W912QR22R0028_CUI_CF_Plans-0003.pdf
PDF 10 MB Posted
- Solicitation number
- W912QR22R0028
About this file
This solicitation notice provides details for a firm-fixed-price construction contract to renovate the Air Force Materiel Command Headquarters building at Wright-Patterson Air Force Base, Ohio. The U.S. Army Corps of Engineers Louisville District will issue a request for proposal seeking a contractor to complete the first phase of renovations, which includes repairing, renovating and modernizing over 60,000 square feet of the building. Work will involve replacing HVAC, electrical, plumbing and telecommunications systems, as well as interior finishes. Exterior improvements will include new windows and doors, waterproofing and site work. The contract duration is estimated at 1,095 calendar days, and the project value is anticipated to be between $100-250 million. The solicitation is scheduled for release on November 10, 2022 via SAM.gov. Proposals will be evaluated using best value tradeoff, with past performance and price being the most important factors.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled by: USACE-LRL-ED-MA CUI Category(ies):
LDC or Distribution Statement: N/A POC: Blake Gevedon Contracting Specialist william.b.gevedon@usace.army.mi 502.315.6791
Materials shall be submitted to potential offerors currently certified in the Joint Certification Program (JCP) only.
LS SEQUENCING KEY:
AREA OF WORK: ONCE SPRINKLERED THROUGHOUT, THE AREA OF
WORK DOES NOT REQUIRE RATED SEPARATION FROM OCCUPIED
AREA
1-HOUR FIRE RATED
AREA EXCEEDING COMMON PATH AND/OR TRAVEL DISTANCES.
REQUIRING ADDITIONAL EXIT SIGNAGE - REFER TO KEYED NOTE
2-HOUR FIRE RATED
POLYETHYLENE DUST BARRIER
DEMOLITION OF EXISTING BUILDING ELEMENTS AS DEPICTED IN SET
OCCUPIED AREA (FULLY SPRINKLED)
AREA OF FOCUS FOR LIFE SAFETY SEQUENCE W ORK
X
Y EXIT CAPACITY (MAXIMUM OCCUPANTS)
OCCUPANT LOAD
EXIT
EGRESS COMPONENT DESIGNATION
EXITING PROTECTED ENCLOSURE, MAINTAIN A FREE AND
UNOBSTRUCTED PATH (FULLY SPRINKLED)
BUILDING B10266 - NOT IN CONTRACT ENTRAPMENT AREA AND BUILDING B10262
(UNLESS OTHERWISE NOTED)
1 HOUR FIRE RATED
BARRIER MUST BE IN
PLACE UNTIL SUCH TIME
THAT THE ENTIRE
BUILDING IS EQUIPPED
WITH AN AUTOMATIC
SPRINKLER SYSTEM, IN
ACCORDANCE WITH UFC
3-600-01 SECTION 9-7.4
TRAVEL DISTANCE AND COMMON PATH LEGEND
0' * IMPROVED AT THE END OF PHASE 1
0' ** DEGRADED AT THE END OF PHASE 1
0' *** NON-COMPLIANT EXISTING CONDITION TO REMAIN
COMMON PATH (CP) OF
TRAVEL END POINT SYMBOL
TRAVEL PATH END POINT
TRAVEL PATH START POINT
AND WAY POINTS
TRAVEL DISTANCE (FEET) AND
COMMON PATH DISTANCE (FEET)
ASTERISK (REFER TO DESCRIPTION ABOVE)
TD 100'-0"
1. LIFE SAFETY SEQUENCING PLANS DEPICT PROTECTED EXIT ROUTE
THROUGHOUT AREA(S) OF WORK.
2. DOORS IN CONSTRUCTION BARRER MUST HAVE CLOSER AND LATCH OR BE IN-
FILLED WITH NEW PARTITION AS NOTED THAT MEETS OR EXCEEDS 1 HOUR FIRE
RATING.
3. SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION PHASE UNLESS
OTHERWISE NOTED.
4. WORK TO BE PERFORMED IN THE SHADED AREAS MUST BE COORDINATED WITH
COR FOUR WEEKS PRIOR TO MINIMIZE MISSION IMPACT.
5. EXITING PROTECTED ENCLOSURE MAY BE REMOVED AT SUCH TIME THAT THE
ENTIRE AREA IS FULLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM, IN
ACCORDANCE WITH UFC 3-600-01.
6. COORDINATE CONSTRUCTION ACCESS DOORS FROM PROTECTIVE
ENCLOSURES IN ORDER TO ACCESS CONSTRUCTION ZONES IN PHASE 1.
GENERAL NOTES - LS SEQUENCINGKEYED NOTES - LS SEQUENCING#
ENTRAPMENT AREA AND BUILDING B10262
STAIR 6
STAIR 40002
STAIR 2
A3 G101
STAIR 7
STAIR 8
A3 G101
036046
AREA ADDED TO
CONTRACTOR SCOPE OF
WORK - LS SEQUENCE 5 OF 5.
AREA ADDED TO
CONTRACTOR SCOPE OF
WORK - LS SEQUENCE 5 OF 5.
TD 241' - 1"
EXIT 6.0B*
TD 256' - 0"
EXIT 6.0B*
TD 237' - 8"
EXIT 15.0B**
TD 188' - 0"
EXIT 10.0B
TD 288' - 0"
EXIT 10.1B***
TD 301' - 0"
EXIT 10.3B***
TD 303' - 0"
EXIT 5.0B*
TD 337' - 0"
EXIT 5.1B*
TD 245' - 0"
EXIT 5.2B*
TD 383' - 0"
EXIT 6.0B*
CP 63' - 0"
EXIT 10.2B
CP 52' - 0"
EXIT 5.0B
CP 55' - 0"
EXIT 6.0B
TD 384' - 9"
EXIT 6.2B*
STAIR 18
STAIR 17
STAIR 16
STAIR 3
STAIR 5
STAIR 1
TD 168' - 4"
EXIT 5.0B
EXIT 10B
EXIT 6
EXIT 5
EXIT 15B
TD 169' - 0"
EXIT 10.2B
BUILDING B10262:
EXISTING FIRST FLOOR OCCUPANCY: 1,132
AVAILABLE EGRESS: 1,714
NOTE:
PLAN REPRESENTS CONDITION DURING
CONSTRUCTION.
NOTE:
REFER TO LS100B.1 AND LS100B.2 FOR
FINAL OCCUPANCY LOADS AND EGRESS
CAPACITY.
BUILDING B10266:
EXISTING FIRST FLOOR OCCUPANCY: 747
AVAILABLE EGRESS: 1,214
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
G100B.5
LI
FE
S
AF
ET
Y
SE
Q
U
EN
C
IN
G F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
C . M
EL
EN
D
EZ
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
FI
R
ST
F
LO
O
R
PH
AS
E
G
EN
E R
AL
N
0 32'16' 64'
G009
1/32" = 1'-0"A1 FIRST FLOOR OVERALL LIFE SAFETY PLAN - SEQUENCE 5 OF 5
035 1 HOUR FIRE RATED PROTECTIVE ENCLOSURE MUST BE IN PLACE UNTIL SUCH
TIME THAT THE ENTIRE BUILDING IS EQUIPPED WITH AN AUTOMATIC SPRINKLER,
IN ACCORDANCE WITH UFC 3-600-01 SECTION 9-7.4
036 7'-0" WIDE (MINIMUM) EGRESS PATH
038 UPON COMPLETION OF EXIT 15B, IF BUILDING B10262 IS NOT FULLY EQUIPPED
WITH AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH UFC 3-600-01
SECTION 9-7.4, THEN A 1 HOUR FIRE RATED PROTECTIVE ENCLOSURE MUST BE
IN PLACE
046 PHASING OF STAIR CONFIGURATION/CONSTRUCTION MUST BE SUBMITTED AND
REVIEWED BY COR. OCCUPANTS OF THE BUILDING MUST REMAIN IN A
PROTECTIVE ENVIRONMENT AND HAVE UNOBSTRUCTED ACCESS TO THE PUBLIC
WAY
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
1. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO AFCEC SPECIFICATIONS AND PLANS EXCEPT
AS NOTED HEREIN AND APPROVED BY THE CONTRACTING OFFICER (C.O.).
2. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL PUBLIC AND PRIVATE UTILITIES IN THE CONSTRUCTION OF THIS PROJECT. ALL MANHOLES, CLEANOUTS, VALVE BOXES, FIRE HYDRANTS ETC. MUST BE ADJUSTED TO PROPER LINE AND GRADE BY THE CONTRACTOR PRIOR TO AND AFTER
PLACING OF PERMANENT PAVING AND/OR ESTABLISHING FINISHED GRADE IN EARTHEN AREAS.
UTILITIES MUST BE MAINTAINED TO PROPER LINE AND GRADE DURING CONSTRUCTION OF THE PAVING
FOR THIS PROJECT.
3. CONTRACTOR TO FIELD VERIFY ELEVATION OF EXISTING PAVEMENT AND LANDSCAPE AREAS PRIOR TO
CONSTRUCTION AND NOTIFY ENGINEER AND C.O. OF DISCREPANCIES IN FIELD CONDITIONS.
4. PRIOR TO PLACING ANY FILL MATERIAL, ALL EXISTING SURFACES, VEGETATION, LOOSE FILL AND DEBRIS
SHOULD BE REMOVED TO A MINIMUM DEPTH OF 4". ALL EXPOSED SURFACES SHOULD THEN BE
SCARIFIED, WATERED AS REQUIRED AND RE-COMPACTED ACCORDING TO EARTHWORK
SPECIFICATIONS.
5. ALL GRADES AND CONTOURS SHOWN ARE TOP OF FINISH SURFACE ELEVATIONS, UNLESS OTHERWISE
NOTED.
6. POSITIVE DRAINAGE SHALL BE MAINTAINED ON ALL SURFACES WITHIN THE SCOPE OF THE PROJECT.
DRAINAGE SHALL BE DIRECTED AWAY FROM ALL BUILDING FOUNDATIONS. CONTRACTOR TO TAKE PRECAUTIONS NOT TO ALLOW ANY PONDING OF WATER. CONTRACTOR SHALL IMMEDIATELY NOTIFY
ENGINEER OF ANY AREAS WHERE PONDING BECOMES AN ISSUE.
7. CONTRACTOR TO OBTAIN GRADES WITHIN ±FOUR-HUNDREDTHS (0.04) FOOT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING TO ITS ORIGINAL OR BETTER CONDITIONS ANY
DAMAGE DONE TO EXISTING BUILDINGS, UTILITIES, FENCES, PAVEMENTS, CURBS OR DRIVEWAYS.
9. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE C.O. OF ANY QUESTIONS THAT MAY ARISE CONCERNING
THE INTENT, PLACEMENT, OR LIMITS OF DIMENSIONS OR GRADES NECESSARY FOR CONSTRUCTION OF
THE PROJECT.
10. CONTRACTOR SHALL GRADE AREAS ADJACENT TO THE EXISTING CHANNELS TO MATCH EXISTING SITE
GRADES BASED ON MAXIMUM SLOPES OF 4:1 UNLESS OTHERWISE NOTED.
11. ALL EXCAVATION IS UNCLASSIFIED.
12. SITE AREAS REQUIRING FILL PLACEMENT SHALL BE SCARIFIED AND MOISTURE ACTIVATED TO WITHIN
±3% OF OPTIMUM MOISTURE CONTENT. COMPACT SUBGRADE TO 95% MAXIMUM DRY DENSITY, OR AS
INDICATED BY THE GEOTECHNICAL REPORT.
13. EXISTING AND PROPOSED GRADE CONTOURS ARE SHOWN AT ONE FOOT (1.0 FT) INTERVALS.
14. ACCESSIBLE ROUTES AND PATHWAYS SHALL CONFORM TO ADA STANDARDS FOR ACCESSIBLE DESIGN, LATEST EDITION. PATHWAY/SIDEWALK SHALL MEET MAXIMUM 2% CROSS SLOPE AND MAXIMUM 5%
RUNNING SLOPE REQUIREMENTS.
15. ALL DISTURBED AREAS SHALL BE HYDRO-MULCHED AND WATERED FOR TWO WEEKS UNTIL GRASS IS
ESTABLISHED.
16. ALL SURPLUS SOIL FROM EXCAVATIONS SHALL BE DISPOSED OF OFF SITE.
17. SILT FENCING AND/OR TEMPORARY BERMS SHALL BE INSTALLED PRIOR TO START OF CONSTRUCTION.
18. TEMPORARY SWALES AND DE-SILTING BASINS WILL BE PLACED WHERE NECESSARY IN ORDER TO
CONVEY STORMWATER RUN-OFF.
19. BECAUSE THIS PROJECT LIES WITHIN THE HUFFMAN DAM RETARDING BASIN; A STORAGE
COMPENSATION AGREEMENT MUST BE PREPARED BY THE CONTRACTOR FOR APPROVAL BY WPAFB
AND THE MIAMI CONSERVANCY DISTRICT (MCD) FOR ALL SOILS IMPORTED, EXPORTED OR STOCKPILED.
SEE EARTHWORK SPECIFICATION 31 00 00.00 06 AND THE STORAGE COMPENSATION AGREEMENT
ATTACHMENT.
1. CONTRACTOR TO INSTALL TEMPORARY TAB STRIPING FOR 30 CALENDAR DAYS TO ALLOW FOR
PROPER ASPHALT CURE TIME.
2. TEMPORARY TAB STRIPING SHOULD BE PLACED NO SOONER THAN 3 CALENDAR DAYS AFTER THE
PLACEMENT OF ASPHALT.
3. MAINTAIN ALIGNMENT TRAFFIC CONTROL DEVICES AND OPERATION UNTIL MARKINGS ARE
INSTALLED.
4. ALL MARKING MUST BE VISIBLE FROM A DISTANCE OF AT LEAST 300 FEET IN DAYLIGHT CONDITIONS
AND FROM A DISTANCE OF AT LEAST 160 FEET IN NIGHTTIME CONDITIONS, ILLUMINATED BY
LOW-BEAM HEADLIGHT.
5. CONTRACTOR SHALL REFERENCE SDDCTEA PAMPHLET 55-17 FOR PAVEMENT MARKINGS AND UFGS
FOR COMPLETE REGULATIONS.
Base Civil Engineering POC for Anti-Terrorism/Force Protection (AT/FP):
Mr. Mike Wethington, 88 CEG/CENPD, 656—3579
Base Civil Engineering/88 CEG:
Mike Baumann, Senior Leader, Oversight, 937-257-6208, michael.bauman@wpafb.af.mil Robert Blevins, project Execution Section Chief, Engineering Division, 937-257-2764, robert.blevins@us.af.mil Randy Brown (DCIC) (primary) Scott Michaelson (alternate)
Architectural Review Committee (ARC):
Mr. Amir Mott, 88 CEG/CENMP, 937-257-6214, amir.mott@us.af.mil MICHAEL SAPP, 88 CEG/CEN, 937-904-1235, michael.sapp.8@us.af.mil Chris Pleiman, 88 CEG/CEN, 937-904-1164, christopher.pleiman.1@us.af.mil
Base Communications:
Ms. Kathy Fletcher, 88 CG/SCXP, 255-0681 Chris Dunham, Comm PM Supervisor, 937-257-2548, christopher.dunham.4@us.af.mil
Base Community Planners:
Mrs. Laura Wade, 88 CEG/CENPL, 904-3519 Mrs. JoLynn Anderson, 88 CEG/CENPL, 656-3382
Base Energy Management:
Mr. Michael Tibbs, 88 CEG/CENPE, 656-3394
Base Facility Standard Editor:
Ms. Christine Yankel, 88 CEG/CENMP, 656-3385
Base Safety:
Stew Balczone
Comprehensive Interior Design:
Ms. Sharion Harvin, 88 CEG/CENMP, 656-3390
Electric Utility Privatization:
Mr. Darryl Thomas, 88 CES/CEOER, 904-2201
Environmental Management:
Dr. Christina Powell, 88 CEG/CEIEA, 257-5527
Fire Prevention:
Mr. Jeffery Kitzmiller, 788 CES/CEXFP, 904-3158
Fire Protection Specialist – Alarm/Detection Systems:
Mr. Gary Stevens, 88 CEG/CENMP, 257-1509 Mr. Dan Sharp, 88 CEG/CENMP, 656-3593
Fire Protection Specialist – Sprinkler Systems:
Mr. Steve Grimes, 88 CEG/CENMP, 656-3562
Historic Preservation:
Mr. Paul Woodruff, 88 CEG/CEIEA, 257-1374
Industrial Control Systems (ICS):
Mr. David Vaughn, 88 CES/CEOIC, 904-2431 (primary) Mr. Michael Labar, 88 CES/CEOIC, 656 -0360 (Alternate)
Information Protection – Physical Security (Classified Facility Construction):
Mr. William Speakman, 88 ABW/IPI, 255-4756 Mr. Thomas Pavlick, 88 ABW/IPI, 255-4890
Mechanical HVAC & Plumbing Engineer:
Keith Bishop, Plumbing, 937-257-1928, keith.bishop.6@us.af.mil Kevin Haas, 937-257-1928, kevin.haas@us.af.mil
Mechanical Infrastructure Engineer:
Mr. Jesse Poorman, 88 CES/CEOER, 656-3028
Pavement/Airfield Pavement Engineer:
Mr.Jari Ulmer, 88 CEG/CENMP, 257-8941
Record Drawings:
Mr. Michael Louis, 88 CEG/CENME, 656-3410
Structural Engineer:
Mr. Victor Erewele, 88 CEG/CENMP, 656-3455
Traffic Engineer:
Mr. Brady Klein, 88 CEG/CENMP, 937-904-0199
Water/Sanitary/Waste Treatment Engineer:
Mr. Joe Piechota, 88 CEG/CENMP, 904-1183
USACE Louisville District Kevin Jefferson, Chief Construction, 502-315-6115, kevin.r.jefferson@usace.army.mil Greg Moore, Project Manager, 502-315-6902 , 502-381-6061, gregory.f.moore@usace.army.mil Linda Myrphy, Louisville DDE, 502-315-6104, Linda.R.Murphy@usace.army.mil Michael Hutchens, Contracting Lead, 502-315-6180, michael.d.hutchens@usace.army.mil John Hearn, Lead Construction Rep, 937-656-6463, john.p.hearn@usace.army.mil Kelly Hecht, Project Engineer, 937-656-9127, kelly.e.hecht@usace.army.mil
AFCEC
Thomas Hodges Design & Construction Branch Chief, 210-395-8520, thomas.hodges@us.af.mil Steve Frahm, Program Manager,210-395-8273, stephen.frahm@us.af.mil
HQ AFMC
Robert Gingell. PMO Chief, 937-503-3183, robert.gingell@us.af.mil
AES OHIO
Mark Edsall Mark.Edsall@AES.com
AMERICAN WATER
Cory Kinnison, 937-371-9648, cory.kinnison@amwater.COM Randy Fries, 937-623-9786, randolph.fries@amwater.com
VECTREN GAS
Brenton Balsbaugh, 765-939-4608, brenton.balsbaugh@centerpointenergy.com Robert A. Robinson, 937-271-7125, robertarobinson@centerpointenergy.com
1. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
2. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL REQUIRE EROSION CONTROL
MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE OF SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE. FOR PROJECTS THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED BY THE OHIO EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88 CEG/CEIEA WATR PM MIKE VAUGHN, (937- 257-8028 OR
MICHAEL.VAUGHN.3@US.AF.MIL ) FOR ADDITIONAL INFORMATION.
3. THE GENERATION OF FUGITIVE EMISSIONS MUST BE KEPT TO A MINIMUM USING APPROVED DUST SUPPRESSING METHODS SUCH AS WATER SPRAYS ON AREAS OF HIGH DUST GENERATION. FOR ADDITIONAL INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM MR. CHET POWERS. CHET CAN BE REACHED AT 937-257-3349 OR BY EMAIL AT CHET.POWERS@US.AF.MIL
4. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 35 43.
5. ALL WINDOW AND DOOR FRAME CAULKING AND GLAZING WILL BE TREATED AS CONTAINING ASBESTOS UNLESS TESTING PROVES IT
TO BE ASBESTOS FREE.
6. DEMOLITION OF LOAD-BEARING WALLS OR STRUCTURALCOMPONENTS REQUIRE NOTIFICATION OF DEMOLITION AND RENOVATION TO THE REGIONAL AIR POLLUTION AND CONTROL AGENCY (RAPCA) A MINIMUM OF 10 WORK DAYS PRIOR TO
BEGINNING CONSTRUCTION.
7. RECOVER AND RECLAIM ANY REFRIGERANT IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 02 41 00.
8. IF ANY REFRIGERANT-CONTAINING EQUIPMENT SCHEDULED FOR NEW INSTALLATION, INCLUDING WATER COOLERS, THEY
MUST UTILIZE AN HFC REFRIGERANT. CFC AND HCFC REFRIGERANTS ARE NOT AUTHORIZED FOR NEW EQUIPMENT INSTALLATIONS. FOR ADDITIONAL INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM CHET POWERS. CHET CAN BE
REACHED AT 937-257-3349 OR BY EMAIL AT CHET.POWERS@US.AF.MIL.
9. ALL HAZARDOUS MATERIALS MUST BE PROPERLY MANAGED, LABELED AND STORED. ANY HAZARDOUS WASTE GENERATED FROM THIS CONSTRUCTION ACTIVITY MUST BE PROPERLY CHARACTERIZED, LABELED AND MANAGED BY TRAINED EMPLOYEE OF THE CONTRACTOR WITH KNOWLEDGE OF THE ACTIVITY / PROCESS WHERE THE WASTE WAS GENERATED.
ALL HAZARDOUS WASTE WILL BE TURNED OVER TO THE GOV'T FOR DISPOSAL. IN ADDITION PROPER COORDINATION IS NEEDED WITH 88 CEG/CEIEC. QUESTIONS CONCERNING THE REQUIREMENTS FOR STORAGE AND DISPOSAL OF ANY
HAZARDOUS MATERIALS CAN BE ADDRESSED BY THE 88 CEG/CEIEC HAZARDOUS MATERIALS PM,
KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 OR 88 CEG/CEIEC HAZARDOUS WASTE PM, EMILY EDREI (937-257-
0023 OR EMILY.ERDEI@US.AF.MIL).
10. ANY LEAD CONTAINING PAINT CONTROL MEASURES SHALL BE PERFORMED IN ACCORDANCE WITH WPAFB SPECIFICATION
SECTION 01 35 43.
11. ALL METAL AND WIRING SHALL BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER. THE WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO REDUCE WASTE DISPOSAL. ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING CENTER. ALL RECYCLING MUST BE ACCOMPLISHED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 35 43. CONTACT WPAFB RECYCLING PROGRAM MANAGER AT 937-257-5060 TO CONFIRM WHAT MATERIALS ARE RECYCLABLE AND TO COORDINATE TURN-IN. THE CONTRACTOR SHALL SUBMIT A QUARTERLY SUMMARY REPORT TO THE GOVERNMENT CONTRACT REPRESENTATIVE IAW WPAFB SPECIFICATION SECTION 01 35 43 STATING (1) THE COST TO RECYCLE AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS RECYCLED, (2) THE COST TO DIVERT/REUSE THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS DIVERTED/REUSE, (3) THE COST TO MULCH AND THE TONNAGE AND COST OF CONSTRUCTION AND DEMOLITION MATERIALS MULCHED, (4) THE COST FOR WASTE-TO-ENERGY AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS CONVERTED FROM WASTE-TO-ENERGY, (5) THE COST TO LANDFILL AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED, (6) THE COST TO INCINERATE AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS INCINERATED, AND (7) EXPLANATION OF THE DIVERSION RATE IF LESS THAN 60%. THE QUARTERLY SUMMARY REPORTS SHALL BE RECEIVED ON APRIL 7, JULY 7, OCTOBER 7, AND JANUARY 7 COVERING THE THREE MONTHS PRIOR. THE QUARTERLY SUMMARY REPORTS SHALL BE ON THE WPAFB DIVERSION FORM. FOR ADDITIONAL INFORMATION CONTACT THE RECYCLING PM, DAVE DALTON, AT
937-257-5060 OR DAVID.DALTON.2@US.AF.MIL.
12. TURN-IN ALL MERCURY CONTAINING DEVICES, SWITCHES AND THERMOSTATS TO 88 CEG/CEIE IN ACCORDANCE WITH
WPAFB SPECIFICATION SECTION 01 35 43 FOR RECYCLING.
13. TURN-IN ALL PCB CONTAINING LIGHT BALLAST TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 35 43.
14. 30 DAYS PRIOR TO START OF WORK, THE CONTRACTOR SHALL TAKE A REPRESENTATIVE SAMPLE OF THE HVAC SYSTEM WATER TO DETERMINE WHETHER IT CAN BE DRAINED DIRECTLY INTO THE SANITARY SEWER. ANALYZE THE WATER TO DETERMINE THE TOTAL LEVEL OF EACH OF THE FOLLOWING: CADMIUM, CHROMIUM, COPPER, CYANIDE, LEAD, MERCURY, MOLYBDENUM, NICKEL, SILVER, ZINC, SULFIDE, OIL AND GREASE. THE LAB PERFORMING THE ANALYSES MUST BE CERTIFIED BY OHIO EPA TO ANALYZE FOR THESE PARAMETERS. PROVIDE A COPY OF THE LAB'S REPORT TO THE CONTRACTING OFFICER, WHO WILL IN TURN FORWARD IT TO 88 CEG/CEIEA FOR A DETERMINATION ON THE WASTEWATER
DISPOSAL METHOD.
15. COORDINATE DISPOSITION OF EXCESS RADIOACTIVE COMMODITIES, E.G. IONIZATION TYPE SMOKE DETECTORS, RADIOLUMINESCENT EMERGENCY EXIT SIGNS, OR ANY OTHER RADIOACTIVE COMMODITY AND/OR RADIOACTIVE
CONTAMINANT THROUGH THE INSTALLATION RADIATION SAFETY OFFICER, 88 AMDS/SGPB.
16. IF ANY SANITARY SEWER MAINS ARE BEING EXTENDED, UPSIZED OR NEW MAINS ARE BEING INSTALLED A PERMIT TO INSTALL (PTI) MAY BE REQUIRED FROM THE OHIO EPA PRIOR TO BEGINNING MAIN INSTALLATION. THE CONSTRUCTION CONTRACTOR SHALL PREPARE AND SUBMIT A DRAFT PTI PACKAGE TO THE CONTRACTING OFFICER'S REPRESENTATIVE, INCLUDING A CHECK FOR ANY APPLICABLE OHIO EPA FEES, FOR REVIEW AND PROCESSING BY ENVIRONMENTAL MANAGEMENT, 88 CEG/CEIEA. ENVIRONMENTAL MANAGEMENT SHALL ENDORSE THE PACKAGE AS THE UTILITY OWNER AND SHALL SUBMIT IT TO OHIO EPA. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM, MIKE VAUGHN, (937-257-8028 OR
MICHAEL.VAUGHN.3@US.AF.MIL).
17. NO TREE CUTTING BETWEEN 01 APRIL AND 30 SEPTEMBER W/ OUT THE WRITTEN APPROVAL FROM THE 88 CEG/CEIEA NATURAL RESOURCE PROGRAM MANAGER (NR PM). SUBMIT A LIST OF THE TREES TO BE REMOVED AND REPLACED. THREE TREES SHALL BE REPLACED FOR EVERY ONE TREE REMOVED. THE GENERAL 10-20-30 DIVERSITY RULE SHALL BE FOLLOWED WHEN PLANTING TREES. ONLY PLANTS/TREES ON THE APPROVED PLANTING LIST CAN BE PLANTED AND MUST BE OHIO NATIVES. CONTACT NATURAL RESOURCE PM DARRYN WARNER BY EMAIL AT DARRYN.WARNER@US.AF.MIL OR BY PHONE AT
937-257-4857 FOR ADDITIONAL INFORMATION.
ENVIRONMENTAL NOTES GRADING NOTES PROJECT CONTACTS
STRIPING NOTES
C
IV
IL
N
O
TE
S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
J.
V
ER
ST
J.
V
ER
ST
S.
L
EE
P2
N O
SE
C
O N
D T
IT
LE
J.
B
EN
SO
N
C
IV
IL
C U
I
CUI
CUI
D
EC
EM
BE
R
W
R
IG
H T-
PA
TT
ER
SO
N A
IR
F
O R
C E
BA
SE
D
AY
TO
N
, O H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE 1
B10262 PHASE 1 - CERTIFIED FINAL
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
PH
AS
E
AM
EN
D
M
EN
T
C-001
1 1
W
2Q R
R
_C U
I_ C
F_ Pl an s-
G
F
E
D
C
B
A
18 19 20 21 22 23 24 2522E 23E
M
AT
C H
LI
N
E
A1
AD
4C
MATCHLINE
A1 AD102C
FOR PROTOCOL OF
STAIR 6 - REFER TO
LS002 AND ENLARGED
STAIR PLAN
10' - 3"
VIF
6' - 2"
CB
CB
CB
CB
CB
415446 415
CONTINUED ON AD102C
421 409
409409409
EXISTING BUILDING B10263 -
REFER TO AD401 AND AD402
EXISTING BUILDING B10264 -
REFER TO AD401 AND AD402
CB
446446 305
446305
2 1/2" 12' - 0 1/2"
7'
/2
CB
4 CB
CB
CB
9' - 6 3/4"
CB
543543
C2213 C2214
C2208
C2211
C
PROTECT EXISTING
PARTITION AND
DOOR IN PLACE
C2221
1' - 2" 1' - 2"
2'
1/
2" 3'
1/ 2"
C
CB
1/
2"
KEYED NOTES - DEMOLITION#
DEMOLITION LEGEND
REMOVE WALL / PARTITION
REMOVE DOOR
REMOVE DOORS
CONSTRUCTION BARRIER - REFER TO A704 FOR ADDITIONAL
INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION PHASE
UNLESS OTHERWISE NOTED - W ORK TO BE PERFORMED IN THE
SHADED AREAS MUST BE COORDINATED WITH COR FOUR WEEKS
PRIOR TO MINIMIZE MISSION IMPACT
NOTE:
AVAILABLE HAUL ROUTES FOR MOVEMENT OF CONSTRUCTION
MATERIALS AND REMOVAL OF DEBRIS ARE INDICATED ON THE
OVERALL DEMOLITION PLANS. HAUL ROUTE THROUGH AFMC
OCCUPIED/USED SPACES MUST OCCUR AT TIMES WHEN AFMC STAFF
IS NOT OCCUPYING THE BUILDING AND HAUL ROUTE MUST BE
CLEANED AT THE COMPLETION OF WORK FOR EACH SHIFT. NO
DEBRIS WILL BE ALLOWED IN HAUL ROUTES NOR A BUILD-UP OF DUST
OR OTHER CONSTRUCTION RELATED CONTAMINATES.
NOTE:
THIS LOCATION MAY BE USED FOR MATERIAL
HANDLING INTO AND CONSTRUCTION DEBRIS
REMOVAL FROM FLOOR DURING TIMES WHEN
AFMC STAFF IS NOT OCCUPYING THE
BUILDING AND PRIOR TO CONSTRUCTION OF
NEW EXTERIOR EGRESS STAIR. OPENING
MUST BE MADE WEATHERTIGHT AND
INSULATED AND SECURED SAFE AT TIMES
WHEN AFMC STAFF OCCUPIES THE BUILDING
NOTE:
THIS LOCATION MAY BE USED FOR MATERIAL
HANDLING INTO AND CONSTRUCTION DEBRIS
REMOVAL FROM FLOOR DURING TIMES WHEN
AFMC STAFF IS NOT OCCUPYING THE
BUILDING AND PRIOR TO CONSTRUCTION OF
NEW EXTERIOR EGRESS STAIR. OPENING
MUST BE MADE WEATHERTIGHT AND
INSULATED
NOTE:
DOORS MUST MAINTAIN INTEGRITY OF FIRE
RATED STAIRWELL AND UNINTERRUPTED USE
OF STAIR FOR EGRESS UNTILL SUCH TIME AS
STAIR 6 IS CLOSED FOR RECONSTRUCTION.
REFER TO LIFE SAFETY SEQUENCE SHEETS
G100A.2 - G100C.4
NOTE:
STAIRWELL IS NOT AVAILABLE FOR
CONSTRUCTION ACCESS OTHER THAN WORK
IN STAIRWELL
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
AD101C
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
P.
M
C
EL
V
EN
EY
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
SE
C
O N
D F
LO
O
R
AR
EA
PH
AS
E
AR
C
H
IT
EC
TU
R
AL
D
EM
O
LI
TI
O
N
1/8" = 1'-0"A1 SECOND FLOOR DEMOLITION PLAN - AREA 1
214 PROVIDE AND MAINTAIN AFMC STAFF EGRESS EXCEPT AS OTHERWISE NOTED.
REFER TO LIFE SAFETY PLANS
305 CONSTRUCTION BARRIER MUST BE DISMANTLED ONCE CUTTING OF SLAB
OPENINGS HAS BEEN COMPLETED AND 2 HOUR SHAFT WALLS ARE INSTALLED.
COORDINATE REMOVAL OF TEMPORARY, RATED CONSTRUCTION BARRIER WITH
NEW WORK IN PHASE 1
409 REMOVE PLUMBING FIXTURES AND STALLS - TYPICAL. PATCH OPENINGS IN
FLOOR - REFER TO D1/A534
415 REMOVE CONCRETE SLAB AS REQUIRED FOR MECHANICAL SHAFT - REFER TO
STRUCTURAL AND MECHANICAL TO COORDINATE OPENING SIZE
421 REMOVE CASEWORK / COUNTERTOPS
446 CONSTRUCTION BARRIER LOCATIONS SHOWN MUST BE COORDINATED WITH
COR PRIOR TO ERECTION
543 CONSTRUCTION ACCESS DOOR(S)
908 REMOVE EXISTING PIPING AND CLEANOUTS. PATCH FLOORS TO REMAIN - REFER
TO D1 AND C1 ON A534
999 REPLACE EXISTING DOOR(S) AND FRAME AND PROVIDE NEW DOOR(S) AND
FRAME FOR CONSTRUCTION ACCESS. DOOR(S) WITH CLOSER. PATCH CMU AT
DOOR OPENING TO PROVIDE A SMOOTH, CONTINUOUS SURFACE AT THE DOOR
OPENING.
AD100C
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
T
S
R
Q
P
O
N
M 18 19 20 21 22 23 24 2522E 23E
MATCHLINE
A1 AD102C
M
AT
C H
LI
N
E
A1
AD
6C
409409 421
421421 409
CONTINUED ON AD102C
CB
CB
CB
CB
7' - 1 1/4"
446446 305
2 1/2" 12' - 0 1/2"
1/
4"
/4
CB
CB
CB
CB
446446
C2212
C2218
C2209
C
7'
3/
4"
C2 A519
C2228
KEYED NOTES - DEMOLITION#
DEMOLITION LEGEND
REMOVE WALL / PARTITION
REMOVE DOOR
REMOVE DOORS
CONSTRUCTION BARRIER - REFER TO A704 FOR ADDITIONAL
INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION PHASE
UNLESS OTHERWISE NOTED - W ORK TO BE PERFORMED IN THE
SHADED AREAS MUST BE COORDINATED WITH COR FOUR WEEKS
PRIOR TO MINIMIZE MISSION IMPACT
NOTE:
AVAILABLE HAUL ROUTES FOR MOVEMENT OF CONSTRUCTION
MATERIALS AND REMOVAL OF DEBRIS ARE INDICATED ON THE
OVERALL DEMOLITION PLANS. HAUL ROUTE THROUGH AFMC
OCCUPIED/USED SPACES MUST OCCUR AT TIMES WHEN AFMC STAFF
IS NOT OCCUPYING THE BUILDING AND HAUL ROUTE MUST BE
CLEANED AT THE COMPLETION OF WORK FOR EACH SHIFT. NO
DEBRIS WILL BE ALLOWED IN HAUL ROUTES NOR A BUILD-UP OF DUST
OR OTHER CONSTRUCTION RELATED CONTAMINATES.
NOTE:
THIS LOCATION MAY BE USED FOR MATERIAL
HANDLING INTO AND CONSTRUCTION DEBRIS
REMOVAL FROM FLOOR DURING TIMES WHEN
AFMC STAFF IS NOT OCCUPYING THE
BUILDING AND PRIOR TO CONSTRUCTION OF
NEW EXTERIOR EGRESS STAIR. OPENING
MUST BE MADE WEATHERTIGHT AND
INSULATED AND SECURED SAFE AT TIMES
WHEN AFMC STAFF OCCUPIES THE BUILDING
NOTE:
THIS LOCATION MAY BE USED FOR MATERIAL
HANDLING INTO AND CONSTRUCTION DEBRIS
REMOVAL FROM FLOOR DURING TIMES WHEN
AFMC STAFF IS NOT OCCUPYING THE
BUILDING AND PRIOR TO CONSTRUCTION OF
NEW EXTERIOR EGRESS STAIR. OPENING
MUST BE MADE WEATHERTIGHT AND
INSULATED
A411
C1
A411
C3
A411
A1
A412
A1
NOTE:
DOORS MUST MAINTAIN INTEGRITY OF FIRE
RATED STAIRWELL AND UNINTERRUPTED USE
OF STAIR FOR EGRESS UNTILL SUCH TIME AS
STAIR 5 IS CLOSED FOR RECONSTRUCTION.
REFER TO LIFE SAFETY SEQUENCE SHEETS
G100A.2 - G100C.4
NOTE:
STAIRWELL IS NOT AVAILABLE FOR
CONSTRUCTION ACCESS OTHER THAN WORK
IN STAIRWELL
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
AD103C
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
P.
M
C
EL
V
EN
EY
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
SE
C
O N
D F
LO
O
R
AR
EA
PH
AS
E
AR
C
H
IT
EC
TU
R
AL
D
EM
O
LI
TI
O
N
1/8" = 1'-0"A1 SECOND FLOOR DEMOLITION PLAN - AREA 3
214 PROVIDE AND MAINTAIN AFMC STAFF EGRESS EXCEPT AS OTHERWISE NOTED.
REFER TO LIFE SAFETY PLANS
255 REMOVE RAIN WATER LEADER - FILL RESULTANT OPENING - REFER TO B3/A532
305 CONSTRUCTION BARRIER MUST BE DISMANTLED ONCE CUTTING OF SLAB
OPENINGS HAS BEEN COMPLETED AND 2 HOUR SHAFT WALLS ARE INSTALLED.
COORDINATE REMOVAL OF TEMPORARY, RATED CONSTRUCTION BARRIER WITH
NEW WORK IN PHASE 1
409 REMOVE PLUMBING FIXTURES AND STALLS - TYPICAL. PATCH OPENINGS IN
FLOOR - REFER TO D1/A534
415 REMOVE CONCRETE SLAB AS REQUIRED FOR MECHANICAL SHAFT - REFER TO
STRUCTURAL AND MECHANICAL TO COORDINATE OPENING SIZE
421 REMOVE CASEWORK / COUNTERTOPS
446 CONSTRUCTION BARRIER LOCATIONS SHOWN MUST BE COORDINATED WITH
COR PRIOR TO ERECTION
543 CONSTRUCTION ACCESS DOOR(S)
AD100C
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
E
D
C
B
A
18 19 20 21 22 23 24 2522E 23E
A414
A1
MATCHLINE
A1 A102A
M
AT
C H
LI
N
E
A1 A1
A
514514
514514
519519
519519
ELECTRICAL
STAIR 6
SW ITCH A TELCO
RACKS
A-SWITCH TELCO
RACKS
0266B
0006A
C0285
NOTES:
1. WORK IN A-SWITCH ROOM MUST BE COORDINATED
WITH EQUIPMENT OWNER AND COR. AFMC STAFF WILL
NEED FULL ACCESS TO THIS AREA DURING
CONSTRUCTION. PROVIDE CONTINUAL SAFE ACCESS
AND EGRESS FOR AFMC STAFF DURING PHASE 1
2. DEMOLITION/CONSTRUCTION WITHIN THE A-SWITCH
SPACE MUST HAVE DUST/DEBRIS MITIGATION.
INTRODUCTION OF CONSTRUCTION DUST WILL
DECREASE LIFE OF EQUIPMENT AND/OR CAUSE
CATASTROPHIC SYSTEM FAILURE . EXPECTED
CLEANLINESS OF 0.5 MICRONS PER CU3 MUST BE
MAINTAINED
3. PRIOR TO PENETRATION OR REMOVAL OF EXISTING
SPACE BOUNDARY, COORDINATION IS REQUIRED.
BREACHES THAT WILL NOT BE COMPLETED IN DUTY
DAY, WILL REQUIRE 24/7 STAFFING TO ENSURE
PERIMETER SECURITY. THIS SPACE HOUSES HIGH
VALUE MISSION DEPENDENT EQUIPMENT
UP
C0286
C0293
W HITE SPACE
W HITE SPACE
514514
KEYED NOTES - FLOOR PLAN#
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PHASE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
1. FOR THE LOCATION, CONSTRUCTION BARRIER PARTITION TYPES AND
CONSTRUCTION BARRIER DOOR TAGS - REFER TO AD100A - AD112C
2. PARTITIONS ARE TYPE "0H" UNLESS OTHERWISE NOTED.
3. EXISTING CONCRETE COLUMNS ON EXTERIOR WALLS WITH FURRING MUST
ALSO BE FURRED.
4. EXISTING CONCRETE COLUMNS ENGAGING PARTITIONS MUST BE FURRED
WITH A "0A" UNLESS OTHERWISE NOTED.
5. EXISTING CONCRETE COLUMNS FREE STANDING (NOT ENGAGING
PARTITIONS) MUST BE CLEANED, PATCHED, PRIMED AND PAINTED, UNLESS
OTHERWISE NOTED.
AREA OF CLIN 002 - MINOR CONSTRUCTION ADDITION
GENERAL NOTES
NOTE:
EXISTING CMU WALL PROVIDES 2 HOUR
SEPARATION. NEW NFPA 76 BOUNDARY
WILL BE EXPANDED WESTWARD IN
FUTURE PHASE.
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
A101A
AR
EA
F
LO
O R
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
C . M
EL
EN
D
EZ
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
BA
SE
M
EN
T -A
R
EA
P H
AS
E
AR
C
H
IT
EC
TU
R
AL
1/8" = 1'-0"
A100A
A1 BASEMENT PLAN - AREA 1
013 BRACKET MOUNTED FIRE EXTINGUISHER
170 EXISTING WINDOW WELL ABOVE AND BELOW GRADE WITH RAILINGS -
REHABILITATE IN PLACE - FOR TYPICAL CONDITIONS REFER TO A100AA.3
334 EXISTING CMU PARTITION IS 2 HOUR FIRE-RATED
514 ELASTOMERIC SHEET WATERPROOFING AT PERIMETER OF BELOW-GRADE
BUILDING FOUNDATION FOR TERMINATION - REFER TO C3 AND B3/A520
519 PORTION OF CONSTRUCTION BARRIER AND DOOR(S) AS IDENTIFIED ON
DEMOLITION PLANS WILL REMAIN IN PLACE AT THE END OF CONSTRUCTION OF
PHASE 1. MAINTAIN FINISHED GYPSUM BOARD ON CONSTRUCTION SIDE OF
DURATION OF USE. AT CONCLUSION OF PHASE 1 THIS WILL BE THE FINISHED
PARTITION FULLY PAINTED AND WITH COMPLETE BASE
523 INFILL EXTERIOR WALL OPENING - MATCH EXISTING CONSTRUCTION
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
M
L
K
J
I
H
G
18 19 20 21 22 23 24 2522E 23E
MATCHLINE
A1 A101A
MATCHLINE
A1 A103A
M
AT
C H
LI
N
E
A1 A1
A
A468
C3
ELEVATOR 3
0003A
C0284
514514514
W HITE SPACE
CORRIDOR
KEYED NOTES - FLOOR PLAN#
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PHASE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
1. FOR THE LOCATION, CONSTRUCTION BARRIER PARTITION TYPES AND
CONSTRUCTION BARRIER DOOR TAGS - REFER TO AD100A - AD112C
2. PARTITIONS ARE TYPE "0H" UNLESS OTHERWISE NOTED.
3. EXISTING CONCRETE COLUMNS ON EXTERIOR WALLS WITH FURRING MUST
ALSO BE FURRED.
4. EXISTING CONCRETE COLUMNS ENGAGING PARTITIONS MUST BE FURRED
WITH A "0A" UNLESS OTHERWISE NOTED.
5. EXISTING CONCRETE COLUMNS FREE STANDING (NOT ENGAGING
PARTITIONS) MUST BE CLEANED, PATCHED, PRIMED AND PAINTED, UNLESS
OTHERWISE NOTED.
AREA OF CLIN 002 - MINOR CONSTRUCTION ADDITION
GENERAL NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
A102A
AR
EA
F
LO
O R
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
C . M
EL
EN
D
EZ
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
BA
SE
M
EN
T -A
R
EA
P H
AS
E
AR
C
H
IT
EC
TU
R
AL
1/8" = 1'-0"
A100A
A1 BASEMENT PLAN - AREA 2
514 ELASTOMERIC SHEET WATERPROOFING AT PERIMETER OF BELOW-GRADE
BUILDING FOUNDATION FOR TERMINATION - REFER TO C3 AND B3/A520
519 PORTION OF CONSTRUCTION BARRIER AND DOOR(S) AS IDENTIFIED ON
DEMOLITION PLANS WILL REMAIN IN PLACE AT THE END OF CONSTRUCTION OF
PHASE 1. MAINTAIN FINISHED GYPSUM BOARD ON CONSTRUCTION SIDE OF
DURATION OF USE. AT CONCLUSION OF PHASE 1 THIS WILL BE THE FINISHED
PARTITION FULLY PAINTED AND WITH COMPLETE BASE
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
E
D
C
B
A
19 20 21 22 23 24 2522E 23E
A451
A3
A419
A3
MATCHLINE
A1 A102C
M
AT
C H
LI
N
E
A1 A1
C
0006C
206420652066
3' - 0" 8'
1/
2" 0D
0D0D
0D
1' - 1"
2' - 11"
12' - 1"
6'
7" 1'
3"
5'
6"
2'
" 13
/4
8' - 7 3/4"
10 1/4"
9' - 8 1/2"
0D
4' - 0"
3' - 0"
6"
8'
0" 1'
3"
8' - 7 3/4"17' - 3 3/4"
6'
9"
10' - 2"9' - 9 3/4" 5' - 0 1/2"
0A0A
A222
B1
0S
2F 2F2F
2F
0L 0A 0A
0L 0L
3'
3/
4" 5'
3/ 4"
/2
13' - 1 1/4" 13' - 1 1/4"
0H 1H 0S
548548
9 1/2" 9 1/2"
ELECTRICAL
TELECOMMUNICATIONS
STAIR 6
COLLABORATION
ROOM
CORRIDOR
COPY/COFFEE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OPEN OFFICE
OFFICE
W OMEN
COPY/COFFEE
OPEN OFFICE
STORAGE
CUSTODIAL
6' - 4"
6' - 3"CORRIDOR
STORAGE
0L
0S 3'
7"0S
0S
0S
327327C
C
0S
0S
0R
0S
3'
0"
C
C2211
C2221
0R
0R
0Q
0Q0Q0Q
0A
A222
D3
W HITE SPACE
0E
0E 0E
0E
0E
0E
0E
0E 0E
0E
0E
0A
0A
TYPICAL
TYPICAL
611611
0A
TYPICAL
C
KEYED NOTES - FLOOR PLAN#
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PHASE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
1. FOR THE LOCATION, CONSTRUCTION BARRIER PARTITION TYPES AND
CONSTRUCTION BARRIER DOOR TAGS - REFER TO AD100A - AD112C
2. PARTITIONS ARE TYPE "0H" UNLESS OTHERWISE NOTED.
3. EXISTING CONCRETE COLUMNS ON EXTERIOR WALLS WITH FURRING MUST
ALSO BE FURRED.
4. EXISTING CONCRETE COLUMNS ENGAGING PARTITIONS MUST BE FURRED
WITH A "0A" UNLESS OTHERWISE NOTED.
5. EXISTING CONCRETE COLUMNS FREE STANDING (NOT ENGAGING
PARTITIONS) MUST BE CLEANED, PATCHED, PRIMED AND PAINTED, UNLESS
OTHERWISE NOTED.
AREA OF CLIN 002 - MINOR CONSTRUCTION ADDITION
GENERAL NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
A101C
AR
EA
F
LO
O R
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
C . M
EL
EN
D
EZ
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
SE
C
O N
D F
LO
O
R
AR
EA
PH
AS
E
AR
C
H
IT
EC
TU
R
AL
1/8" = 1'-0"
A100C
A1 SECOND FLOOR PLAN - AREA 1
012 SEMI-RECESSED FIRE EXTINGUISHER CABINET - REFER TO C2/A573
327 WALL/FLOOR EXPANSION JOINT COVERS - REFER TO A567
519 PORTION OF CONSTRUCTION BARRIER AND DOOR(S) AS IDENTIFIED ON
DEMOLITION PLANS WILL REMAIN IN PLACE AT THE END OF CONSTRUCTION OF
PHASE 1. MAINTAIN FINISHED GYPSUM BOARD ON CONSTRUCTION SIDE OF
DURATION OF USE. AT CONCLUSION OF PHASE 1 THIS WILL BE THE FINISHED
PARTITION FULLY PAINTED AND WITH COMPLETE BASE
548 OPENING IN FLOOR SLAB FOR MECHANICAL DUCTWORK
607 CORNER GUARD - REFER TO A3/A573
611 END WALL GUARD DETAIL - REFER TO A4/A573
931 (L) LAVATORY
994 EXISTING CONCRETE COLUMN PROVIDES 1 HOUR FIRE RATING AND IS AN
INTEGRAL COMPONENT OF THE 1 HOUR RATING
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
T
S
R
Q
P
O
N
M
18 19 20 21 22 23 24 2522E 23E
MATCHLINE
A1 A102C
M
AT
C H
LI
N
E
A1 A1
C
A419
A3
MIRRORED
2158 2159 2098B
2096 2095
20942097
2101A
A450
B3
2101B
A422
B2
5'
1/
2"
A225
A5
ALIGN
0D
2098A A233
C2
0Q0Q
A422
A2
A560
D4
A562
A3
A233A1
ALIGN
3' - 0"
6"
1' - 1"
2' - 6"
1' - 10 3/4"
3' - 6"
5'
3/
4" 9'
1"
1' - 1 1/2"
6' - 9 1/2" 4' - 2 1/2"
0S
0S
0S
0S
6'
1/
2" 4'
8"
1'
3"
A450
D2
MEN
2102CORRIDOR
OFFICE
OPEN OFFICE
W OMEN
CUSTODIAL
VESTIBULE
KITCHEN
OPEN OFFICE
OFFICE
OFFICE
RESTROOM
RESTROOM
COPY
RESTROOM
STAIR 5
TELECOMMUNICATIONS
ELECTRICAL
CORRIDOR
6' - 9 1/2"
1' - 1 1/2"
0D 0D
0005C
327327
C2209
C2216
0D
A559
A4
A559
A4
A233 B1 147
0S
0S
OFFICE
0S
0S
0S
0S
3'
1/
2"
1/ 2"
5'
1' - 4"
0E
8'
0"
607607
ELECTRICAL
A1
C3
A233
C1
6" 3' - 0" 611611611611
C1 OPP. SIM
C2228
KEYED NOTES - FLOOR PLAN#
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PHASE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
1. FOR THE LOCATION, CONSTRUCTION BARRIER PARTITION TYPES AND
CONSTRUCTION BARRIER DOOR TAGS - REFER TO AD100A - AD112C
2. PARTITIONS ARE TYPE "0H" UNLESS OTHERWISE NOTED.
3. EXISTING CONCRETE COLUMNS ON EXTERIOR WALLS WITH FURRING MUST
ALSO BE FURRED.
4. EXISTING CONCRETE COLUMNS ENGAGING PARTITIONS MUST BE FURRED
WITH A "0A" UNLESS OTHERWISE NOTED.
5. EXISTING CONCRETE COLUMNS FREE STANDING (NOT ENGAGING
PARTITIONS) MUST BE CLEANED, PATCHED, PRIMED AND PAINTED, UNLESS
OTHERWISE NOTED.
AREA OF CLIN 002 - MINOR CONSTRUCTION ADDITION
GENERAL NOTES
A412
A3
NOTE:
STAIRWELL IS NOT AVAILABLE FOR
CONSTRUCTION ACCESS OTHER THAN WORK
IN STAIRWELL
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
A103C
AR
EA
F
LO
O R
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
C . M
EL
EN
D
EZ
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
SE
C
O N
D F
LO
O
R
AR
EA
PH
AS
E
AR
C
H
IT
EC
TU
R
AL
1/8" = 1'-0"
A100C
A1 SECOND FLOOR PLAN - AREA 3
012 SEMI-RECESSED FIRE EXTINGUISHER CABINET - REFER TO C2/A573
125 FREE-STANDING ALUMINUM BARRIER GATE WITHOUT SIGN. SWING AS INDICATED
- REFER TO A2/A578 (SIMILAR)
147 SECURITY CABINETS - NIC
327 WALL/FLOOR EXPANSION JOINT COVERS - REFER TO A567
519 PORTION OF CONSTRUCTION BARRIER AND DOOR(S) AS IDENTIFIED ON
DEMOLITION PLANS WILL REMAIN IN PLACE AT THE END OF CONSTRUCTION OF
PHASE 1. MAINTAIN FINISHED GYPSUM BOARD ON CONSTRUCTION SIDE OF
DURATION OF USE. AT CONCLUSION OF PHASE 1 THIS WILL BE THE FINISHED
PARTITION FULLY PAINTED AND WITH COMPLETE BASE
607 CORNER GUARD - REFER TO A3/A573
611 END WALL GUARD DETAIL - REFER TO A4/A573
774 KNEE WALL - REFER TO INTERIOR ELEVATIONS AND C1/A592
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
DS
DS
OS
OS
OS
OS
OS
OS
OS
OS
OSOS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OSOS
OS
OS
KEYED NOTES - REFLECTED CEILING PLAN#
G
F
E
D
C
B
A
18 19 20 21 22 23 24 2522E 23E
M
AT
C H
LI
N
E
A1 A1
C
MATCHLINE
A1 A122C
2'
3/
4"
1/ 4"
7 1/4"
2' - 4 3/4"
617 617
EQ
EQ
EQ
4'
6"
EQ
1' - 10" 6' - 0" 3' - 10"
5' - 11" 4' - 11" 6' - 5"
7'
1" 6'
0"
5'
9" 9'
5"
4'
6'
5"
5' - 2"
3'
9"
10' - 4"
ELECTRICAL
TELECOMMUNICATIONS
STAIR 6
COLLABORATION
ROOM
OFFICE
STORAGE
COPY/COFFEE
OFFICE
OFFICE
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OPEN OFFICE
COPY/COFFEE
W OMEN
STORAGE
CORRIDOR
CORRIDOR
8' - 6"
10' - 4"
352352352
EQ 6' - 0" EQ
1'
8'
0" 8'
0"
11' - 0" 5' - 6"5' - 6" 11' - 0"
W HITE SPACE
A493
A3
REFLECTED CEILING PLAN LEGEND:
ACOUSTICAL PANEL CEILING
(APC) 2'x2'
GYPSUM BOARD CEILING
WORK ABOVE CEILING
CONCRETE
SMOKE DETECTOR
SUPPLY DIFFUSER
RETURN DIFFUSER
EXHAUST DIFFUSER
OCCUPANCY SENSOR
LINEAR PENDANT FIXTURE LINEAR RECESSED LIGHT
FIXTURE
INDUSTRIAL PENDANT FIXTURE
RECESSED CAN LIGHT FIXTURE
SURFACE MOUNTED VANITY
FIXTURE
RECESSED MOUNTED WALL
WASH FIXTURE
CEILING MOUNTED EXIT SIGN
1. NOT EVERY DEVICE ON LEGEND SHOWN MAY BE USED ON THIS PROJECT.
2. CEILING HEIGHTS ARE 9'-0" AFF UNLESS OTHERWISE NOTED.
3. MECHANICAL DUCTWORK IS INDICATED IN HALFTONE.
4. AREAS WITHOUT THE ABOVE INDICATED CEILING HATCHES IN THIS LEGEND
ARE OPEN TO STRUCTURE - PAINT WHITE.
5. COLUMNS AND COLUMN CAPS THAT ARE NOT FURRED - PAINT WHITE.
6. REFER TO SOUND MASKING DRAWINGS IN VOLUME 8.
PARTITIONS THAT PENETRATE
CEILING
FIRE ALARM SPEAKER AND
STROBE
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION PHASE UNLESS
OTHERWISE NOTED - WORK TO BE PERFORMED IN THE SHADED AREAS
MUST BE COORDINATED W ITH COR FOUR WEEKS PRIOR TO MINIMIZE
MISSION IMPACT
AREA OF CLIN 002
DAYLIGHT SENSORDS
FIRE ALARM CONTROL
MODULE
CM
PERFORATED METAL PAN
CEILING AND INTEGRAL LIGHT
FIXTURE (MPC-1)
LUMINOUS PANEL CEILING
SYSTEM AND INTEGRAL LIGHT
FIXTURE
EXTERIOR FINISH SYSTEM
CEILING SPEAKER
CCTV CAMERA
MICROPHONE OUTLET CEILINGM
PERFORATED METAL PAN
CEILING AND INTEGRAL LIGHT
FIXTURE (MPC-2)
SLOT DIFFUSER
FIRE ALARM SPEAKER
FIRE ALARM STROBE
S
PROJ PROJECTOR OUTLET
EMERGENCY LIGHT FIXTURE
LIGHT FIXTURE
GYPSUM BOARD SOFFIT AND
PLASTIC LAMINATE PANEL
ACOUSTICAL PANEL CEILING
(APC) 2'x4'
GENERAL NOTES
RETURN GRILLE EXHAUST GRILLE
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
A121C
AR
EA
C
EI
LI
N
G P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
M . B
U R
TO
N
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
SE
C
O N
D F
LO
O
R
AR
EA
PH
AS
E
AR
C
H
IT
EC
TU
R
AL
133 CEILING DETAIL - REFER TO C3/A570 (SIMILAR) OPENING HEIGHT AT 8' - 0" FROM
FINISHED FLOOR
146 REMOVE EXISTING CEILING TO THE NEXT FULL PANEL - VERIFY IN FIELD AND
REPLACE WITH NEW TO MATCH ADJACENT EXISTING CEILING
195 FRP REINFORCING, TYPICAL - REFER TO S101R, S104R, S107R, AND S110R
284 EXPANSION JOINT COVER - REFER TO D5/A567
352 REMOVE CEILING AS REQUIRED FOR OVERHEAD MECHANICAL WORK ABOVE
CEILING. INSTALL NEW CEILING SUSPENSION GRID AND CEILING PANELS UPON
COMPLETION OF WORK ABOVE CEILING TO MATCH LAYOUT OF EXISTING CEILING
GRID
362 EXPANSION JOINT COVER - REFER TO D2/A567
617 CONTROL JOINT - REFER TO C1/A571
659 GYPSUM BOARD SOFFIT - REFER TO EXTERIOR WALL SECTIONS
761 REMOVE CEILING AS REQUIRED FOR OVERHEAD PLUMBING WORK ABOVE
CEILING. PROVIDE NEW CEILING SUSPENSION GRID AND CEILING PANELS UPON
COMPLETION OF WORK ABOVE CEILING TO MATCH LAYOUT OF EXISTING CEILING
GRID
1/8" = 1'-0"A1 SECOND FLOOR REFLECTED CEILING PLAN - AREA 1
G010
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
ALIGN
Q
P
20 21
CB
C2216
CB
3' - 9 1/2"
PORTION OF
CONSTRUCTION
BARRIER (CB1) MUST BE
CONSTRUCTED AS AN
'0H' PARTITION - REFER
TO A702
7"
7' - 0"
CB
NOTE:
DEMOLISH PARTITIONS AND
DOORS SHOWN DASHED
CONSTRUCTION AREA
ACCESS DOOR
MAINTAIN EXISTING DOOR FOR
EGRESS
1' - 1 1/2"
CB
1CB
C2228
5"
Q
P
20 21
C2216
5'
7"
7' - 0"
0L
0A
0L
0H 2F
0H
TELECOMMUNICATIONS
CONSTRUCTION AREA
ACCESS DOOR
MAINTAIN EXISTING DOOR FOR
EGRESS
9 1/2"
0H
1' - 1 1/2"
0H
NOTE:
PARTITION TYPE 2F' IN SEQUENCE 2 IS IN
CONSIDERATION OF FUTURE PHASE FIRE RATING.
OFFICE
0A 0A
0A
0A
TYPICAL
TYPICAL
TYPICALTYPICAL
C2228
Q
P
20 21
C2216
5'
7"
7' - 0"
2F
TELECOMMUNICATIONS
SEQUENCE OF CONSTRUCTION
1. INSTALL EXIT SIGN.
2. REMOVE PARTITION DURING HOURS WHEN AFMC STAFF IS NOT OCCUPYING
THE BUILDING. AFMC STAFF WILL USE DOOR C2216 AS NEW EGRESS DOOR.
3. INSTALL PARTITION '2F' AS INDICATED AFTER PARTITION IS DEMOLISHED AND
NEW EGRESS PATHWAY IS ESTABLISHED.
4. PATCH PARTITION TO REMAIN TO MATCH EXISTING ADJACENT.
NEW RAIN LEADER
OFFICE
C2228
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
A411
EN
LA
R G
ED
S
EQ
U
E N
C
ED
F
LO
O R
P
LA
N S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
D . W
IN
D
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
AR
C
H
IT
EC
TU
R
AL
1/4" = 1'-0"
AD103C
C1 SECOND FLOOR ELECTRICAL AND TELECOM ROOM - SEQUENCE 1
1/4" = 1'-0"
AD103C
C3 SECOND FLOOR ELECTRICAL AND TELECOM ROOM - SEQUENCE 2
1/4" = 1'-0"
AD103C
A1 SECOND FLOOR ELECTRICAL AND TELECOM ROOM - SEQUENCE 3
AM
EN
D
M
EN
T 0 0
D
EC
W
2Q R
R
_C U
I_ C
F_ Pl an s-
ALIGN
Q
P
20 21
C2216
5'
7"
7' - 0"
TELECOMMUNICATIONS
MAINTAIN AFMC EGRESS
DOOR IN PLACE
0H
ELECTRICAL
1' - 0"
BRACKET
MOUNTED FIRE
EXTINGUISHER
NEW RAIN LEADER
OFFICE
C2228
Q
P
20 21
C2216
5'
7"
7' - 0"
0L
0A
0L
TELECOMMUNICATIONS
MAINTAIN AFMC
EGRESS DOOR IN PLACE
SEQUENCE OF CONSTRUCTION
1. DEMOLISH PARTITION IN ENCLOSED AREA AS
INDICATED
2. INSTALL NEW PARTITIONS AS INDICATED
3. REMOVE PARTITION AND DOOR AS INDICATED
4. INSTALL REMAINING PARTITION AND DOOR -
REFER TO SEQUENCE 5
NEW RAIN LEADER
OFFICE
C2228
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
A412
EN
LA
R G
ED
S
EQ
U
E N
C
ED
F
LO
O R
P
LA
N S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
D . W
IN
D
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
AR
C
H
IT
EC
TU
R
AL
1/4" = 1'-0"
A103C
A3 SECOND FLOOR ELECTRICAL AND TELECOM ROOM - SEQUENCE 5
1/4" = 1'-0"
AD103C
A1 SECOND FLOOR ELECTRICAL AND TELECOM ROOM - SEQUENCE 4
AM
EN
D
M
EN
T 0 0
D
EC
1 1
W
2Q R
R
_C U
I_ C
F_ Pl an s-
GLASS TYPESDOOR AND FRAME LEGEND
ALUM ALUMINUM
HM HOLLOW METAL
SS STAINLESS STEEL
-- NOT APPLICABLE
STL STEEL
WD FLUSH CORE WOOD
DD DEMOUNTABLE DOOR
DF DEMOUNTABLE FRAME
LOW-E-COATED, TINTED INSULATING LAMINATED SPANDREL
GLASS
LOW-E-COATED, TINTED INSULATING LAMINATED GLASS,
SAFETY APPLICATION
G3 CLEAR INSULATING LAMINATED GLASS, SAFETY
APPLICATION
CLEAR FLOAT GLASS, FULLY TEMPERED
CLEAR LAMINATED 120-MINUTE FIRE RESISTANCE
RATED GLAZING
LOW-E-COATED, TINTED INSULATING LAMINATED GLASS
G6
TWO-WAY MIRROR INSULATION GLASS, SAFETY
APPLICATION
G7G4
G5
G2
G1
1 HOUR FIRE RATED LOW-E-COATED, TINTED INSULATING
LAMINATED GLASS, SAFETY APPLICATION
G8
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
A603
D O
O R
S C
H
ED
U
LE
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R . M
ES
SE
L
J.
C
AM
PO
S
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
AR
C
H
IT
EC
TU
R
AL
REFER TO A601 FOR DOOR SCHEDULE GENERAL
NOTES, DOOR SCHEDULE REMARKS, DOOR AND
FRAME TYPES
DOOR SCHEDULE NOTES
B10262 - PHASE 1 - LEVEL - A - BASEMENT - (CONSTRUCTION BARRIER)
B10262 - PHASE 1 - LEVEL - B - FIRST FLOOR - (CONSTRUCTION BARRIER)
B10262 - PHASE 1 - LEVEL - C - SECOND FLOOR - (CONSTRUCTION BARRIER)
ROOM NAME DOOR NO.
DOOR FRAME FIRE
RATING
HARDWARE
SET REMARKSTYPE MATERIAL GLAZING DOOR PAIR WIDTH HEIGHT THICKNESS TYPE MATERIAL HEAD DETAIL JAMB DETAIL SILL DETAIL
C2201 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2203 F HM -- 3' - 6" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2204 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40
C2205 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-26.1 1,40
C2206 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2207 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-26.1 1,40
C2208 F WD -- 3' - 0" 7' - 0" 1 3/4" HM -- -- -- 90 MIN. 1-26.1 1,40
C2209 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 3 HM -- -- -- 45 MIN. 1-22.0 1,31,40 C2210 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40 C2211 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 3 HM -- -- -- 45 MIN. 1-22.0 1,31,40 C2212 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40
C2213 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2214 F WD -- 3' - 0" 7' - 0" 1 3/4" HM -- -- -- 90 MIN. 1-53.0 1,40
C2216 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C2217 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2218 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2219 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2221 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-26.1 1,40
C2223 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2224 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C2225 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40 C2226 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40
C2227 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- 45 MIN. 1-53.0 1,40
C2228 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- 45 MIN. 1-88.0 5
ROOM NAME DOOR NO.
DOOR FRAME FIRE
RATING
HARDWARE
SET REMARKSTYPE MATERIAL GLAZING DOOR PAIR WIDTH HEIGHT THICKNESS TYPE MATERIAL HEAD DETAIL JAMB DETAIL SILL DETAIL
C1210 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C1212 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40 C1213 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40 C1214 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40
C1215 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C1216 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40
C1217 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C1218 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C1219 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C1220 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40 C1221 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40 C1222 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40
C1223 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C1224 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1225 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-26.1 1,40
C1226 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1227 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1228 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1231 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1232 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1233 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1234 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1235 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1236 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C1237 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C1238 F HM -- PR 3' - 0" = 6' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-28.0 1,31,40
ROOM NAME DOOR NO.
DOOR FRAME FIRE
RATING
HARDWARE
SET REMARKSTYPE MATERIAL GLAZING DOOR PAIR WIDTH HEIGHT THICKNESS TYPE MATERIAL HEAD DETAIL JAMB DETAIL SILL DETAIL
C0280 F HM -- 3' - 6" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-53.0 1,40
C0281 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C0282 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C0283 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C0284 F HM -- 3' - 6" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-26.1 1,40
C0285 F HM -- 3' - 6" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-53.0 1,40
C0286 F HM -- 3' - 6" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-53.0 1,40
C0287 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-53.0 1,40
C0288 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-26.1 1,40
C0290 F HM -- 2' - 8" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-53.0 1,40
C0293 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 45 MIN. 1-53.0 1,40
C0294 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN. 1-53.0 1,40
C0295 F HM -- 3' - 0" 7' - 0" 1 3/4" 1 HM -- -- -- 90 MIN.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .