This solicitation notice provides details for a renovation project at Wright-Patterson Air Force Base in Ohio. The U.S. Army Corps of Engineers Louisville District plans to issue a request for proposal for design and construction services to renovate over 60,000 square feet of the Air Force Materiel Command Headquarters building. Renovation work will include HVAC, plumbing, electrical and telecommunications systems replacement, as well as interior finishes, windows, doors and waterproofing. The contract duration is estimated at 1,095 calendar days with a construction value between $100-250 million. The solicitation is anticipated for release on November 10, 2022 via the System for Award Management website and will utilize best value source selection considering technical evaluation and price factors.

View the file

Other files

File Type Posted
W912QR22R0028_CUI_CF_Plans-0004.pdf PDF
W912QR22R0028_CUI_CF_Specs-0004.pdf PDF
W912QR22R0028_CUI_CF_Plans-0003.pdf PDF
W912QR22R0028_CUI_CF_Specs-0003.pdf PDF
W912QR22R0028_CUI_CF_CIDV2_FFE-0003.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol2-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol7-0002.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol4-0002.pdf PDF
W912QR22R0028_CUI_Pre bid contractors site visit requested photos - 1 Dec 2022.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol3-0002.pdf PDF
W912QR22R0028_CUI_CF_CIDV2_FFE-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol5-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol4-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol3-0002.pdf PDF
W912QR22R0028_CUI_CF_CIDV1_SID-0002.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol5-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol1-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol6-0002.pdf PDF
W912QR22R0028_CUI_Site Visit Attendee list - AFMC HQ Project 1 DEC 22.pdf PDF
W912QR22R0028_CUI_CF_Specs_Vol1-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol2-0002.pdf PDF
W912QR22R0028_CUI_CF_Plans_Vol8-0002.pdf PDF
W912QR22R0028_AFMC_Phase 1_CID_V2_FFE-0001.pdf PDF
JA - AFMC HQ - Reno Trane Chillers - SAM Redacted.pdf PDF
W912QR22R0028_Plans_PH1_Vol2-0000.pdf PDF
JA - AFMC HQ Reno - FFE Basis of Design - SAM Redacted.pdf PDF
W912QR22R0028_Specs_PH1_Vol1-0000.pdf PDF
REDACTED - SPE - Signed Class JA for Basis of Design Items.pdf PDF
JA - AFMC HQ Reno - Fire Alarm System - Brand Name - SAM Redacted.pdf PDF
W912QR22R0028_Specs_PH1_Vol2-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol7-0000.pdf PDF
JA - AFMC HQ Reno - Integrated Sec Platform - Brand Name - SAM Redacted.pdf PDF
W912QR22R0028_Plans_PH1_Vol1-0000.pdf PDF
W912QR22R0028_Specs_PH1_Vol5-0000.pdf PDF
W912QR22R0028_Specs_PH1_Vol4-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol4-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol5-0000.pdf PDF
JA - AFMC HQ Reno - Brand Name Siemens Talon or Johnson Controls - SAM Redacted.pdf PDF
W912QR22R0028_Plans_PH1_Vol6-0000.pdf PDF
W912QR22R0028_Plans_PH1_Vol3-0000.pdf PDF
W912QR22R0028_Specs_PH1_Vol3-0000.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled by: USACE-LRL-ED-MA CUI Category(ies):

LDC or Distribution Statement: N/A POC: Blake Gevedon Contracting Specialist william.b.gevedon@usace.army.mi 502.315.6791

Materials shall be submitted to potential offerors currently certified in the Joint Certification Program (JCP) only.

WRIGHT-PATTERSON AIR

FORCE BASE

STATE R

O

UTE 4

IN

T

E R

S T

A T

E

INTERSTATE 70

S T

A T

E R

O U

T E

STATE ROUTE 4

STATE ROUTE 444

T ROAD

A S

T R

E E

T

O G

D E

N A

V E

N U

E

C H

ID

L

A W

R O

A D

B R

O A D

N R

O A

D

A STREET

S

TA

TE

R

O U

TE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I

D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5

D

C

B

A

US Army Corps of Engineers ®

P2 NO.:

ISSUE DATE:

VOLUME:

CUI

CUI

C U

I

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E D

A Y

T O

N

O H

IO

R E

P A

IR

/R

E N

O V

A T

E A

F M

C H

Q B

U

IL

D

IN

G

B

P

H A

S E

SOLICITATION NO.:

PHASEREPAIR/RENOVATE AFMC HEADQUARTERS BUILDING

B 10262

W912QR21R0028

CONTROLLED BY: USACE

CONTROLLED BY: LOUISVILLE DISTRICT

CUI CATEGORY: CUI BASIC

DISTRIBUTION/DISSEMINATION CONTROLS: DISTRO C

POC: STEVE SKAGGS, 502-315-6368

B262 PHASE

P

N O

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

J

B E

N S

O N

PLAN NORTH PLAN NORTHTRUE NORTH TRUE NORTH

G008

V O

L U

M E

P H

A S

E

C O

V E

R S

H E

E T

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

J A

C O

B S

E N

G

IN

E E

R

IN

G G

R O

U P

I N

C

N

B

R O

A D

W A

Y S

T

L O

U

IS

M

O

R

M E

S S

E L

N

R E

N D

L E

M A

N

J

C O

R S

O N

O C

T O

B E

R

W

Q R

R

X X

X X

B10262 PHASE 1 - 90% FINAL REVISED - NOT FOR CONSTRUCTION

LOUISVILLE DISTRICT

475429

20 OCTOBER 2022

WRIGHT-PATTERSON AIR FORCE BASE

DAYTON, OHIO 45433

B10262 PHASE 1 - 90% FINAL REVISED - NOT FOR CONSTRUCTION

G E

N E

R A

L

VICINITY MAP LOCATION MAP

T E

L E

C O

M M

U N

IC

A

T

IO

N S

/S O

U N

D

M A

S K

IN

G

/E L

E C

T R

O N

IC

S

E C

U R

IT

Y

S Y

S T

E M

S

TELECOMMUNICATIONS/SOUND MASKING/ELECTRONIC SECURITY SYSTEM

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

ARIMS: 200A Disposition: Maintain for 15yrs after construction

10 November 2022

W912QR22R0028

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I

D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 2 3 4 5

D

C

B

A

CUI

CUI

C U

I

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E D

A Y

T O

N

O H

IO

R E

P A

IR

/R

E N

O V

A T

E A

F M

C H

Q B

U

IL

D

IN

G

B

P

H A

S E

B262 PHASE

P

N O

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

J

B E

N S

O N

G016

V O

L U

M E

P H

A S

E

S H

E E

T I

N D

E X

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

J A

C O

B S

E N

G

IN

E E

R

IN

G G

R O

U P

I N

C

N

B

R O

A D

W A

Y S

T

L O

U

IS

M

O

R

M E

S S

E L

N

R E

N D

L E

M A

N

J

C O

R S

O N

O C

T O

B E

R

W

Q R

R

X X

X X

B10262 PHASE 1 - 90% FINAL REVISED - NOT FOR CONSTRUCTION

G E

N E

R A

L

TA604 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1

TA605 CONTROL CONCEPT - RM 2083 - PHASE 1

TA606 CONTROL CONCEPT - RM 2088 - PHASE 1

TA607 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1

TA608 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1

TT101B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 1 - PHASE 1

TT102B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 2 - PHASE 1

TT103B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 3 - PHASE 1

TT104B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 4 - PHASE 1

TT105B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 5 - PHASE 1

TT106B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 6 - PHASE 1

TT107B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 7 - PHASE 1

TT108B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 8 - PHASE 1

TT109B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 9 - PHASE 1

TT110B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TT110B-A TELECOM FLOOR PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TT111B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 11 - PHASE 1

TT112B TELECOM FLOOR PLAN - FIRST FLOOR - AREA 12 - PHASE 1

TT120B CABLE TRAY PLAN - FIRST FLOOR - OVERALL - PHASE 1

TT121B CABLE TRAY PLAN - FIRST FLOOR - AREA 1 - PHASE 1

TT122B CABLE TRAY PLAN - FIRST FLOOR - AREA 2 - PHASE 1

TT123B CABLE TRAY PLAN - FIRST FLOOR - AREA 3 - PHASE 1

TT124B CABLE TRAY PLAN - FIRST FLOOR - AREA 4 - PHASE 1

TT125B CABLE TRAY PLAN - FIRST FLOOR - AREA 5 - PHASE 1

TT126B CABLE TRAY PLAN - FIRST FLOOR - AREA 6 - PHASE 1

TT127B CABLE TRAY PLAN - FIRST FLOOR - AREA 7 - PHASE 1

TT128B CABLE TRAY PLAN - FIRST FLOOR - AREA 8 - PHASE 1

TT129B CABLE TRAY PLAN - FIRST FLOOR - AREA 9 - PHASE 1

TT130B CABLE TRAY PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TT130B-A CABLE TRAY PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TT131B CABLE TRAY PLAN - FIRST FLOOR - AREA 11 - PHASE 1

TT132B CABLE TRAY PLAN - FIRST FLOOR - AREA 12 - PHASE 1

TT140B WIRELESS PLAN - FIRST FLOOR - OVERALL - PHASE 1

TT141B WIRELESS PLAN - FIRST FLOOR - AREA 1 - PHASE 1

TT142B WIRELESS PLAN - FIRST FLOOR - AREA 2 - PHASE 1

TT143B WIRELESS PLAN - FIRST FLOOR - AREA 3 - PHASE 1

TT144B WIRELESS PLAN - FIRST FLOOR - AREA 4 - PHASE 1

TT145B WIRELESS PLAN - FIRST FLOOR - AREA 5 - PHASE 1

TT146B WIRELESS PLAN - FIRST FLOOR - AREA 6 - PHASE 1

TT147B WIRELESS PLAN - FIRST FLOOR - AREA 7 - PHASE 1

TT148B WIRELESS PLAN - FIRST FLOOR - AREA 8 - PHASE 1

TT149B WIRELESS PLAN - FIRST FLOOR - AREA 9 - PHASE 1

TT150B WIRELESS PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TT150B-A WIRELESS PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TT151B WIRELESS PLAN - FIRST FLOOR - AREA 11 - PHASE 1

TT152B WIRELESS PLAN - FIRST FLOOR - AREA 12 - PHASE 1

TT100C TELECOM FLOOR PLAN - SECOND FLOOR - OVERALL - PHASE 1

TT101C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 1 - PHASE 1

TT102C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 2 - PHASE 1

TT103C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 3 - PHASE 1

TT104C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 4 - PHASE 1

TT105C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 5 - PHASE 1

TT106C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 6 - PHASE 1

TT107C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 7 - PHASE 1

TT108C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 8 - PHASE 1

TT109C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 9 - PHASE 1

TT110C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 10 - PHASE 1

TT111C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 11 - PHASE 1

TT112C TELECOM FLOOR PLAN - SECOND FLOOR - AREA 12 - PHASE 1

TT120C CABLE TRAY PLAN - SECOND FLOOR - OVERALL - PHASE 1

TT121C CABLE TRAY PLAN - SECOND FLOOR - AREA 1 - PHASE 1

TT122C CABLE TRAY PLAN - SECOND FLOOR - AREA 2 - PHASE 1

TT123C CABLE TRAY PLAN - SECOND FLOOR - AREA 3 - PHASE 1

TT124C CABLE TRAY PLAN - SECOND FLOOR - AREA 4 - PHASE 1

TT125C CABLE TRAY PLAN - SECOND FLOOR - AREA 5 - PHASE 1

TT126C CABLE TRAY PLAN - SECOND FLOOR - AREA 6 - PHASE 1

TT127C CABLE TRAY PLAN - SECOND FLOOR - AREA 7 - PHASE 1

TT128C CABLE TRAY PLAN - SECOND FLOOR - AREA 8 - PHASE 1

TT129C CABLE TRAY PLAN - SECOND FLOOR - AREA 9 - PHASE 1

TT130C CABLE TRAY PLAN - SECOND FLOOR - AREA 10 - PHASE 1

TT131C CABLE TRAY PLAN - SECOND FLOOR - AREA 11 - PHASE 1

TT132C CABLE TRAY PLAN - SECOND FLOOR - AREA 12 - PHASE 1

TT201 RACK ELEVATIONS - PHASE 1

TT202 RACK ELEVATIONS - PHASE 1

TT203 RACK ELEVATIONS - PHASE 1

TT401 ENLARGED TELECOM ROOMS - FIRST FLOOR - PHASE 1

TT402 ENLARGED TELECOM ROOMS - FIRST FLOOR - PHASE 1

TT403 ENLARGED TELECOM ROOMS - SECOND FLOOR - PHASE 1

TT501 OUTLET DETAILS - PHASE 1

TT503 PATHWAY DETAILS - PHASE 1

TT504 GROUNDING DETAILS - PHASE 1

TT507 TELECOM DETAILS - PHASE 1

TT508 TELECOM DETAILS - PHASE 1

TT509 DUCT DETAILS - PHASE 1

TT601 ONE-LINE DIAGRAMS - PHASE 1

TT602 TELECOM GROUNDING BACKBONE ONE-LINE - PHASE 1

TT603 TEMPORARY BACKBONE RISER DIAGRAM - PHASE 1

TA001A GENERAL NOTES, SYMBOL, AND ABBREVIATIONS - PHASE 1

TA002A GENERAL NOTES, SYMBOL, AND ABBREVIATIONS - PHASE 1

TA100C AV FLOOR PLAN - SECOND FLOOR - OVERALL - PHASE 1

TA101C AV FLOOR PLAN - SECOND FLOOR - AREA 1 - PHASE 1

TA102C AV FLOOR PLAN - SECOND FLOOR - AREA 2 - PHASE 1

TA103C AV FLOOR PLAN - SECOND FLOOR - AREA 3 - PHASE 1

TA104C AV FLOOR PLAN - SECOND FLOOR - AREA 4 - PHASE 1

TA105C AV FLOOR PLAN - SECOND FLOOR - AREA 5 - PHASE 1

TA106C AV FLOOR PLAN - SECOND FLOOR - AREA 6 - PHASE 1

TA107C AV FLOOR PLAN - SECOND FLOOR - AREA 7 - PHASE 1

TA108C AV FLOOR PLAN - SECOND FLOOR - AREA 8 - PHASE 1

TA109C AV FLOOR PLAN - SECOND FLOOR - AREA 9 - PHASE 1

TA110C AV FLOOR PLAN - SECOND FLOOR - AREA 10 - PHASE 1

TA111C AV FLOOR PLAN - SECOND FLOOR - AREA 11 - PHASE 1

TA112C AV FLOOR PLAN - SECOND FLOOR - AREA 12 - PHASE 1

TA210A AV RACK ELEVATIONS - PHASE 1

TA301A AV SECTIONS - SECOND FLOOR - PHASE 1

TA302A AV SECTIONS - SECOND FLOOR - PHASE 1

TA401A ENLARGED AV ROOMS - SECOND FLOOR - PHASE 1

TA402A ENLARGED AV ROOMS - SECOND FLOOR - PHASE 1

TA501 AV DETAILS - PHASE 1

TA502 AV DETAILS - PHASE 1

TA503 AV DETAILS - PHASE 1

TA504 CONFERENCE ROOM RISER DIAGRAM - PHASE 1

TA601 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1

TA602 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1

TA603 AUDIO VISUAL ONE-LINE DIAGRAM - PHASE 1

TS101 SITE PLAN - PHASE 1

TT001 GENERAL NOTES, SYMBOLS, & ABBREVIATIONS - PHASE 1

TN100A TEMPORARY BACKBONE PLAN - BASEMENT - OVERALL - PHASE 1

TN101A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 1 - PHASE 1

TN102A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 2 - PHASE 1

TN103A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 3 - PHASE 1

TN104A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 4 - PHASE 1

TN105A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 5 - PHASE 1

TN106A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 6 - PHASE 1

TN107A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 7 - PHASE 1

TN108A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 8 - PHASE 1

TN109A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 9 - PHASE 1

TN110A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 10 - PHASE 1

TN111A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 11 - PHASE 1

TN112A TEMPORARY BACKBONE PLAN - BASEMENT - AREA 12 - PHASE 1

TN100B TEMPORARY BACKBONE PLAN - FIRST FLOOR - OVERALL - PHASE 1

TN101B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 1 - PHASE 1

TN102B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 2 - PHASE 1

TN103B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 3 - PHASE 1

TN104B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 4 - PHASE 1

TN105B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 5 - PHASE 1

TN106B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 6 - PHASE 1

TN107B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 7 - PHASE 1

TN108B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 8 - PHASE 1

TN109B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 9 - PHASE 1

TN110B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TN111B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 11 - PHASE 1

TN112B TEMPORARY BACKBONE PLAN - FIRST FLOOR - AREA 12 - PHASE 1

TN100C TEMPORARY BACKBONE PLAN - SECOND FLOOR - OVERALL - PHASE 1

TN101C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 1 - PHASE 1

TN102C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 2 - PHASE 1

TN103C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 3 - PHASE 1

TN104C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 4 - PHASE 1

TN105C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 5 - PHASE 1

TN106C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 6 - PHASE 1

TN107C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 7 - PHASE 1

TN108C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 8 - PHASE 1

TN109C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 9 - PHASE 1

TN110C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 10 - PHASE 1

TN111C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 11 - PHASE 1

TN112C TEMPORARY BACKBONE PLAN - SECOND FLOOR - AREA 12 - PHASE 1

TD100A DEMOLITION PLAN - BASEMENT - OVERALL - PHASE 1

TD101A DEMOLITION PLAN - BASEMENT - AREA 1 - PHASE 1

TD102A DEMOLITION PLAN - BASEMENT - AREA 2 - PHASE 1

TD103A DEMOLITION PLAN - BASEMENT - AREA 3 - PHASE 1

TD104A DEMOLITION PLAN - BASEMENT - AREA 4 - PHASE 1

TD105A DEMOLITION PLAN - BASEMENT - AREA 5 - PHASE 1

TD106A DEMOLITION PLAN - BASEMENT - AREA 6 - PHASE 1

TD107A DEMOLITION PLAN - BASEMENT - AREA 7 - PHASE 1

TD108A DEMOLITION PLAN - BASEMENT - AREA 8 - PHASE 1

TD109A DEMOLITION PLAN - BASEMENT - AREA 9 - PHASE 1

TD110A DEMOLITION PLAN - BASEMENT - AREA 10 - PHASE 1

TD111A DEMOLITION PLAN - BASEMENT - AREA 11 - PHASE 1

TD112A DEMOLITION PLAN - BASEMENT - AREA 12 - PHASE 1

TD100B DEMOLITION PLAN - FIRST FLOOR - OVERALL - PHASE 1

TD101B DEMOLITION PLAN - FIRST FLOOR - AREA 1 - PHASE 1

TD102B DEMOLITION PLAN - FIRST FLOOR - AREA 2 - PHASE 1

TD103B DEMOLITION PLAN - FIRST FLOOR - AREA 3 - PHASE 1

TD104B DEMOLITION PLAN - FIRST FLOOR - AREA 4 - PHASE 1

TD105B DEMOLITION PLAN - FIRST FLOOR - AREA 5 - PHASE 1

TD106B DEMOLITION PLAN - FIRST FLOOR - AREA 6 - PHASE 1

TD107B DEMOLITION PLAN - FIRST FLOOR - AREA 7 - PHASE 1

TD108B DEMOLITION PLAN - FIRST FLOOR - AREA 8 - PHASE 1

TD109B DEMOLITION PLAN - FIRST FLOOR - AREA 9 - PHASE 1

TD110B DEMOLITION PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TD111B DEMOLITION PLAN - FIRST FLOOR - AREA 11 - PHASE 1

TD112B DEMOLITION PLAN - FIRST FLOOR - AREA 12 - PHASE 1

TD100C DEMOLITION PLAN - SECOND FLOOR - OVERALL - PHASE 1

TD101C DEMOLITION PLAN - SECOND FLOOR - AREA 1 - PHASE 1

TD102C DEMOLITION PLAN - SECOND FLOOR - AREA 2 - PHASE 1

TD103C DEMOLITION PLAN - SECOND FLOOR - AREA 3 - PHASE 1

TD104C DEMOLITION PLAN - SECOND FLOOR - AREA 4 - PHASE 1

TD105C DEMOLITION PLAN - SECOND FLOOR - AREA 5 - PHASE 1

TD106C DEMOLITION PLAN - SECOND FLOOR - AREA 6 - PHASE 1

TD107C DEMOLITION PLAN - SECOND FLOOR - AREA 7 - PHASE 1

TD108C DEMOLITION PLAN - SECOND FLOOR - AREA 8 - PHASE 1

TD109C DEMOLITION PLAN - SECOND FLOOR - AREA 9 - PHASE 1

TD110C DEMOLITION PLAN - SECOND FLOOR - AREA 10 - PHASE 1

TD111C DEMOLITION PLAN - SECOND FLOOR - AREA 11 - PHASE 1

TD112C DEMOLITION PLAN - SECOND FLOOR - AREA 12 - PHASE 1

TD601 DEMOLITION BACKBONE RISER DIAGRAM - PHASE 1

TT100A TELECOM FLOOR PLAN - BASEMENT - OVERALL - PHASE 1

TT101A TELECOM FLOOR PLAN - BASEMENT - AREA 1 - PHASE 1

TT102A TELECOM FLOOR PLAN - BASEMENT - AREA 2 - PHASE 1

TT103A TELECOM FLOOR PLAN - BASEMENT - AREA 3 - PHASE 1

TT104A TELECOM FLOOR PLAN - BASEMENT - AREA 4 - PHASE 1

TT105A TELECOM FLOOR PLAN - BASEMENT - AREA 5 - PHASE 1

TT106A TELECOM FLOOR PLAN - BASEMENT - AREA 6 - PHASE 1

TT107A TELECOM FLOOR PLAN - BASEMENT - AREA 7 - PHASE 1

TT108A TELECOM FLOOR PLAN - BASEMENT - AREA 8 - PHASE 1

TT109A TELECOM FLOOR PLAN - BASEMENT - AREA 9 - PHASE 1

TT110A TELECOM FLOOR PLAN - BASEMENT - AREA 10 - PHASE 1

TT110A-A TELECOM FLOOR PLAN - BASEMENT - AREA 10 - PHASE 1

TT111A TELECOM FLOOR PLAN - BASEMENT - AREA 11 - PHASE 1

TT112A TELECOM FLOOR PLAN - BASEMENT - AREA 12 - PHASE 1

TT120A CABLE TRAY PLAN - BASEMENT - OVERALL - PHASE 1

TT121A CABLE TRAY PLAN - BASEMENT - AREA 1 - PHASE 1

TT122A CABLE TRAY PLAN - BASEMENT - AREA 2 - PHASE 1

TT123A CABLE TRAY PLAN - BASEMENT - AREA 3 - PHASE 1

TT124A CABLE TRAY PLAN - BASEMENT - AREA 4 - PHASE 1

TT125A CABLE TRAY PLAN - BASEMENT - AREA 5 - PHASE 1

TT126A CABLE TRAY PLAN - BASEMENT - AREA 6 - PHASE 1

TT127A CABLE TRAY PLAN - BASEMENT - AREA 7 - PHASE 1

TT128A CABLE TRAY PLAN - BASEMENT - AREA 8 - PHASE 1

TT129A CABLE TRAY PLAN - BASEMENT - AREA 9 - PHASE 1

TT130A CABLE TRAY PLAN - BASEMENT - AREA 10 - PHASE 1

TT130A-A CABLE TRAY PLAN - BASEMENT - AREA 10 - PHASE 1

TT131A CABLE TRAY PLAN - BASEMENT - AREA 11 - PHASE 1

TT132A CABLE TRAY PLAN - BASEMENT - AREA 11 - PHASE 1

TT100B TELECOM FLOOR PLAN - FIRST FLOOR - OVERALL - PHASE 1

TELECOMMUNICATIONS SHEET INDEX GENERAL SHEET INDEX

G008 VOLUME 8 - PHASE 1 COVER SHEET -

G016 VOLUME 8 - PHASE 1 SHEET INDEX -

TYD02C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 2 -

PHASE 1

TYD03C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 3 -

PHASE 1

TYD04C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 4 -

PHASE 1

TYD05C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 5 -

PHASE 1

TYD06C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 6 -

PHASE 1

TYD07C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 7 -

PHASE 1

TYD08C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 8 -

PHASE 1

TYD09C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 9 -

PHASE 1

TYD10C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 10 -

PHASE 1

TYD11C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 11 -

PHASE 1

TYD12C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 12 -

PHASE 1

TY101A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 1 - PHASE 1

TY102A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 2 - PHASE 1

TY103A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 3 - PHASE 1

TY104A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 4 - PHASE 1

TY105A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 5 - PHASE 1

TY106A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 6 - PHASE 1

TY107A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 7 - PHASE 1

TY108A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 8 - PHASE 1

TY109A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 9 - PHASE 1

TY110A ELECRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 10 - PHASE 1

TY111A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 11 - PHASE 1

TY112A ELECTRONIC SECURITY SYSTEM PLAN - BASEMENT - AREA 12 - PHASE 1

TY101B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 1 - PHASE 1

TY102B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 2 - PHASE 1

TY103B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 3 - PHASE 1

TY104B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 4 - PHASE 1

TY105B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 5 - PHASE 1

TY106B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 6 - PHASE 1

TY107B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 7 - PHASE 1

TY108B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 8 - PHASE 1

TY109B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 9 - PHASE 1

TY110B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 10 - PHASE 1

TY111B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 11 - PHASE 1

TY112B ELECTRONIC SECURITY SYSTEM PLAN - FIRST FLOOR - AREA 12 - PHASE 1

TY101C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 1 - PHASE 1

TY102C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 2 - PHASE 1

TY103C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 3 - PHASE 1

TY104C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 4 - PHASE 1

TY105C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 5 - PHASE 1

TY106C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 6 - PHASE 1

TY107C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 7 - PHASE 1

TY108C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 8 - PHASE 3

TY109C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 9 - PHASE 1

TY110C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 10 - PHASE

TY111C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 11 - PHASE

TY112C ELECTRONIC SECURITY SYSTEM PLAN - SECOND FLOOR - AREA 12 - PHASE

TY100R ELECTRONIC SECURITY SYSTEM PLAN - ROOF - OVERALL - PHASE 1

TY401 ENLARGED ELECTRONIC SECURITY SYSTEM PLANS - FIRST FLOOR - PHASE

1 -

TY501 SECURED DOOR DETAILS - PHASE 1

TY502 SECURITY DETAILS - PHASE 1

TY001 GENERAL NOTES, SYMBOLS, & SCHEDULES - PHASE 1

TYD01A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 1 - PHASE

TYD02A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 2 - PHASE

TYD03A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 3 - PHASE

TYD04A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 4 - PHASE

TYD05A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 5 - PHASE

TYD06A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 6 - PHASE

TYD07A ELECTRONIC SECURITY SYSTEM DEMOLITION PLAN - BASEMENT - AREA 7 -

PHASE 1

TYD08A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 8 - PHASE

TYD09A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 9 - PHASE

TYD10A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 10 -

PHASE 1

TYD11A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 11 -

PHASE 1

TYD12A ELECTRONIC SECURITY SYSTEM DEMOLITION - BASEMENT - AREA 12 -

PHASE 1

TYD01B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 1 -

PHASE 1

TYD02B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 2 -

PHASE 1

TYD03B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 3 -

PHASE 1

TYD04B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 4 -

PHASE 1

TYD05B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 5 -

PHASE 1

TYD06B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 6 -

PHASE 1

TYD07B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 7 -

PHASE 1

TYD08B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 8 -

PHASE 1

TYD09B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 9 -

PHASE 1

TYD10B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 10 -

PHASE 1

TYD11B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 11 -

PHASE 1

TYD12B ELECTRONIC SECURITY SYSTEM DEMOLITION - FIRST FLOOR - AREA 12 -

PHASE 1

TYD01C ELECTRONIC SECURITY SYSTEM DEMOLITION - SECOND FLOOR - AREA 1 -

PHASE 1

T E

L E

C O

M M

U N

IC

A

T

IO

N S

/S O

U N

D

A

S K

IN

G

/E L

E C

T R

O N

IC

S

E C

U R

IT

Y

S Y

S T

E M

S

SOUND MASKING SHEET INDEX

SM100A OVERALL SOUND MASKING PLAN

SM101A AREA SOUND MASKING PLAN

SM102A AREA SOUND MASKING PLAN

SM103A AREA SOUND MASKING PLAN

SM104A AREA SOUND MASKING PLAN

SM105A AREA SOUND MASKING PLAN

SM106A AREA SOUND MASKING PLAN

SM107A AREA SOUND MASKING PLAN

SM108A AREA SOUND MASKING PLAN

SM109A AREA SOUND MASKING PLAN

SM110A AREA SOUND MASKING PLAN

SM111A AREA SOUND MASKING PLAN

SM112A AREA SOUND MASKING PLAN

SM100B OVERALL SOUND MASKING PLAN

SM101B AREA SOUND MASKING PLAN

SM102B AREA SOUND MASKING PLAN

SM103B AREA SOUND MASKING PLAN

SM104B AREA SOUND MASKING PLAN

SM105B AREA SOUND MASKING PLAN

SM106B AREA SOUND MASKING PLAN

SM107B AREA SOUND MASKING PLAN

SM108B AREA SOUND MASKING PLAN

SM109B AREA SOUND MASKING PLAN

SM110B AREA SOUND MASKING PLAN

SM111B AREA SOUND MASKING PLAN

SM112B AREA SOUND MASKING PLAN

SM100C OVERALL SOUND MASKING PLAN

SM101C AREA SOUND MASKING PLAN

SM102C AREA SOUND MASKING PLAN

SM103C AREA SOUND MASKING PLAN

SM104C AREA SOUND MASKING PLAN

SM105C AREA SOUND MASKING PLAN

SM106C AREA SOUND MASKING PLAN

SM107C AREA SOUND MASKING PLAN

SM108C AREA SOUND MASKING PLAN

SM109C AREA SOUND MASKING PLAN

SM110C AREA SOUND MASKING PLAN

SM111C AREA SOUND MASKING PLAN

SM112C AREA SOUND MASKING PLAN

SM500 DETAILS - SOUND MASKING - PHASE 1

ELECTRONIC SECURITY SYSTEMS

SHEET INDEX

ELECTRONIC SECURITY SYSTEMS

SHEET INDEX - CONTINUED

SITE PLAN - PHASE 1

GENERAL NOTES, SYMBOLS, & ABBREVIATIONS - PHASE 1

TS101

TT001

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

ARIMS: 200A Disposition: Maintain for 15yrs after construction

1.

2.

3.

4.

5.

6.

7.

8.

9.

TELECOMMUNICATIONS GENERAL NOTES

ALL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES SHOWN ARE NOT

NECESSARILY USED ON THIS PROJECT.

SEE ONE-LINE DIAGRAM FOR CABLE SIZES, CONDUIT SIZES, AND DEVICES NOT

SHOWN ON PLANS.

MOUNTING HEIGHTS FOR CEILING MOUNTED DEVICES ARE TO THE BOTTOM OF

THE DEVICE, UNLESS OTHERWISE NOTED.

MOUNTING HEIGHTS FOR WALL MOUNTED DEVICES ARE LISTED ON TT508.

PHASING:

COMPLETE TS AND TN SHEETS PRIOR TO BEGINNING WORK ON TD SHEETS.

COMPLETE TD SHEETS PRIOR TO BEGINNING WORK ON TT AND TY SHEETS

COORDINATE WITH CS 88.

REFER TO "CHAPTER 10.0 TELECOMMUNICATIONS" AND "ANNEX 1 - 88TH

COMMUNICATIONS GROUP LABELING REQUIREMENTS FOR COMMUNICATIONS"

IN THE WRIGHT-PATTERSON AFB BASE FACILITY STANDARDS FOR LABELING

INFORMATION.

FOR BIDDING PURPOSES, INCLUDE ALL WORK, LABOR, MATERIALS, AND

EQUIPMENT REQUIRED TO FURNISH AND INSTALL ELECTRONIC SECURITY

SYSTEM (ESS) DEVICES, AND TO COMMISSION THE SYSTEM FOR PHASE 1 IN

CLIN 005. THE ESS CONSISTS OF CLOSED CIRCUIT TELEVISION (CCTV),

ACCESS CONTROL SYSTEM (ACS) AND INTRUSION DETECTION SYSTEM (IDS).

EQUIPMENT INCLUDES CARD READERS, MOTION AND DOOR SENSORS,

KEYPADS, CONTROL UNITS, HEADEND EQUIPMENT, SCANNERS

AND CAMERAS. CLIN 005 ALSO INCLUDES ALL WORK, LABOR, MATERIALS, AND

EQUIPMENT REQUIRED TO FURNISH AND INSTALL AUDIO-VISUAL SYSTEM

DEVICES FOR PHASE 1 AND EQUIPMENT REQUIRED TO FIT-OUT THE

COMMUNICATIONS ROOMS FOR PHASE 1. CLIN 005 ALSO INCLUDES ALL WORK

TO FURNISH AND INSTALL DATA CABINETS/RACKS, PDU’S, AND PATCH PANELS

WITHIN THE COMMUNICATIONS ROOMS.

TELECOMMUNICATION SEQUENCING

NOTES

CONTRACTOR MUST PROVIDE NEW OUTSIDE PLANT (OSP) BACKBONE

CABLING,INCLUDING CABLE PATHWAYS AND DUCKBANKS.

A. AMFC 88TH COMMUNICATION SQUADRON MUST PROVIDE PATCHING

AND CROSS-CONNECTING .

CONTRACTOR MUST PROVIDE TEMPORARY BACKBONE FIBER CABLING,

INCLUDING CABLE CABLING INFRASTRUCTURE REQUIRED TO SUPPORT THE

TEMPORARY CABLING (SUPPORTS, PATHWAYS ,ETC.)

A. AMFC 88TH COMMUNICATION SQUADRON CUTS OVER FROM EXISTING

BACKBONE FIBER CABLING IN THE THREE FIBER CABINETS TO

TEMPORARY BACKBONE CABLING .

B. CONTRACTOR MUST DEMOLISH THREE FIBER CABINETS AND EXISTING

BACKBONE FIBER CABLING THAT TERMINATES IN THESE THREE

CABINETS .

C.

1.

2.

3.

ACEG ALTERNATING CURRENT EQUIPMENT GROUND

ACS ACCESS CONTROL SYSTEM

AFC ABOVE FINISHED CEILING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ANN ANNUNCIATOR

ARCH ARCHITECTURAL

AV AUDIO AND VISUAL

AWG AMERICAN WIRE GAGE

BAS BUILDING AUTOMATION SYSTEM

BATT BATTERY

BB BACKBONE

BBFPP BACKBONE FIBER PATCH PANEL

BBV BACKBONE VOICE

BEPB BUILDING ENTRANCE PROTECTION BLOCKS

BLDG BUILDING

BMS BALANCED MAGNETIC SWITCH

BVPP BACKBONE VOICE PATCH PANEL

C CONDUIT

CAB CABINET

CAT CATEGORY

CCTV CLOSED CIRCUIT TELEVISION

CLG CEILING

CMH COMMUNICATIONS MANHOLE

COB CENTER OF BOX

COMM COMMUNICATIONS

CONST CONSTRUCTION

CONT CONTINUATION

DIA DIAMETER

DIST DISTRIBUTION

DR DISTRIBUTION ROOM

DWG DRAWING

EF ENTRANCE FACILITY

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

EQPT EQUIPMENT

EX EXISTING

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FIXT FIXTURE

FLR FLOOR

FO FIBER OPTIC

FOC FIBER OPTIC CABLE

FTU FIBER TERMINATION UNIT

GFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLED

HCPP HORIZONTAL COPPER PATCH PANEL

HFPP HORIZONTAL FIBER PATCH PANEL

HMC HORIZONTAL CABLE MANAGER

HOV HORIZONTAL VOICE

HSS HIGH SECURITY SWITCH

HVPP HORIZONTAL VOICE PATCH PANEL

IDS INTRUSION DETECTION SYSTEM

ISP INTERNET SERVICE PROVIDER

JB JUNCTION BOX

MFR MANUFACTURER

MH MOUNTING HEIGHT

MMF MULTI MODE FIBER

MTD MOUNTED

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OH OVERHEAD

OSP OUTSIDE PLANT

PA PUBLIC ADDRESS

PBB PRIMARY BONDING BUSBAR

PB PULL BOX

PBX PRIVATE BRANCH EXCHANGE

PC PERSONAL COMPUTER

PLAS PLASTIC

PP PATCH PANEL

PR PAIR

PWR POWER

QTY QUANTITY

RAF RAISED ACCESS FLOOR

RBB RACK BONDING BUSBAR

RBC RACK BONDING CONDUCTOR

RECP RECEPTACLE

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RSC RIGID STEEL CONDUIT

SBB SECONDARY BONDING BUSBAR

SCRT SECURITY

SECT SECTION

SPEC SPECIFICATION

SM SINGLE MODE

SMF SINGLE MODE FIBER

SP SERVICE PROVIDER

STR STRAND

SURF SURFACE

SW SW ITCH

SYM SYMMETRICAL

SYS SYSTEMS

TBB TELECOMMUNICATIONS BONDING BACKBONE

TBC TELECOMMUNICATIONS BONDING CONDUCTOR

TEBC TELECOMMUNICAITONS EQUIPMENT BONDING CONDUCTOR

TEL TELEPHONE

TELECOM TELECOMMUNICATIONS

TER TELECOMMUNICATIONS EQUIPMENT ROOM

TR TELECOMMUNICATIONS ROOM

TYP TYPICAL

UG UNDERGROUND

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

WP WEATHERPROOF

XFR TRANSFER

XP EXPLOSION PROOF

TELECOMMUNICATIONS ABBREVIATIONS

TELEPHONE AND DATA COMMUNICATIONS

PLYWOOD BACKBOARD

DATA WALL OUTLET

AV = AUDIO VISUAL

S = SIPRNET / X CAT6A

4 = 4 CAT6A

WAP = WIRELESS ACCESS POINT

ISP = COMMERCIAL ISP CONNECTION / 1 CAT6A

BLANK = CAT6A

W = WALL PHONE OUTLET / 1 CAT6A

DATA OUTLET IN SURFACE MOUNTED COMMON FLOOR BOX WITH

ELECTRICAL OUTLET

COMBINATION (3) FIBER OPTIC / (1)

CAT6A OUTLET = NIPRNET

EQUIPMENT CABINET

PRIMARY BONDING BUSBAR (PBB); SECONDARY BONDING BUSBAR (SBB)

BUILDING ENTRANCE TERMINAL

DATA CEILING OUTLET

WAP = WIRELESS ACCESS POINT (NIPR)

ISP = WIRELESS ACCESS POINT (ISP)

CM = CEILING CAMERA / 1 CAT 6

AV = AUDIO/VISUAL / 1 CAT 6

AIR = AIR MONITOR / 1 CAT 6

BASKET CABLE TRAY

CONSOLIDATION POINT

6 = 36 STRANDS OM5 OPTICAL FIBER CABLE AND 6 CATEGORY 6A CABLES

12 = 72 STRANDS OM5 OPTICAL FIBER CABLE AND 12 CATEGORY 6A CABLES

24 = 144 STRANDS OM5 OPTICAL FIBER CABLE AND 24 CATEGORY 6A CABLES

TWO POST RACK

WALL OR COLUMN MOUNTED JUNCTION BOX WITH FLEXIBLE WHIP TO

FURNITURE BASE POWER FEED, MOUNT AT 18-INCHES ABOVE FINISHED

FLOOR

POWER POLE FEED WITH FLEXIBLE W HIP TO FURNITURE BASE POWER FEED

LADDER CABLE TRAY

T

TP

CP

TELECOMMUNICATIONS SYMBOLS

110 BLOCKS110

M MUTOA

UNDERFLOOR WALL PENETRATION. REFER TO ARCHITECTURAL FOR

PARTITION TYPES.

WAP

BET

COMBINATION (3) FIBER OPTIC / (1)

CAT 6A OUTLET = NIPRNET

M = MODULAR FURNITURE

(X)

(X)

SPECIALTY OUTLET

C = CATV / 1 RG6

A = PHONE / 1 CAT 6A

SITE

EXISTING MANHOLE (CMH) OR EXISTING HANDHOLE (CHH)

C

NEW MANHOLE (CMH) OR NEW HANDHOLE (CHH)

C

COMMUNICATIONS DUCTBANK

EXISTING COMMUNICATIONS DUCTBANK

COMMUNICATIONS OVERHEAD LINE

EXISTING COMMUNICATIONS OVERHEAD LINE

CU

CUx

C

Cx

X

(X)

SINGLE FACE CLOCK, A = ANALOG, D = DIGITAL - ROUGH-IN HEIGHT NOTED

ON DRAW INGS.

C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

S U

B M

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

A N

SI

D

IS

SU

E D

AT

E

C O

N

TR

AC

T

N O

S O

LI

C

IT

A

TI

O

N N

O

1 2 3 4 5

D

C

B

A

CUI

CUI

C U

I

W R

IG

H

T-

PA

TT

ER

SO

N

A

IR

F O

R C

E

BA

SE

D

AY

TO

N , O

H

IO

R

EP

A

IR

/R E

N O

V

AT

E A

FM

C

H Q

B U

IL

D

IN

G

(B

2)

P H

AS

E

B262 PHASE

P2 N

O

D

AT

E M

A R

K D

ES

C

R

IP

TI

O

N

J.

B

EN

S

O N

TT001

G

EN

ER

AL

N O

TE

S, S

YM

BO

LS

A

BB

R

EV

IA

TI

O

N S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

N . B

R O

AD

W

AY

S

T.

L

O U

IS

, M

O . 6

C . M

E A

D E

E . H

A

JA

S

R . R

U B

IO

O

C

TO

B

ER

W

2Q R

R

XX

XX

B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION

PH

AS

E

TE

LE

C O

M

PROVIDE 25-FEET OF EXTRA SERVICE LOOP LENGTH ON CABLES TERMINATED IN

TR 2055. THIS ROOM WILL BE EXPANDED IN FUTURE PHASES. IF A CABLE

LENGTH WILL EXCEED 295-FEET CONTRACTOR MUST NOTIFY GENERAL

CONTRACTOR PRIOR TO INSTALLATION.

PROVIDE J-HOOKS AS NEEDED TO SUPPORT TEMPORARY BACKBONE CABLING IN

WORK AREAS NOT INCLUDED IN THE SCOPE OF WORK. CABLE TRAY WILL BE

PROVIDED IN FUTURE PHASES IN THESE AREAS.

(48" AFF)

(18" AFF)

SOME EXISTING BACKBONE FIBER CABLING MAY NEED TO BE DEMOLISHED PRIOR TO

INSTALLATION OF SOME TEMPORARY BACKBONE FIBER CABLING TO MAKE ROOM IN

CABLE PATHS FOR THE NEW CABLING.

COORDINATE WITH AFMC 88TH COMMUNICATION SQUADRON PRIOR TO DEMOLISING

ANY CABLING.

D.

A. CONTRACTOR MUST PROVIDE CABLES FROM NEW TRs TO THESE OUTLETS THEN

NOTIFY THE 88TH COMMUNICATION SQUADRON PRIOR TO DEMOLISHING THE

EXISTING CABLES.

B. UPON NOTIFICATION, THE 88TH COMMUNICATION SQUADRON IS TO CUT OVER FROM

THE EXISTING CABLING TO THE NEW CABLING.

C. AFTER CUT OVER, CONTRACTOR IS TO DEMOLISH THE EXISTING CABLING.

FOR EXISTING CABLES TERMINATED IN TELECOMMUNICATION ROOMS THAT MUST BE

DEMOLISHED AND SUPPORT WORK AREA OUTLETS (WAO) LOCATED IN FUTURE PHASE AREAS:

BY THIS POINT , ALL PRE-CONSTRUCTION WORK SHOULD BE COMPLETED AS

TEMPORARY BACKBONE FIBER CABLING HAS BEEN PROVIDED AND CABLING

FOR WORKSTATIONS OUTSIDE OF THE SOWA HAS BEEN PROVIDED .

CONTRACTOR MUST DEMOLISH CABLING AND INFRASTRUCTURE INSIDE SOWA

AND PROVIDED NEW .

4.

5.

/AFNET

/AFNET

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

DN

DN

UP

DN

DN

DN

DN

AeccDbFace (AeccLand130)AeccDbFeatureLine (AeccLand130)

C

C U x C

U x

CUx C

C C

C

C

C

CUx CUx

CUxCUx

C U x

CU

SS

SS

AeccDbFace (AeccLand130)

C

C CUx

C

C U x

C U x

C U x

C

CUx

CUx

CU

SCALE: 1" = 50'

100'0 50'

B10262

B10266

H RO

AD

M S

TR

EE

T

SA

C

R

AM

EN

TO

S

TR

EE

T

A R

O

AD

T ROAD

A STREET

B10271

C R

OAD

B10264

N

GENERAL NOTES

A PATHWAYS SHOWN ARE DIAGRAMMATICAL IN NATURE. REFER TO CIVIL SITE

UTILITIES FOR EXACT LOCATIONS OF OTHER UTILITIES AND SITE FEATURES.

CONTRACTOR MUST COORDINATE THE FINAL SEQUENCING, ROUTING, AND

DEPTH OF COMMUNICATION DUCTBANKS WITH OTHER UTILITIES PRIOR TO

INSTALLATION.

B. REFER TO TT601 FOR OUTSIDE PLANT SINGLE-LINE CABLING DIAGRAM.

EXCAVATION AND/OR PENETRATION OF EXISTING STRUCTURES REQUIRES THE

USE OF GROUND/WALL PENETRATING RADAR OR X-RAY PRIOR TO DRILLING OR

CORING TO PREVENT DAMAGE TO THE REINFORCING AND/OR OTHER OBJECTS

WITHIN THE STRUCTURE.

C. PROVIDE TELECOMMUNICATIONS DUCTBANK AND CABLING (INCLUDING

SPLICING AND TESTING) PRIOR TO COMMENCING TELECOMMUNICATIONS

DEMOLITION.

CMH MH5

CMH MH3

CMH MH226

CMH MH225

PROVIDE (4) 4" CONDUITS FROM

MH225 TO THE B10266 TELECOM

ENTRANCE FACILITY. PROVIDE

(3) 3-INCH 3-CELL FABRIC/MESH

INNERDUCTS IN ONE OF THE

FOUR CONDUITS.

TS101

SI

TE

P

LA

N

C . M

EA

D

E

E.

H

AJ

AS

J.

B

EN

SO

N

R . R

U

BI

O

SE

C

O N

D T

IT

LE

PH

AS

E

TE

LE

C O

M

UNKNOWN CMH #

CMH MH4

CMH MH2

CMH MH1

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

1 2 3 4 5

D

C

B

A

CUI

CUI

C U

I

W R

IG

H

T-

PA

TT

ER

SO

N

A

IR

F O

R C

E

BA

SE

D

AY

TO

N , O

H

IO

R

EP

AI

R

/R

EN

O

VA

TE

A

FM

C

H Q

B U

IL

D

IN

G

(B

2)

P H

AS

E

B262 PHASE 1

P2 N

O

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

B10262 PHASE 1 - 90% FINAL REVISED - NOT FOR CONSTRUCTION

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

N . B

R O

AD

W

AY

S

T.

L

O U

IS

, M

O . 6

O

C

TO

BE

R

W

2Q R

R

XX

XX

UNKNOWN CMH #

8' x 24' TRAILER

UNKNOWN CMH # PROVIDE (2) 2" CONDUITS

FROM CMH TO TRAILER

REFER TO SHEET

TT101A

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

T

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 18 19 20 21 22 23 24 25171-A 1-B 1-C 1-D 1-E 1-EA 1-F 1-G 1-H 1-J

1-17

1-16

1-15

1-14

1-13.5

1-13

1-12

1-11

1-10

1-9.1

1-8

1-7

1-6

1-5

1-4.5

1-4

1-3

1-2

1-1

23E22EML3ML1 15

ML4

ML5

LEGEND

SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION

PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE

PERFORMED IN THE SHADED AREAS MUST BE

COORDINATED WITH COR FOUR WEEKS PRIOR TO

MINIMIZE MISSION IMPACT

NOTE:

REFER TO LIFE SAFETY PLANS FOR FIRE RATED

PARTITIONS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

S U

B M

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

A N

SI

D

IS

SU

E D

AT

E

C O

N

TR

AC

T

N O

S O

LI

C

IT

A

TI

O

N N

O

1 2 3 4 5

D

C

B

A

CUI

CUI

C U

I

W R

IG

H

T-

PA

TT

ER

SO

N

A

IR

F O

R C

E

BA

SE

D

AY

TO

N , O

H

IO

R

EP

A

IR

/R E

N O

V

AT

E A

FM

C

H Q

B U

IL

D

IN

G

(B

2)

P H

AS

E

B262 PHASE

P2 N

O

D

AT

E M

A R

K D

ES

C

R

IP

TI

O

N

J.

B

EN

S

O N

TN100A

TE

M

PO

R

AR

Y

BA

C

KB

O

N E

P

LA

N

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

N . B

R O

AD

W

AY

S

T.

L

O U

IS

, M

O . 6

C . M

E A

D E

E . H

A

JA

S

R . R

U B

IO

O

C

TO

B

ER

W

2Q R

R

XX

XX

B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION

BA

SE

M

EN

T -O

VE

R

AL

L

-P H

AS

E

TE

LE

C O

M

0 32'16' 64'

N

1/32" = 1'-0"A1 OVERALL BASEMENT TEMPORARY BACKBONE PLAN

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

G

F

E

D

C

B

A

18 19 20 21 22 23 24 2523E22E

ITN RACK 3

(2) EXISTING

4" SLEEVES

EXISTING 12" LADDER RACK

ABOVE DATA RACKS

MATCHLINE

A1 TN102A

M

AT

C H

LI

N

E

A1

TN

4A

LEGEND

SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION

PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE

PERFORMED IN THE SHADED AREAS MUST BE

COORDINATED WITH COR FOUR WEEKS PRIOR TO

MINIMIZE MISSION IMPACT

DEMOUNTABLE PARTITION

KEY PLAN

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

S U

B M

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

A N

SI

D

IS

SU

E D

AT

E

C O

N

TR

AC

T

N O

S O

LI

C

IT

A

TI

O

N N

O

1 2 3 4 5

D

C

B

A

8'4' 16'

CUI

CUI

C U

I

W R

IG

H

T-

PA

TT

ER

SO

N

A

IR

F O

R C

E

BA

SE

D

AY

TO

N , O

H

IO

R

EP

A

IR

/R E

N O

V

AT

E A

FM

C

H Q

B U

IL

D

IN

G

(B

2)

P H

AS

E

B262 PHASE

P2 N

O

D

AT

E M

A R

K D

ES

C

R

IP

TI

O

N

J.

B

EN

S

O N

TN101A

TE

M

PO

R

AR

Y

BA

C

KB

O

N E

P

LA

N

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

N . B

R O

AD

W

AY

S

T.

L

O U

IS

, M

O . 6

C . M

E A

D E

E . H

A

JA

S

R . R

U B

IO

O

C

TO

B

ER

W

2Q R

R

XX

XX

B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION

BA

SE

M E

N T

-A R

EA

P

H

AS

E

TE

LE

C O

M

1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 1

1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR

(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.

2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,

88TH COR BEFORE NETWORK OUTAGES.

3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE

BASE NETWORK ENGINEER AND PROJECT MANAGER.

4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE

DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,

NETWORK ENGINEER AND PROJECT MANAGER.

5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY

WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.

6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS

TO BE REMOVED IN PHASE 1 DEMOLITION.

7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE

PHASE 1 AREAS.

8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION

AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN

SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A

TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE

INFORMATION.

9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE

AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM

ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC

CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)

AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,

S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230

10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE

AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE

BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.

PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE

FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.

11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102

TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO

MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO

ACCESS TR S102 .

12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE

CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY

EXISTING BACKBONE CABLING.

13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING

(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING

TELECOMMUNICATIONS DEMOLITION.

14.

15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.

GENERAL NOTES

REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.

CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK

AREAS TO BE PROVIDED IN FUTURE PHASES BY THE FUTURE PHASE

CONTRACTORS. PROVIDE J-HOOKS OR OTHER CABLE SUPPORTS WHERE

NEEDED TO PROPERLY SUPPORT TEMPORARY BACKBONE CABLES.

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

L

K

J

I

H

G

18 19 20 21 22 23 24 2523E22EML3

A022

MATCHLINE

A1 TN103A

M

AT

C H

LI

N

E

A1

TN

5A

MATCHLINE

A1 TN101A

LEGEND

SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION

PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE

PERFORMED IN THE SHADED AREAS MUST BE

COORDINATED WITH COR FOUR WEEKS PRIOR TO

MINIMIZE MISSION IMPACT

DEMOUNTABLE PARTITION

KEY PLAN

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

S U

B M

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

A N

SI

D

IS

SU

E D

AT

E

C O

N

TR

AC

T

N O

S O

LI

C

IT

A

TI

O

N N

O

1 2 3 4 5

D

C

B

A

8'4' 16'

CUI

CUI

C U

I

W R

IG

H

T-

PA

TT

ER

SO

N

A

IR

F O

R C

E

BA

SE

D

AY

TO

N , O

H

IO

R

EP

A

IR

/R E

N O

V

AT

E A

FM

C

H Q

B U

IL

D

IN

G

(B

2)

P H

AS

E

B262 PHASE

P2 N

O

D

AT

E M

A R

K D

ES

C

R

IP

TI

O

N

J.

B

EN

S

O N

TN102A

TE

M

PO

R

AR

Y

BA

C

KB

O

N E

P

LA

N

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

N . B

R O

AD

W

AY

S

T.

L

O U

IS

, M

O . 6

C . M

E A

D E

E . H

A

JA

S

R . R

U B

IO

O

C

TO

B

ER

W

2Q R

R

XX

XX

B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION

BA

SE

M E

N T

-A R

EA

P

H

AS

E

TE

LE

C O

M

1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 2

1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR

(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.

2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,

88TH COR BEFORE NETWORK OUTAGES.

3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE

BASE NETWORK ENGINEER AND PROJECT MANAGER.

4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE

DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,

NETWORK ENGINEER AND PROJECT MANAGER.

5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY

WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.

6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS

TO BE REMOVED IN PHASE 1 DEMOLITION.

7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE

PHASE 1 AREAS.

8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION

AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN

SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A

TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE

INFORMATION.

9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE

AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM

ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC

CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)

AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,

S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230

10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE

AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE

BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.

PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE

FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.

11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102

TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO

MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO

ACCESS TR S102 .

12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE

CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY

EXISTING BACKBONE CABLING.

13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING

(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING

TELECOMMUNICATIONS DEMOLITION.

14.

15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.

GENERAL NOTES

REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.

CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK

AREAS TO BE PROVIDED IN FUTURE PHASES BY THE FUTURE PHASE

CONTRACTORS. PROVIDE J-HOOKS OR OTHER CABLE SUPPORTS WHERE

NEEDED TO PROPERLY SUPPORT TEMPORARY BACKBONE CABLES.

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

R

Q

P

O

N

18 19 20 21 22 23 24 2523E22E

S009

S007

M

AT

C H

LI

N

E

A1

TN

6A

MATCHLINE

A1 TN102A

LEGEND

SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION

PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE

PERFORMED IN THE SHADED AREAS MUST BE

COORDINATED WITH COR FOUR WEEKS PRIOR TO

MINIMIZE MISSION IMPACT

DEMOUNTABLE PARTITION

KEY PLAN

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

S U

B M

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

A N

SI

D

IS

SU

E D

AT

E

C O

N

TR

AC

T

N O

S O

LI

C

IT

A

TI

O

N N

O

1 2 3 4 5

D

C

B

A

8'4' 16'

CUI

CUI

C U

I

W R

IG

H

T-

PA

TT

ER

SO

N

A

IR

F O

R C

E

BA

SE

D

AY

TO

N , O

H

IO

R

EP

A

IR

/R E

N O

V

AT

E A

FM

C

H Q

B U

IL

D

IN

G

(B

2)

P H

AS

E

B262 PHASE

P2 N

O

D

AT

E M

A R

K D

ES

C

R

IP

TI

O

N

J.

B

EN

S

O N

TN103A

TE

M

PO

R

AR

Y

BA

C

KB

O

N E

P

LA

N

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

N . B

R O

AD

W

AY

S

T.

L

O U

IS

, M

O . 6

C . M

E A

D E

E . H

A

JA

S

R . R

U B

IO

O

C

TO

B

ER

W

2Q R

R

XX

XX

B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION

BA

SE

M E

N T

-A R

EA

P

H

AS

E

TE

LE

C O

M

1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 3

1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR

(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.

2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,

88TH COR BEFORE NETWORK OUTAGES.

3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE

BASE NETWORK ENGINEER AND PROJECT MANAGER.

4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE

DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,

NETWORK ENGINEER AND PROJECT MANAGER.

5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY

WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.

6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS

TO BE REMOVED IN PHASE 1 DEMOLITION.

7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE

PHASE 1 AREAS.

8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION

AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN

SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A

TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE

INFORMATION.

9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE

AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM

ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC

CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)

AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,

S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230

10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE

AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE

BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.

PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE

FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.

11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102

TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO

MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO

ACCESS TR S102 .

12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE

CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY

EXISTING BACKBONE CABLING.

13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING

(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING

TELECOMMUNICATIONS DEMOLITION.

14.

15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.

GENERAL NOTES

REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.

CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK

AREAS TO BE PROVIDED IN FUTURE PHASES BY THE FUTURE PHASE

CONTRACTORS. PROVIDE J-HOOKS OR OTHER CABLE SUPPORTS WHERE

NEEDED TO PROPERLY SUPPORT TEMPORARY BACKBONE CABLES.

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

E

D

C

B

A

11 12 13 14 16 18 191715

M

AT

C H

LI

N

E

A1

TN

1A

M

AT

C H

LI

N

E

A1

TN

7A

M

AT

C H

LI

N

E

A1

TN

1A

LEGEND

SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION

PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE

PERFORMED IN THE SHADED AREAS MUST BE

COORDINATED WITH COR FOUR WEEKS PRIOR TO

MINIMIZE MISSION IMPACT

DEMOUNTABLE PARTITION

KEY PLAN

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

S U

B M

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

A N

SI

D

IS

SU

E D

AT

E

C O

N

TR

AC

T

N O

S O

LI

C

IT

A

TI

O

N N

O

1 2 3 4 5

D

C

B

A

8'4' 16'

CUI

CUI

C U

I

W R

IG

H

T-

PA

TT

ER

SO

N

A

IR

F O

R C

E

BA

SE

D

AY

TO

N , O

H

IO

R

EP

A

IR

/R E

N O

V

AT

E A

FM

C

H Q

B U

IL

D

IN

G

(B

2)

P H

AS

E

B262 PHASE

P2 N

O

D

AT

E M

A R

K D

ES

C

R

IP

TI

O

N

J.

B

EN

S

O N

TN104A

TE

M

PO

R

AR

Y

BA

C

KB

O

N E

P

LA

N

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

N . B

R O

AD

W

AY

S

T.

L

O U

IS

, M

O . 6

C . M

E A

D E

E . H

A

JA

S

R . R

U B

IO

O

C

TO

B

ER

W

2Q R

R

XX

XX

B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION

BA

SE

M E

N T

-A R

EA

P

H

AS

E

TE

LE

C O

M

1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 4

1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR

(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.

2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,

88TH COR BEFORE NETWORK OUTAGES.

3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE

BASE NETWORK ENGINEER AND PROJECT MANAGER.

4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE

DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,

NETWORK ENGINEER AND PROJECT MANAGER.

5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY

WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.

6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS

TO BE REMOVED IN PHASE 1 DEMOLITION.

7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE

PHASE 1 AREAS.

8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION

AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN

SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A

TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE

INFORMATION.

9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE

AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM

ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC

CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)

AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,

S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230

10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE

AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE

BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.

PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE

FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.

11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102

TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO

MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO

ACCESS TR S102 .

12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE

CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY

EXISTING BACKBONE CABLING.

13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING

(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING

TELECOMMUNICATIONS DEMOLITION.

14.

15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.

GENERAL NOTES

REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.

CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK

AREAS TO BE PROVIDED IN FUTURE PHASES BY THE FUTURE PHASE

CONTRACTORS. PROVIDE J-HOOKS OR OTHER CABLE SUPPORTS WHERE

NEEDED TO PROPERLY SUPPORT TEMPORARY BACKBONE CABLES.

W

2Q R

R

_P la ns _P

H 1_

Vo l8

-0

K

J

I

H

G

11 12 13 14 16 18 1917 ML315

S013A

M

AT

C H

LI

N

E

A1

TN

2A

M

AT

C H

LI

N

E

A1

TN

8A

LEGEND

SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION

PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE

PERFORMED IN THE SHADED AREAS MUST BE

COORDINATED WITH COR FOUR WEEKS PRIOR TO

MINIMIZE MISSION IMPACT

DEMOUNTABLE PARTITION

KEY PLAN

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

S U

B M

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

A N

SI

D

IS

SU

E D

AT

E

C O

N

TR

AC

T

N O

S O

LI

C

IT

A

TI

O

N N

O

1 2 3 4 5

D

C

B

A

8'4' 16'

CUI

CUI

C U

I

W R

IG

H

T-

PA

TT

ER

SO

N

A

IR

F O

R C

E

BA

SE

D

AY

TO

N , O

H

IO

R

EP

A

IR

/R E

N O

V

AT

E A

FM

C

H Q

B U

IL

D

IN

G

(B

2)

P H

AS

E

B262 PHASE

P2 N

O

D

AT

E M

A R

K D

ES

C

R

IP

TI

O

N

J.

B

EN

S

O N

TN105A

TE

M

PO

R

AR

Y

BA

C

KB

O

N E

P

LA

N

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

N . B

R O

AD

W

AY

S

T.

L

O U

IS

, M

O . 6

C . M

E A

D E

E . H

A

JA

S

R . R

U B

IO

O

C

TO

B

ER

W

2Q R

R

XX

XX

B10262 PHASE 1 - FINAL 90% REVISED - NOT FOR CONSTRUCTION

BA

SE

M E

N T

-A R

EA

P

H

AS

E

TE

LE

C O

M

1/8" = 1'-0"A1 BASEMENT TEMPORARY BACKBONE PLAN - AREA 5

1. PROVIDE WRITTEN NOTICE TO WRIGHT-PATTERSON AIR FORCE BASE FOUR

(4) WEEKS IN ADVANCE OF NETWORK OUTAGES.

2. OBTAIN WRITTEN APPROVAL FROM WRIGHT-PATTERSON AIR FORCE BASE,

88TH COR BEFORE NETWORK OUTAGES.

3. COORDINATE NETWORK OUTAGES WITH WRIGHT-PATTERSON AIR FORCE

BASE NETWORK ENGINEER AND PROJECT MANAGER.

4. COORDINATE DEMOLITION OF TELECOMMUNICATIONS ROOMS TO BE

DEMOLISHED WITH WRIGHT-PATTERSON AIR FORCE BASE, 88TH COR,

NETWORK ENGINEER AND PROJECT MANAGER.

5. REMOVAL OF NETWORK EQUIPMENT IS TO BE PERFORMED BY

WRIGHT-PATTERSON AIR FORCE BASE NETWORK ENGINEER.

6. TRACE AND VERIFY POINT OF ORIGIN OF TELECOMMUNICATIONS CIRCUITS

TO BE REMOVED IN PHASE 1 DEMOLITION.

7. REMOVE TELECOMMUNICATIONS CIRCUITS THAT ORIGINATE AND SERVICE

PHASE 1 AREAS.

8. TELECOMMUNICATIONS CIRCUITS ORIGINATING IN PHASE 1 DEMOLITION

AREAS, BUT SERVICING PHASE 1 & 2 AREAS MUST REMAIN IN

SERVICE.THOSE CIRCUITS MUST BE RELOCATED TO A

TELECOMMUNICATIONS ROOM. REFER TO TD SHEETS FOR MORE

INFORMATION.

9. PROVIDE (1) ARMORED 12-STRAND SINGLE-MODE OS2 OPTICAL FIBER CABLE

AND (1) ARMORED 12-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE FROM

ITN RACK 3 TO THESE TR'S. TERMINATE ON BOTH ENDS WITH LC

CONNECTORS. PROVIDE RACK-MOUNTED FIBER TERMINATION UNITS (FTU'S)

AND MOUNT TERMINATED FIBER IN THE FTU'S.BASEMENT LEVEL: S007, A022,

S013A, S014.FIRST FLOOR: N114, C117, S138.SECOND FLOOR: B230

10. PROVIDE (1) ARMORED 6-STRAND SINGLE-MODE 0S2 OPTICAL FIBER CABLE

AND (1) ARMORED 6-STRAND MULTIMODE OM5 OPTICAL FIBER CABLE

BETWEEN THESE TRS. TERMINATE ON BOTHE ENDS WITH LC COMMECTORS.

PROVIDE RACK-MOUNTED FTU'S ADN MOUNT TERMINATE FIBER IN THE

FTU'S. FIRST FLOOR : FROM S138 TO C106 , S134,S110,AND S142.

11. ON THE FIRST FLOOR, EXISTING CABLES CONNECTING TR'S S105 AND S102

TO C126 MUST BE DISCONNECTED IN C126 AND REROUTED TO S138 TO

MINIMIZE DISRUPTIONS TO, TR S102. THIS WILL ALSO MINIMIZE THE NEED TO

ACCESS TR S102 .

12. REFER TO SHEET TT603 FOR INFORMATION ON TEMPORARY BACKBONE

CABLING. REFER TO DEMOLITION SHEETS FOR PATHWAYS USED BY

EXISTING BACKBONE CABLING.

13. PROVIDE TEMPORARY TELECOMMUNICATIONS BACKBONE CABLING

(INCLUDING SPLICING AND TESTING) PRIOR TO COMMENCING

TELECOMMUNICATIONS DEMOLITION.

14.

15. COORDINATE WITH 88TH COMMUNICATIONS GROUP.

GENERAL NOTES

REFER TO CABLE TRAY SHEETS FOR CABLE TRAYS AND CONDUITS.

CABLE TRAY AND CONDUITS OUTSIDE OF THE CURRENT SCOPE OF WORK

AREAS TO BE PROVIDED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .