This federal contract opportunity announcement describes a design-bid-build renovation project. The U.S. Army Corps of Engineers Louisville District will issue a request for proposal for Phase 1 renovation of over 60,000 square feet of the Air Force Materiel Command Headquarters at Wright-Patterson Air Force Base, Ohio. The project includes HVAC, plumbing, electrical, and telecommunications system replacements along with interior finish renovations. Exterior improvements include window, door, and envelope repairs. The contract duration is estimated at 1,095 calendar days from notice to proceed. The solicitation is anticipated for release on November 10, 2022 and will utilize a best value tradeoff source selection evaluating past performance and price/cost factors. The project magnitude is estimated between $100-250 million. Interested parties must register in the System for Award Management at SAM.gov. The point of contact is the listed contracting specialist.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled by: USACE-LRL-ED-MA CUI Category(ies):
LDC or Distribution Statement: N/A POC: Blake Gevedon Contracting Specialist william.b.gevedon@usace.army.mi 502.315.6791
Materials shall be submitted to potential offerors currently certified in the Joint Certification Program (JCP) only.
Solicitation For Repair/Renovate AFMC Headquarters Building (B10262), WPAFB Phase 1
P2: 475429 Design-Bid-Build
Specifications Vol. 3 of 5
10 November 2022
W912QR22R0028
90% Final Revised Specification Submittal
14 December 2022
W912QR22R0028-0002
Certified Final
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR22R0028_CUI_CF_Specs_Vol3-0002
US Army Corps of Engineers Louisville District
Rev00
Repair/Renovate AFMC Headquarters Building (B10262)
Phase 1 - Certifi ed Final Specifi cation Submittal
Project Number: ZHTV160500-262 P2 # 475429
Fiscal Year 2023
12 December 2022
CONTROLLED
UNCLASSIFIED
INFORMATION
Volume 3 of 5
SPECIFICATIONS
EXPIRES: 31 DEC 2023
P2#475429 Repair/Reno AFMC HQ 10262 CUI Wright-Patterson AFB –Phase 1
PROJECT TABLE OF CONTENTS Page 1 CUI Certified Final
PROJECT TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15 SUMMARY OF WORK
01 32 01.00 06 07/18 PROJECT SCHEDULE
01 33 000 8/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 35 43 12/20 GENERAL ENVIRONMENTAL PROTECTION
REQUIREMENTS (WPAFB)
01 42 00 02/19 SOURCES FOR REFERENCE
PUBLICATIONS
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM
CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20 TEMPORARY CONSTRUCTION
FACILITIES AND CONTROLS
01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT
AND DISPOSAL
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
VOLUME 2
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10 DEMOLITION AND DECONSTRUCTION
PROJECT TABLE OF CONTENTS Page 2 CUI Certified Final
DIVISION 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL
CONCRETE
03 35 43 12/21 POLISHED CONCRETE FINISHING
03 62 15.00 06 07/16 FLOWABLE FILL
DIVISION 04 - MASONRY
04 20 00 11/15 UNIT MASONRY
04 72 00 09/20 CAST STONE MASONRY
DIVISION 05 - METALS
05 05 20.00 27 02/21 POST-INSTALLED CONCRETE AND
MASONRY ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18 STRUCTURAL STEEL
05 30 00 05/15 STEEL DECKS
05 40 00 05/15 COLD-FORMED METAL FRAMING
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 00.01 05/22 PREFABRICATED ALUMINUM STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
05 52 16 12/21 METAL EGRESS BARRIER GATES
05 75 00 05/21 DECORATIVE FORMED METAL
PROJECT TABLE OF CONTENTS Page 3 CUI Certified Final
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
06 16 00 10/20 SHEATHING
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD
ARCHITECTURAL CABINETS
06 61 16 08/10 SOLID SURFACING FABRICATIONS
06 64 00 11/19 PLASTIC PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 05/20 PREPARATION FOR REROOFING
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 17 00 08/22 BENTONITE WATERPROOFING
07 17 10 08/22 BENTONITE INJECTION
WATERPROOFING
07 21 13 02/16 BOARD INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 24 00 05/11 POLYMER-BASED EXTERIOR FINISH
SYSTEMS (EFS)
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS
07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR
BARRIERS
07 27 36 05/17 SPRAY FOAM AIR BARRIERS
07 42 13 05/11 METAL WALL PANELS
07 42 17 06/20 INSULATED-CORE METAL WALL BACKUP
PANEL SYSTEM
07 42 93 05/22 SOFFIT PANELS
07 44 56 06/20 MINERAL-FIBER-REINFORCED
CEMENTITIOUS PANELS
PROJECT TABLE OF CONTENTS Page 4 CUI Certified Final
07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE
ROOFING
07 54 23 02/13 THERMOPLASTIC POLYOLEFIN (TPO)
ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 61 15.00 20 08/16 ALUMINUM STANDING SEAM ROOFING
07 71 00 05/20 ROOF SPECIALTIES
07 72 10 11/19 ROOFTOP FALL ARREST SYSTEM
07 72 30 ROOF ACCESSORIES
07 72 53 07/20 SNOW GUARDS
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 81 23 05/20 INTUMESCENT FIREPROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
07 95 13.13 12/20 INTERIOR EXPANSION JOINT COVER
ASSEMBLIES
07 95 13.16 01/21 EXTERIOR EXPANSION JOINT COVER
ASSEMBLIES
DIVISION 08 - OPENINGS
08 08 13 07/20 FIRE-RESISTANT GLAZING
08 11 13 02/10 STEEL DOORS AND FRAMES
08 14 00 08/16 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 33 13 05/09 COILING COUNTER DOORS
08 33 23 11/19 OVERHEAD COILING DOORS
08 33 26 01/21 OVERHEAD COILING GRILLES
08 34 60 05/22 HORIZONTAL SLIDING WINDOW
08 34 73 02/15 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
PROJECT TABLE OF CONTENTS Page 5 CUI Certified Final
08 44 00 05/19 CURTAIN WALL AND GLAZED
ASSEMBLIES
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 85 10 08/09 DECORATIVE FILM FOR GLASS
08 88 13 10/22 FIRE-RESISTANT STOREFRONT
GLAZING
08 91 00 05/11 METAL WALL LOUVERS
VOLUME 3
DIVISION 09 - FINISHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM
BOARD
09 22 16 01/21 EXTRUDED ALUMINUM PARTITION
CLOSURE
09 23 00 08/16 GYPSUM PLASTERING
09 24 23 08/17 CEMENT STUCCO
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC, QUARRY, AND GLASS
TILING
09 51 00 08/17 ACOUSTICAL CEILINGS
09 54 70 05/21 METAL PANEL CEILING SYSTEM
09 62 38 08/17 STATIC-CONTROL FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 66 13 08/16, CHG 2: 11/18 PRECAST TERRAZZO TREADS
09 66 16 08/16 TERRAZZO FLOOR TILE
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 68 00 11/17 CARPETING
09 72 00 08/17 WALLCOVERINGS
09 84 20 08/16 ACOUSTICAL WALL PANELS
09 90 00 05/11 PAINTS AND COATINGS
PROJECT TABLE OF CONTENTS Page 6 CUI Certified Final
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 96 46 11/19 INTUMESCENT PAINTING
DIVISION 10 - SPECIALTIES
10 11 00 08/17 VISUAL DISPLAY UNITS
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/17 TOILET COMPARTMENTS
10 26 00 08/17 WALL AND DOOR PROTECTION
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 45 13 10/20 DEFIBRILLATOR CABINETS AND
DEFIBRILLATORS
10 51 13.10 05/11 METAL LOCKERS - SPECIAL PURPOSE
10 99 00 11/19 MISCELLANEOUS ITEMS
DIVISION 11 - EQUIPMENT
11 10 10 09/20 MODULAR ACCESS RAMPS
11 13 13 04/20 LOADING DOCK BUMPER
11 13 19.13 08/09 LOADING DOCK LEVELERS
DIVISION 12 - FURNISHINGS
12 24 13 08/17 ROLLER WINDOW SHADES
12 36 00 08/18 COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/20 BRACING FOR EQUIPMENT
PROJECT TABLE OF CONTENTS Page 7 CUI Certified Final
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 05/20 ELECTRIC TRACTION PASSENGER
ELEVATORS
14 42 50 05/20 VERTICAL WHEELCHAIR LIFTS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
22 11 16.11 WATER SERVICE TAPS AND SERVICE
LINE INSTALLATION
22 11 16.13 CROSS CONNECTION CONTROL AND
BACKFLOW PREVENTION
22 13 19.23 GREASE TRAPS
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 08/18 AIR SUPPLY, DISTRIBUTION,
VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 02/15 HVAC SYSTEM CLEANING
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND
BALANCING (TAB) OF HVAC
23 07 00 02/13 THERMAL INSULATION FOR
MECHANICAL SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR
HVAC
PROJECT TABLE OF CONTENTS Page 8 CUI Certified Final
23 09 13 11/15 INSTRUMENTATION AND CONTROL
DEVICES FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL
FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 11/08 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 64 10 11/16 WATER CHILLERS, VAPOR
COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND
CONDENSER WATER PIPING SYSTEMS
23 81 00 05/18 DECENTRALIZED UNITARY HVAC
EQUIPMENT
23 82 01.00 10 04/08 WARM AIR HEATING SYSTEMS
VOLUME 4
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS FIRE AND
LIFE SAFETY
25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS ENERGY
MANAGEMENT CONTROL SYSTEM
25 05 11.26 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS UTILITY
CONTROL SYSTEM
25 05 11.26 02 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS BUILDING
CONTROL SYSTEM
25 05 11.28 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS
ELECTRONIC SECURITY SYSTEM
PROJECT TABLE OF CONTENTS Page 9 CUI Certified Final
25 08 10 04/06 UTILITY MONITORING AND CONTROL
SYSTEM TESTING
25 10 10 02/19 UTILITY MONITORING AND CONTROL
SYSTEM (UMCS) FRONT END AND
INTEGRATION
DIVISION 26 - ELECTRICAL
26 08 00 08/08, CHG 1: 02/15 APPARATUS INSPECTION AND TESTING
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 24 13 05/15 SWITCHBOARDS
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM
PROTECTION
26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD)
SYSTEMS UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM
(SACRIFICIAL ANODE)
26 51 00 05/20 INTERIOR LIGHTING
26 56 00 05/20 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 04/06 CABLE TELEVISION PREMISES
DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS
CABLING SYSTEM
27 41 00 10/20 AUDIOVISUAL SYSTEMS
27 51 19 01/22 SOUND MASKING SYSTEMS
PROJECT TABLE OF CONTENTS Page 10 CUI Certified Final
VOLUME 5
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM
ACCEPTANCE TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS
(ESS)
28 31 76 08/11 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 31 16.13 08/16 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 02/17 COLD MILLING ASPHALT PAVING
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID
PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 08/17 BASE COURSE FOR RIGID AND
SUBBASES FOR FLEXIBLE PAVING
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE
PAVEMENT FOR ROADS AND SITE
FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND
SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 17 26 01/21 TACTILE WARNING SURFACING
32 31 13 11/16 CHAIN LINK FENCES AND GATES
PROJECT TABLE OF CONTENTS Page 11 CUI Certified Final
32 31 13.10 11/16 CHAIN LINK FENCES AND GATES (FOR
BUILDING INTERIORS)
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK
AND ORNAMENTAL) AND GATES
32 92 19 08/17 SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 01 10.13 PRESSURE AND LEAKAGE TESTS
33 01 30.13 ACCEPTANCE TESTING FOR SANITARY
SEWERS
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL
DRILLING
33 11 00 PIPING AND ACCESSORIES – GENERAL
PROVISIONS
33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
33 11 00.15 DUCTILE IRON PIPE AND FITTINGS
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 46 13 04/08 FOUNDATION DRAINAGE SYSTEM
33 46 16 05/18 SUBDRAINAGE PIPING
33 51 15 08/19 NATURAL-GAS / LIQUEFIED
PETROLEUM GAS DISTRIBUTION
PIPELINES
33 52 10 11/18 FUEL SYSTEMS PIPING
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE
TANKS
33 61 13.13 02/16 PREFABRICATED UNDERGROUND
HYDRONIC ENERGY DISTRIBUTION
33 71 02 02/15 UNDERGROUND ELECTRICAL
DISTRIBUTION
PROJECT TABLE OF CONTENTS Page 12 CUI Certified Final
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT
(OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.19 02/20 CRASH RATED ACTIVE VEHICLE
BARRIERS AND CONTROLS
-- End of Project Table of Contents --
Wright-Patterson AFB – Phase 1
SECTION 09 22 00
SUPPORTS FOR PLASTER AND GYPSUM BOARD
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A463/A463M (2010; R 2015) Standard Specification for Steel Sheet, Aluminum-Coated, by the Hot-Dip Process
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM C645 (2014; E 2015) Nonstructural Steel Framing Members
ASTM C754 (2020) Standard Specification for Installation of Steel Framing Members to Receive Screw-Attached Gypsum Panel Products
ASTM C841 (2003; R 2013) Installation of Interior Lathing and Furring
ASTM C847 (2014a) Standard Specification for Metal Lath
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)
NAAMM EMLA 920 (2009) Guide Specifications for Metal Lathing and Furring
UNDERWRITERS LABORATORIES (UL)
UL Fire Resistance (2014) Fire Resistance Directory
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SECTION 09 22 00 Page 1 CUI Certified Final
SD-02 Shop Drawings
Metal Support Systems
Submit for the erection of metal framing, furring, and ceiling suspension systems. Indicate materials, sizes, thicknesses, and fastenings.
SD-03 Product Data
Metal Support Systems
Recycled Content for Metal Support Systems; S
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the job site and store in ventilated dry locations permitting easy access for inspection and handling. If materials are stored outdoors, stack materials off the ground, supported on a level platform, and fully protected from the weather. Handle materials carefully to prevent damage. Remove damaged items and provide new items.
PART 2 PRODUCTS
2.1 MATERIALS
Provide steel materials for metal support systems with galvanized coating ASTM A653/A653M , G-60; aluminum coating ASTM A463/A463M , T1-25; or a 55-percent aluminum-zinc coating.
Provide metal support systems containing a minimum of 20 percent recycled content. Provide data identifying percentage of recycled content for metal support systems.
2.1.1 Materials for Attachment of Lath
2.1.1.1 Suspended and Furred Ceiling Systems and Wall Furring
ASTM C841, and ASTM C847.
2.1.1.2 Non-load Bearing Wall Framing
NAAMM EMLA 920.
2.1.2 Materials for Attachment of Gypsum Board
2.1.2.1 Suspended and Furred Ceiling Systems
ASTM C645.
2.1.2.2 Non-load Bearing Wall Framing and Furring
ASTM C645 and as indicated on Drawings, but not thinner than 0.0329 inch thickness regardless of the ASTM certified third party testing statement for equivalent thicknesses.
2.1.2.3 Furring Structural Steel Columns
ASTM C645 and as indicated on Drawings. Steel (furring) clips and support
SECTION 09 22 00 Page 2 angles listed in UL Fire Resistance may be provided in lieu of steel studs for erection of gypsum board around structural steel columns.
2.1.2.4 Z-Furring Channels with Wall Insulation
Not lighter than 26 gauge galvanized steel, Z-shaped, with 1-1/4 inch and 3/4 inch flanges and furring depth as required by the insulation thickness provided.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Systems for Attachment of Lath
3.1.1.1 Suspended and Furred Ceiling Systems and Wall Furring
ASTM C841, except as indicated otherwise.
3.1.1.2 Non-load Bearing Wall Framing
NAAMM EMLA 920, except provide framing members 16 inches o.c. unless indicated otherwise.
3.1.2 Systems for Attachment of Gypsum Board
3.1.2.1 Suspended and Furred Ceiling Systems
ASTM C754, except provide framing members 16 inches o.c. unless indicated otherwise.
3.1.2.2 Non-load Bearing Wall Framing and Furring
ASTM C754, except as indicated otherwise.
3.1.2.3 Furring Structural Steel Columns
Install studs or galvanized steel clips and support angles for erection of gypsum wallboard around structural steel columns in accordance with the UL Fire Resistance , design number(s) of the fire resistance rating indicated.
3.1.2.4 Z-Furring Channels with Wall Insulation
Install Z-furring channels vertically spaced not more than 24 inches o.c.
Locate Z-furring channels at interior and exterior corners in accordance with manufacturer's printed erection instructions. Fasten furring channels to masonry and concrete walls with powder-driven fasteners or hardened concrete steel nails through narrow flange of channel. Space fasteners not more than 24 inches o.c.
3.2 ERECTION TOLERANCES
Provide framing members which will be covered by finish materials such as wallboard, plaster, or ceramic tile set in a mortar setting bed, within the following limits:
a. Layout of walls and partitions: 1/4 inch from intended position;
SECTION 09 22 00 Page 3
b. Plates and runners: 1/4 inch in 8 feet from a straight line;
c. Studs: 1/4 inch in 8 feet out of plumb, not cumulative; and
d. Face of framing members: 1/4 inch in 8 feet from a true plane.
Provide framing members which will be covered by ceramic tile set in dry-set mortar, latex-portland cement mortar, or organic adhesive within the following limits:
a. Layout of walls and partitions: 1/4 inch from intended position;
b. Plates and runners: 1/8 inch in 8 feet from a straight line;
c. Studs: 1/8 inch in 8 feet out of plumb, not cumulative; and
d. Face of framing members: 1/8 inch in 8 feet from a true plane.
-- End of Section --
SECTION 09 22 00 Page 4
SECTION 09 22 16
EXTRUDED ALUMINUM PARTITION CLOSURE
01/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B221M (2013) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUMMARY
This section includes gypsum board accessories or noise control components as shown on the architectural drawings.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Shop drawings
SD-03 Product Data
SECTION 09 22 16 Page 1
Manufacturer's Technical Data
SD-04 Samples
Samples
SD-07 Certificates
Certification from Manufacturer
Indoor Air Quality for Field-Applied Caulk; S
1.4 SUBMITTAL INFORMATION
A. Manufacturer's Literature and Data:
1. Product Data: Submit manufacturer's technical data and brochures for each type of specified component required, including detail drawings, and installation instructions.
B. Shop Drawings:
1. Shop drawings must show dimensions, sizes, thickness, alloys, tempers, finishes, joining, attachments, and relationship of adjoining work.
C. Samples:
1. Samples must include three, 12-inch samples of each type of partition closure and finish as specified and accessories.
D. Certification:
1. Submit certification from manufacturer of accessory attesting that products comply with specified requirements including finish as specified.
E. Qualification Data:
1. Firms specified in "Quality Assurance" Article must demonstrate their capabilities and experience by including lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.
1.5 CERTIFICATIONS
Provide sealant/caulk products certified to meet indoor air quality emissions requirements of CDPH SECTION 01350 . Give preference to certifications by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.6 QUALITY ASSURANCE
Manufacturer: Firm with manufacturing and delivery capacity required for the project, shall have successfully completed at least ten projects within the past five years, utilizing systems, materials and techniques as
SECTION 09 22 16 Page 2 herein specified.
Fabricator must own and operate its own manufacturing facilities for all metal components. Systems consisting of components from a variety of manufacturers will not be considered or accepted.
1.7 DELIVERY, STORAGE, AND HANDLING
All materials shall be protected during fabrication, shipment, site storage and erection to prevent damage from other trades. Store accessories inside a well-ventilated area, away from uncured concrete and masonry, and protected from the weather, moisture, soiling, abrasion, extreme temperatures, and humidity.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Extruded aluminum partition closures must be pre-assembled and spring loaded to provide a tight fit for vertical junctures of partitions and window walls. Finish to match storefront mullions finish. Sound test to a composite STC of 37 with acoustical blankets for sound attenuation.
2.2 MATERIALS
Aluminum extrusions: 6063-T5 temper, tensile strength 31 KSI ( ASTM B221, ASTM B221M). Provide in widths to fit the partition type engaging a window. Install in lengths to fit installed vertical window openings
Acoustical blankets for sound attenuation. Factory-supplied caulk must be installed in the field for acoustical performance purposes.
Accessories:
1. Window Mate End Caps - Provide in widths to fit the partition type engaging a window. Install in lengths to fit installed vertical window openings.
General: Provide metals free from surface blemishes where exposed to view in finished unit. Surfaces that exhibit pitting, seam marks, roller marks, stains, and discolorations, or other imperfections on finished units are not acceptable. All metal must be of the highest-grade commercial type.
2.3 FABRICATION
Provide extruded aluminum in required lengths and size to fit specified openings.
2.4 FINISHES
All material must be factory finished to match storefront frames.
PART 3 EXECUTION
3.1 INSPECTION
Examination of Surfaces: Installer must examine conditions under which work is to be performed and must notify contractor and COR in writing of
SECTION 09 22 16 Page 3 unsatisfactory conditions.
Verify that field measurements and block-out dimensions are as shown on shop drawings.
3.2 CLEANING
Clean all surfaces following installation. If necessary use only a mild soap or detergent solution as recommended by the manufacturer.
3.3 PROTECTION
Procedures: Protect the finished work from damage during the remainder of the construction period.
Damage to finished work: Finished units must be without damage.
-- End of Section --
SECTION 09 22 16 Page 4
SECTION 09 23 00
GYPSUM PLASTERING
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C28/C28M (2010) Gypsum Plasters
ASTM C35 (2001; R 2014) Inorganic Aggregates for Use in Gypsum Plaster
ASTM C206 (2014) Standard Specification for Finishing Hydrated Lime
ASTM C472 (1999; R 2014) Physical Testing of Gypsum, Gypsum Plasters and Gypsum Concrete
ASTM C631 (2009; R 2014) Bonding Compounds for Interior Gypsum Plastering
ASTM C842 (2005; E 2010; R 2010) Application of Interior Gypsum Plaster
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Gypsum Base Coat Plaster
Gypsum Finish Coat Plaster
SD-04 Samples
Sample Panel; G
Submit four 36 inch square panels of varying texture for the Contracting Officer's approval.
Gypsum Plaster Full Size Sample
SECTION 09 23 00 Page 1
SD-08 Manufacturer's Instructions
Ready-Mix Gypsum Plaster
Submit manufacturer's printed mixing instructions for ready-mix plaster.
1.3 QUALITY ASSURANCE
1.3.1 Sample Panels
Erect sample panel at the building site, or as otherwise directed.
Finished gypsum plaster work must match the approved sample panel.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver manufactured materials in the manufacturers' original unbroken packages or containers which are labeled plainly with the manufacturers' names and brands. Keep cementitious materials dry and stored off the ground, under cover, and away from sweating walls and other damp surfaces until ready for use. Keep materials wrapped and separate from off-gassing materials, such as paints and adhesives. Do not use materials that have visible moisture or biological growth.
1.5 GYPSUM PLASTER FULL SIZE SAMPLE
After selection of an acceptable texture to match existing, construct a sample wall at location in one of the existing stairwells as directed by the Contracting Officer minimum size of 4 feet in height, by 4 feet in length, using existing plaster surface sand gypsum plaster. Provide and protect the sample wall from damage during the length of the contract.
1.6 SCHEDULING AND ENVIRONMENTAL REQUIREMENTS
Commence application only after the area scheduled for gypsum plastering work is completely weathertight. The heating, ventilating, and air-conditioning systems must be complete and in operation prior to application of the plaster. If the mechanical system cannot be activated before veneer plastering is begun, the plastering may proceed in accordance with an approved plan to maintain the environmental requirements specified below. Apply plaster prior to the installation of finish flooring and acoustic ceiling.
PART 2 PRODUCTS
2.1 MATERIALS
Conform to the specifications, standards, and requirements specified herein. Provide asbestos-free materials.
2.2 GYPSUM BASE COAT PLASTER
Gypsum Ready-Mixed Plaster Base Coat.
2.3 GYPSUM FINISH COAT PLASTER
ASTM C28/C28M.
SECTION 09 23 00 Page 2
2.3.1 High Strength Gypsum Gauging Plaster Finish Coat
ASTM C28/C28M, gypsum gauging plaster, except plaster must have a compressive strength of not less than 4,500 psi when tested dry in accordance with ASTM C472.
2.4 HYDRATED LIME
ASTM C206, Type S.
2.5 AGGREGATES
2.5.1 Sand for Gypsum Base Coats
ASTM C35.
Sand Gradation: Percentage retained by weight (plus or minus 2 percent) on each sieve.
Sieve Size Maximum Minimum
No. 4 4760 microns 0 0
No. 8 2380 microns 5 0
No. 16 1190 microns 30 5
No. 30 590 microns 65 30
No. 50 300 microns 95 65
No. 100 150 microns 100 90
2.6 WATER
Use only potable water, free of mineral and organic substances that affect the hardening and durability of the plaster or stucco.
2.7 PROPORTIONING
Unless specified otherwise, materials are specified on a volume basis and must be measured in approved containers, to ensure that the specified proportions will be controlled and accurately maintained during the progress of the work. Measuring materials with shovels (shovel count) is not be permitted. Prepare ready-mix gypsum plaster for use by the addition of water only.
2.7.1 Gypsum Base Coat Plaster
Use of sand or lightweight aggregate is optional in gypsum plaster basecoats, except provide (1) sand for Keene's cement and high strength gypsum-gauged finish coats and (2) lightweight aggregate when necessary for a required fire resistance rating.
SECTION 09 23 00 Page 3
2.7.2 Gypsum Plaster Finish Coat
2.7.2.1 Lime-Putty Gypsum-Gauged (White Coat)
Use over sand and gypsum plaster. Mix finish coat in the proportions of one part of gypsum gauging plaster to a volume of hydrated lime or lime putty.
This mix is approximately equivalent to one 100 lb. bag of gypsum gauging plaster to:
a. Not more than four 50 lb. bags of hydrated lime, or
b. Not more than 4-1/2 cu ft of lime putty, or
c. Not more than 35 gallons of lime putty.
Mix finish in accordance with manufacturer's printed instructions.
2.8 MIXING
2.8.1 Job-Mixed Materials
Mix materials in mechanical mixers except finish coats containing lime may be hand mixed. Mechanical mixers must be an approved type that accurately and uniformly controls the quantity of water. When mixing by hand, mix dry plaster aggregate to a uniform color in the mixing box, add water, and hoe the plaster immediately into the water and mix thoroughly to a proper consistency.
2.8.1.1 Water
Water used for rinsing and cleaning containers and tools must not be used in mixing the materials.
2.8.1.2 Sand
Sand proportions must be damp and in loose condition. A volume of damp loose sand must contain a minimum of 80 lb. of dry sand in one cu ft.
2.8.1.3 Mixing (Do's)
Mix the material while the mixer is in continuous operation in the following sequence:
a. Add maximum close to 90 percent of estimated quantity of water.
b. Add cement and approved admixtures. Add lime prior to cement.
c. Add remainder of sand.
d. Mix with remainder of water as required. Mix until the mixture is uniform in color and consistency.
2.8.1.4 Mixing (Don'ts)
Avoid excessive mixing and agitation. Discard gypsum plaster which has begun to set before it is used; do not permit retempering. Do not use frozen, caked, or lumped materials. Empty mixers and mixing boxes after
SECTION 09 23 00 Page 4 each batch is mixed, and keep free of old plaster.
2.8.2 Ready-Mixed Packaged Materials
Mix ready-mixed packaged gypsum plaster in accordance with manufacturer's printed instructions.
2.9 BONDING AGENT
ASTM C631, interior application.
PART 3 EXECUTION
3.1 SURFACE PREPARATION
A. Clean surfaces before application of gypsum plaster of projections, dust, loose particles, grease, bond breakers, and foreign matter. Do not apply plaster directly to surfaces (1) of masonry or concrete that have been coated with bituminous compound or other waterproofing agents, or (2) that have been painted or previously plastered. Before plaster work is started, wet masonry and concrete surfaces thoroughly with a fine fog spray of clean water to produce a uniformly moist condition. Check metal grounds, corner beads, screeds, and other accessories carefully for alignment before starting work. Do not apply gypsum plaster to surfaces containing frost.
B. Anticipate that both existing plaster and painted finishes contain asbestos containing materials and proceed accordingly.
C. For cracks, break away any loose pieces of plaster and lightly sand the surface with a medium-grit sandpaper. Wipe the area clean with a clean towel. Fill the crack with base plaster. If the crack is over 1/4 inch wide, place a piece of fiberglass tape over the crack and base plaster. Allow the base plaster to dry. Apply a second coat of finish plaster, feathering it out along the wall. Allow the finish plaster to dry. Sand the surface with a fine-grit sandpaper after the finish plaster has dried until surface matches existing adjacent.
D. For holes break away loose plaster and wipe the area lean with a towel. Fill the hole with a base coat of plaster using a medium-width trowel. Scrape the plaster compound so that it sits 1/4 inch below the finished surface of the plaster. Allow the plaster to set, but not dry. Apply a second coat of finish plaster using a trowel. If the hole is larger than 4 inches, scrape the plaster out until it is just below the existing surface of the wall. Otherwise, smooth the plaster using the straight end of the trowel until it is flush with the rest of the wall and smooth in appearance. Apply a third coat of finish plaster, if necessary, once the previous coat has set but not dried.
Smooth the plaster until it is seamless against the rest of the wall using a trowel. Once the plaster has dried completely, lightly sand with fine-grit sandpaper if he plaster did not dry completely smooth.
3.2 WORKMANSHIP
3.2.1 Slump Tests
Apply Plaster by hand. Subsequent to determining water content to meet the specified slump, do not add additional water to the mix. Conduct the slump test according to the following procedure:
SECTION 09 23 00 Page 5
3.2.2 Application
Apply gypsum plaster in three coats, except as follows:
Gypsum plaster applied to masonry using the two-coat double-up method.
Apply base coats with sufficient pressure and ensure plaster is sufficiently plastic to provide a strong bond to bases. Work base coats into screeds at intervals from 5 to 8 feet. Plaster must not be continuous across expansion and control joints occurring in walls, partitions, and ceilings. Finish work level, plumb, square, and true, within a tolerance of 1/8 inch in 8 feet, without waves, cracks, blisters, pits, crazing, discoloration, projections, or other imperfections. Form plaster work carefully around angles and contours, and well-up to screeds. Take special care to prevent sagging and consequent dropping of applications. There must be no visible junction marks in finish coat where one day's work adjoins another.
3.2.3 Curing
3.2.3.1 Gypsum Plaster
Before the plaster has set, provide environmental controls to prevent the plaster from drying too fast. After the plaster has set, provide for rapid drying to develop high strength.
3.3 GYPSUM PLASTER WORK
ASTM C842.
3.3.1 Gypsum Plaster Thickness Requirements
Match original thickness.
3.3.2 Gypsum Plaster Basecoat Work
3.3.2.1 Gypsum Two-Coat System
Apply the first coat to cover the base with sufficient material and pressure to form a good bond on the wall or ceiling base. Before the first coat has set and without scratching or cracking the surface, apply a second coat (double back) of the same material proportion as the base coat to the screeds. Straighten to a true surface without application of water, and cross rake or scratch to receive the finish coat.
3.3.3 Gypsum Plaster Finish Coats
Moderately moisten or fog spray base coat of plaster that has become dry before finish coat is applied. Accelerate plaster, if necessary, to provide a setting time of not more than 4 hours from the time the plaster is mixed.
3.3.3.1 Lime-Putty and Gypsum-Gauged Finish Coats
Apply lime-putty gypsum-gauged finish white coat or aggregated white coat and high strength gypsum gauged finish over the base coat, scratch in thoroughly, lay on well, double back, and fill out to a true, even surface. Allow the finish to dry a few minutes, then trowel well with
SECTION 09 23 00 Page 6 water. Apply maximum pressure in order to compact the finish coat and provide a smooth finish free from blemishes and irregularities. Apply trowel finish coats of gypsum-gauged lime-putty over properly prepared base coats as thin as possible and 1/16 to 1/8 inch thick for conventional plaster system, except as necessary in spots to level out hollows in base coat.
3.4 PATCHING AND POINTING
Cut out and patch loose, cracked, damaged, or defective gypsum plaster.
Patch must match existing work in texture, color and finish flush with previously applied gypsum plaster surfaces. Point work abutting or adjoining finish work in a neat manner. Remove droppings or spatterings from surfaces. Leave clean and in a condition to receive paint or other finish. Remove protective covering from floors and other surfaces, and rubbish and debris from the interior and exterior of the building.
-- End of Section --
SECTION 09 23 00 Page 7
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 09 23 00 Page 8
SECTION 09 24 23
CEMENT STUCCO
08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C150/C150M (2021) Standard Specification for Portland Cement
ASTM C206 (2014) Standard Specification for Finishing Hydrated Lime
ASTM C897 (2015) Aggregate for Job-Mixed Portland Cement-Based Plasters
ASTM C926 (2018b) Standard Specification for Application of Portland Cement-Based Plaster
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Proportions and Mixing
SD-04 Samples
Sample Panel; G
1.3 QUALITY ASSURANCE
Submit a SAMPLE PANEL as follows: One 12 inch square stucco panel showing finish texture and color and exposed reinforcement at the edges, one 12 inch square of reinforcement, and a 12 inch length of each accessory proposed, prior to proceeding with stucco work. Following acceptance by the Contracting Officer, a sample panel of stucco, constructed at the jobsite, and located as directed, to demonstrate installation procedures, texture and color, prior to proceeding with any stucco work will be required. Panel size must be a minimum of 4 feet wide by 4 feet high;
containing each type accessory proposed for use and constructed in the
SECTION 09 24 23 Page 1 vertical position. Each phase of installation such as removal of existing loose stucco, preparation of the base concrete wall, scratch coat, brown coat, finish coat and curing procedures must be demonstrated in the construction of the panel. Submit one 12 inch length of each accessory proposed for use, prior to constructing the sample panel.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver packaged materials to the site in the original packages and containers with labels intact and seals unbroken. Keep cementitious materials dry and stored off the ground, under cover and away from damp surfaces until ready to be used. Aggregate must be covered to prevent the absorption or loss of moisture.
1.5 ENVIRONMENTAL REQUIREMENTS
Do not apply stucco when the ambient temperature is 40 degrees F or lower, or when a drop in temperature below 40 degrees F is expected within 48 hours after application.
PART 2 PRODUCTS
2.1 PORTLAND CEMENT
Portland cement must conform to ASTM C150/C150M, gray Portland cement Type I.
2.2 LIME
Lime must conform to ASTM C206, Type S.
2.3 SAND
Sand aggregate for job-mixed base coat and job-mixed finish coat stucco must conform to ASTM C897.
2.4 WATER
Provide clean, fresh, potable water, free from amounts of oils, acids, alkalis and organic matter that would be injurious to the stucco.
PART 3 EXECUTION
3.1 INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
Within boundaries of the Phase of the project under reconstruction, sound all existing stucco coatings over the original board-formed cast-in-place concrete walls to identify areas that are not sound and are delaminating from the concrete substrate.
Remove loose stucco by hand using a trowel or scraping tool. Remove only as much as is required to leave soundly bound stucco in place.
Brush all loose materials off remaining wall.
SECTION 09 24 23 Page 2
3.2 PREPARATION OF SURFACES
Preparation of surfaces for application of stucco to solid bases such as stone, masonry or concrete must conform to the applicable requirements of
ASTM C926.
3.3 PROPORTIONS AND MIXING
Proportions and mixing for job-mixed base coat and finish coat must conform to the applicable requirements of ASTM C926. Mixing of mill-mixed finish coat must be in accordance with the manufacturer's directions.
Submit detailed description of the proposed job-mix proportions for base and finish coats; including identification of thickness of coats.
3.4 STUCCO APPLICATION
Stucco must be applied in three coats to a thickness to match the existing application, to the finished stucco surface of the existing, to the finished stucco surface of the existing, including moderate texture match existing variations. Stucco application must conform to the applicable requirements of ASTM C926 and the following:
3.4.1 Workmanship
Items or features of the work in connection with or adjoining the stucco must be in place, plumb, straight, and true prior to beginning the stucco work. Concrete and masonry surfaces to receive stucco must be evenly dampened immediately prior to application of stucco. Each stucco coat must be applied continuously in one general direction, without allowing mortar to dry at edges. Where it is impossible to work the full dimension of a wall surface in a continuous operation, jointing must be made at a break, opening, or other natural division of the surface. Edges to be joined must be dampened slightly to produce a smooth confluence. Exterior corners of stucco must be slightly rounded. Stucco on soffit surfaces must be pitched forward to form a drip.
3.4.2 Scratch Coat
Apply scratch coat under sufficient pressure to form good keys. Before the scratch coat has set, it must be lightly scratched in one direction and vertical surfaces must be scratched in the horizontal direction only.
The scratch coat must be fog cured for a minimum of 72 hours.
3.4.3 Brown Coat
Evenly dampen the scratch coat to obtain uniform suction before the brown coat is applied. There must be no visible water on the surface when the brown coat is applied. The brown coat must be applied to the scratch coat with sufficient pressure to force the stucco into the scratches and must be brought to a plumb, true, even plane with rod or straightedge. When set sufficiently, the brown coat must be uniformly floated with a dry float to promote densification of the coat and to provide a surface receptive to bonding of the finish coat. Brown coat must be fog cured for a minimum of 72 hours.
3.4.4 Finish Coat
Dampen surfaces of the brown coat not more than 1 hour before the finish coat is to be applied to a uniform wetness with no free-standing water on
SECTION 09 24 23 Page 3 the surface. The finish coat must have a rough-textured finish to match existing adjacent and must conform to the approved sample. Fog cure the finish coat for a minimum of 48 hours. Take care to prevent staining.
3.4.5 Surface Tolerance
When a 10 foot straightedge is placed at any location on the finished surface of the stucco, excluding rough-textured finish, the surface must not vary more than 1/8 inch from the straightedge.
3.5 CURING AND PROTECTION
Perform fog curing by applying a fine mist of water to the stucco.
Exercise care during fog curing to avoid erosion damage of the stucco surfaces. Do not use a solid stream of water. Fog not less than three times daily. Protect the stucco from the direct rays of the sun during severe drying conditions using canvas, cloth or other approved sheet material.
3.6 PATCHING AND POINTING
Replace or patch loose, cracked, damaged or defective work as directed.
Patching must match existing work in texture and color and must be finished flush.
-- End of Section --
SECTION 09 24 23 Page 4
SECTION 09 29 00
GYPSUM BOARD
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A108.11 (1992; Reaffirmed 2005) Specifications for Interior Installation of Cementitious Backer Units
ASTM INTERNATIONAL (ASTM)
ASTM C475/C475M (2017) Standard Specification for Joint Compound and Joint Tape for Finishing Gypsum Board
ASTM C840 (2018b) Standard Specification for Application and Finishing of Gypsum Board
ASTM C919 (2012; R 2017) Standard Practice for Use of Sealants in Acoustical Applications
ASTM C954 (2018) Standard Specification for Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from 0.033 in. (0.84 mm) to
0.112 in. (2.84 mm) in Thickness
ASTM C1002 (2018) Standard Specification for Steel Self-Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs
ASTM C1047 (2014a) Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer Base
ASTM C1177/C1177M (2017) Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
ASTM C1178/C1178M (2013) Standard Specification for Glass Mat Water-Resistant Gypsum Backing Panel
ASTM C1396/C1396M (2017) Standard Specification for Gypsum Board
ASTM C1629/C1629M (2018a) Standard Classification for Abuse-Resistant Nondecorated Interior
SECTION 09 29 00 Page 1
Gypsum Panel Products and Fiber-Reinforced Cement Panels
ASTM C1766 (2015; R2019) Standard Specification for Factory-Laminated Gypsum Panel Products
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D624 (2000; R 2012) Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers
ASTM D1037 (2012) Evaluating Properties of Wood-Base Fiber and Particle Panel Materials
ASTM D1149 (2007; R 2012) Standard Test Method for Rubber Deterioration - Surface Ozone Cracking in a Chamber
ASTM D2394 (2017) Standard Test Methods for Simulated Service Testing of Wood and Wood-Base Finish Flooring
ASTM D3273 (2016) Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber
ASTM D5420 (2016) Standard Test Method for Impact Resistance of Flat, Rigid Plastic Specimen by Means of a Strike Impacted by a Falling Weight (Gardner Impact)
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E695 (2003; R 2015; E 2015) Measuring Relative Resistance of Wall, Floor, and Roof Construction to Impact Loading
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
SECTION 09 29 00 Page 2
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
GYPSUM ASSOCIATION (GA)
GA 214 (2010) Recommended Levels of Gypsum Board Finish
GA 216 (2010) Application and Finishing of Gypsum Panel Products
GA 600 (2009) Fire Resistance Design Manual
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
UL Fire Resistance (2014) Fire Resistance Directory
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Cementitious Backer Units
Glass Mat Water-Resistant Gypsum Tile Backing Board
Abuse Resistant Gypsum Board
Acoustically enhanced gypsum board
Accessories
Submit for each type of gypsum board and for cementitious backer units.
Gypsum Board
Recycled Content for Gypsum Board; S
SECTION 09 29 00 Page 3
Recycled Content for Paper Facing and Gypsum Cores; S
VOC Content of Joint Compound; S
SD-07 Certificates
Asbestos Free Materials
Certify that gypsum board types, gypsum backing board types, cementitious backer units, and joint treating materials do not contain asbestos.
Indoor Air Quality for Gypsum Board; S
Indoor Air Quality for Non-aerosol Adhesives; S
Indoor Air Quality for Aerosol Adhesives; S
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
Submit required indoor air quality certifications in one submittal package.
Provide current certification from certification body.
1.3.1.1 Ceiling and Wall Systems
Provide products certified to meet indoor air quality emissions requirements of CDPH Section 01350. Give preference to certification by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.