This solicitation notice provides details for a renovation project at Wright-Patterson Air Force Base in Ohio. The U.S. Army Corps of Engineers Louisville District plans to issue a request for proposal for design and construction services to renovate over 60,000 square feet of the Air Force Materiel Command Headquarters building. Renovation work will include HVAC, plumbing, electrical and telecommunications systems replacement, as well as interior finishes, windows, doors and waterproofing. The contract duration is estimated at 1,095 calendar days with a construction value between $100-250 million. The solicitation is anticipated for release on November 10, 2022 via the System for Award Management website and will utilize best value source selection considering technical evaluation and price factors.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled by: USACE-LRL-ED-MA CUI Category(ies):
LDC or Distribution Statement: N/A POC: Blake Gevedon Contracting Specialist william.b.gevedon@usace.army.mi 502.315.6791
Materials shall be submitted to potential offerors currently certified in the Joint Certification Program (JCP) only.
WRIGHT-PATTERSON AIR
FORCE BASE
STATE R
O
UTE 4
IN
T
E R
S T
A T
E
INTERSTATE 70
S T
A T
E R
O U
T E
STATE ROUTE 4
STATE ROUTE 444
T ROAD
A S
T R
E E
T
O G
D E
N A
V E
N U
E
C H
ID
L
A W
R O
A D
B R
O A D
N R
O A
D
A STREET
S
TA
TE
R
O U
TE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers ®
P2 NO.:
ISSUE DATE:
VOLUME:
CUI
CUI
C U
I
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E D
A Y
T O
N
O H
IO
R E
P A
IR
/R
E N
O V
A T
E A
F M
C H
Q B
U
IL
D
IN
G
B
P
H A
S E
SOLICITATION NO.:
PHASEREPAIR/RENOVATE AFMC HEADQUARTERS BUILDING
B 10262
W912QR21R0028
CONTROLLED BY: USACE
CONTROLLED BY: LOUISVILLE DISTRICT
CUI CATEGORY: CUI BASIC
DISTRIBUTION/DISSEMINATION CONTROLS: DISTRO C
POC: STEVE SKAGGS, 502-315-6368
B262 PHASE
P
N O
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
J
B E
N S
O N
PLAN NORTH PLAN NORTHTRUE NORTH TRUE NORTH
G008
V O
L U
M E
P H
A S
E
C O
V E
R S
H E
E T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
E N
G
IN
E E
R
IN
G G
R O
U P
I N
C
N
B
R O
A D
W A
Y S
T
L O
U
IS
M
O
R
M E
S S
E L
N
R E
N D
L E
M A
N
J
C O
R S
O N
O C
T O
B E
R
W
Q R
R
X X
X X
B10262 PHASE 1 - 90% FINAL REVISED - NOT FOR CONSTRUCTION
LOUISVILLE DISTRICT
475429
20 OCTOBER 2022
WRIGHT-PATTERSON AIR FORCE BASE
DAYTON, OHIO 45433
B10262 PHASE 1 - 90% FINAL REVISED - NOT FOR CONSTRUCTION
G E
N E
R A
L
VICINITY MAP LOCATION MAP
T E
L E
C O
M M
U N
IC
A
T
IO
N S
/S O
U N
D
M A
S K
IN
G
/E L
E C
T R
O N
IC
S
E C
U R
IT
Y
S Y
S T
E M
S
TELECOMMUNICATIONS/SOUND MASKING/ELECTRONIC SECURITY SYSTEM
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
ARIMS: 200A Disposition: Maintain for 15yrs after construction
10 November 2022
W912QR22R0028
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E D
A Y
T O
N
O H
IO
R E
P A
IR
/R
E N
O V
A T
E A
F M
C H
Q B
U
IL
D
IN
G
B
P
H A
S E
B262 PHASE
P
N O
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
J
B E
N S
O N
G016
V O
L U
M E
P H
A S
E
S H
E E
T I
N D
E X
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
E N
G
IN
E E
R
IN
G G
R O
U P
I N
C
N
B
R O
A D
W A
Y S
T
L O
U
IS
M
O
R
M E
S S
E L
N
R E
N D
L E
M A
N
J
C O
R S
O N
O C
T O
B E
R
W
Q R
R
X X
X X
B10262 PHASE 1 - 90% FINAL REVISED - NOT FOR CONSTRUCTION
G E
N E
R A
L
TA604 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1
TA605 CONTROL CONCEPT - RM 2083 - PHASE 1
TA606 CONTROL CONCEPT - RM 2088 - PHASE 1
TA607 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1
TA608 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1
TT101B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 1 - PHASE 1
TT102B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 2 - PHASE 1
TT103B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 3 - PHASE 1
TT104B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 4 - PHASE 1
TT105B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 5 - PHASE 1
TT106B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 6 - PHASE 1
TT107B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 7 - PHASE 1
TT108B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 8 - PHASE 1
TT109B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 9 - PHASE 1
TT110B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TT110B-A TELECOM FLOOR PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TT111B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 11 - PHASE 1
TT112B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 12 - PHASE 1
TT120B CABLE TRAY PLAN - FIRST FLOOR - OVERALL - PHASE 1
TT121B CABLE TRAY PLAN - FIRST FLOOR - AREA 1 - PHASE 1
TT122B CABLE TRAY PLAN - FIRST FLOOR - AREA 2 - PHASE 1
TT123B CABLE TRAY PLAN - FIRST FLOOR - AREA 3 - PHASE 1
TT124B CABLE TRAY PLAN - FIRST FLOOR - AREA 4 - PHASE 1
TT125B CABLE TRAY PLAN - FIRST FLOOR - AREA 5 - PHASE 1
TT126B CABLE TRAY PLAN - FIRST FLOOR - AREA 6 - PHASE 1
TT127B CABLE TRAY PLAN - FIRST FLOOR - AREA 7 - PHASE 1
TT128B CABLE TRAY PLAN - FIRST FLOOR - AREA 8 - PHASE 1
TT129B CABLE TRAY PLAN - FIRST FLOOR - AREA 9 - PHASE 1
TT130B CABLE TRAY PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TT130B-A CABLE TRAY PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TT131B CABLE TRAY PLAN - FIRST FLOOR - AREA 11 - PHASE 1
TT132B CABLE TRAY PLAN - FIRST FLOOR - AREA 12 - PHASE 1
TT140B WIRELESS PLAN - FIRST FLOOR - OVERALL - PHASE 1
TT141B WIRELESS PLAN - FIRST FLOOR - AREA 1 - PHASE 1
TT142B WIRELESS PLAN - FIRST FLOOR - AREA 2 - PHASE 1
TT143B WIRELESS PLAN - FIRST FLOOR - AREA 3 - PHASE 1
TT144B WIRELESS PLAN - FIRST FLOOR - AREA 4 - PHASE 1
TT145B WIRELESS PLAN - FIRST FLOOR - AREA 5 - PHASE 1
TT146B WIRELESS PLAN - FIRST FLOOR - AREA 6 - PHASE 1
TT147B WIRELESS PLAN - FIRST FLOOR - AREA 7 - PHASE 1
TT148B WIRELESS PLAN - FIRST FLOOR - AREA 8 - PHASE 1
TT149B WIRELESS PLAN - FIRST FLOOR - AREA 9 - PHASE 1
TT150B WIRELESS PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TT150B-A WIRELESS PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TT151B WIRELESS PLAN - FIRST FLOOR - AREA 11 - PHASE 1
TT152B WIRELESS PLAN - FIRST FLOOR - AREA 12 - PHASE 1
TT100C TELECOM FLOOR PLAN - SECOND FLOOR - OVERALL - PHASE 1
TT101C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 1 - PHASE 1
TT102C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 2 - PHASE 1
TT103C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 3 - PHASE 1
TT104C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 4 - PHASE 1
TT105C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 5 - PHASE 1
TT106C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 6 - PHASE 1
TT107C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 7 - PHASE 1
TT108C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 8 - PHASE 1
TT109C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 9 - PHASE 1
TT110C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 10 - PHASE 1
TT111C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 11 - PHASE 1
TT112C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 12 - PHASE 1
TT120C CABLE TRAY PLAN - SECOND FLOOR - OVERALL - PHASE 1
TT121C CABLE TRAY PLAN - SECOND FLOOR - AREA 1 - PHASE 1
TT122C CABLE TRAY PLAN - SECOND FLOOR - AREA 2 - PHASE 1
TT123C CABLE TRAY PLAN - SECOND FLOOR - AREA 3 - PHASE 1
TT124C CABLE TRAY PLAN - SECOND FLOOR - AREA 4 - PHASE 1
TT125C CABLE TRAY PLAN - SECOND FLOOR - AREA 5 - PHASE 1
TT126C CABLE TRAY PLAN - SECOND FLOOR - AREA 6 - PHASE 1
TT127C CABLE TRAY PLAN - SECOND FLOOR - AREA 7 - PHASE 1
TT128C CABLE TRAY PLAN - SECOND FLOOR - AREA 8 - PHASE 1
TT129C CABLE TRAY PLAN - SECOND FLOOR - AREA 9 - PHASE 1
TT130C CABLE TRAY PLAN - SECOND FLOOR - AREA 10 - PHASE 1
TT131C CABLE TRAY PLAN - SECOND FLOOR - AREA 11 - PHASE 1
TT132C CABLE TRAY PLAN - SECOND FLOOR - AREA 12 - PHASE 1
TT201 RACK ELEVATIONS - PHASE 1
TT202 RACK ELEVATIONS - PHASE 1
TT203 RACK ELEVATIONS - PHASE 1
TT401 ENLARGED TELECOM ROOMS - FIRST FLOOR - PHASE 1
TT402 ENLARGED TELECOM ROOMS - FIRST FLOOR - PHASE 1
TT403 ENLARGED TELECOM ROOMS - SECOND FLOOR - PHASE 1
TT501 OUTLET DETAILS - PHASE 1
TT503 PATHWAY DETAILS - PHASE 1
TT504 GROUNDING DETAILS - PHASE 1
TT507 TELECOM DETAILS - PHASE 1
TT508 TELECOM DETAILS - PHASE 1
TT509 DUCT DETAILS - PHASE 1
TT601 ONE-LINE DIAGRAMS - PHASE 1
TT602 TELECOM GROUNDING BACKBONE ONE-LINE - PHASE 1
TT603 TEMPORARY BACKBONE RISER DIAGRAM - PHASE 1
TA001A GENERAL NOTES, SYMBOL, AND ABBREVIATIONS - PHASE 1
TA002A GENERAL NOTES, SYMBOL, AND ABBREVIATIONS - PHASE 1
TA100C AV FLOOR PLAN - SECOND FLOOR - OVERALL - PHASE 1
TA101C AV FLOOR PLAN - SECOND FLOOR - AREA 1 - PHASE 1
TA102C AV FLOOR PLAN - SECOND FLOOR - AREA 2 - PHASE 1
TA103C AV FLOOR PLAN - SECOND FLOOR - AREA 3 - PHASE 1
TA104C AV FLOOR PLAN - SECOND FLOOR - AREA 4 - PHASE 1
TA105C AV FLOOR PLAN - SECOND FLOOR - AREA 5 - PHASE 1
TA106C AV FLOOR PLAN - SECOND FLOOR - AREA 6 - PHASE 1
TA107C AV FLOOR PLAN - SECOND FLOOR - AREA 7 - PHASE 1
TA108C AV FLOOR PLAN - SECOND FLOOR - AREA 8 - PHASE 1
TA109C AV FLOOR PLAN - SECOND FLOOR - AREA 9 - PHASE 1
TA110C AV FLOOR PLAN - SECOND FLOOR - AREA 10 - PHASE 1
TA111C AV FLOOR PLAN - SECOND FLOOR - AREA 11 - PHASE 1
TA112C AV FLOOR PLAN - SECOND FLOOR - AREA 12 - PHASE 1
TA210A AV RACK ELEVATIONS - PHASE 1
TA301A AV SECTIONS - SECOND FLOOR - PHASE 1
TA302A AV SECTIONS - SECOND FLOOR - PHASE 1
TA401A ENLARGED AV ROOMS - SECOND FLOOR - PHASE 1
TA402A ENLARGED AV ROOMS - SECOND FLOOR - PHASE 1
TA501 AV DETAILS - PHASE 1
TA502 AV DETAILS - PHASE 1
TA503 AV DETAILS - PHASE 1
TA504 CONFERENCE ROOM RISER DIAGRAM - PHASE 1
TA601 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1
TA602 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1
TA603 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1
TS101 SITE PLAN - PHASE 1
TT001 GENERAL NOTES, SYMBOLS, & ABBREVIATIONS - PHASE 1
TN100A TEMPORARY BACKBONE PLAN - BASEMENT - OVERALL - PHASE 1
TN101A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 1 - PHASE 1
TN102A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 2 - PHASE 1
TN103A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 3 - PHASE 1
TN104A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 4 - PHASE 1
TN105A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 5 - PHASE 1
TN106A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 6 - PHASE 1
TN107A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 7 - PHASE 1
TN108A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 8 - PHASE 1
TN109A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 9 - PHASE 1
TN110A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 10 - PHASE 1
TN111A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 11 - PHASE 1
TN112A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 12 - PHASE 1
TN100B TEMPORARY BACKBONE PLAN - FIRST FLOOR - OVERALL - PHASE 1
TN101B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 1 - PHASE 1
TN102B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 2 - PHASE 1
TN103B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 3 - PHASE 1
TN104B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 4 - PHASE 1
TN105B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 5 - PHASE 1
TN106B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 6 - PHASE 1
TN107B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 7 - PHASE 1
TN108B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 8 - PHASE 1
TN109B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 9 - PHASE 1
TN110B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TN111B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 11 - PHASE 1
TN112B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 12 - PHASE 1
TN100C TEMPORARY BACKBONE PLAN - SECOND FLOOR - OVERALL - PHASE 1
TN101C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 1 - PHASE 1
TN102C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 2 - PHASE 1
TN103C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 3 - PHASE 1
TN104C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 4 - PHASE 1
TN105C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 5 - PHASE 1
TN106C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 6 - PHASE 1
TN107C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 7 - PHASE 1
TN108C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 8 - PHASE 1
TN109C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 9 - PHASE 1
TN110C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 10 - PHASE 1
TN111C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 11 - PHASE 1
TN112C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 12 - PHASE 1
TD100A DEMOLITION PLAN - BASEMENT - OVERALL - PHASE 1
TD101A DEMOLITION PLAN - BASEMENT - AREA 1 - PHASE 1
TD102A DEMOLITION PLAN - BASEMENT - AREA 2 - PHASE 1
TD103A DEMOLITION PLAN - BASEMENT - AREA 3 - PHASE 1
TD104A DEMOLITION PLAN - BASEMENT - AREA 4 - PHASE 1
TD105A DEMOLITION PLAN - BASEMENT - AREA 5 - PHASE 1
TD106A DEMOLITION PLAN - BASEMENT - AREA 6 - PHASE 1
TD107A DEMOLITION PLAN - BASEMENT - AREA 7 - PHASE 1
TD108A DEMOLITION PLAN - BASEMENT - AREA 8 - PHASE 1
TD109A DEMOLITION PLAN - BASEMENT - AREA 9 - PHASE 1
TD110A DEMOLITION PLAN - BASEMENT - AREA 10 - PHASE 1
TD111A DEMOLITION PLAN - BASEMENT - AREA 11 - PHASE 1
TD112A DEMOLITION PLAN - BASEMENT - AREA 12 - PHASE 1
TD100B DEMOLITION PLAN - FIRST FLOOR - OVERALL - PHASE 1
TD101B DEMOLITION PLAN - FIRST FLOOR - AREA 1 - PHASE 1
TD102B DEMOLITION PLAN - FIRST FLOOR - AREA 2 - PHASE 1
TD103B DEMOLITION PLAN - FIRST FLOOR - AREA 3 - PHASE 1
TD104B DEMOLITION PLAN - FIRST FLOOR - AREA 4 - PHASE 1
TD105B DEMOLITION PLAN - FIRST FLOOR - AREA 5 - PHASE 1
TD106B DEMOLITION PLAN - FIRST FLOOR - AREA 6 - PHASE 1
TD107B DEMOLITION PLAN - FIRST FLOOR - AREA 7 - PHASE 1
TD108B DEMOLITION PLAN - FIRST FLOOR - AREA 8 - PHASE 1
TD109B DEMOLITION PLAN - FIRST FLOOR - AREA 9 - PHASE 1
TD110B DEMOLITION PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TD111B DEMOLITION PLAN - FIRST FLOOR - AREA 11 - PHASE 1
TD112B DEMOLITION PLAN - FIRST FLOOR - AREA 12 - PHASE 1
TD100C DEMOLITION PLAN - SECOND FLOOR - OVERALL - PHASE 1
TD101C DEMOLITION PLAN - SECOND FLOOR - AREA 1 - PHASE 1
TD102C DEMOLITION PLAN - SECOND FLOOR - AREA 2 - PHASE 1
TD103C DEMOLITION PLAN - SECOND FLOOR - AREA 3 - PHASE 1
TD104C DEMOLITION PLAN - SECOND FLOOR - AREA 4 - PHASE 1
TD105C DEMOLITION PLAN - SECOND FLOOR - AREA 5 - PHASE 1
TD106C DEMOLITION PLAN - SECOND FLOOR - AREA 6 - PHASE 1
TD107C DEMOLITION PLAN - SECOND FLOOR - AREA 7 - PHASE 1
TD108C DEMOLITION PLAN - SECOND FLOOR - AREA 8 - PHASE 1
TD109C DEMOLITION PLAN - SECOND FLOOR - AREA 9 - PHASE 1
TD110C DEMOLITION PLAN - SECOND FLOOR - AREA 10 - PHASE 1
TD111C DEMOLITION PLAN - SECOND FLOOR - AREA 11 - PHASE 1
TD112C DEMOLITION PLAN - SECOND FLOOR - AREA 12 - PHASE 1
TD601 DEMOLITION BACKBONE RISER DIAGRAM - PHASE 1
TT100A TELECOM FLOOR PLAN - BASEMENT - OVERALL - PHASE 1
TT101A TELECOM FLOOR PLAN - BASEMENT - AREA 1 - PHASE 1
TT102A TELECOM FLOOR PLAN - BASEMENT - AREA 2 - PHASE 1
TT103A TELECOM FLOOR PLAN - BASEMENT - AREA 3 - PHASE 1
TT104A TELECOM FLOOR PLAN - BASEMENT - AREA 4 - PHASE 1
TT105A TELECOM FLOOR PLAN - BASEMENT - AREA 5 - PHASE 1
TT106A TELECOM FLOOR PLAN - BASEMENT - AREA 6 - PHASE 1
TT107A TELECOM FLOOR PLAN - BASEMENT - AREA 7 - PHASE 1
TT108A TELECOM FLOOR PLAN - BASEMENT - AREA 8 - PHASE 1
TT109A TELECOM FLOOR PLAN - BASEMENT - AREA 9 - PHASE 1
TT110A TELECOM FLOOR PLAN - BASEMENT - AREA 10 - PHASE 1
TT110A-A TELECOM FLOOR PLAN - BASEMENT - AREA 10 - PHASE 1
TT111A TELECOM FLOOR PLAN - BASEMENT - AREA 11 - PHASE 1
TT112A TELECOM FLOOR PLAN - BASEMENT - AREA 12 - PHASE 1
TT120A CABLE TRAY PLAN - BASEMENT - OVERALL - PHASE 1
TT121A CABLE TRAY PLAN - BASEMENT - AREA 1 - PHASE 1
TT122A CABLE TRAY PLAN - BASEMENT - AREA 2 - PHASE 1
TT123A CABLE TRAY PLAN - BASEMENT - AREA 3 - PHASE 1
TT124A CABLE TRAY PLAN - BASEMENT - AREA 4 - PHASE 1
TT125A CABLE TRAY PLAN - BASEMENT - AREA 5 - PHASE 1
TT126A CABLE TRAY PLAN - BASEMENT - AREA 6 - PHASE 1
TT127A CABLE TRAY PLAN - BASEMENT - AREA 7 - PHASE 1
TT128A CABLE TRAY PLAN - BASEMENT - AREA 8 - PHASE 1
TT129A CABLE TRAY PLAN - BASEMENT - AREA 9 - PHASE 1
TT130A CABLE TRAY PLAN - BASEMENT - AREA 10 - PHASE 1
TT130A-A CABLE TRAY PLAN - BASEMENT - AREA 10 - PHASE 1
TT131A CABLE TRAY PLAN - BASEMENT - AREA 11 - PHASE 1
TT132A CABLE TRAY PLAN - BASEMENT - AREA 11 - PHASE 1
TT100B TELECOM FLOOR PLAN - FIRST FLOOR - OVERALL - PHASE 1
TELECOMMUNICATIONS SHEET INDEX GENERAL SHEET INDEX
G008 VOLUME 8 - PHASE 1 COVER SHEET -
G016 VOLUME 8 - PHASE 1 SHEET INDEX -
TYD02C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 2 -
PHASE 1
TYD03C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 3 -
PHASE 1
TYD04C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 4 -
PHASE 1
TYD05C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 5 -
PHASE 1
TYD06C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 6 -
PHASE 1
TYD07C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 7 -
PHASE 1
TYD08C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 8 -
PHASE 1
TYD09C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 9 -
PHASE 1
TYD10C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 10 -
PHASE 1
TYD11C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 11 -
PHASE 1
TYD12C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 12 -
PHASE 1
TY101A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 1 - PHASE 1
TY102A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 2 - PHASE 1
TY103A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 3 - PHASE 1
TY104A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 4 - PHASE 1
TY105A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 5 - PHASE 1
TY106A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 6 - PHASE 1
TY107A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 7 - PHASE 1
TY108A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 8 - PHASE 1
TY109A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 9 - PHASE 1
TY110A ELECRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 10 - PHASE 1
TY111A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 11 - PHASE 1
TY112A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 12 - PHASE 1
TY101B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 1 - PHASE 1
TY102B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 2 - PHASE 1
TY103B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 3 - PHASE 1
TY104B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 4 - PHASE 1
TY105B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 5 - PHASE 1
TY106B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 6 - PHASE 1
TY107B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 7 - PHASE 1
TY108B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 8 - PHASE 1
TY109B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 9 - PHASE 1
TY110B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 10 - PHASE 1
TY111B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 11 - PHASE 1
TY112B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 12 - PHASE 1
TY101C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 1 - PHASE 1
TY102C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 2 - PHASE 1
TY103C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 3 - PHASE 1
TY104C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 4 - PHASE 1
TY105C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 5 - PHASE 1
TY106C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 6 - PHASE 1
TY107C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 7 - PHASE 1
TY108C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 8 - PHASE 3
TY109C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 9 - PHASE 1
TY110C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 10 - PHASE
TY111C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 11 - PHASE
TY112C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 12 - PHASE
TY100R ELECTRONIC SECURITY SYSTEM PLAN - ROOF - OVERALL - PHASE 1
TY401 ENLARGED ELECTRONIC SECURITY SYSTEM PLANS - FIRST FLOOR - PHASE
1 -
TY501 SECURED DOOR DETAILS - PHASE 1
TY502 SECURITY DETAILS - PHASE 1
TY001 GENERAL NOTES, SYMBOLS, & SCHEDULES - PHASE 1
TYD01A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 1 - PHASE
TYD02A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 2 - PHASE
TYD03A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 3 - PHASE
TYD04A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 4 - PHASE
TYD05A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 5 - PHASE
TYD06A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 6 - PHASE
TYD07A ELECTRONIC SECURITY SYSTEM DEMOLITION PLAN - BASEMENT - AREA 7 -
PHASE 1
TYD08A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 8 - PHASE
TYD09A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 9 - PHASE
TYD10A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 10 -
PHASE 1
TYD11A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 11 -
PHASE 1
TYD12A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 12 -
PHASE 1
TYD01B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 1 -
PHASE 1
TYD02B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 2 -
PHASE 1
TYD03B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 3 -
PHASE 1
TYD04B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 4 -
PHASE 1
TYD05B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 5 -
PHASE 1
TYD06B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 6 -
PHASE 1
TYD07B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 7 -
PHASE 1
TYD08B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 8 -
PHASE 1
TYD09B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 9 -
PHASE 1
TYD10B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 10 -
PHASE 1
TYD11B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 11 -
PHASE 1
TYD12B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 12 -
PHASE 1
TYD01C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 1 -
PHASE 1
T E
L E
C O
M M
U N
IC
A
T
IO
N S
/S O
U N
D
A
S K
IN
G
/E L
E C
T R
O N
IC
S
E C
U R
IT
Y
S Y
S T
E M
S
SOUND MASKING SHEET INDEX
SM100A OVERALL SOUND MASKING PLAN
SM101A AREA SOUND MASKING PLAN
SM102A AREA SOUND MASKING PLAN
SM103A AREA SOUND MASKING PLAN
SM104A AREA SOUND MASKING PLAN
SM105A AREA SOUND MASKING PLAN
SM106A AREA SOUND MASKING PLAN
SM107A AREA SOUND MASKING PLAN
SM108A AREA SOUND MASKING PLAN
SM109A AREA SOUND MASKING PLAN
SM110A AREA SOUND MASKING PLAN
SM111A AREA SOUND MASKING PLAN
SM112A AREA SOUND MASKING PLAN
SM100B OVERALL SOUND MASKING PLAN
SM101B AREA SOUND MASKING PLAN
SM102B AREA SOUND MASKING PLAN
SM103B AREA SOUND MASKING PLAN
SM104B AREA SOUND MASKING PLAN
SM105B AREA SOUND MASKING PLAN
SM106B AREA SOUND MASKING PLAN
SM107B AREA SOUND MASKING PLAN
SM108B AREA SOUND MASKING PLAN
SM109B AREA SOUND MASKING PLAN
SM110B AREA SOUND MASKING PLAN
SM111B AREA SOUND MASKING PLAN
SM112B AREA SOUND MASKING PLAN
SM100C OVERALL SOUND MASKING PLAN
SM101C AREA SOUND MASKING PLAN
SM102C AREA SOUND MASKING PLAN
SM103C AREA SOUND MASKING PLAN
SM104C AREA SOUND MASKING PLAN
SM105C AREA SOUND MASKING PLAN
SM106C AREA SOUND MASKING PLAN
SM107C AREA SOUND MASKING PLAN
SM108C AREA SOUND MASKING PLAN
SM109C AREA SOUND MASKING PLAN
SM110C AREA SOUND MASKING PLAN
SM111C AREA SOUND MASKING PLAN
SM112C AREA SOUND MASKING PLAN
SM500 DETAILS - SOUND MASKING - PHASE 1
ELECTRONIC SECURITY SYSTEMS
SHEET INDEX
ELECTRONIC SECURITY SYSTEMS
SHEET INDEX - CONTINUED
SITE PLAN - PHASE 1
GENERAL NOTES, SYMBOLS, & ABBREVIATIONS - PHASE 1
TS101
TT001
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
ARIMS: 200A Disposition: Maintain for 15yrs after construction
1.
2.
3.
4.
5.
6.
7.
8.
9.
TELECOMMUNICATIONS GENERAL NOTES
ALL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES SHOWN ARE NOT
NECESSARILY USED ON THIS PROJECT.
SEE ONE-LINE DIAGRAM FOR CABLE SIZES, CONDUIT SIZES, AND DEVICES NOT
SHOWN ON PLANS.
MOUNTING HEIGHTS FOR CEILING MOUNTED DEVICES ARE TO THE BOTTOM OF
THE DEVICE, UNLESS OTHERWISE NOTED.
MOUNTING HEIGHTS FOR WALL MOUNTED DEVICES ARE LISTED ON TT508.
PHASING:
COMPLETE TS AND TN SHEETS PRIOR TO BEGINNING WORK ON TD SHEETS.
COMPLETE TD SHEETS PRIOR TO BEGINNING WORK ON TT AND TY SHEETS
COORDINATE WITH CS 88.
REFER TO "CHAPTER 10.0 TELECOMMUNICATIONS" AND "ANNEX 1 - 88TH
COMMUNICATIONS GROUP LABELING REQUIREMENTS FOR COMMUNICATIONS"
IN THE WRIGHT-PATTERSON AFB BASE FACILITY STANDARDS FOR LABELING
INFORMATION.
FOR BIDDING PURPOSES, INCLUDE ALL WORK, LABOR, MATERIALS, AND
EQUIPMENT REQUIRED TO FURNISH AND INSTALL ELECTRONIC SECURITY
SYSTEM (ESS) DEVICES, AND TO COMMISSION THE SYSTEM FOR PHASE 1 IN
CLIN 005. THE ESS CONSISTS OF CLOSED CIRCUIT TELEVISION (CCTV),
ACCESS CONTROL SYSTEM (ACS) AND INTRUSION DETECTION SYSTEM (IDS).
EQUIPMENT INCLUDES CARD READERS, MOTION AND DOOR SENSORS,
KEYPADS, CONTROL UNITS, HEADEND EQUIPMENT, SCANNERS
AND CAMERAS. CLIN 005 ALSO INCLUDES ALL WORK, LABOR, MATERIALS, AND
EQUIPMENT REQUIRED TO FURNISH AND INSTALL AUDIO-VISUAL SYSTEM
DEVICES FOR PHASE 1 AND EQUIPMENT REQUIRED TO FIT-OUT THE
COMMUNICATIONS ROOMS FOR PHASE 1. CLIN 005 ALSO INCLUDES ALL WORK
TO FURNISH AND INSTALL DATA CABINETS/RACKS, PDU’S, AND PATCH PANELS
WITHIN THE COMMUNICATIONS ROOMS.
TELECOMMUNICATION SEQUENCING
NOTES
CONTRACTOR MUST PROVIDE NEW OUTSIDE PLANT (OSP) BACKBONE
CABLING,INCLUDING CABLE PATHWAYS AND DUCKBANKS.
A. AMFC 88TH COMMUNICATION SQUADRON MUST PROVIDE PATCHING
AND CROSS-CONNECTING .
CONTRACTOR MUST PROVIDE TEMPORARY BACKBONE FIBER CABLING,
INCLUDING CABLE CABLING INFRASTRUCTURE REQUIRED TO SUPPORT THE
TEMPORARY CABLING (SUPPORTS, PATHWAYS ,ETC.)
A. AMFC 88TH COMMUNICATION SQUADRON CUTS OVER FROM EXISTING
BACKBONE FIBER CABLING IN THE THREE FIBER CABINETS TO
TEMPORARY BACKBONE CABLING .
B. CONTRACTOR MUST DEMOLISH THREE FIBER CABINETS AND EXISTING
BACKBONE FIBER CABLING THAT TERMINATES IN THESE THREE
CABINETS .
C.
1.
2.
3.
ACEG ALTERNATING CURRENT EQUIPMENT GROUND
ACS ACCESS CONTROL SYSTEM
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ANN ANNUNCIATOR
ARCH ARCHITECTURAL
AV AUDIO AND VISUAL
AWG AMERICAN WIRE GAGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERY
BB BACKBONE
BBFPP BACKBONE FIBER PATCH PANEL
BBV BACKBONE VOICE
BEPB BUILDING ENTRANCE PROTECTION BLOCKS
BLDG BUILDING
BMS BALANCED MAGNETIC SWITCH
BVPP BACKBONE VOICE PATCH PANEL
C CONDUIT
CAB CABINET
CAT CATEGORY
CCTV CLOSED CIRCUIT TELEVISION
CLG CEILING
CMH COMMUNICATIONS MANHOLE
COB CENTER OF BOX
COMM COMMUNICATIONS
CONST CONSTRUCTION
CONT CONTINUATION
DIA DIAMETER
DIST DISTRIBUTION
DR DISTRIBUTION ROOM
DWG DRAWING
EF ENTRANCE FACILITY
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EQPT EQUIPMENT
EX EXISTING
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FIXT FIXTURE
FLR FLOOR
FO FIBER OPTIC
FOC FIBER OPTIC CABLE
FTU FIBER TERMINATION UNIT
GFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLED
HCPP HORIZONTAL COPPER PATCH PANEL
HFPP HORIZONTAL FIBER PATCH PANEL
HMC HORIZONTAL CABLE MANAGER
HOV HORIZONTAL VOICE
HSS HIGH SECURITY SWITCH
HVPP HORIZONTAL VOICE PATCH PANEL
IDS INTRUSION DETECTION SYSTEM
ISP INTERNET SERVICE PROVIDER
JB JUNCTION BOX
MFR MANUFACTURER
MH MOUNTING HEIGHT
MMF MULTI MODE FIBER
MTD MOUNTED
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OH OVERHEAD
OSP OUTSIDE PLANT
PA PUBLIC ADDRESS
PBB PRIMARY BONDING BUSBAR
PB PULL BOX
PBX PRIVATE BRANCH EXCHANGE
PC PERSONAL COMPUTER
PLAS PLASTIC
PP PATCH PANEL
PR PAIR
PWR POWER
QTY QUANTITY
RAF RAISED ACCESS FLOOR
RBB RACK BONDING BUSBAR
RBC RACK BONDING CONDUCTOR
RECP RECEPTACLE
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RSC RIGID STEEL CONDUIT
SBB SECONDARY BONDING BUSBAR
SCRT SECURITY
SECT SECTION
SPEC SPECIFICATION
SM SINGLE MODE
SMF SINGLE MODE FIBER
SP SERVICE PROVIDER
STR STRAND
SURF SURFACE
SW SW ITCH
SYM SYMMETRICAL
SYS SYSTEMS
TBB TELECOMMUNICATIONS BONDING BACKBONE
TBC TELECOMMUNICATIONS BONDING CONDUCTOR
TEBC TELECOMMUNICAITONS EQUIPMENT BONDING CONDUCTOR
TEL TELEPHONE
TELECOM TELECOMMUNICATIONS
TER TELECOMMUNICATIONS EQUIPMENT ROOM
TR TELECOMMUNICATIONS ROOM
TYP TYPICAL
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
WP WEATHERPROOF
XFR TRANSFER
XP EXPLOSION PROOF
TELECOMMUNICATIONS ABBREVIATIONS
TELEPHONE AND DATA COMMUNICATIONS
PLYWOOD BACKBOARD
DATA WALL OUTLET
AV = AUDIO VISUAL
S = SIPRNET / X CAT6A
4 = 4 CAT6A
WAP = WIRELESS ACCESS POINT
ISP = COMMERCIAL ISP CONNECTION / 1 CAT6A
BLANK = CAT6A
W = WALL PHONE OUTLET / 1 CAT6A
DATA OUTLET IN SURFACE MOUNTED COMMON FLOOR BOX WITH
ELECTRICAL OUTLET
COMBINATION (3) FIBER OPTIC / (1)
CAT6A OUTLET = NIPRNET
EQUIPMENT CABINET
PRIMARY BONDING BUSBAR (PBB); SECONDARY BONDING BUSBAR (SBB)
BUILDING ENTRANCE TERMINAL
DATA CEILING OUTLET
WAP = WIRELESS ACCESS POINT (NIPR)
ISP = WIRELESS ACCESS POINT (ISP)
CM = CEILING CAMERA / 1 CAT 6
AV = AUDIO/VISUAL / 1 CAT 6
AIR = AIR MONITOR / 1 CAT 6
BASKET CABLE TRAY
CONSOLIDATION POINT
6 = 36 STRANDS OM5 OPTICAL FIBER CABLE AND 6 CATEGORY 6A CABLES
12 = 72 STRANDS OM5 OPTICAL FIBER CABLE AND 12 CATEGORY 6A CABLES
24 = 144 STRANDS OM5 OPTICAL FIBER CABLE AND 24 CATEGORY 6A CABLES
TWO POST RACK
WALL OR COLUMN MOUNTED JUNCTION BOX WITH FLEXIBLE WHIP TO
FURNITURE BASE POWER FEED, MOUNT AT 18-INCHES ABOVE FINISHED
FLOOR
POWER POLE FEED WITH FLEXIBLE W HIP TO FURNITURE BASE POWER FEED
LADDER CABLE TRAY
T
TP
CP
TELECOMMUNICATIONS SYMBOLS
110 BLOCKS110
M MUTOA
UNDERFLOOR WALL PENETRATION. REFER TO ARCHITECTURAL FOR
PARTITION TYPES.
WAP
BET
COMBINATION (3) FIBER OPTIC / (1)
CAT 6A OUTLET = NIPRNET
M = MODULAR FURNITURE
(X)
(X)
SPECIALTY OUTLET
C = CATV / 1 RG6
A = PHONE / 1 CAT 6A
SITE
EXISTING MANHOLE (CMH) OR EXISTING HANDHOLE (CHH)
C
NEW MANHOLE (CMH) OR NEW HANDHOLE (CHH)
C
COMMUNICATIONS DUCTBANK
EXISTING COMMUNICATIONS DUCTBANK
COMMUNICATIONS OVERHEAD LINE
EXISTING COMMUNICATIONS OVERHEAD LINE
CU
CUx
C
Cx
X
(X)
SINGLE FACE CLOCK, A = ANALOG, D = DIGITAL - ROUGH-IN HEIGHT NOTED
ON DRAW INGS.
C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F
EN
G
IN
E
ER
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
S U
B M
IT
TE
D B
Y:
SI
ZE
C H
EC
K
ED
B
Y:
A N
SI
D
IS
SU
E D
AT
E
C O
N
TR
AC
T
N O
S O
LI
C
IT
A
TI
O
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
A
IR
/R E
N O
V
AT
E A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
A R
K D
ES
C
R
IP
TI
O
N
J.
B
EN
S
O N
TT001
G
EN
ER
AL
N O
TE
S, S
YM
BO
LS
A
BB
R
EV
IA
TI
O
N S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
N . B
R O
AD
W
AY
S
T.
L
O U
IS
, M
O . 6
C . M
E A
D E
E . H
A
JA
S
R . R
U B
IO
O
C
TO
B
ER
W
2Q R
R
XX
XX
B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION
PH
AS
E
TE
LE
C O
M
PROVIDE 25-FEET OF EXTRA SERVICE LOOP LENGTH ON CABLES TERMINATED IN
TR 2055. THIS ROOM WILL BE EXPANDED IN FUTURE PHASES. IF A CABLE
LENGTH WILL EXCEED 295-FEET CONTRACTOR MUST NOTIFY GENERAL
CONTRACTOR PRIOR TO INSTALLATION.
PROVIDE J-HOOKS AS NEEDED TO SUPPORT TEMPORARY BACKBONE CABLING IN
WORK AREAS NOT INCLUDED IN THE SCOPE OF WORK. CABLE TRAY WILL BE
PROVIDED IN FUTURE PHASES IN THESE AREAS.
(48" AFF)
(18" AFF)
SOME EXISTING BACKBONE FIBER CABLING MAY NEED TO BE DEMOLISHED PRIOR TO
INSTALLATION OF SOME TEMPORARY BACKBONE FIBER CABLING TO MAKE ROOM IN
CABLE PATHS FOR THE NEW CABLING.
COORDINATE WITH AFMC 88TH COMMUNICATION SQUADRON PRIOR TO DEMOLISING
ANY CABLING.
D.
A. CONTRACTOR MUST PROVIDE CABLES FROM NEW TRs TO THESE OUTLETS THEN
NOTIFY THE 88TH COMMUNICATION SQUADRON PRIOR TO DEMOLISHING THE
EXISTING CABLES.
B. UPON NOTIFICATION, THE 88TH COMMUNICATION SQUADRON IS TO CUT OVER FROM
THE EXISTING CABLING TO THE NEW CABLING.
C. AFTER CUT OVER, CONTRACTOR IS TO DEMOLISH THE EXISTING CABLING.
FOR EXISTING CABLES TERMINATED IN TELECOMMUNICATION ROOMS THAT MUST BE
DEMOLISHED AND SUPPORT WORK AREA OUTLETS (WAO) LOCATED IN FUTURE PHASE AREAS:
BY THIS POINT , ALL PRE-CONSTRUCTION WORK SHOULD BE COMPLETED AS
TEMPORARY BACKBONE FIBER CABLING HAS BEEN PROVIDED AND CABLING
FOR WORKSTATIONS OUTSIDE OF THE SOWA HAS BEEN PROVIDED .
CONTRACTOR MUST DEMOLISH CABLING AND INFRASTRUCTURE INSIDE SOWA
AND PROVIDED NEW .
4.
5.
/AFNET
/AFNET
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
DN
DN
UP
DN
DN
DN
DN
AeccDbFace (AeccLand130)AeccDbFeatureLine (AeccLand130)
C
C U x C
U x
CUx C
C C
C
C
C
CUx CUx
CUxCUx
C U x
CU
SS
SS
AeccDbFace (AeccLand130)
C
C CUx
C
C U x
C U x
C U x
C
CUx
CUx
CU
SCALE: 1" = 50'
100'0 50'
B10262
B10266
H RO
AD
M S
TR
EE
T
SA
C
R
AM
EN
TO
S
TR
EE
T
A R
O
AD
T ROAD
A STREET
B10271
C R
OAD
B10264
N
GENERAL NOTES
A PATHWAYS SHOWN ARE DIAGRAMMATICAL IN NATURE. REFER TO CIVIL SITE
UTILITIES FOR EXACT LOCATIONS OF OTHER UTILITIES AND SITE FEATURES.
CONTRACTOR MUST COORDINATE THE FINAL SEQUENCING, ROUTING, AND
DEPTH OF COMMUNICATION DUCTBANKS WITH OTHER UTILITIES PRIOR TO
INSTALLATION.
B. REFER TO TT601 FOR OUTSIDE PLANT SINGLE-LINE CABLING DIAGRAM.
EXCAVATION AND/OR PENETRATION OF EXISTING STRUCTURES REQUIRES THE
USE OF GROUND/WALL PENETRATING RADAR OR X-RAY PRIOR TO DRILLING OR
CORING TO PREVENT DAMAGE TO THE REINFORCING AND/OR OTHER OBJECTS
WITHIN THE STRUCTURE.
C. PROVIDE TELECOMMUNICATIONS DUCTBANK AND CABLING (INCLUDING
SPLICING AND TESTING) PRIOR TO COMMENCING TELECOMMUNICATIONS
DEMOLITION.
CMH MH5
CMH MH3
CMH MH226
CMH MH225
PROVIDE (4) 4" CONDUITS FROM
MH225 TO THE B10266 TELECOM
ENTRANCE FACILITY. PROVIDE
(3) 3-INCH 3-CELL FABRIC/MESH
INNERDUCTS IN ONE OF THE
FOUR CONDUITS.
TS101
SI
TE
P
LA
N
C . M
EA
D
E
E.
H
AJ
AS
J.
B
EN
SO
N
R . R
U
BI
O
SE
C
O N
D T
IT
LE
PH
AS
E
TE
LE
C O
M
UNKNOWN CMH #
CMH MH4
CMH MH2
CMH MH1
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE 1
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
B10262 PHASE 1 - 90% FINAL REVISED - NOT FOR CONSTRUCTION
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
N . B
R O
AD
W
AY
S
T.
L
O U
IS
, M
O . 6
O
C
TO
BE
R
W
2Q R
R
XX
XX
UNKNOWN CMH #
8' x 24' TRAILER
UNKNOWN CMH # PROVIDE (2) 2" CONDUITS
FROM CMH TO TRAILER
REFER TO SHEET
TT101A
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
T
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 18 19 20 21 22 23 24 25171-A 1-B 1-C 1-D 1-E 1-EA 1-F 1-G 1-H 1-J
1-17
1-16
1-15
1-14
1-13.5
1-13
1-12
1-11
1-10
1-9.1
1-8
1-7
1-6
1-5
1-4.5
1-4
1-3
1-2
1-1
23E22EML3ML1 15
ML4
ML5
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
NOTE:
REFER TO LIFE SAFETY PLANS FOR FIRE RATED
PARTITIONS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F
EN
G
IN
E
ER
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
S U
B M
IT
TE
D B
Y:
SI
ZE
C H
EC
K
ED
B
Y:
A N
SI
D
IS
SU
E D
AT
E
C O
N
TR
AC
T
N O
S O
LI
C
IT
A
TI
O
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
A
IR
/R E
N O
V
AT
E A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
A R
K D
ES
C
R
IP
TI
O
N
J.
B
EN
S
O N
TN100A
TE
M
PO
R
AR
Y
BA
C
KB
O
N E
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
N . B
R O
AD
W
AY
S
T.
L
O U
IS
, M
O . 6
C . M
E A
D E
E . H
A
JA
S
R . R
U B
IO
O
C
TO
B
ER
W
2Q R
R
XX
XX
B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION
BA
SE
M
EN
T -O
VE
R
AL
L
-P H
AS
E
TE
LE
C O
M
0 32'16' 64'
N
1/32" = 1'-0"A1 OVERALL BASEMENT TEMPORARY BACKBONE PLAN
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
G
F
E
D
C
B
A
18 19 20 21 22 23 24 2523E22E
ITN RACK 3
(2) EXISTING
4" SLEEVES
EXISTING 12" LADDER RACK
ABOVE DATA RACKS
MATCHLINE
A1 TN102A
M
AT
C H
LI
N
E
A1
TN
4A
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
DEMOUNTABLE PARTITION
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F
EN
G
IN
E
ER
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
S U
B M
IT
TE
D B
Y:
SI
ZE
C H
EC
K
ED
B
Y:
A N
SI
D
IS
SU
E D
AT
E
C O
N
TR
AC
T
N O
S O
LI
C
IT
A
TI
O
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
A
IR
/R E
N O
V
AT
E A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
A R
K D
ES
C
R
IP
TI
O
N
J.
B
EN
S
O N
TN101A
TE
M
PO
R
AR
Y
BA
C
KB
O
N E
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
N . B
R O
AD
W
AY
S
T.
L
O U
IS
, M
O . 6
C . M
E A
D E
E . H
A
JA
S
R . R
U B
IO
O
C
TO
B
ER
W
2Q R
R
XX
XX
B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION
BA
SE
M E
N T
-A R
EA
P
H
AS
E
TE
LE
C O
M
1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 1
1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR
(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.
2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,
88TH COR BEFORE NETWORK OUTAGES.
3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE
BASE NETWORK ENGINEER AND PROJECT MANAGER.
4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE
DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,
NETWORK ENGINEER AND PROJECT MANAGER.
5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY
WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.
6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS
TO BE REMOVED IN PHASE 1 DEMOLITION.
7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE
PHASE 1 AREAS.
8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION
AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN
SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A
TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE
INFORMATION.
9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE
AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM
ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC
CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)
AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,
S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230
10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE
AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE
BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.
PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE
FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.
11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102
TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO
MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO
ACCESS TR S102 .
12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE
CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY
EXISTING BACKBONE CABLING.
13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING
(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING
TELECOMMUNICATIONS DEMOLITION.
14.
15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.
GENERAL NOTES
REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.
CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK
AREAS TO BE PROVIDED IN FUTURE PHASES BY THE FUTURE PHASE
CONTRACTORS. PROVIDE J-HOOKS OR OTHER CABLE SUPPORTS WHERE
NEEDED TO PROPERLY SUPPORT TEMPORARY BACKBONE CABLES.
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
L
K
J
I
H
G
18 19 20 21 22 23 24 2523E22EML3
A022
MATCHLINE
A1 TN103A
M
AT
C H
LI
N
E
A1
TN
5A
MATCHLINE
A1 TN101A
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
DEMOUNTABLE PARTITION
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F
EN
G
IN
E
ER
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
S U
B M
IT
TE
D B
Y:
SI
ZE
C H
EC
K
ED
B
Y:
A N
SI
D
IS
SU
E D
AT
E
C O
N
TR
AC
T
N O
S O
LI
C
IT
A
TI
O
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
A
IR
/R E
N O
V
AT
E A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
A R
K D
ES
C
R
IP
TI
O
N
J.
B
EN
S
O N
TN102A
TE
M
PO
R
AR
Y
BA
C
KB
O
N E
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
N . B
R O
AD
W
AY
S
T.
L
O U
IS
, M
O . 6
C . M
E A
D E
E . H
A
JA
S
R . R
U B
IO
O
C
TO
B
ER
W
2Q R
R
XX
XX
B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION
BA
SE
M E
N T
-A R
EA
P
H
AS
E
TE
LE
C O
M
1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 2
1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR
(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.
2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,
88TH COR BEFORE NETWORK OUTAGES.
3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE
BASE NETWORK ENGINEER AND PROJECT MANAGER.
4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE
DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,
NETWORK ENGINEER AND PROJECT MANAGER.
5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY
WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.
6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS
TO BE REMOVED IN PHASE 1 DEMOLITION.
7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE
PHASE 1 AREAS.
8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION
AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN
SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A
TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE
INFORMATION.
9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE
AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM
ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC
CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)
AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,
S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230
10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE
AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE
BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.
PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE
FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.
11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102
TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO
MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO
ACCESS TR S102 .
12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE
CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY
EXISTING BACKBONE CABLING.
13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING
(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING
TELECOMMUNICATIONS DEMOLITION.
14.
15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.
GENERAL NOTES
REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.
CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK
AREAS TO BE PROVIDED IN FUTURE PHASES BY THE FUTURE PHASE
CONTRACTORS. PROVIDE J-HOOKS OR OTHER CABLE SUPPORTS WHERE
NEEDED TO PROPERLY SUPPORT TEMPORARY BACKBONE CABLES.
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
R
Q
P
O
N
18 19 20 21 22 23 24 2523E22E
S009
S007
M
AT
C H
LI
N
E
A1
TN
6A
MATCHLINE
A1 TN102A
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
DEMOUNTABLE PARTITION
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F
EN
G
IN
E
ER
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
S U
B M
IT
TE
D B
Y:
SI
ZE
C H
EC
K
ED
B
Y:
A N
SI
D
IS
SU
E D
AT
E
C O
N
TR
AC
T
N O
S O
LI
C
IT
A
TI
O
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
A
IR
/R E
N O
V
AT
E A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
A R
K D
ES
C
R
IP
TI
O
N
J.
B
EN
S
O N
TN103A
TE
M
PO
R
AR
Y
BA
C
KB
O
N E
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
N . B
R O
AD
W
AY
S
T.
L
O U
IS
, M
O . 6
C . M
E A
D E
E . H
A
JA
S
R . R
U B
IO
O
C
TO
B
ER
W
2Q R
R
XX
XX
B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION
BA
SE
M E
N T
-A R
EA
P
H
AS
E
TE
LE
C O
M
1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 3
1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR
(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.
2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,
88TH COR BEFORE NETWORK OUTAGES.
3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE
BASE NETWORK ENGINEER AND PROJECT MANAGER.
4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE
DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,
NETWORK ENGINEER AND PROJECT MANAGER.
5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY
WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.
6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS
TO BE REMOVED IN PHASE 1 DEMOLITION.
7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE
PHASE 1 AREAS.
8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION
AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN
SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A
TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE
INFORMATION.
9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE
AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM
ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC
CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)
AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,
S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230
10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE
AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE
BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.
PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE
FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.
11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102
TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO
MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO
ACCESS TR S102 .
12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE
CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY
EXISTING BACKBONE CABLING.
13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING
(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING
TELECOMMUNICATIONS DEMOLITION.
14.
15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.
GENERAL NOTES
REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.
CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK
AREAS TO BE PROVIDED IN FUTURE PHASES BY THE FUTURE PHASE
CONTRACTORS. PROVIDE J-HOOKS OR OTHER CABLE SUPPORTS WHERE
NEEDED TO PROPERLY SUPPORT TEMPORARY BACKBONE CABLES.
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
E
D
C
B
A
11 12 13 14 16 18 191715
M
AT
C H
LI
N
E
A1
TN
1A
M
AT
C H
LI
N
E
A1
TN
7A
M
AT
C H
LI
N
E
A1
TN
1A
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
DEMOUNTABLE PARTITION
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F
EN
G
IN
E
ER
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
S U
B M
IT
TE
D B
Y:
SI
ZE
C H
EC
K
ED
B
Y:
A N
SI
D
IS
SU
E D
AT
E
C O
N
TR
AC
T
N O
S O
LI
C
IT
A
TI
O
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
A
IR
/R E
N O
V
AT
E A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
A R
K D
ES
C
R
IP
TI
O
N
J.
B
EN
S
O N
TN104A
TE
M
PO
R
AR
Y
BA
C
KB
O
N E
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
N . B
R O
AD
W
AY
S
T.
L
O U
IS
, M
O . 6
C . M
E A
D E
E . H
A
JA
S
R . R
U B
IO
O
C
TO
B
ER
W
2Q R
R
XX
XX
B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION
BA
SE
M E
N T
-A R
EA
P
H
AS
E
TE
LE
C O
M
1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 4
1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR
(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.
2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,
88TH COR BEFORE NETWORK OUTAGES.
3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE
BASE NETWORK ENGINEER AND PROJECT MANAGER.
4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE
DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,
NETWORK ENGINEER AND PROJECT MANAGER.
5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY
WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.
6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS
TO BE REMOVED IN PHASE 1 DEMOLITION.
7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE
PHASE 1 AREAS.
8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION
AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN
SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A
TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE
INFORMATION.
9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE
AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM
ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC
CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)
AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,
S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230
10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE
AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE
BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.
PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE
FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.
11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102
TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO
MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO
ACCESS TR S102 .
12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE
CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY
EXISTING BACKBONE CABLING.
13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING
(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING
TELECOMMUNICATIONS DEMOLITION.
14.
15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.
GENERAL NOTES
REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.
CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK
AREAS TO BE PROVIDED IN FUTURE PHASES BY THE FUTURE PHASE
CONTRACTORS. PROVIDE J-HOOKS OR OTHER CABLE SUPPORTS WHERE
NEEDED TO PROPERLY SUPPORT TEMPORARY BACKBONE CABLES.
W
2Q R
R
_P la ns _P
H 1_
Vo l8
-0
K
J
I
H
G
11 12 13 14 16 18 1917 ML315
S013A
M
AT
C H
LI
N
E
A1
TN
2A
M
AT
C H
LI
N
E
A1
TN
8A
LEGEND
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS MUST BE
COORDINATED WITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
DEMOUNTABLE PARTITION
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F
EN
G
IN
E
ER
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
S U
B M
IT
TE
D B
Y:
SI
ZE
C H
EC
K
ED
B
Y:
A N
SI
D
IS
SU
E D
AT
E
C O
N
TR
AC
T
N O
S O
LI
C
IT
A
TI
O
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
A
IR
/R E
N O
V
AT
E A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
A R
K D
ES
C
R
IP
TI
O
N
J.
B
EN
S
O N
TN105A
TE
M
PO
R
AR
Y
BA
C
KB
O
N E
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
N . B
R O
AD
W
AY
S
T.
L
O U
IS
, M
O . 6
C . M
E A
D E
E . H
A
JA
S
R . R
U B
IO
O
C
TO
B
ER
W
2Q R
R
XX
XX
B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION
BA
SE
M E
N T
-A R
EA
P
H
AS
E
TE
LE
C O
M
1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 5
1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR
(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.
2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,
88TH COR BEFORE NETWORK OUTAGES.
3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE
BASE NETWORK ENGINEER AND PROJECT MANAGER.
4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE
DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,
NETWORK ENGINEER AND PROJECT MANAGER.
5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY
WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.
6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS
TO BE REMOVED IN PHASE 1 DEMOLITION.
7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE
PHASE 1 AREAS.
8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION
AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN
SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A
TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE
INFORMATION.
9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE
AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM
ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC
CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)
AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,
S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230
10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE
AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE
BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.
PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE
FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.
11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102
TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO
MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO
ACCESS TR S102 .
12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE
CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY
EXISTING BACKBONE CABLING.
13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING
(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING
TELECOMMUNICATIONS DEMOLITION.
14.
15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.
GENERAL NOTES
REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.
CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK
AREAS TO BE PROVIDED…