W912QR22R0028_CUI_CF_Specs_Vol5-0002.pdf
PDF 7 MB Posted
- Solicitation number
- W912QR22R0028
About this file
This announcement provides details for a federal construction contract opportunity. The U.S. Army Corps of Engineers Louisville District will issue a Request for Proposal for the renovation of over 60,000 square feet of the Air Force Materiel Command Headquarters Building at Wright-Patterson Air Force Base, Ohio. Renovation work includes HVAC, plumbing, electrical, and telecommunications systems replacement along with interior finishes, windows, and site improvements. The contract value is estimated between $100-250 million. The solicitation will utilize a best value tradeoff selection process, with technical evaluation weighted approximately equal to price. The anticipated solicitation release date is 10 November 2022 on SAM.gov, and the contract duration is estimated at 1,095 calendar days.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled by: USACE-LRL-ED-MA CUI Category(ies):
LDC or Distribution Statement: N/A POC: Blake Gevedon Contracting Specialist william.b.gevedon@usace.army.mi 502.315.6791
Materials shall be submitted to potential offerors currently certified in the Joint Certification Program (JCP) only.
Solicitation For Repair/Renovate AFMC Headquarters Building (B10262), WPAFB Phase 1
P2: 475429 Design-Bid-Build
Specifications Vol. 5 of 5
10 November 2022
W912QR22R0028
90% Final Revised Specification Submittal
14 December 2022
W912QR22R0028-0002
Certified Final
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR22R0028_CUI_CF_Specs_Vol5-0002
US Army Corps of Engineers Louisville District
Volume 5 of 5
SPECIFICATIONS
Rev00
Repair/Renovate AFMC Headquarters Building (B10262)
Phase 1 - Certifi ed Final Specifi cation Submittal
Project Number: ZHTV160500-262 P2 # 475429
Fiscal Year 2023
12 December 2022
CONTROLLED
UNCLASSIFIED
INFORMATION
EXPIRES: 31 DEC 2023
P2#475429 Repair/Reno AFMC HQ 10262 CUI Wright-Patterson AFB –Phase 1
PROJECT TABLE OF CONTENTS Page 1 CUI Certified Final
PROJECT TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15 SUMMARY OF WORK
01 32 01.00 06 07/18 PROJECT SCHEDULE
01 33 000 8/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 35 43 12/20 GENERAL ENVIRONMENTAL PROTECTION
REQUIREMENTS (WPAFB)
01 42 00 02/19 SOURCES FOR REFERENCE
PUBLICATIONS
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM
CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20 TEMPORARY CONSTRUCTION
FACILITIES AND CONTROLS
01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT
AND DISPOSAL
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
VOLUME 2
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10 DEMOLITION AND DECONSTRUCTION
PROJECT TABLE OF CONTENTS Page 2 CUI Certified Final
DIVISION 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL
CONCRETE
03 35 43 12/21 POLISHED CONCRETE FINISHING
03 62 15.00 06 07/16 FLOWABLE FILL
DIVISION 04 - MASONRY
04 20 00 11/15 UNIT MASONRY
04 72 00 09/20 CAST STONE MASONRY
DIVISION 05 - METALS
05 05 20.00 27 02/21 POST-INSTALLED CONCRETE AND
MASONRY ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18 STRUCTURAL STEEL
05 30 00 05/15 STEEL DECKS
05 40 00 05/15 COLD-FORMED METAL FRAMING
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 00.01 05/22 PREFABRICATED ALUMINUM STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
05 52 16 12/21 METAL EGRESS BARRIER GATES
05 75 00 05/21 DECORATIVE FORMED METAL
PROJECT TABLE OF CONTENTS Page 3 CUI Certified Final
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
06 16 00 10/20 SHEATHING
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD
ARCHITECTURAL CABINETS
06 61 16 08/10 SOLID SURFACING FABRICATIONS
06 64 00 11/19 PLASTIC PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 05/20 PREPARATION FOR REROOFING
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 17 00 08/22 BENTONITE WATERPROOFING
07 17 10 08/22 BENTONITE INJECTION
WATERPROOFING
07 21 13 02/16 BOARD INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 24 00 05/11 POLYMER-BASED EXTERIOR FINISH
SYSTEMS (EFS)
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS
07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR
BARRIERS
07 27 36 05/17 SPRAY FOAM AIR BARRIERS
07 42 13 05/11 METAL WALL PANELS
07 42 17 06/20 INSULATED-CORE METAL WALL BACKUP
PANEL SYSTEM
07 42 93 05/22 SOFFIT PANELS
07 44 56 06/20 MINERAL-FIBER-REINFORCED
CEMENTITIOUS PANELS
PROJECT TABLE OF CONTENTS Page 4 CUI Certified Final
07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE
ROOFING
07 54 23 02/13 THERMOPLASTIC POLYOLEFIN (TPO)
ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 61 15.00 20 08/16 ALUMINUM STANDING SEAM ROOFING
07 71 00 05/20 ROOF SPECIALTIES
07 72 10 11/19 ROOFTOP FALL ARREST SYSTEM
07 72 30 ROOF ACCESSORIES
07 72 53 07/20 SNOW GUARDS
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 81 23 05/20 INTUMESCENT FIREPROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
07 95 13.13 12/20 INTERIOR EXPANSION JOINT COVER
ASSEMBLIES
07 95 13.16 01/21 EXTERIOR EXPANSION JOINT COVER
ASSEMBLIES
DIVISION 08 - OPENINGS
08 08 13 07/20 FIRE-RESISTANT GLAZING
08 11 13 02/10 STEEL DOORS AND FRAMES
08 14 00 08/16 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 33 13 05/09 COILING COUNTER DOORS
08 33 23 11/19 OVERHEAD COILING DOORS
08 33 26 01/21 OVERHEAD COILING GRILLES
08 34 60 05/22 HORIZONTAL SLIDING WINDOW
08 34 73 02/15 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
PROJECT TABLE OF CONTENTS Page 5 CUI Certified Final
08 44 00 05/19 CURTAIN WALL AND GLAZED
ASSEMBLIES
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 85 10 08/09 DECORATIVE FILM FOR GLASS
08 88 13 10/22 FIRE-RESISTANT STOREFRONT
GLAZING
08 91 00 05/11 METAL WALL LOUVERS
VOLUME 3
DIVISION 09 - FINISHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM
BOARD
09 22 16 01/21 EXTRUDED ALUMINUM PARTITION
CLOSURE
09 23 00 08/16 GYPSUM PLASTERING
09 24 23 08/17 CEMENT STUCCO
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC, QUARRY, AND GLASS
TILING
09 51 00 08/17 ACOUSTICAL CEILINGS
09 54 70 05/21 METAL PANEL CEILING SYSTEM
09 62 38 08/17 STATIC-CONTROL FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 66 13 08/16, CHG 2: 11/18 PRECAST TERRAZZO TREADS
09 66 16 08/16 TERRAZZO FLOOR TILE
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 68 00 11/17 CARPETING
09 72 00 08/17 WALLCOVERINGS
09 84 20 08/16 ACOUSTICAL WALL PANELS
09 90 00 05/11 PAINTS AND COATINGS
PROJECT TABLE OF CONTENTS Page 6 CUI Certified Final
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 96 46 11/19 INTUMESCENT PAINTING
DIVISION 10 - SPECIALTIES
10 11 00 08/17 VISUAL DISPLAY UNITS
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/17 TOILET COMPARTMENTS
10 26 00 08/17 WALL AND DOOR PROTECTION
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 45 13 10/20 DEFIBRILLATOR CABINETS AND
DEFIBRILLATORS
10 51 13.10 05/11 METAL LOCKERS - SPECIAL PURPOSE
10 99 00 11/19 MISCELLANEOUS ITEMS
DIVISION 11 - EQUIPMENT
11 10 10 09/20 MODULAR ACCESS RAMPS
11 13 13 04/20 LOADING DOCK BUMPER
11 13 19.13 08/09 LOADING DOCK LEVELERS
DIVISION 12 - FURNISHINGS
12 24 13 08/17 ROLLER WINDOW SHADES
12 36 00 08/18 COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/20 BRACING FOR EQUIPMENT
PROJECT TABLE OF CONTENTS Page 7 CUI Certified Final
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 05/20 ELECTRIC TRACTION PASSENGER
ELEVATORS
14 42 50 05/20 VERTICAL WHEELCHAIR LIFTS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
22 11 16.11 WATER SERVICE TAPS AND SERVICE
LINE INSTALLATION
22 11 16.13 CROSS CONNECTION CONTROL AND
BACKFLOW PREVENTION
22 13 19.23 GREASE TRAPS
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 08/18 AIR SUPPLY, DISTRIBUTION,
VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 02/15 HVAC SYSTEM CLEANING
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND
BALANCING (TAB) OF HVAC
23 07 00 02/13 THERMAL INSULATION FOR
MECHANICAL SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR
HVAC
PROJECT TABLE OF CONTENTS Page 8 CUI Certified Final
23 09 13 11/15 INSTRUMENTATION AND CONTROL
DEVICES FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL
FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 11/08 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 64 10 11/16 WATER CHILLERS, VAPOR
COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND
CONDENSER WATER PIPING SYSTEMS
23 81 00 05/18 DECENTRALIZED UNITARY HVAC
EQUIPMENT
23 82 01.00 10 04/08 WARM AIR HEATING SYSTEMS
VOLUME 4
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS FIRE AND
LIFE SAFETY
25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS ENERGY
MANAGEMENT CONTROL SYSTEM
25 05 11.26 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS UTILITY
CONTROL SYSTEM
25 05 11.26 02 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS BUILDING
CONTROL SYSTEM
25 05 11.28 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS
ELECTRONIC SECURITY SYSTEM
PROJECT TABLE OF CONTENTS Page 9 CUI Certified Final
25 08 10 04/06 UTILITY MONITORING AND CONTROL
SYSTEM TESTING
25 10 10 02/19 UTILITY MONITORING AND CONTROL
SYSTEM (UMCS) FRONT END AND
INTEGRATION
DIVISION 26 - ELECTRICAL
26 08 00 08/08, CHG 1: 02/15 APPARATUS INSPECTION AND TESTING
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 24 13 05/15 SWITCHBOARDS
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM
PROTECTION
26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD)
SYSTEMS UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM
(SACRIFICIAL ANODE)
26 51 00 05/20 INTERIOR LIGHTING
26 56 00 05/20 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 04/06 CABLE TELEVISION PREMISES
DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS
CABLING SYSTEM
27 41 00 10/20 AUDIOVISUAL SYSTEMS
27 51 19 01/22 SOUND MASKING SYSTEMS
PROJECT TABLE OF CONTENTS Page 10 CUI Certified Final
VOLUME 5
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM
ACCEPTANCE TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS
(ESS)
28 31 76 08/11 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 31 16.13 08/16 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 02/17 COLD MILLING ASPHALT PAVING
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID
PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 08/17 BASE COURSE FOR RIGID AND
SUBBASES FOR FLEXIBLE PAVING
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE
PAVEMENT FOR ROADS AND SITE
FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND
SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 17 26 01/21 TACTILE WARNING SURFACING
32 31 13 11/16 CHAIN LINK FENCES AND GATES
PROJECT TABLE OF CONTENTS Page 11 CUI Certified Final
32 31 13.10 11/16 CHAIN LINK FENCES AND GATES (FOR
BUILDING INTERIORS)
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK
AND ORNAMENTAL) AND GATES
32 92 19 08/17 SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 01 10.13 PRESSURE AND LEAKAGE TESTS
33 01 30.13 ACCEPTANCE TESTING FOR SANITARY
SEWERS
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL
DRILLING
33 11 00 PIPING AND ACCESSORIES – GENERAL
PROVISIONS
33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
33 11 00.15 DUCTILE IRON PIPE AND FITTINGS
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 46 13 04/08 FOUNDATION DRAINAGE SYSTEM
33 46 16 05/18 SUBDRAINAGE PIPING
33 51 15 08/19 NATURAL-GAS / LIQUEFIED
PETROLEUM GAS DISTRIBUTION
PIPELINES
33 52 10 11/18 FUEL SYSTEMS PIPING
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE
TANKS
33 61 13.13 02/16 PREFABRICATED UNDERGROUND
HYDRONIC ENERGY DISTRIBUTION
33 71 02 02/15 UNDERGROUND ELECTRICAL
DISTRIBUTION
PROJECT TABLE OF CONTENTS Page 12 CUI Certified Final
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT
(OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.19 02/20 CRASH RATED ACTIVE VEHICLE
BARRIERS AND CONTROLS
-- End of Project Table of Contents --
Wright-Patterson AFB – Phase 1
SECTION 28 08 10
ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
05/16
PART 1 GENERAL
1.1 SUMMARY
This specification defines the process and procedures for initial acceptance testing of electronic security systems (ESS) to include intrusion detection, access control and video as well as associated power and communications. Requirements to plan, conduct, and document all testing activities are covered along with the Government responsibility to witness testing and review and approve submittals. During the course of the acceptance test, demonstrate that, without exception, the completed and integrated ESS complies with the contract requirements.
1.2 DEFINITIONS
The Government Representative is a qualified individual given specific authority to witness system acceptance testing and evaluate the results.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-05 Design Data
Test Plan; G
SD-06 Test Reports
Draft Test Report
Final Test Report; G
SD-07 Certificates
Qualifications
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
1.4.1.1 General
The Test Director, Operator, and Technician must have prior experience with the specific equipment, hardware and software installed under the contract.
SECTION 28 08 10 Page 1 CUI Certified Final
1.4.1.2 Operator
The Operator must have at least two years of hands-on experience installing and maintaining ESS workstations to include both hardware and software. The Operator must be capable of demonstrating all workstation features and capabilities.
1.4.1.3 Technician
The technician must have at least two years of hands-on experience installing and maintaining ESS field equipment to include sensors, card readers, cameras, local processors, and communications equipment. The Technician must be capable of demonstrating all features and capabilities of ESS field equipment. Qualifications may be met by the individual experience of one technician or by the combined experience of a team of technicians.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 TEST PLAN
Clearly establish the scope for ESS testing prior to beginning testing.
Submit a Test Plan that addresses the following topics:
3.1.1 Personnel
Identify the Test Director, Operator, Technician, and any other personnel that will be performing test activities.
3.1.2 Equipment
List all equipment that is required to support testing. State the purpose of each piece of equipment. Describe equipment that will be used to enable voice communications between the monitoring location and the field.
3.1.3 Procedures
Provide a step-by-step procedure for conducting each functional test.
Describe actions and expected results. Ensure that functional test procedures address performance standards described in contract specifications.
Download example procedures from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables and review for applicability and completeness. Adapt example procedures to meet specific project requirements and develop additional ones as needed. Follow TEST-MASTERTP0023-005 for Air Force projects.
3.1.4 Special Provisions
Discuss any special test provisions such as facility access, safety, integration with existing systems, and coordination with other work.
SECTION 28 08 10 Page 2
3.1.5 Test Logs
Provide logs for recording all data from functional testing and burn-in testing.
Download example logs from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables and review for applicability and completeness. Adapt example logs to meet specific project requirements and develop additional ones as needed.
3.1.6 Schedule
Provide an overall schedule that includes all testing milestones.
3.2 PRE-ACCEPTANCE TESTING
Conduct a complete test of all field equipment, workstations, and central system hardware and software in accordance with the approved Test Plan.
The Test Director must be on site to conduct a pre-test inspection and oversee all testing activities. Prior to testing, visually inspect all ESS components and correct workmanship and neatness deficiencies as needed. During the pre-test inspection, verify the accuracy of redline drawings and update drawings as needed. Conduct testing in two phases -functional testing followed by burn-in testing.
3.2.1 Phased Testing
3.2.1.1 Functional Testing Phase
During the functional testing phase, verify system performance in accordance with approved Test Plan. Record results in approved Test Logs, and provide a written explanation of each failure to include cause, corrective action, and retest result. Continue functional testing until all tests have been successfully completed with no unresolved failures.
3.2.1.2 Burn-In Testing Phase
Begin burn-in testing after successful completion of all functional testing.During the burn-in testing phase, place the ESS in normal operating mode and evaluate system performance for a continuous 24-hour period. During this time, the ESS must be fully functional and programmed such that all features can be exercised and evaluated through normal use.
Record all system anomalies in approved Test Logs. Include a description of each anomaly along with any actions taken in response. Immediately correct minor deficiencies observed during the course of testing and continue with burn-in testing. Determine the root cause of any failures and make necessary repairs or modifications to restore full functionality. After a failure is corrected repeat functional tests for components and features associated with the failure, and repeat the entire burn-in testing phase .
3.2.2 Draft Test Report
Prepare and submit a Draft Test Report detailing the results of the testing. Refer to paragraph FINAL TEST REPORT for required content.
Include a cover letter signed by the Test Director stating that pre-acceptance testing has been completed and that the system is ready for acceptance testing.
SECTION 28 08 10 Page 3
3.3 SYSTEM ACCEPTANCE
Test the ESS in accordance with the approved Test Plan in the presence of the Government Representative to certify acceptable performance. Verify that the total system meets all requirements of the specification and complies with the specified standards.
Begin acceptance testing upon arrival of the Government Representative at the project site. Place the ESS in normal operating mode and evaluate system performance during the testing period. Immediately report any deficiencies observed during testing to the Government Representative and discuss possible causes and corrective measures. Obtain Government approval prior to making any adjustments, repairs or modifications. The Government retains the right to terminate testing at any time the ESS is found to be incomplete or fails to perform as specified. Such termination of acceptance testing constitutes a FAILED system acceptance test.
3.3.1 Preparation
Nofity the Contracting Officer of system readiness 15 days prior to the expected start date of acceptance testing. Prior to acceptance testing, complete all clean-up and patch work requirements. Ensure that security equipment closets and similar areas are free of accumulation of waste materials or rubbish caused by prior installation work.
3.3.2 Personnel
Ensure that the following personnel are on site to perform test activities: Test Director, Operator, Technician, and Test Intruder.
Ensure that the Quality Control Manager is on site during acceptance testing.
3.3.3 Visual Inspection
Assist the Government Representative in conducting a visual inspection of ESS equipment and wiring. This inspection will focus on the general neatness and quality of workmanship and compliance with applicable codes and manufacturers' recommended installation methods. Provide a comprehensive listing of installed equipment and software along with a complete set of ESS red line drawings to be used during the inspection.
Document deficiencies identified during the inspection.
3.3.4 Functional Testing
Comply with requests from the Government Representative to repeat functional tests performed previously during pre-acceptance testing. The Government reserves the right to request the Contractor to repeat all functional tests or a representative sampling thereof as a means of performance verification. Add all test results to approved Test Logs.
3.3.5 System Activity Reports
Retrieve archived data from the system and provide activity reports as requested by the Government Representative. Reports may address any type of activity to include alarms, portal transactions, and video archives.
Assist with analyzing reports to identify trends and anomalies.
SECTION 28 08 10 Page 4
3.3.6 Corrective Actions
Correct any deficiencies in coordination with the Government Representative. Maintain a punch list and review status at the end of each day. Work diligently to complete corrective actions the same day that deficiencies are observed. Add deficiencies not corrected on the same day to the rework items list maintained by the Quality Control Manager. Failure to resolve punch list items to the satisfaction of the Government constitutes a FAILED system acceptance test.
3.4 FINAL TEST REPORT
Submit a Final Test Report following the successful completion of acceptance testing to include resolution of all punch list items. Address the following topics in the Final Test Report:
3.4.1 Summary
Provide a chronological summary of all testing. Describe test activities and results in narrative form.
3.4.2 Personnel
Provide a list of all Contractor and Government personnel who participated in the testing.
3.4.3 Test Logs
Provide all completed test logs along with a test log verification signed by the Test Director.
-- End of Section --
SECTION 28 08 10 Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 28 08 10 Page 6
SECTION 28 10 05
ELECTRONIC SECURITY SYSTEMS (ESS)
05/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ASC/X9 X9.52 (1998) Triple Data Encryption Algorithm Modes of Operation
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM B32 (2020) Standard Specification for Solder Metal
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 802.3 (2018) Ethernet
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
INTELLIGENCE COMMUNITY STANDARD (ICS)
ICS 705-1 (2010) Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 2 (2000; R 2020) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
SECTION 28 10 05 Page 1
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST FIPS 140-2 (2001) Security Requirements for Cryptographic Modules
OPEN NETWORK VIDEO INTERFACE FORUM (ONVIF)
ONVIF (2017) Core Specification Version 17.06
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-222 (2018H; Add 1 2019) Structural Standard for Antenna Supporting Structures and Antennas and Small Wind Turbine Support Structures
TIA-568.2 (2018d) Balanced Twisted-Pair Telecommunications Cabling and Components Standards
U.S. DEPARTMENT OF DEFENSE (DOD)
DODI 8500.01 (2014) Cybersecurity
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
47 CFR 15 Radio Frequency Devices
UNDERWRITERS LABORATORIES (UL)
UL 294 (2018; Reprint Oct 2018) UL Standard for Safety Access Control System Units
UL 437 (2013; Reprint Oct 2017) UL Standard for Safety Key Locks
UL 634 (2007; Reprint Mar 2015) Connectors and Switches for Use with Burglar-Alarm Systems
UL 636 (2018) UL Standard for Safety Holdup Alarm Units and Systems
UL 639 (2007; Reprint Nov 2019) Standard for Intrusion Detection Units
UL 681 (2014; Reprint Jan 2021) UL Standard for Safety Installation and Classification of Burglar and Holdup Alarm Systems
UL 796 (2020; Reprint Mar 2022) UL Standard for
SECTION 28 10 05 Page 2
Safety Printed Wiring Boards
UL 1037 (2016; Reprint Sep 2017) UL Standard for Safety Antitheft Alarms and Devices
UL 1076 (2018; Reprint Feb 2021) UL Standard for Safety Proprietary Burglar Alarm Units and Systems
UL 1610 (2016; Reprint Apr 2021) UL Standard for Safety Central-Station Burglar-Alarm Units
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
The Naval Facilities Engineering Command will approve submittals requiring special review in this section.
SD-02 Shop Drawings
ESS Components; G
ESS Design for Doors 0464, 0901A, 0901B, 0500A, 0500B; G
Overall System Schematic; G
SD-03 Product Data
Detection Sensors; G
Access Control Unit; G
Access Control Devices; G
Cameras; G
Camera Housing and Mounts; G
Video Recording; G
Communications Interface Devices; G
Video and ESS Transmission; G
Batteries; G
Component Enclosure; G
SD-05 Design Data
Backup Battery Capacity Calculations; G
CCTV Storage Calculations
SECTION 28 10 05 Page 3
SD-07 Certificates
Contractor Qualifications; G
Instructor Qualifications; G
Data Encryption; G
SD-10 Operation and Maintenance Data
Training Plan; G
Training Content; G
ESS Components and ESS Software: Data Package 4; G
ESS Software and ESS Components: Data Package 4; G
Submit data package in accordance with Section 01 78 23
OPERATION AND MAINTENANCE DATA
SD-11 Closeout Submittals
As-Built Drawings; G
1.3 QUALITY ASSURANCE
1.3.1 Regulatory Requirements
The advisory provisions in each of the publications referred to in this specification are mandatory. Interpret these publications as though the word "must" has been substituted for "should" wherever it appears.
Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer.
Equipment, materials, installation, and workmanship must be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.3.2 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening, and have been utilized in applications of equipment and materials under similar circumstances and of similar size.
b. Have been available on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer.
d. Provide commercial off-the-shelf (COTS) products in which the
SECTION 28 10 05 Page 4 manufacturer allows a network of qualified distributors to sell, install, integrate, maintain, and repair the hardware and software products that make up the system.
1.3.2.1 Alternative Qualifications
Products having less than a 2 year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.3.2.2 Material and Equipment Manufacturing Date
Products manufactured more than one year prior to date of delivery to the site are not acceptable.
1.3.2.3 Product Safety
System components are to conform to applicable rules and requirements of NFPA 70 . Equip system components with instruction stickers including warnings and cautions describing physical safety, and special or important procedures to be followed in operating and servicing system equipment.
1.3.3 Shop Drawings
1.3.3.1 ESS Components
Submit the ESS Components, Data Package 4 with the ESS Software submittal package in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.Submit drawings that clearly and completely indicate each ESS component function that includes:
a. Termination device points
b. Interconnections required for system operation
c. Interconnections between modules and devices
d. Proposed wireway or conduit systems to be used including:
(1) Locations
(2) Sizes
(3) Types
e. Drawings showing:
(1) Device locations and spacing
(2) Mounting and positioning details
(3) Riser Diagrams with cable sizes and types
(4) Bill of Materials (Device make, model and quantities)
(5) Alarm and access control zones
(6) CCTV and sensor coverage areas
SECTION 28 10 05 Page 5
(7) Spare capacity
1.3.3.2 ESS Design for Doors 0464, 0901A, 0901B, 0500A, 0500B
ACS Devices must be installed, tested, and accepted by the Government prior to removal of entrapment area gates. Comply to this section prior to installation.
1.3.3.3 Overall System Schematic
Indicate the relationship of integrated components on one-line diagram and show:
a. Power source
b. System controls
c. Impedance matches
d. Interconnecting wire data including:
(1) Number
(2) Size
(3) Identification
(4) Maximum lengths
1.3.4 Evidence of Experience and Qualifications
1.3.4.1 Contractor Qualifications
Submit experience and certified qualifications data prior to installation. Show that specific installers who will perform the work have a minimum of 5 years of experience successfully installing ESS of the same type and similar design as specified. Include the names, locations, and points of contact of at least two installations of similar type and design as specified in this document where the installer has installed such systems. Indicate the type of each system installed. Certify that each system has performed satisfactorily in the manner intended for a period of at least 12 months.
1.3.4.2 Instructor Qualifications
Submit the instructor's experience and certified qualifications data prior to installation. Show that the instructor has received a minimum of 24 hours of ESS training from a technical organization such as the National Burglar and Fire Alarm Association, and 2 years experience in installing the specified ESS type.
1.4 Environmental Conditions
1.4.1 Interior Conditions
Equipment installed in environmentally protected interior areas must meet performance requirements specified for the following ambient conditions:
SECTION 28 10 05 Page 6
1.4.1.1 Temperature
32 to 120 degrees F. Components installed in unheated security protected areas must meet performance requirements for temperatures as low as 0 degrees F
1.4.1.2 Pressure
Sea level to 15,000 feet above sea level
1.4.1.3 Relative Humidity
5 to 95 percent
1.4.1.4 Fungus
Components must be constructed of non fungus nutrient materials or be treated to inhibit fungus growth
1.4.1.5 Acoustical Noise
Components must be suitable for use in high noise areas above 100 dB, without adversely affecting their performance
1.4.2 Exterior Conditions
Components in enclosures must meet performance requirements when exposed to the following ambient conditions:
1.4.2.1 Temperature
Minus 25 to 140 degrees F
1.4.2.2 Pressure
Sea level to 15,000 feet above sea level
1.4.2.3 Solar Radiation
Six hours of solar radiation per day at dry bulb temperature of 120 degrees F including 4 hours of solar radiation at 104 watts per square foot
1.4.2.4 Sand and Dust
Wind driven for up to 6 miles per hour (mph)
1.4.2.5 Rain
2 inches per hour and 5 inches per hour cyclic with wind plus one period of 12 inches per hour
1.4.2.6 Humidity
5 to 95 percent
1.4.2.7 Fungus
Warm, humid atmosphere conducive to the growth of heterotrophic plants
SECTION 28 10 05 Page 7
1.4.2.8 Salt Fog
Salt atmosphere with 5 percent salinity
1.4.2.9 Snow
Snow loading of 48 (psf) per hour; blowing snow of 4.6 psf per hour
1.4.2.10 Ice Accretion
Up to 1/2 inches of radial ice
1.4.2.11 Wind
Continual velocity up to 50 mph with gusts to 66 mph, except that fence sensors must detect intrusions up to 35 mph
1.4.2.12 Acoustical Noise
Components must be suitable for use in high noise areas above 110 dB without adversely affecting their performance. Examples areas include flight lines, run-up pads, and generator sites.
1.5 SYSTEM CALCULATIONS AND ANALYSIS
1.5.1 Backup Battery Capacity Calculations
Submit calculations showing that backup battery capacity exceeds sensor operation, communications supervision, and alarm annunciation power requirements for proposed equipment plus 25 percent spare capacity.
1.5.2 CCTV Storage Calculations
Submit calculations showing the required storage capacity for each video storage device.
1.6 ESS SOFTWARE, DATA PACKAGE 4
Submit the ESS software, Data Package 4 with the ESS Components submittal package in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. Describe the functions of all software in the software manual and include:
a. All information necessary to enable proper loading, testing, and operation
b. Terms and functions definitions
c. Use of system and application software
d. Procedures for system initialization, start-up and shutdown
e. Alarm reports
f. Reports generation
g. Database format and data entry requirements
h. Directory of all files
SECTION 28 10 05 Page 8
i. All communication protocol descriptions, including data formats, command characters, and a sample of each type of data transfer
j. Interface definition
k. List of software keys
1.7 AS-BUILT DRAWINGS
Maintain a separate set of drawings, elementary diagrams, and wiring diagrams of the system to be used for as-built drawings. Keep this set accurately and neatly up-to-date with all changes and additions. This set is not to be used for installation purposes.
Finish the final drawings submitted with the endurance test report as specified for as-built requirements.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide a complete and integrated electronic security system (ESS) that the meet requirements. ESS must be compatible with the Installation's central monitoring system and monitored within the secure/protected area at the Installation central monitoring station. ESS consisting of the following subsystems and features:
a. Intrusion Detection System (IDS)
b. Access Control System (ACS)
c. Closed-circuit Television System (CCTV)
d. Communications System
Include materials not normally furnished by the manufacturer with the ESS equipment as specified in:
a. Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
b. Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM
2.2 PERFORMANCE REQUIREMENTS
Integrate the installed and operating subsystems into the overall ESS system to detect intrusion, control access, provide CCTV surveillance, provide visual verification, and perform as an entity, as specified below. Provide electronic equipment that complies with 47 CFR 15 and are suitable for the environment where they will be installed.
2.2.1 Growth Capability
Provide capability for modular ESS expansion of inputs, outputs, card readers, and remote control stations with minimal equipment modification.
Software must be able to handle design requirements plus 25 percent spare capacity. Growth capability is not to be limited by the provided products.
SECTION 28 10 05 Page 9
2.2.2 Hazardous Locations
When located in areas where fire or explosion hazards exist, provide system components rated and installed according to Chapter 5 of NFPA 70 .
2.2.3 Network Certification
Certify all Platform Information Technology (PIT) in accordance with DODI 8500.01 and the individual service implementation policy.
2.2.4 Maintainability
Provide components that can be maintained using commercially available tools and equipment. Arrange and assemble components to be readily accessible to maintenance personnel without compromising system defeat resistance and with no degradation in tamper protection, structural integrity, EMI or RFI attenuation, or line supervision after maintenance when it is performed in accordance with manufacturer's instructions.
2.2.5 Availability
Provide components rated for continuous operation. Provide solid-state electronic components mounted on printed circuit boards, conforming to UL 796 . Provide boards that are plug-in, quick-disconnect type. Do not impede maintenance with densely packed circuitry. Provide power-dissipating components with safety margins of not less than 25 percent with respect to dissipation ratings, maximum voltages, and current-carrying capacity. Provide solid-state type or hermetically sealed electromechanical type light duty relays and similar switching devices.
2.2.6 Fail-Safe Capability
Provide fail-safe capability in critical elements of the ESS including, but not be limited to, the capability to monitor communication link integrity and to provide self-test. Provide fault annunciation when diminished functional capabilities are detected. Annunciate fail-safe alarms to clearly distinguish from other types of alarms.
2.2.7 Line Supervision
Provide the same geographic resolution for fault isolation at the systems level as provided for intrusion detection. Provide either a static or dynamic system with active mode for line supervision of communication links of the ESS.
a. The static system must represent "no-alarm" always by the same signal, which is different than the originally transmitted signal.
b. The dynamic system must represent "no-alarm" with a signal which continually changes with time.
2.2.8 Power Loss Detection
Detect AC and DC power loss and generate an alarm when a critical component of the system experiences temporary or permanent loss of power.
Annunciate the alarm in the Security Command Center to clearly identify the component experiencing power loss.
SECTION 28 10 05 Page 10
2.2.9 Controls and Designations
Provide controls and designations as specified in NEMA ICS 1 .
2.2.10 Special Test Equipment
Provide all special test equipment, special hardware, software, tools, and programming or initialization equipment needed to start or maintain any part of the system and its components. Special test equipment is defined as any test equipment not normally used in an electronics maintenance facility.
2.2.11 Electromagnetic Interference (EMI)
Configure and provide ESS components employing electromagnetic radiation constructed to provide minimal vulnerability to electronic countermeasures.
2.2.12 Electromagnetic Radiation (EMR)
Provide only ESS communication components which are Federal Communications Commission (FCC) licensed and approved. Provide system components which are electromagnetically compatible.
2.2.13 Interchangeability
Use off-the-shelf components which are physically, electrically, and functionally interchangeable with equivalent components as complete items. Equivalent, replacement components must not require new or other component modification. Do not use custom designed or one-of-a-kind items. Interchangeable components or modules must not require trial and error matching in order to meet integrated system requirements, system accuracy, or restore complete system functionality.
2.3 INTRUSION DETECTION SYSTEM (IDS)
The IDS primary function is to detect intrusion into secured areas.
Utilize a single database for all IDS programming data that seamlessly integrates with the ESS under a single operating environment. The IDS events must be viewable as separate or as a combined list of all ESS events. Control the IDS alarm monitoring through software control from the ESS.
a. Provide both supervised and non-supervised alarm point monitoring.
b. Secure or access alarm points both manually and automatically by time of day, day of week or by operator command.
2.3.1 IDS Components
Provide components:
a. Premise Control Units (PCU)
b. Detection Sensors
c. Tamper Switches
SECTION 28 10 05 Page 11
2.3.2 Detection Sensitivity
The sensitivity of the IDS must allow for the following:
a. Locating intrusions at individually protected assets or at an individual portal
b. Locating failures or tampering at individual sensors
2.3.3 Detection Alarm and Reporting Capacity
Collect, communicate, and display up to 12 sensor zone alarms inside of the protected area with a delayed alarm.
Identify individual sensors in alarm if the sensor zone is a multiple alarm source combination. Annunciate a single alarm within 2 seconds maximum, after sensor transducer or other detection device activation except that alarms transmitted by radio frequency signaling must communicate in less than 3 seconds.
2.3.4 False Alarm Rate
The false alarm rate for each interior IDS zone must not exceed one false alarm per 30-day period. The false alarm rate for each exterior IDS zone must not exceed one false alarm per 24-hour period.
2.3.5 Nuisance Alarm Rate
The nuisance alarm rate for each interior IDS zone must not exceed three nuisance alarms per 30-day period. The nuisance alarm rate for each exterior IDS zone must not exceed three nuisance alarms per 24-hour period.
2.3.6 Premise Control Unit (PCU)
Install the PCU command processor in a tamper resistant enclosure that is specified in paragraph "Component Enclosure". Package the following with the PCU:
a. Power transformer
b. Battery(s)
c. Network connection cable
d. Keypad(s)
e. Keypad connection cable(s)
f. Additional components as required for full functionality
2.3.6.1 PCU Capabilities
Provide the PCU at a minimum but not limited to, the following capabilities;
a. Expansion to a total of at least 10,000 user codes with 99 user profile definitions.
b. Support 4 keypads with alphanumeric display. Each keypad must be
SECTION 28 10 05 Page 12 capable of securing and accessing any system area based on a pass code or access control card and or key FOB authorization. Provide keypad alphanumeric display with complete prompt messages during all stages of operation and system programming and display all relevant operating and test data.
c. Four 4 shift schedules per area.
d. A total of at least 100 programmable output relay schedules.
e. 32 individual reporting areas.
f. Data line supervision.
g. Two-man access code or credentials.
h. Support programming to require the same or different access code entered within a programmed delay time of 1 to 15 minutes after disarming before activating a silent ambush alarm.
i. Support area programming that disables schedule and time-of-day changes while system is armed so that area can only be disarmed during scheduled times.
j. Provide a minimum of a 4,000 event log buffer per PCU. Record and hold alarm activity information in the log buffer until the ESS is connected and receives the information. Provide a software-configurable warning log buffer filling notification for PCU(s) configured with network switch capabilities.
k. Support a Network Interface Card (NIC) plug-in module with built in network router capable of 128 Bit AES Rijndael Encryption process certified by NIST (National Institute of Standards and Technology).
2.3.6.2 Overcurrent Protection and Indication
When overcurrent more than it is rated for is detected by the PCU, communication bus(es) and keypad(s) are to be shut down and an overcurrent notification LED lit to indicate the situation.
2.3.6.3 Manual and Self-Test
All testing from any alphanumeric keypad include testing for: standby battery, alarm bell or siren, and communication to the Security Command Center (SCC). Include provisions for an automatic, daily, weekly, 30 day, or up to 60 day communication link test from the PCU installation site to the SCC. Include a provision for displaying the internal system power and wiring conditions.
Include the following for internal monitoring points:
a. The bell circuit
b. AC power
c. Battery voltage level
d. Charging voltage
SECTION 28 10 05 Page 13
e. Panel box tamper
f. Phone trouble line 1
g. Phone trouble line 2
h. Transmit trouble
i. Network trouble
A battery test must be automatically performed to test the integrity of the standby battery by disconnecting the standby battery from the charging circuit and placing a load on the battery. Perform this test at an interval no greater than 180 days.
2.3.7 Detection Sensors
a. Sensors are to detect facility perimeter or protected zone penetrations by unauthorized personnel or intruders and transmit an alarm signal to the alarm annunciation system upon change detection.
Accomplish this with a probability of detection (PD) of 0.9 with a 95 percent confidence level and conforming to UL 639 where applicable.
b. Required sensor power is 12 VDC unless otherwise specified.
c. An interior IDS zone is a room or space within a building that can be secured and accessed independently from all other zones.
d. Provide line supervision for all sensors with an end-of-line resistor at the sensor or within a tampered junction box with conduit from the junction box to the sensor.
e. Provide sensors and components rated for operation in the installed environment. The sensors must transmit an alarm signal to the alarm annunciation system upon change detection. Provide all sensors with a tamper switch and elements housed in a tamper-alarmed enclosure in accordance of paragraph "Component Enclosure".
2.3.7.1 Interior Sensors
2.3.7.1.1 High Security Balanced Magnetic Switch (BMS)
Mount the BMS inside the secure location and on the opening side of the door. BMS sensors do not have the capability to incorporate an end-of-line (EOL) resistor.
2.3.7.1.1.1 Level 1 Switch
UL 634 . Level 1 High Security
2.3.7.2 Exterior Sensors
2.3.7.2.1 Video Motion Sensor (Exterior)
Provide a video motion sensor to detect changes in the video signal within a user defined detection zone as described in paragraph VIDEO ANALYTICS.
The system must detect changes in the video signal corresponding to a standard intruder moving within the defined detection zone and wearing clothing with a reflectivity that differs from that of the background
SECTION 28 10 05 Page 14 scene by a factor of 2. Provide signal processing techniques to eliminate non-alarm background motion including light changes, trees blowing, and birds. Provide sensor with controls and method needed by the operator to define and adjust the sensor detection zone within the video picture.
Video motion sensor system must operate using digital cameras. The number of detection zones, the size of the detection zones, and the sensitivity of the detection zones are to be user definable. Provide sensors that accommodate multiple video inputs and have the capability of modular growth. The video inputs must accept composite video. The sensor must not require external sync for operation. Provide one alarm output for each video input. Provide number of video inputs and alarm outputs as required for an operable system. Rack-mount sensor equipment in a standard rack as described in paragraph EQUIPMENT RACK with hardware includes as required to mount the sensor components.
2.3.7.3 Duress Alarms (Hold Up Switch)
UL 636 . Duress alarm switches must provide the means for an individual to covertly notify the alarm annunciation system that a duress situation exists with no visible or audible signal in the secure area.
2.3.7.3.1 Hardwire Duress Alarms
Alarms must be capable of being secretly activated by the foot or hand of an average adult in both standing and seated positions. Upon activation the alarm signal is to lock-in until manually reset with a key or similar device and be readily identifiable by the ESS.
Provide sensors that are easy to operate and configured to minimize the possibility of accidental activation. Hardwire duress alarms must be rated for a minimum lifetime of 50,000 operations. Securely mount sensors in rugged, corrosion-resistant housing.
2.3.7.4 Tamper Switches
a. Corrosion-resistant tamper switches are required for the following IDS and CCTV equipment with hinged doors or removable covers that contain open circuits:
(1) Enclosures
(2) Cabinets
(3) Housings
(4) Boxes
(5) Raceways
(6) Fittings
(7) Sensors
b. Tamper switches are to initiate an alarm signal when the door or cover is moved as little as 1/4 inch from the normally closed position.
Mechanically mount tamper switches to maximize defeat time when enclosure covers are opened or removed. One second is the minimum amount of time required to depress or defeat the tamper switch after
SECTION 28 10 05 Page 15 opening or removing the cover. Enclosure and tamper switch must prevent direct line of sight to internal components and prevent switch or circuit tampering. Conceal mounting hardware so switch cannot be observed from enclosure exterior.
c. Tamper switches on doors which are opened to make normal maintenance adjustments to the system and to service power supplies must not have a maintenance position.
2.3.7.4.1 Tamper Switch Performance Requirements
Tamper switches are to be:
a. Inaccessible until switch is activated.
b. Under electrical supervision at all times, irrespective of the protection mode in which the circuit is operating.
c. Annunciated to be clearly distinguishable from intrusion detection alarms and exempt from being disarmed, shunted, or silenced.
d. Spring-loaded and held in the closed position by the door, or cover protected.
e. Wired to break the circuit when the door or cover is disturbed.
f. Wired so that each sensor and device is annunciated by zone at…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .