box shown in previous pix.

Rm N015 Elect. Equip., pix 8 of 9. N/W of the Rm. Conduit entrance.

Rm N015 Elect, Equip., pix 8 of 9. N/E. view

Command Suit stair/entry area (N. stairwell) existing finishes, N/W view

Command Suit stair/entry area existing finishes, N view.

Command Suit stair/entry area existing finishes, another N view.

Command Suit stair/entry (south stairwell) area existing finishes, N/W view

Command Suit stair/entry (south stairwell) area existing finishes, S/E view

Command Suit Generals office window pix 1 of 2, S view.

Command Suit Generals office, pix 2 of 2. looking out the window to roof below, S view.

Rm A024 Men’s locker room toilet/lavatories

Rm A024 Men’s locker room showers, pix 1 or 2.

Rm A024 Men’s locker room showers, pix 2 or 2.

Rm S018-06 (Elect. Rm) ATS-3

Rm S018-06 (Elect. Rm) ATS-4

Rm S018-06 (Elect. Rm) transformer

Rm S034 Mech Rm ceiling

Corridor S001-S030 Above ceiling wall/deck junction

Loading dock area, pix 1 of 2.

Loading dock area, pix 2 of 2

View between Bldg. 262 and Bldg. 263.

General overall roof view, pix 1 of 7. Location is centered on the south parapet wall, viewing W.

General overall roof view, pix 2 of 7. Location is centered on the south parapet wall, viewing W N/W.

General overall roof view, pix 3 of 7. Location is centered on the south parapet wall, viewing N/W.

General overall roof view, pix 4 of 7. Location is centered on the south parapet wall, viewing N.

General overall roof view, pix 5 of 7. Location is centered on the south parapet wall, viewing N/E.

General overall roof view, pix 6 of 7. Location is centered on the south parapet wall, viewing E N/E.

General overall roof view, pix 7 of 7. Location is centered on the south parapet wall, viewing E.

Crane on roof located in the N/W

Abandoned roof curbs.

CUI Cover
Slide Number 1
Entrapment area, pix 2 of 11. N/E view.
Entrapment area, pix 3 of 11. E/NE view.
Entrapment area, pix 4 of 11. E view.
Entrapment area, pix 5 of 11. E/SE view.
Entrapment area, pix 6 of 11. S/E view.
Entrapment area, pix 7 of 11. S view.
Entrapment area, pix 8 of 11. S/W view.
Entrapment area, pix 9 of 11. W/SW view.
Entrapment area, pix 10 of 11. W view.
Entrapment area, pix 11 of 11. N/W view.
Common basement corridor existing finishes
Rm N015 Elect. Equip., pix 1 of 9.
Rm N015 Elect. Equip., pix 2 of 9. View N wall.
Rm N015 Elect. Equip., pix 3 of 9. N. wall Continued. O/H conduits.
Rm N015 Elect. Equip., pix 4 of 9. N wall cont., moving W.
Rm N015 Elect. Equip., pix 5 of 9. N wall cont., moving W.
Rm N015 Elect. Equip., pix 6 of 9. N wall cont. or N/W of the Rm. Last of this bank of equip.
Rm N015 Elect. Equip., pix 7 of 9. N wall showing a better view of the O/H Conduits/Junction box shown in previous pix.
Rm N015 Elect. Equip., pix 8 of 9. N/W of the Rm. Conduit entrance.
Rm N015 Elect, Equip ., pix 8 of 9. N/E. view
Command Suit stair/entry area (N. stairwell) existing finishes, N/W view
Command Suit stair/entry area existing finishes, N view.
Command Suit stair/entry area existing finishes, another N view.
Command Suit stair/entry (south stairwell) area existing finishes, N/W view
Command Suit stair/entry (south stairwell) area existing finishes, S/E view
Command Suit Generals office window pix 1 of 2, S view.
Command Suit Generals office, pix 2 of 2. looking out the window to roof below, S view.
Rm A024 Men’s locker room toilet/lavatories
Rm A024 Men’s locker room showers, pix 1 or 2.
Rm A024 Men’s locker room showers, pix 2 or 2.
Rm S018-06 (Elect. Rm) ATS-3
Rm S018-06 (Elect. Rm) ATS-4
Rm S018-06 (Elect. Rm) transformer
Rm S034 Mech Rm ceiling
Corridor S001-S030 Above ceiling wall/deck junction
Loading dock area, pix 1 of 2.
Loading dock area, pix 2 of 2
View between Bldg. 262 and Bldg. 263.
General overall roof view, pix 1 of 7. Location is centered on the south parapet wall, viewing W.
General overall roof view, pix 2 of 7. Location is centered on the south parapet wall, viewing W N/W.
General overall roof view, pix 3 of 7. Location is centered on the south parapet wall, viewing N/W.
General overall roof view, pix 4 of 7. Location is centered on the south parapet wall, viewing N.
General overall roof view, pix 5 of 7. Location is centered on the south parapet wall, viewing N/E.
General overall roof view, pix 6 of 7. Location is centered on the south parapet wall, viewing E N/E.
General overall roof view, pix 7 of 7. Location is centered on the south parapet wall, viewing E.
Crane on roof located in the N/W
Abandoned roof curbs.

File details come from the government source that posted it. Updated .