This document provides details for a federal contract opportunity to renovate the Air Force Materiel Command Headquarters Building at Wright-Patterson Air Force Base. The U.S. Army Corps of Engineers intends to issue a Request for Proposal for a fully designed building renovation with an estimated value between $100-250 million. Phase 1 renovation includes repair, renovation and modernization of over 60,000 square feet, including replacement of HVAC, plumbing, electrical, telecommunications, and interior finish systems. Proposals will be evaluated using Best Value Trade Off and are due in November 2022, with contract award anticipated shortly thereafter. The period of performance is estimated at 1,095 calendar days. Registration in the System for Award Management is required to receive the solicitation, which will be posted at SAM.gov. The point of contact is the listed contracting specialist.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled by: USACE-LRL-ED-MA CUI Category(ies):
LDC or Distribution Statement: N/A POC: Blake Gevedon Contracting Specialist william.b.gevedon@usace.army.mi 502.315.6791
Materials shall be submitted to potential offerors currently certified in the Joint Certification Program (JCP) only.
Solicitation For Repair/Renovate AFMC Headquarters Building (B10262), WPAFB Phase 1
P2: 475429 Design-Bid-Build
Specifications Vol. 2 of 5
10 November 2022
W912QR22R0028
90% Final Revised Specification Submittal
14 December 2022
W912QR22R0028-0002
Certified Final
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR22R0028_CUI_CF_Specs_Vol2-0002
US Army Corps of Engineers Louisville District
Rev00
Repair/Renovate AFMC Headquarters Building (B10262)
Phase 1 - Certifi ed Final Specifi cation Submittal
Project Number: ZHTV160500-262 P2 # 475429
Fiscal Year 2023
12 December 2022
CONTROLLED
UNCLASSIFIED
INFORMATION
Volume 2 of 5
SPECIFICATIONS
EXPIRES: 31 DEC 2023
P2#475429 Repair/Reno AFMC HQ 10262 CUI Wright-Patterson AFB –Phase 1
PROJECT TABLE OF CONTENTS Page 1 CUI Certified Final
PROJECT TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15 SUMMARY OF WORK
01 32 01.00 06 07/18 PROJECT SCHEDULE
01 33 000 8/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 35 43 12/20 GENERAL ENVIRONMENTAL PROTECTION
REQUIREMENTS (WPAFB)
01 42 00 02/19 SOURCES FOR REFERENCE
PUBLICATIONS
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM
CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20 TEMPORARY CONSTRUCTION
FACILITIES AND CONTROLS
01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT
AND DISPOSAL
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
VOLUME 2
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10 DEMOLITION AND DECONSTRUCTION
PROJECT TABLE OF CONTENTS Page 2 CUI Certified Final
DIVISION 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL
CONCRETE
03 35 43 12/21 POLISHED CONCRETE FINISHING
03 62 15.00 06 07/16 FLOWABLE FILL
DIVISION 04 - MASONRY
04 20 00 11/15 UNIT MASONRY
04 72 00 09/20 CAST STONE MASONRY
DIVISION 05 - METALS
05 05 20.00 27 02/21 POST-INSTALLED CONCRETE AND
MASONRY ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18 STRUCTURAL STEEL
05 30 00 05/15 STEEL DECKS
05 40 00 05/15 COLD-FORMED METAL FRAMING
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 00.01 05/22 PREFABRICATED ALUMINUM STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
05 52 16 12/21 METAL EGRESS BARRIER GATES
05 75 00 05/21 DECORATIVE FORMED METAL
PROJECT TABLE OF CONTENTS Page 3 CUI Certified Final
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
06 16 00 10/20 SHEATHING
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD
ARCHITECTURAL CABINETS
06 61 16 08/10 SOLID SURFACING FABRICATIONS
06 64 00 11/19 PLASTIC PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 05/20 PREPARATION FOR REROOFING
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 17 00 08/22 BENTONITE WATERPROOFING
07 17 10 08/22 BENTONITE INJECTION
WATERPROOFING
07 21 13 02/16 BOARD INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 24 00 05/11 POLYMER-BASED EXTERIOR FINISH
SYSTEMS (EFS)
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS
07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR
BARRIERS
07 27 36 05/17 SPRAY FOAM AIR BARRIERS
07 42 13 05/11 METAL WALL PANELS
07 42 17 06/20 INSULATED-CORE METAL WALL BACKUP
PANEL SYSTEM
07 42 93 05/22 SOFFIT PANELS
07 44 56 06/20 MINERAL-FIBER-REINFORCED
CEMENTITIOUS PANELS
PROJECT TABLE OF CONTENTS Page 4 CUI Certified Final
07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE
ROOFING
07 54 23 02/13 THERMOPLASTIC POLYOLEFIN (TPO)
ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 61 15.00 20 08/16 ALUMINUM STANDING SEAM ROOFING
07 71 00 05/20 ROOF SPECIALTIES
07 72 10 11/19 ROOFTOP FALL ARREST SYSTEM
07 72 30 ROOF ACCESSORIES
07 72 53 07/20 SNOW GUARDS
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 81 23 05/20 INTUMESCENT FIREPROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
07 95 13.13 12/20 INTERIOR EXPANSION JOINT COVER
ASSEMBLIES
07 95 13.16 01/21 EXTERIOR EXPANSION JOINT COVER
ASSEMBLIES
DIVISION 08 - OPENINGS
08 08 13 07/20 FIRE-RESISTANT GLAZING
08 11 13 02/10 STEEL DOORS AND FRAMES
08 14 00 08/16 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 33 13 05/09 COILING COUNTER DOORS
08 33 23 11/19 OVERHEAD COILING DOORS
08 33 26 01/21 OVERHEAD COILING GRILLES
08 34 60 05/22 HORIZONTAL SLIDING WINDOW
08 34 73 02/15 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
PROJECT TABLE OF CONTENTS Page 5 CUI Certified Final
08 44 00 05/19 CURTAIN WALL AND GLAZED
ASSEMBLIES
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 85 10 08/09 DECORATIVE FILM FOR GLASS
08 88 13 10/22 FIRE-RESISTANT STOREFRONT
GLAZING
08 91 00 05/11 METAL WALL LOUVERS
VOLUME 3
DIVISION 09 - FINISHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM
BOARD
09 22 16 01/21 EXTRUDED ALUMINUM PARTITION
CLOSURE
09 23 00 08/16 GYPSUM PLASTERING
09 24 23 08/17 CEMENT STUCCO
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC, QUARRY, AND GLASS
TILING
09 51 00 08/17 ACOUSTICAL CEILINGS
09 54 70 05/21 METAL PANEL CEILING SYSTEM
09 62 38 08/17 STATIC-CONTROL FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 66 13 08/16, CHG 2: 11/18 PRECAST TERRAZZO TREADS
09 66 16 08/16 TERRAZZO FLOOR TILE
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 68 00 11/17 CARPETING
09 72 00 08/17 WALLCOVERINGS
09 84 20 08/16 ACOUSTICAL WALL PANELS
09 90 00 05/11 PAINTS AND COATINGS
PROJECT TABLE OF CONTENTS Page 6 CUI Certified Final
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 96 46 11/19 INTUMESCENT PAINTING
DIVISION 10 - SPECIALTIES
10 11 00 08/17 VISUAL DISPLAY UNITS
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/17 TOILET COMPARTMENTS
10 26 00 08/17 WALL AND DOOR PROTECTION
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 45 13 10/20 DEFIBRILLATOR CABINETS AND
DEFIBRILLATORS
10 51 13.10 05/11 METAL LOCKERS - SPECIAL PURPOSE
10 99 00 11/19 MISCELLANEOUS ITEMS
DIVISION 11 - EQUIPMENT
11 10 10 09/20 MODULAR ACCESS RAMPS
11 13 13 04/20 LOADING DOCK BUMPER
11 13 19.13 08/09 LOADING DOCK LEVELERS
DIVISION 12 - FURNISHINGS
12 24 13 08/17 ROLLER WINDOW SHADES
12 36 00 08/18 COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/20 BRACING FOR EQUIPMENT
PROJECT TABLE OF CONTENTS Page 7 CUI Certified Final
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 05/20 ELECTRIC TRACTION PASSENGER
ELEVATORS
14 42 50 05/20 VERTICAL WHEELCHAIR LIFTS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
22 11 16.11 WATER SERVICE TAPS AND SERVICE
LINE INSTALLATION
22 11 16.13 CROSS CONNECTION CONTROL AND
BACKFLOW PREVENTION
22 13 19.23 GREASE TRAPS
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 08/18 AIR SUPPLY, DISTRIBUTION,
VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 02/15 HVAC SYSTEM CLEANING
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND
BALANCING (TAB) OF HVAC
23 07 00 02/13 THERMAL INSULATION FOR
MECHANICAL SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR
HVAC
PROJECT TABLE OF CONTENTS Page 8 CUI Certified Final
23 09 13 11/15 INSTRUMENTATION AND CONTROL
DEVICES FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL
FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 11/08 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 64 10 11/16 WATER CHILLERS, VAPOR
COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND
CONDENSER WATER PIPING SYSTEMS
23 81 00 05/18 DECENTRALIZED UNITARY HVAC
EQUIPMENT
23 82 01.00 10 04/08 WARM AIR HEATING SYSTEMS
VOLUME 4
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS FIRE AND
LIFE SAFETY
25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS ENERGY
MANAGEMENT CONTROL SYSTEM
25 05 11.26 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS UTILITY
CONTROL SYSTEM
25 05 11.26 02 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS BUILDING
CONTROL SYSTEM
25 05 11.28 11/17 CYBERSECURITY FOR FACILITY-
RELATED CONTROL SYSTEMS
ELECTRONIC SECURITY SYSTEM
PROJECT TABLE OF CONTENTS Page 9 CUI Certified Final
25 08 10 04/06 UTILITY MONITORING AND CONTROL
SYSTEM TESTING
25 10 10 02/19 UTILITY MONITORING AND CONTROL
SYSTEM (UMCS) FRONT END AND
INTEGRATION
DIVISION 26 - ELECTRICAL
26 08 00 08/08, CHG 1: 02/15 APPARATUS INSPECTION AND TESTING
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 24 13 05/15 SWITCHBOARDS
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM
PROTECTION
26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD)
SYSTEMS UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM
(SACRIFICIAL ANODE)
26 51 00 05/20 INTERIOR LIGHTING
26 56 00 05/20 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 04/06 CABLE TELEVISION PREMISES
DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS
CABLING SYSTEM
27 41 00 10/20 AUDIOVISUAL SYSTEMS
27 51 19 01/22 SOUND MASKING SYSTEMS
PROJECT TABLE OF CONTENTS Page 10 CUI Certified Final
VOLUME 5
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM
ACCEPTANCE TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS
(ESS)
28 31 76 08/11 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 31 16.13 08/16 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 02/17 COLD MILLING ASPHALT PAVING
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID
PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 08/17 BASE COURSE FOR RIGID AND
SUBBASES FOR FLEXIBLE PAVING
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE
PAVEMENT FOR ROADS AND SITE
FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND
SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 17 26 01/21 TACTILE WARNING SURFACING
32 31 13 11/16 CHAIN LINK FENCES AND GATES
PROJECT TABLE OF CONTENTS Page 11 CUI Certified Final
32 31 13.10 11/16 CHAIN LINK FENCES AND GATES (FOR
BUILDING INTERIORS)
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK
AND ORNAMENTAL) AND GATES
32 92 19 08/17 SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 01 10.13 PRESSURE AND LEAKAGE TESTS
33 01 30.13 ACCEPTANCE TESTING FOR SANITARY
SEWERS
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL
DRILLING
33 11 00 PIPING AND ACCESSORIES – GENERAL
PROVISIONS
33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
33 11 00.15 DUCTILE IRON PIPE AND FITTINGS
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 46 13 04/08 FOUNDATION DRAINAGE SYSTEM
33 46 16 05/18 SUBDRAINAGE PIPING
33 51 15 08/19 NATURAL-GAS / LIQUEFIED
PETROLEUM GAS DISTRIBUTION
PIPELINES
33 52 10 11/18 FUEL SYSTEMS PIPING
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE
TANKS
33 61 13.13 02/16 PREFABRICATED UNDERGROUND
HYDRONIC ENERGY DISTRIBUTION
33 71 02 02/15 UNDERGROUND ELECTRICAL
DISTRIBUTION
PROJECT TABLE OF CONTENTS Page 12 CUI Certified Final
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT
(OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.19 02/20 CRASH RATED ACTIVE VEHICLE
BARRIERS AND CONTROLS
-- End of Project Table of Contents --
Wright-Patterson AFB – Phase 1
SECTION 02 41 00
DEMOLITION AND DECONSTRUCTION
05/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline K (2009) Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.6 (2006) Safety & Health Program Requirements for Demolition Operations - American National Standard for Construction and Demolition Operations
CARPET AND RUG INSTITUTE (CRI)
CRI 104 (2015) Carpet Installation Standard for Commercial Carpet
CRI 105 (2015) Carpet Installation Standard for Residential Carpet
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25 (Jun 2000; Reaffirmed Oct 2010) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders
SECTION 02 41 00 Page 1 CUI Certified Final http://www.aviation.dla.mil/UserWeb/aviationengineering/HazInfo/
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M (2006) MILSTRIP - Military Standard Requisitioning and Issue Procedures
MIL-STD-129 (2014; Rev R; Change 1 2018; Change 2 2019) Military Marking for Shipment and Storage
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 70/7460-1 (2016; Rev L; Change 2) Obstruction Marking and Lighting
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 82 Protection of Stratospheric Ozone
49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels
1.2 PROJECT DESCRIPTION
1.2.1 Definitions
1.2.1.1 Demolition
Demolition is the process of wrecking or taking out any load-supporting structural member of a facility together with any related handling and disposal operations.
1.2.1.2 Deconstruction
Deconstruction is the process of taking apart a facility with the primary goal of preserving the value of all useful building materials.
1.2.1.3 Demolition Plan
Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.
1.2.1.4 Deconstruction Plan
Deconstruction Plan is the planned steps and processes for dismantling all or portions of a structure or assembly, to include managing sequencing activities, storage, re-installation activities, salvage and disposal mechanisms.
1.2.2 Demolition/Deconstruction Plan
Prepare a Demolition Plan and Deconstruction Plan and submit proposed salvage, demolition, deconstruction, and removal procedures for approval before work is started. Include in the plan procedures for careful
SECTION 02 41 00 Page 2 removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, and a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Coordinate with Waste Management Plan in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1 . Plan shall be approved by Contracting Officer prior to work beginning.
1.2.3 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the station daily; do not allow accumulations inside or outside the buildings. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed.
Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1 , Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.
Coordinate the work of this section with all other work indicated.
Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
SECTION 02 41 00 Page 3
1.3.3 Trees
Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.
1.3.4 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.
1.3.5 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer.
Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.
1.4 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted.
1.5 AVAILABILITY OF WORK AREAS
Areas in which the work is to be accomplished will be available in accordance with schedule agreed upon by the demolition contractor and the Contracting Officer:
Schedule
Area Date
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SECTION 02 41 00 Page 4
SD-01 Preconstruction Submittals
Demolition Plan; G, S
Deconstruction Plan; G
Existing Conditions
SD-07 Certificates
Notification
SD-11 Closeout Submittals
Receipts; S
1.7 QUALITY ASSURANCE
Submit timely notification of demolition and deconstruction and renovation projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61 , Subpart M. Notify the Regional Office of the United States Environmental Protection Agency (USEPA) State's environmental protection agency or local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61 , Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSP A10.6 . Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.
1.7.1 Dust and Debris Control
Prevent the spread of dust and debris to occupied portions of the building on airfield pavements and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum and dust the work area daily. Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft.
1.8 PROTECTION
1.8.1 Traffic Control Signs
a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind blast. Notify the Contracting Officer prior to beginning such work.
Provide a minimum of 2 FAA type L-810 steady burning red obstruction lights on temporary structures (including cranes) over 100 feet, but less than 200 ft, above ground level. The use of LED based obstruction lights are not permitted. For temporary structures (including cranes) over 200 ft above ground level provide obstruction lighting in accordance with FAA AC 70/7460-1 . Light construction and installation shall comply with FAA AC 70/7460-1 . Lights shall be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer. Maintain the temporary services
SECTION 02 41 00 Page 5 during the period of construction and remove only after permanent services have been installed and tested and are in operation.
1.8.2 Protection of Personnel
Before, during and after the demolition and deconstruction work continuously evaluate the condition of the structure being demolished and deconstructed and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.
1.9 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
1.10 EXISTING CONDITIONS
Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.
PART 2 PRODUCTS
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures.
b. Fill material shall conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
Soil classification AASHTO M 145
SECTION 02 41 00 Page 6
Moisture-density relations AASHTO T 180, Method B or D
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.
Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.
Materials shall be designated for reuse onsite whenever possible.
3.1.1 Structures
a. Remove existing structures indicated to be removed to extent indicated.
Interior walls, other than retaining walls and partitions, shall be removed to top of concrete slab. Remove sidewalks, curbs, gutters and street light bases as indicated.
b. Demolish or Deconstruct structures in a systematic manner from the top of the structure to the ground. Complete demolition work above each tier or floor before the supporting members on the lower level are disturbed. Demolish and Deconstruct concrete and masonry walls in small sections. Remove structural framing members and lower to ground by means of derricks, platforms hoists, or other suitable methods as approved by the Contracting Officer.
c. Locate demolition and deconstruction equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.
d. Building, or the remaining portions thereof, not exceeding 80 feet in height may be demolished by the mechanical method of demolition.
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.
Shut off and cap utilities for future use, as indicated.
3.1.2.2 Disconnecting Existing Utilities
Remove existing utilities, as indicated and uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer.
When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location on the station in accordance with instructions of the Contracting Officer.
SECTION 02 41 00 Page 7
3.1.3 Chain Link Fencing
Remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas. Remove gates as whole units. Cut chain link fabric to 25 foot lengths and store in rolls off the ground.
3.1.4 Paving and Slabs
Remove sawcut concrete and asphaltic concrete paving and slabs indicated.
Provide neat sawcuts at limits of pavement removal as indicated. Pavement and slabs designated to be recycled and utilized in this project shall be moved, ground and stored as directed by the Contracting Officer. Pavement and slabs not to be used in this project shall be removed from the Installation at Contractor's expense.
3.1.5 Roofing
Remove existing roof system and associated components in their entirety down to existing roof deck. Remove built-up roofing to effect the connections with new flashing or roofing. Cut existing membrane and insulation along straight lines. Remove roofing system and insulation without damaging the roof deck. Sequence work to minimize building exposure between demolition or deconstruction and new roof materials installation.
3.1.5.1 Temporary Roofing
Install temporary roofing and flashing as necessary to maintain a watertight condition throughout the course of the work. Remove temporary work prior to installation of permanent roof system materials unless approved otherwise by the Contracting Officer.
3.1.5.2 Reroofing
When removing the existing roofing system from the roof deck, remove only as much roofing as can be recovered by the end of the work day, unless approved otherwise by the Contracting Officer. Do not attempt to open the roof covering system in threatening weather. Reseal all openings prior to suspension of work the same day.
3.1.6 Masonry
Sawcut and remove masonry so as to prevent damage to surfaces to remain, to removed materials being salvaged and to facilitate the installation of new work. Where new masonry adjoins existing, the new work shall abut or tie into the existing construction as indicated. Provide square, straight edges and corners where existing masonry adjoins new work and other locations. Masonry removed in whole blocks shall be salvaged and stored for reuse. Masonry removed in pieces shall be crushed for use as aggregate.
3.1.7 Concrete
Saw concrete along straight lines to a depth of a minimum 2 inches. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.
SECTION 02 41 00 Page 8
3.1.8 Structural Steel
Dismantle structural steel at field connections and in a manner that will prevent bending or damage. Salvage for recycle structural steel, steel joists, girders, angles, plates, columns and shapes. Flame-cutting torches are permitted when other methods of dismantling are not practical;
however, precautions are to be taken to prevent the airborne release of lead including, but not limited to pre-abatement of paint prior to cutting activities. All metal flame cutting activities are to comply with Section 01 35 43 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB). Transport steel joists and girders as whole units and not dismantled. Transport structural steel shapes to a designated storage area as directed by the Contracting Officer, stacked according to size, type of member and length, and stored off the ground, protected from the weather.
3.1.9 Miscellaneous Metal
Salvage shop-fabricated items such as access doors and frames, steel gratings, metal ladders, wire mesh partitions, metal railings, metal windows and similar items as whole units. Salvage light-gage and cold-formed metal framing, such as steel studs, steel trusses, metal gutters, roofing and siding, metal toilet partitions, toilet accessories and similar items. Scrap metal shall become the Contractor's property.
Recycle scrap metal as part of demolition and deconstruction operations.
Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility, in accordance with the Waste Management Plan.
3.1.10 Carpentry
Salvage for recycle lumber, millwork items, and finished boards, and sort by type and size. Chip or shred and recycle salvaged wood unfit for reuse, except stained, painted, or treated wood. Remove windows, doors, frames, and cabinets, and similar items as whole units, complete with trim and accessories. Do not remove hardware attached to units, except for door closers. Brace the open end of door frames to prevent damage.
3.1.11 Carpet
Remove existing carpet for reclamation in accordance with manufacturer recommendations and as follows. Remove used carpet in large pieces, roll tightly, and pack neatly in a container. Remove adhesive according to recommendations of the Carpet and Rug Institute (CRI). Adhesive removal solvents shall comply with CRI 104 / CRI 105 . Recycle removed carpet cushion.
3.1.12 Acoustic Ceiling Panels
Remove, neatly stack, and recycle acoustic ceiling panels. Recycling may be available with manufacturer. Otherwise, priority shall be given to a local recycling organization. Recycling is not required if the tiles contain or may have been exposed to asbestos material.
3.1.13 Patching
Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces, using on-site materials when available. Where new work
SECTION 02 41 00 Page 9 is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated, and shall include:
a. Concrete and Masonry: Completely fill holes and depressions, caused by previous physical damage or left as a result of removals in existing masonry walls to remain, with an approved masonry patching material, applied in accordance with the manufacturer's printed instructions.
b. Where existing partitions have been removed leaving damaged or missing resilient tile flooring, patch to match the existing floor tile.
c. Where applicable patch acoustic lay-in ceiling where partitions have been removed. The transition between the different ceiling heights shall be effected by continuing the higher ceiling level over to the first runner on the lower ceiling and closing the vertical opening with a painted sheet metal strip.
3.1.14 Air Conditioning Equipment
Remove air conditioning, refrigeration, and other equipment containing refrigerants without releasing chlorofluorocarbon refrigerants to the atmosphere in accordance with the Clean Air Act Amendment of 1990. Recover all refrigerants prior to removing air conditioning, refrigeration, and other equipment containing refrigerants and dispose of in accordance with the paragraph entitled "Disposal of Ozone Depleting Substance (ODS)." Turn in salvaged Class I ODS refrigerants as specified in paragraph, "Salvaged Materials and Equipment."
3.1.15 Cylinders and Canisters
Remove all fire suppression system cylinders and canisters and dispose of in accordance with the paragraph entitled "Disposal of Ozone Depleting Substance (ODS)."
3.1.16 Locksets on Swinging Doors
Remove all locksets from all swinging doors indicated to be removed and disposed of. Deliver the locksets and related items to a designated location for receipt by the Contracting Officer after removal.
3.1.17 Mechanical Equipment and Fixtures
Disconnect mechanical hardware at the nearest connection to existing services to remain, unless otherwise noted. Disconnect mechanical equipment and fixtures at fittings. Remove service valves attached to the unit. Salvage each item of equipment and fixtures as a whole unit;
listed, indexed, tagged, and stored. Salvage each unit with its normal operating auxiliary equipment. Transport salvaged equipment and fixtures, including motors and machines, to a designated on station storage area as directed by the Contracting Officer. Do not remove equipment until approved. Do not offer low-efficiency equipment for reuse; provide to recycling service for disassembly and recycling of parts.
SECTION 02 41 00 Page 10
3.1.17.1 Preparation for Storage
Remove water, dirt, dust, and foreign matter from units; tanks, piping and fixtures shall be drained; interiors, if previously used to store flammable, explosive, or other dangerous liquids, shall be steam cleaned.
Seal openings with caps, plates, or plugs. Secure motors attached by flexible connections to the unit. Change lubricating systems with the proper oil or grease.
3.1.17.2 Piping
Disconnect piping at unions, flanges and valves, and fittings as required to reduce the pipe into straight lengths for practical storage. Store salvaged piping according to size and type. If the piping that remains can become pressurized due to upstream valve failure, end caps, blind flanges, or other types of plugs or fittings with a pressure gage and bleed valve shall be attached to the open end of the pipe to ensure positive leak control. Carefully dismantle piping that previously contained gas, gasoline, oil, or other dangerous fluids, with precautions taken to prevent injury to persons and property. Store piping outdoors until all fumes and residues are removed. Box prefabricated supports, hangers, plates, valves, and specialty items according to size and type.
Wrap sprinkler heads individually in plastic bags before boxing. Classify piping not designated for salvage, or not reusable, as scrap metal.
3.1.17.3 Ducts
Classify removed duct work as scrap metal.
3.1.17.4 Fixtures, Motors and Machines
Remove and salvage fixtures, motors and machines associated with plumbing, heating, air conditioning, refrigeration, and other mechanical system installations. Salvage, box and store auxiliary units and accessories with the main motor and machines. Tag salvaged items for identification, storage, and protection from damage. Classify non-porcelain broken, damaged, or otherwise unserviceable units and not caused to be broken, damaged, or otherwise unserviceable as debris to be disposed of by the Contractor. Salvage and crush porcelain plumbing fixtures unsuitable for reuse.
3.1.18 Electrical Equipment and Fixtures
Salvage motors, motor controllers, and operating and control equipment that are attached to the driven equipment. Salvage wiring systems and components. Box loose items and tag for identification. Disconnect primary, secondary, control, communication, and signal circuits at the point of attachment to their distribution system.
3.1.18.1 Fixtures
Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately. Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts manufactured prior to 1978, boxed and tagged for identification, and protected from breakage.
SECTION 02 41 00 Page 11
3.1.18.2 Electrical Devices
Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.
3.1.18.3 Wiring Ducts or Troughs
Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths. Remove plug-in or disconnecting devices from the busway and store separately.
3.1.18.4 Conduit and Miscellaneous Items
Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.
3.2 CONCURRENT EARTH-MOVING OPERATIONS
Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition or deconstruction work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.3.2 Reuse of Materials and Equipment
Remove and store materials and equipment listed in the Demolition and Deconstruction Plan indicated to be reused or relocated to prevent damage, and reinstall as the work progresses. Coordinate the re-use of materials and equipment with the re-use requirements in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Capture re-use of materials in the diversion calculations for the project.
3.3.3 Salvaged Materials and Equipment
Remove materials and equipment that are listed in the Demolition and
SECTION 02 41 00 Page 12
Deconstruction Plan indicated and specified to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site, as directed within 5 miles of the work site.
a. Salvage items and material to the maximum extent possible.
b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. Coordinate the salvaged materials with tracking requirements in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Capture salvaged materials in the diversion calculations for the project.
c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers. Deliver the following items reserved as property of the Government to the areas designated.
d. Remove historical items in a manner to prevent damage. Deliver the following historical items to the Government for disposition: Corner stones, contents of corner stones, and document boxes wherever located on the site.
e. Remove and capture all Class I ODS refrigerants in accordance with the Clean Air Act Amendment of 1990, and turn in to the Contracting Officer as directed by the Commanding Officer.
Defense Depot Richmond VA (DDRV)
SW0400
Cylinder Operations 8000 Jefferson Davis Highway Richmond, VA 23297-5900
3.3.4 Disposal of Ozone Depleting Substance (ODS)
Class I and Class II ODS are defined in Section, 602(a) and (b), of The Clean Air Act. Prevent discharge of Class I and Class II ODS to the atmosphere. Place recovered ODS in cylinders meeting AHRI Guideline K suitable for the type ODS (filled to no more than 80 percent capacity) and provide appropriate labeling. Recovered ODS shall be turned over to the Contracting Officer. Products, equipment and appliances containing ODS in a sealed, self-contained system (e.g. residential refrigerators and window air conditioners) shall be disposed of in accordance with 40 CFR 82 .
Submit Receipts or bills of lading, as specified. Submit a shipping receipt or bill of lading for all containers of ozone depleting substance (ODS) shipped to the Defense Depot, Richmond, Virginia.
3.3.4.1 Special Instructions
No more than one type of ODS is permitted in each container. A warning/hazardous label shall be applied to the containers in accordance with Department of Transportation regulations. All cylinders including but not limited to fire extinguishers, spheres, or canisters containing an ODS shall have a tag with the following information:
a. Activity name and unit identification code
SECTION 02 41 00 Page 13
b. Activity point of contact and phone number
c. Type of ODS and pounds of ODS contained
d. Date of shipment
e. National stock number (for information, call (804) 279-4525).
3.3.4.2 Fire Suppression Containers
Deactivate fire suppression system cylinders and canisters with electrical charges or initiators prior to shipment. Also, safety caps must be used to cover exposed actuation mechanisms and discharge ports on these special cylinders.
3.3.5 Transportation Guidance
Ship all ODS containers in accordance with MIL-STD-129 , DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction 4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR 173.301 , and DOD 4000.25-1-M .
3.3.6 Unsalvageable and Non-Recyclable Material
Dispose of unsalvageable and non-recyclable combustible material off the site.
3.4 CLEANUP
Remove debris and rubbish from basement and similar excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified off the WPAFB center in the Waste Management Plan. Storage of removed materials on the project site is prohibited.
3.5.2 Burning on Government Property
Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.
3.5.3 Removal to Spoil Areas on Government Property
Transport noncombustible materials removed from demolition and deconstruction structures to designated spoil areas on Government property.
3.5.4 Removal from Government Property
Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.
SECTION 02 41 00 Page 14
3.6 REUSE OF SALVAGED ITEMS
Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
-- End of Section --
SECTION 02 41 00 Page 15
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 02 41 00 Page 16
SECTION 03 01 00
REHABILITATION OF CONCRETE
02/18
PART 1 GENERAL
1.1 SCOPE
This specification governs the rehabilitation of structural concrete.
1.2 DEFINITIONS
1.2.1 Bracing
Temporary supplemental members used to avoid local or global instability during construction, evaluation, or repair that are intended to be removed after completion of construction.
1.2.2 Delamination
A planar separation in a material that is roughly parallel to the surface of the material.
1.2.3 Rehabilitation
Repairing or modifying an existing structure to a desired useful condition.
1.2.4 Repair
The reconstruction or renewal of concrete parts of an existing structure for its maintenance or to correct deterioration, damage, or faulty construction of members or systems of a structure.
1.2.5 Shoring
Props or posts of timber or other material in compression used for the temporary support of excavations, formwork, or unsafe structures; the process of erecting shores.
1.2.6 Termination Joint
The interface where a placement of repair material meets existing concrete, the edge of an expansion joint, or other existing surfaces.
1.2.7 Unsound Concrete
Concrete that is fractured, delaminated, spalled, deteriorated, defective, contaminated or otherwise damaged.
1.3 REFERENCES
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 288 (2017) Standard Specification for Geosynthetic Specification for Highway
SECTION 03 01 00 Page 1
Applications
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 440.5 (2008) Specification for Construction with Fiber-Reinforced Polymer Reinforcing Bars
ACI 440.6 (2008) Specification for Carbon and Glass Fiber-Reinforced Polymer Bar Materials for Concrete Reinforcement
ACI 440.8 (2013) Specification for Carbon and Glass Fiber-Reinforced Polymer (FRP) Materials Made by Wet Layup for External Strengthening of Concrete and Masonry Structures
ACI 503.2-503.4 (2010, R 2003) Three Epoxy Specifications
ACI 503.3 (2010) Specification for Producing a Skid-Resistant Surface on Concrete by the Use of Epoxy and Aggregate
ACI 503.7 (2007) Specification for Crack Repair by Epoxy Injection
ACI 548.4 (2011) Standard Specification for Latex-Modified Concrete (LMC) Overlays
ACI 548.8 (2007) Specification for Type EM (Epoxy Multi-Layer) Polymer Overlay for Bridge and Parking Garage Decks