W912QR22R0028_CUI_CF_Plans_Vol5-0002.pdf
PDF 13 MB Posted
- Solicitation number
- W912QR22R0028
About this file
This solicitation notice provides details for a renovation project at Wright-Patterson Air Force Base in Ohio. The U.S. Army Corps of Engineers Louisville District plans to issue a request for proposal for design and construction services for phase one of the renovation of the Air Force Materiel Command Headquarters building. The project scope includes repairing and renovating over 60,000 square feet of interior space as well as exterior improvements. Work will be completed over an estimated 1095 calendar day performance period. A firm-fixed price contract valued between $100-250 million is anticipated. The solicitation is designated as unrestricted and will utilize a best value source selection process. The solicitation is scheduled for release on November 10, 2022 via the System for Award Management website. Offers are due in early 2023 with award planned for mid-2023.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled by: USACE-LRL-ED-MA CUI Category(ies):
LDC or Distribution Statement: N/A POC: Blake Gevedon Contracting Specialist william.b.gevedon@usace.army.mi 502.315.6791
Materials shall be submitted to potential offerors currently certified in the Joint Certification Program (JCP) only.
WRIGHT-PATTERSON AIR
FORCE BASE
STATE ROUTE 444
IN
TE
R
ST
AT
E
INTERSTATE 70
S
TA
TE
R
O U
TE
STATE ROUTE 4
STATE ROUTE 444
T ROAD
A
ST
R
EE
T
OGDEN A
VENUE
C H
ID
LAW
R O
AD
B ROAD
N R
O A D
A STREET
STATE R
OUTE 44
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers ®
P2 NO.:
ISSUE DATE:
VOLUME:
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
SOLICITATION NO.:
PHASEREPAIR/RENOVATE AFMC HEADQUARTERS BUILDING
B 10262
W912QR21R0028
CONTROLLED BY: USACE
CONTROLLED BY: LOUISVILLE DISTRICT
CUI CATEGORY: CUI BASIC
DISTRIBUTION/DISSEMINATION CONTROLS: DISTRO C
POC: STEVE SKAGGS, 502-315-6368
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
BE
N
SO
N
PLAN NORTH PLAN NORTHTRUE NORTH TRUE NORTH
G005
VO
LU
M E
-P
H
AS
E
C O
VE
R
S H
EE
T
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
EE
R
IN
G
G R
O U
P
IN
C
H
IG
H
LA
N D
S
PL
AZ
A
D R
IV
E
SU
IT
E
ST
. L O
U
IS
, M O
R .M
ES
SE
L
N .R
EN
D
LE
M
AN
J.
C
O R
SO
N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
LOUISVILLE DISTRICT
475429
05 DECEMBER 2022
PL
U
M
BI
N G
WRIGHT-PATTERSON AIR FORCE BASE
DAYTON, OHIO 45433
B10262 PHASE 1 - CERTIFIED FINAL
G
EN
E R
AL
PLUMBING
VICINITY MAP LOCATION MAP
12-05-2022
14 December 2022
W912QR22R0028-0002
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I
D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E D
A Y
T O
N
O H
IO
R E
P A
IR
/R
E N
O V
A T
E A
F M
C H
Q B
U
IL
D
IN
G
B
P
H A
S E
B262 PHASE
P
N O
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
J
B E
N S
O N
G013
V O
L U
M E
P H
A S
E
S H
E E
T I
N D
E X
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
E N
G
IN
E E
R
IN
G G
R O
U P
I N
C
H
IG
H L
A N
D S
P L
A Z
A D
R
IV
E S
U
IT
E
S T
L
O U
IS
M O
R
M E
S S
E L
N
R E
N D
L E
M A
N
J
C O
R S
O N
D E
C E
M B
E R
B10262 PHASE 1 - CERTIFIED FINAL
P L
U M
B
IN
G
G E
N E
R A
L
P001 GENERAL NOTES, LEGEND AND SYMBOLS - PHASE 1
PD100A OVERALL DEMOLITION FLOOR PLAN - PHASE 1
PD101A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD102A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD103A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD104A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD105A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD106A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD107A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD108A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD109A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD110A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD111A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD112A AREA DEMOLITION FLOOR PLAN - PHASE 1
PD100B OVERALL DEMOLITION FLOOR PLAN - PHASE 1
PD100C OVERALL DEMOLITION FLOOR PLAN - PHASE 1
PD100R OVERALL DEMOLITION ROOF PLAN - PHASE 1
P100A OVERALL FLOOR PLAN - PHASE 1
P101A AREA FLOOR PLAN - PHASE 1
P102A AREA FLOOR PLAN - PHASE 1
P103A AREA FLOOR PLAN - PHASE 1
P104A AREA FLOOR PLAN - PHASE 1
P105A AREA FLOOR PLAN - PHASE 1
P106A AREA FLOOR PLAN - PHASE 1
P107A AREA FLOOR PLAN - PHASE 1
P108A AREA FLOOR PLAN - PHASE 1
P109A AREA FLOOR PLAN - PHASE 1
P110A AREA FLOOR PLAN - PHASE 1
P110A-A NORTH VESTIBULE FLOOR PLAN - PHASE 1
P111A AREA FLOOR PLAN - PHASE 1
P112A AREA FLOOR PLAN - PHASE 1
P100B OVERALL FLOOR PLAN - PHASE 1
P101B AREA FLOOR PLAN - PHASE 1
P102B AREA FLOOR PLAN - PHASE 1
P103B AREA FLOOR PLAN - PHASE 1
P104B AREA FLOOR PLAN - PHASE 1
P105B AREA FLOOR PLAN - PHASE 1
P106B AREA FLOOR PLAN - PHASE 1
P107B AREA FLOOR PLAN - PHASE 1
P108B AREA FLOOR PLAN - PHASE 1
P109B AREA FLOOR PLAN - PHASE 1
P110B AREA FLOOR PLAN - PHASE 1
P110B-A NORTH VESTIBULE FLOOR PLAN - PHASE 1
P111B AREA FLOOR PLAN - PHASE 1
P112B AREA FLOOR PLAN - PHASE 1
P100C OVERALL FLOOR PLAN - PHASE 1
P101C AREA FLOOR PLAN - PHASE 1
P102C AREA FLOOR PLAN - PHASE 1
P103C AREA FLOOR PLAN - PHASE 1
P104C AREA FLOOR PLAN - PHASE 1
P105C AREA FLOOR PLAN - PHASE 1
P106C AREA FLOOR PLAN - PHASE 1
P107C AREA FLOOR PLAN - PHASE 1
P108C AREA FLOOR PLAN - PHASE 1
P109C AREA FLOOR PLAN - PHASE 1
P110C AREA FLOOR PLAN - PHASE 1
P110C-A NORTH VESTIBULE FLOOR PLAN - PHASE 1
P111C AREA FLOOR PLAN - PHASE 1
P112C AREA FLOOR PLAN - PHASE 1
P100R OVERALL ROOF PLAN - PHASE 1
P301 PLUMBING SECTION - PHASE 1
P401 ENLARGED DOCK AREA - PHASE 1
P402 ENLARGED BUILDING 10264 - PHASE 1
P403 ENLARGED MECHANICAL ROOM - PHASE 1
P404 ENLARGED AIR HANDLER UNIT PIPING PLAN - PHASE 1
P405 ENLARGED RESTROOM PLANS - PHASE 1
P406 ENLARGED RESTROOM PLANS - PHASE 1
P407 ENLARGED PENTHOUSE #2 - PHASE 1
P408 ENLARGED DIESEL TANK - PHASE 1
P501 PLUMBING DETAILS - PHASE 1
P502 PLUMBING DETAILS - PHASE 1
P503 PLUMBING DETAILS - PHASE 1
P504 PLUMBING DETAILS - PHASE 1
P505 PLUMBING DETAILS - PHASE 1
P601 FIXTURE SCHEDULE - PHASE 1
P602 EQUIPMENT SCHEDULES - PHASE 1
P603 EQUIPMENT SCHEDULES - PHASE 1
P701 WATER SERVICE DIAGRAM - PHASE 1
P702 RESTROOM WATER DIAGRAM - PHASE 1
P703 NE TOILET WASTE/VENT RISER DIAGRAM - PHASE 1
P704 SE TOILET WASTE/VENT RISER DIAGRAM - PHASE 1
P705 NE TOILET DOMESTIC WATER RISER DIAGRAM - PHASE 1
P706 SE TOILET DOMESTIC WATER RISER DIAGRAM - PHASE 1
P707 NW TOILET WASTE/VENT RISER DIAGRAM - PHASE 1
P708 NW TOILET DOMESTIC WATER RISER DIAGRAM - PHASE 1
P709 WATER HEATING DIAGRAM - FOOD SERVICE - PHASE 1
P710 NATURAL GAS DIAGRAM - PHASE 1
P711 FUEL OIL CONTROL FLOW SCHEMATIC - PHASE 1
P801 CONTROLS SYMBOLS AND LEGEND - PHASE 1
P802 PLUMBING CONTROLS - PHASE 1
P803 PLUMBING CONTROLS - PHASE 1
P804 PLUMBING CONTROLS - PHASE 1
P805 PLUMBING CONTROLS - PHASE 1
P806 PLUMBING CONTROLS - PHASE 1
P807 PLUMBING CONTROLS - PHASE 1
P808 PLUMBING CONTROLS - PHASE 1
P809 PLUMBING CONTROLS - PHASE 1
P810 PLUMBING CONTROLS - PHASE 1
PLUMBING SHEET INDEXGENERAL SHEET INDEX
G005 VOLUME 5 - PHASE 1 COVER SHEET - PLUMBING
G013 VOLUME 5 - PHASE 1 SHEET INDEX - PLUMBING
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
S
LEGEND
PIPING SYMBOLS
GENERAL NOTES
THERE WILL BE TWO GRAVITY OUTFLOWS FROM BUILDING B10262. THE MAIN DRAIN IS A 10" SANITARY HANDLING RESTROOM STACKS WHICH WILL HANDLE 947 DFU'S (APPROXIMATELY 203 GPM). THE SECOND OUTFLOW IS GREASE WASTE ESTIMATED AT 66 DFU'S (APPROXIMATELY 60 GPM BY DFU AND 175 GPM PER GREASE INTERCEPTOR CALCULATION).
EXISTING TO BE
REMOVED
NEW EQUIPMENT
FUTURE
EQUIPMENT
EQUIPMENT SYMBOLS
PITCH DOWN IN DIRECTION OF ARROW
DIRECTION OF FLOW
BRANCH - TOP CONNECTION
BRANCH - SIDE CONNECTION
CONCENTRIC REDUCER
RISER UP (ELBOW)
CAPPED PIPE
BRANCH - BOTTOM
CONNECTION
RISE OR DROP IN PIPE
RISER DOWN (ELBOW)
PUMP
LINE/WALL CLEANOUT
PIPING TYPES
A.
B.
C.
D.
E.
F.
G.
H.
J.
K.
L.
M.
N.
P.
Q.
REFER TO SPECIFICATIONS FOR MATERIALS FOR CONSTRUCTION.
COORDINATE THE EXACT LOCATION OF FLOOR DRAINS WITH THE ARCHITECTURAL DRAWINGS AND MECHANICAL EQUIPMENT LOCATIONS PRIOR TO INSTALLATION OF DRAINS. PROVIDE A RADIUS AROUND THE FLOOR DRAIN THAT SLOPES TOWARD THE FLOOR DRAIN FROM THE FINISHED FLOOR ELEVATION TO A TOP OF DRAIN ELEVATION BETWEEN 1/2 INCH AND 3/4 INCH BELOW FINISHED FLOOR, UNLESS OTHERWISE NOTED ON THE DRAWINGS. THE RADIUS AND RATE OF
SLOPE IS TO BE FIELD COORDINATED.
FURNISH ACCESS DOORS FOR INSTALLATION IN WALLS AND CEILINGS WHERE ACCESS IS REQUIRED TO CONCEALED
PLUMBING EQUIPMENT, VALVES, CONTROLS, AND OTHER DEVICES.
COORDINATE WORK WITH ARCHITECTURAL FEATURES AND COORDINATE WORK SUCH THAT INTERFERENCES BETWEEN PIPING, DUCTWORK, EQUIPMENT, HVAC WORK, FIRE PROTECTION W ORK, ELECTRICAL W ORK, AND BUILDING STRUCTURE
WILL BE AVOIDED.
PROVIDE THE ENTIRE SYSTEM AND ITS COMPONENT ITEMS OF EQUIPMENT IN OPERATING CONDITION WITHOUT OBJECTIONABLE VIBRATION OR NOISE. PROVIDE WATER HAMMER ARRESTORS AT RESTROOM PLUMBING CHASES. NOISE
LEVELS IN OFFICES MUST BE MAINTAINED AT OR BELOW NC35.
VERIFY AND DOCUMENT EXISTING CONDITIONS AND DIMENSIONS ON THE JOB SITE PRIOR TO STARTING WORK. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT' DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD
VERIFY CONDITIONS PRIOR TO CONSTRUCTION.
DO NOT SCALE THESE DRAWINGS FOR CONSTRUCTION PURPOSES.
INSTALL PIPING TO PROVIDE THE MAXIMUM POSSIBLE CLEAR HEIGHT UNDERNEATH. MAINTAIN A MINIMUM OF 6 INCHES
ABOVE FINISHED CEILING TO PROVIDE CLEARANCE FOR LIGHTING FIXTURES.
CONTRACTOR MUST MAKE FINAL CONNECTIONS TO EQUIPMENT.
VENT TERMINALS MUST EXTEND A MINIMUM OF 18 INCHES ABOVE THE FINISHED ROOF AND MUST BE LOCATED A MINIMUM OF 10 FEET HORIZONTALLY FROM DOOR, OPERABLE WINDOW, OR OTHER AIR INTAKE OF THE BUILDING OR ADJACENT BUILDING UNLESS THE VENT TERMINAL IS AT LEAST 3 FEET ABOVE THE TOP OF SUCH OPENING.
VENT LINES ARE TO RISE VERTICALLY (45 DEG. ANGLE OR GREATER FROM HORIZONTAL) TO MINIMUM OF 6 INCHES
ABOVE THE HIGHEST FLOOD RIM LEVEL OF THE HIGHEST FIXTURE SERVED BY VENT.
TO PREVENT FROST CLOSURE, VENT EXTENSIONS THROUGH ROOF OR WALL MUST BE A MINIMUM OF 3 INCH DIAMETER.
INCREASE IN THE SIZE OF THE VENT MUST BE MADE INSIDE THE STRUCTURE A MINIMUM OF 12 INCHES BELOW THE ROOF
OR INSIDE THE WALL.
UTILITIES LOCATED BELOW GROUND AND EXTERIOR OF THE BUILDING MUST BE INSTALLED A MINIMUM OF 12 INCHES
BELOW FROST DEPTH OF 48 INCHES.
REFER TO DRAWINGS AD001, AD100A, AD100B, AD100C, AND AD100R FOR NOTES ON ASBESTOS AND OTHER ENVIRONMENTAL HAZARDS THAT REQUIRE REMOVAL. THESE NOTES ALSO REFERENCE RELATED SPECIFICATION
SECTIONS.
WATER CLOSET FLUSH LEVER CONTROLS MUST BE ORIENTED FOR ACCESS FROM THE WIDE-SIDE OF AN ABA COMPLIANT
RESTROOM STALL.
DRAWING/DETAIL REFERENCE KEY
RE : A2 / P-201
REFER TO
DRAWING/DETAIL
NUMBER
SHEET NUMBER ON
WHICH DETAIL IS
DRAW N A2
P-201
SANITARY SEWER
SANITARY VENT (V)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
COMPRESSED AIR
NATURAL GAS
CONDENSATE DRAIN
TEPID WATER SUPPLY
NON POTABLE WATER
TRAP PRIMER
SAN
DHW
TW
TP
NG
CD
CA
NPW
X "X" DENOTES:
A - COMPRESSED AIR DROP
B - BREATHABLE AIR DROP
P
CLEANOUT
HOSE BIBB, WALL HYDRANT
FLOOR DRAIN, FLOOR SINK
P-TRAP
PLUMBING FIXTURES AND
EQUIPMENT
METER
BACKFLOW PREVENTER
RISER DESIGNATION DENOTING
ASSOCIATED SANITARY OR DOMESTIC
WATER RISER DIAGRAM
PROCESS COMPRESSED AIR
CONNECTION
KEYNOTE REFERENCE
(NEW WORK)
POINT OF CONNECTION
TO EXISTING
WATER HAMMER ARRESTOR
STORM DRAINSD
ODL OVERFLOW ROOF DRAIN LEADER
WATER SERVICE FLOW DATA
HYDRANT FLOW TESTS WERE PERFORMED ON JUNE 12, 2019. REFER TO FIRE PROTECTION DRAWINGS. WATER PIPE SIZES ARE BASED ON A MINIMUM WORKING PRESSURE OF 46.9 PSIG AT A FLOW RATE OF 373 GPM AT THE LOCATION WHERE THE MAIN SERVICE ENTERS THE BUILDING. CURRENTLY, DUE TO AVAILABLE PRESSURE AT THE CITY WATER MAIN AND THE PRESSURE DROP THROUGH A 6 INCH BUILDING SERVICE LINE, A WATER METER, AN ASSE 1013 BACKFLOW PREVENTER AND A WATER SOFTENER, THERE WILL BE AS LOW AS 22.1 PSI AVAILABLE AT THE BUILDING ENTRANCE AND A WATER PRESSURE BOOSTER PUMP WILL BE REQUIRED TO RAISE THE WATER PRESSURE TO 67 PSI REQUIRED TO OPERATE FLUSH VALVES.
VALVE SYMBOLS
CHECK VALVE (NON SLAM)
PLUG VALVE
GLOBE VALVE
GATE VALVE
PRESSURE REDUCING VALVE
(PRV)
BALL VALVE
BUTTERFLY VALVE
VENTURI FLOW METER
NEEDLE VALVE
VALVE IN DROP
VALVE IN RISE
VALVE IN CENTER DROP
GATE VALVE W/ 20 mm HOSE
THREAD ADAPTER
TWO-WAY CONTROL VALVE
THREE-W AY CONTROL VALVE
SOLENOID VALVE
SAFETY VALVE OR
PRESSURE RELIEF VALVE
MANUAL BALANCING VALVE
AUTOMATIC BALANCING
OR FLOW CONTROL VALVE
TEMPERATURE WELL
FLANGED VALVE
(GATE VALVE
SHOWN)
FS
PS
PIPE GUIDE
PIPE ANCHOR
BLIND FLANGE
PRESSURE GAGE WITH COCK
UNION (SCREWED)
ORIFICE UNION
FLANGED CONNECTION
STRAINER WITH BLOWDOWN VALVE
TEMPERATURE & PRESSURE PORT
THERMOMETER
FLOW SWITCH
FLEX CONNECTION
FLEX PIPE
PRESSURE SWITCH
X
DESIGN CRITERIA
STORM DRAINAGE DATA
THE PRIMARY STORM DRAINAGE SYSTEM IS DESIGNED FOR A 3 INCHES PER HOUR RAINFALL RATE. STORM DRAINAGE SYSTEM FOR OFFICE BUILDING WILL CONSIST OF SCUPPERS AND DOWNSPOUTS FOR PENTHOUSES ROUTED TO THE MAIN ROOF. MAIN ROOF WILL INCLUDE GRAVITY PRIMARY DRAINS THROUGHOUT, GRAVITY EMERGENCY OVERFLOW DRAINS AT THE PERIMETER OF THE BUILDING AND COMBINED GRAVITY OVERFLOW DRAINS FOR THE INTERIOR LOCATIONS NOT BORDERING THE
PERIMETER.
SANITARY DRAINAGEX=W FOR W ATER, X=G FOR GAS
POINT OF DISCONNECTION
FROM EXISTING
FLANGED ORIFICE
TEPID WATER RETURNTR
DHWR
DCW
V
NOTES
THE PLUMBING SYSTEM ARE DESIGN IN COMPLIANCE WITH ASHRAE 90.1-2013, ASHRAE 189.1-2014 AND UFC
1-200-02 HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS.
ENERGY CODE COMPLIANCE
PUMP DISCHARGEPD
GREASE WASTEGW
COMBINATION WASTE AND VENTSV
SUBSOIL DRAINSSD
THE PLUMBING SYSTEMS ARE DESIGN IN COMPLIANCE WITH 2018 INTERNATIONAL PLUMBING CODE AS
MODIFIED BY UFC 3-420-01 PLUMBING SYSTEMS.
PLUMBING CODE COMPLIANCE
BREATHABLE AIRBA
1 KEYNOTE REFERENCE
(DEMOLITION WORK)
RDL PRIMARY ROOF DRAIN LEADER
SOFTENED WATERSW
INDUSTRIAL WASTEIW
CONSIDERATIONS IN ADVANCE OF DEMOLITION
1. THERE IS NO TEMPORARY PLUMBING WORK THAT MUST OCCUR PRIOR TO COMMENCEMENT OF
DEMOLITION WORK IN PHASE 1.
2. THERE WILL BE A NEED TO WORK AROUND THE BUILDING OCCUPANTS FOR DEMOLITION WORK
FOR PHASE 1 FIXTURES LOCATED ON THE FIRST FLOOR.
3. THERE WILL BE A NEED TO WORK AROUND THE BUILDING OCCUPANTS FOR THE NEW WORK THAT
WILL NEED TO BE INSTALLED ABOVE THE SECOND FLOOR CEILING.
NATURAL GAS IS SUPPLIED TO THE SITE AT APPROXIMATELY 12 PSIG. VECTREN, THE BASE GAS UTILITY PROVIDER, WILL PROVIDE A REGULATOR DELIVERING 2.0 PSIG NATURAL GAS. GAS PIPE SIZES ARE BASED ON A MAXIMUM PRESSURE DROP OF 1.0 PSIG TO THE MOST EXTREME USERS (FOOD SERVICE AND AHU-5 AND AHU-6 HUMIDIFIERS). GAS PRESSURE REGULATORS ARE REQUIRED FOR EACH APPLIANCE. TOTAL CONNECTED LOAD IS ESTIMATED AT 6,737 KBTUH OR 6,625
CFH.
NATURAL GAS
FUEL OIL RETURNFOR
FUEL OIL SUPPLYFOS
ABV ABOVE
AD AIR DEVICE
ADJ ADJUSTABLE
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
ANSI AMERICAN NATIONAL STANDARD INSTITUTE
ARCH ARCHITECT, ARCHITECTURAL
ARI AIR CONDITIONING & REFRIGERATION INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOS BOTTOM OF STRUCTURE
CD CONDENSATE DRAIN
CFF CAP FOR FUTURE
CFH CUBIC FEET PER HOUR
CIRC CIRCULATING
CO CLEANOUT
CP CIRCULATING PUMP
DCBFP DOUBLE CHECK BACKFLOW PREVENTER
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DN DOWN
DR DRAIN
DWG DRAWING
E EXISTING
EA EXHAUST AIR, EACH
EES EMERGENCY EYE/FACE WASH AND SHOWER
EEW EMERGENCY EYE/FACE WASH
ELEC ELECTRICAL
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
FA FROM ABOVE
FB FROM BELOW
FCO FLOOR CLEANOUT
FLA FULL LOAD AMPS
FS FLOW SWITCH, FOOD SERVICE
GPM GALLONS PER MINUTE
GCO GRADE CLEANOUT
HB HOSE BIBB
HTG HEATING
IE INVERT ELEVATION
IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
IN WC INCHES OF WATER COLUMN
JT JOINT
K CONDUCTIVITY (BT/SF/1" THICKNESS)
KW KILOWATT
KWH KILOWATT-HOUR
L LAVATORY
MECH MECHANICAL
MFR MANUFACTURER
MS MOP SINK
N NEW
NC NOISE CRITERIA, NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
ODL OVERFLOW DRAIN LEADER
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PD PRESSURE DROP
PLBG PLUMBING
PROVIDE FUNISH AND INSTALL
QTY QUANTITY
RDL ROOF DRAIN LEADER
RE: REFERENCE, REFER
REQD REQUIRED
RPBFP REDUCED PRESSURE BACKFLOW PREVENTER
S SINK
SAN SANITARY SEWER
SD SITE DRAIN, STORM DRAIN
SH SHOWER
SPEC SPECIFICATION
SS SANITARY SEWER
STD STANDARD
TMV THERMOSTATIC MIXING VALVE
TYP TYPICAL
TS TEMPERED SUPPLY
U URINAL
UF UNDERFLOOR
UL UNDERWRITERS LABORATORIES, INC.
UON UNLESS OTHERWISE NOTED
V VENT
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
WC WATER CLOSET
WH WATER HEATER
ABBREVIATIONS
HEAT TRACE
T
HEAT TRACE TERMINATION
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
P001
G
EN
ER
AL
N O
TE
S, L
EG
EN
D
A N
D S
YM
B
O
LS
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M
BI
N G
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
T
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 19 20 21 22
23 24 25
1-J1-H1-G1-F1-E1-D1-C1-B1-A
1-17
1-16
1-15
1-14
1-13.5
1-13
1-12
1-11
1-10
1-9.1
1-9.2
1-8
1-7
1-6
1-5
1-4.5
1-4
1-3
1-2
1-1
22E
080 080
026026026
REMOVE VENT FROM
(E) GREASE
INTERCEPTOR
B10264 B10263
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
PD100A
O
VE
R A
LL
D
EM
O
LI
TI
O N
F
LO
O R
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M B
IN
G
D
EM
O
LI
TI
O
N
KEYED NOTES - FLOOR PLAN
012 RESTROOM TO REMAIN IN SERVICE. MAINTAIN SANITARY DRAIN, VENT AND
DOMESTIC WATER SERVICES. REMOVE BRANCH DOMESTIC WATER SERVING
DEMOLITION AREAS. MAINTAIN VENT PIPING THRU TO BUILDING EXTERIOR.
026 REMOVE STORMWATER PIPING AT FOUNDATION. REMAINING PIPING IN BUILDING TO
BE ABANDONED IN PLACE. FOUNDATION OPENINGS TO BE SEALED WATER-TIGHT.
SEE DETAILS C1/A534.
049 REMOVE GREASE INTERCEPTOR AND ALL RELATED PIPING THROUGH FOUNDATION.
REMAINING PIPING WITHIN BUILDING WILL BE RE-ROUTED TO SANITARY.
079 REMOVE TWO PAIR OF 4" FLUE AND 4" COMBUSTION AIR PIPING SERVING BOILERS.
IN-FILL OPENINGS IN CONCRETE WALL PER SPECIFICATIONS.
080 EXISTING ROOF DRAIN LEADER (EXPOSED) TO REMAIN UNCHANGED.
087 DEMOLISH EXISTING ABOVE CEILING SERVICES FOR FIXTURES AT FLOOR ABOVE.
DEMOLITION INCLUDES DCW, DHW, DHWR, SANITARY AND VENT PIPING.
089 REMOVE EXISTING WATER CLOSETS AND CAP PRESSURE PIPING AT BRANCH,
SANITARY PIPING TO REMAIN, PLUG ALL SANITARY PIPING WHERE FIXTURES ARE
REMOVED.
434 THIS CROSSHATCHED AREA IS TO BE TREATED UNIQUELY WITH REGARDS TO
DEMOLITION AND WATERPROOFING FROM THAT OF OTHER AREAS OF THE PROJECT.
SEE DRAWING A100AA.3 AND PD101A, PD104A, P101A AND P104A FOR SPECIFIC
ACTIONS REQUIRED HERE.
0 32'16' 64'
N
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE 1 CONSTRUCTION
PERIOD EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING
SYSTEMS TO REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND
RETURN TO OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER
SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND CLEANOUTS MUST BE REMOVED TO 4" BELOW FINISHED FLOOR,
AND THE FLOOR MUST BE REPAIRED W ITH FINISHED CONCRETE.
REFER TO ARCHITECTURAL DETAIL C1/A534.
5. WHERE ABOVE FLOOR FIXTURES AND SERVICES ARE DEMOLISHED, REMOVE
DCW, DHW , AND DHW R BRANCH PIPING BACK TO SERVICE MAIN ISOLATION
VALVES AND CAP. REMOVE SANITARY BRANCHES AND VENT BRANCHES
BACK TO MAIN AND CAP. MAINTAIN SERVICE FOR EXISTING TO REMAIN
FIXTURES.
GENERAL DEMOLITION NOTES
1/32" = 1'-0"A1 BASEMENT DEMOLITION PLAN - OVERALL
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
G
F
E
D
C
B
A
18 19 20 21 22 23 24 25
M
AT
C H
LI
N
E
A1 P1
A
MATCHLINE
A1 P102A
22E
087093093093
090090
B10264 B10263
(E) 3" V UP
(52 DFU)
(VERIFY LOCATION)
(E) 3" DCW
(E) 2" DHW
(E) 3/4" DHWR(E) 4" V UP
(E) 5" SAN FA
(E) 2-1/2" DCW
(E) 1-1/4" DHW
(E) 3/4" DHWR
4" SSD (VIF)6" SSD (VIF)
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
AREA OF CLIN 002 - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE I PERIOD
EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING SYSTEMS TO
REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND RETURN TO
OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND CLEANOUTS MUST BE REMOVED TO 4" BELOW FINISHED FLOOR,
AND THE FLOOR MUST BE REPAIRED W ITH FINISHED CONCRETE. REFER TO
ARCHITECTURAL DETAIL C1/A534.
5. WHERE DEMOLITION WORK OCCURS ABOVE EXISTING CEILING, REMOVE THE
CEILING PANELS AND REPLACE THEM WHERE REQUIRED. IT IS EXPECTED THAT
THERE WILL BE SOME SUPPORT TEES THAT WILL NEED TO BE REMOVED, BUT
THIS SHOULD BE MINIMAL. SIMILARLY, SOME CEILING PANELS MAY BE DAMAGED.
DAMAGED TEES AND PANELS MUST BE REPLACED WITHIN THE CONTRACT
AMOUNT. ARCHITECTURAL DRAWINGS SHOW W HERE MAJOR WORK REQUIRING
REMOVAL AND REPLACEMENT OF THE CEILING, INCLUDING SUPPORT GRID, IS
REQUIRED.
GENERAL DEMOLITION NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
PD101A
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M B
IN
G
D
EM
O
LI
TI
O
N
1/8" = 1'-0"A1 BASEMENT DEMOLITION PLAN - AREA 1
KEYED NOTES - FLOOR PLAN
001 PLANTER DRAIN BRANCH PIPING AND MAIN TO BE REMOVED TO FOUNDATION.
078 ABANDONED STORMWATER LEADER (VERTICAL) TO REMAIN IN-PLACE.
087 DEMOLISH EXISTING ABOVE CEILING SERVICES FOR FIXTURES AT FLOOR ABOVE.
DEMOLITION INCLUDES DCW, DHW, DHWR, SANITARY AND VENT PIPING.
090 DEMOLISH 3" IRRIGATION PIPING AND BACKFLOW PREVENTER, AND PATCH WALL.
092 EXISTING STORM WATER PIPING TO REMAIN.
093 DISCONNECT, CAP AND ABANDON (E) 3" DCW (NORTH), (E) 1-1/4" DHW (CENTER), AND
(E) 3/4' DHWR (SOUTH) SERVING EXISTING RESTROOMS ON FIRST AND SECOND
FLOORS.
429 DRAINS WITHIN WINDOW WELL TO REMAIN IN SERVICE. PIPING TO BE CLEARED OF
DEBRIS AND SEDIMENT. CAST IRON DOME STRAINER TO BE CLEANED AND
RE-INSTALLED. REPLACE WITH NEW CAST IRON DOME STRAINER IF FOUND TO BE
DAMAGED. TYPICAL OF 3 LOCATIONS WITHIN THIS WINDOW WELL.
430 RETAIN FOUNDATION DRAIN PIPING BENEATH WINDOW WELL BETWEEN B10262 AND
B10264/10263.
433 PRESERVE THE EXISTING SECTIONS OF THE FOUNDATION DRAIN FROM COLUMN 16
TO COLUMN 22. PROVIDE A TELEVISION VIDEO OF THE PIPING FROM COLUMN 16 TO
COLUMN 22. ALSO, VIDEO THE AREAWAY DRAIN PIPING BETWEEN THE WINDOW WELL
DRAIN BODIES AND THE CONNECTION TO THE FOUNDATION DRAIN.
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
M
L
K
J
I
H
G
18 19 20 21 22 23 24 25
MATCHLINE
A1 PD103A
MATCHLINE
A1 PD101A
M
AT
C H
LI
N
E
A1
PD
5A
22E
HVAC
UNIT
HVAC
UNIT
AIR
COMPRESSOR
FIRE
PROTECTION
VALVES
(E) 2" DHW
(E) 3" DCW
(E) 3/4" DHWR
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
AREA OF CLIN 002 - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE I PERIOD
EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING SYSTEMS TO
REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND RETURN TO
OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND CLEANOUTS MUST BE REMOVED TO 4" BELOW FINISHED FLOOR,
AND THE FLOOR MUST BE REPAIRED W ITH FINISHED CONCRETE. REFER TO
ARCHITECTURAL DETAIL C1/A534.
5. WHERE DEMOLITION WORK OCCURS ABOVE EXISTING CEILING, REMOVE THE
CEILING PANELS AND REPLACE THEM WHERE REQUIRED. IT IS EXPECTED THAT
THERE WILL BE SOME SUPPORT TEES THAT WILL NEED TO BE REMOVED, BUT
THIS SHOULD BE MINIMAL. SIMILARLY, SOME CEILING PANELS MAY BE DAMAGED.
DAMAGED TEES AND PANELS MUST BE REPLACED WITHIN THE CONTRACT
AMOUNT. ARCHITECTURAL DRAWINGS SHOW W HERE MAJOR WORK REQUIRING
REMOVAL AND REPLACEMENT OF THE CEILING, INCLUDING SUPPORT GRID, IS
REQUIRED.
GENERAL DEMOLITION NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
PD102A
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M B
IN
G
D
EM
O
LI
TI
O
N
KEYED NOTES - FLOOR PLAN
003 ALL PLUMBING FIXTURES AND RELATED PIPING WITHIN THIS ROOM OR AREA TO BE
REMOVED. REMOVE SANITARY DRAIN PIPING THROUGH BUILDING TO FLUSH WITH
BASEMENT FLOOR SLAB AND DOMESTIC WATER BRANCH PIPING BACK TO MAINS.
REMOVE SANITARY VENT PIPING THROUGH FLOOR ABOVE.
007 PRIMARY RAINWATER LEADER (VERTICAL) TO BE REMOVED TO 4" BELOW FLOOR.
REMOVE HORIZONTAL PIPING WHERE IT IS IN CONFLICT WITH NEW PIPE
INSTALLATION. REMAINING DOWNSTREAM UNDERFLOOR SECTIONS OF
STORMWATER PIPING SHALL RECEIVE FLOWABLE-FILL CONCRETE FOR PERMANENT
ABANDONMENT-IN-PLACE. FLOOR CLEANOUTS SHALL BE REMOVED TO 4" BELOW
FLOOR AND FILLED FLUSH TO ADJACENT FLOOR WITH CONCRETE. REFER TO
ARCHITECTURAL DETAILS AT A534.
026 REMOVE STORMWATER PIPING AT FOUNDATION. REMAINING PIPING IN BUILDING TO
BE ABANDONED IN PLACE. FOUNDATION OPENINGS TO BE SEALED WATER-TIGHT.
SEE DETAILS C1/A534.
078 ABANDONED STORMWATER LEADER (VERTICAL) TO REMAIN IN-PLACE.
087 DEMOLISH EXISTING ABOVE CEILING SERVICES FOR FIXTURES AT FLOOR ABOVE.
DEMOLITION INCLUDES DCW, DHW, DHWR, SANITARY AND VENT PIPING.
418 DEMOLISH SEGMENTS OF UNDERFLOOR STORM PIPING AS REQUIRED FOR
ELEVATOR PIT CONSTRUCTION. CAP REMAINING SEGMENTS OF ABANDONED STORM
PIPING.
419 DEMOLISH BRANCH WATER PIPING WITHIN CONSTRUCTION BARRIER AS REQUIRED
TO AID CONSTRUCTION. CAP REMAINING SEGMENTS OF PIPING, BOTH ABANDONED
AND THAT TO REMAIN IN SERVICE.
420 CAP REMAINING SEGMENT OF STORMWATER PIPING TO PREVENT BACKFLOW.
1/8" = 1'-0"A1 BASEMENT DEMOLITION PLAN - AREA 2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
R
Q
P
O
N
18 19 20 21 22 23 24 25
MA
TC
HL
IN
E
A1
PD
6A
MATCHLINE
A1 PD102A
22E
034 034
(E) STORMWATER MANHOLE
MUST REMAIN IN SERVICE
(E) 1" DHWR
(E) 2" DHW
(E) 4" DCW
(E) 4" DCW
(E) 1" DHWR
(E) 2" DHW
(E) 4" DCW
(E) 3/4" DHWR
(E) 2" DHW
(E) 3" DCW
REMOVE (E) 2-1/2" DCW
BACK TO 4" DCW MAIN
(E) 1-1/4" DHW
(E) 3/4" DHWR
(E) 4" SAN
(E) 3" V
(29 DFU)
424424
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
AREA OF CLIN 002 - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE I PERIOD
EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING SYSTEMS TO
REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND RETURN TO
OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND CLEANOUTS MUST BE REMOVED TO 4" BELOW FINISHED FLOOR,
AND THE FLOOR MUST BE REPAIRED W ITH FINISHED CONCRETE. REFER TO
ARCHITECTURAL DETAIL C1/A534.
5. WHERE DEMOLITION WORK OCCURS ABOVE EXISTING CEILING, REMOVE THE
CEILING PANELS AND REPLACE THEM WHERE REQUIRED. IT IS EXPECTED THAT
THERE WILL BE SOME SUPPORT TEES THAT WILL NEED TO BE REMOVED, BUT
THIS SHOULD BE MINIMAL. SIMILARLY, SOME CEILING PANELS MAY BE DAMAGED.
DAMAGED TEES AND PANELS MUST BE REPLACED WITHIN THE CONTRACT
AMOUNT. ARCHITECTURAL DRAWINGS SHOW W HERE MAJOR WORK REQUIRING
REMOVAL AND REPLACEMENT OF THE CEILING, INCLUDING SUPPORT GRID, IS
REQUIRED.
GENERAL DEMOLITION NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
PD103A
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M B
IN
G
D
EM
O
LI
TI
O
N
KEYED NOTES - FLOOR PLAN
034 PLANTER DRAIN BRANCH PIPING AND MAIN TO BE REMOVED TO CONNECTION AT
SITE CONVEYANCE SYSTEM.
062 SITE STORMWATER CONVEYANCE MAIN TO REMAIN IN SERVICE.
078 ABANDONED STORMWATER LEADER (VERTICAL) TO REMAIN IN-PLACE.
087 DEMOLISH EXISTING ABOVE CEILING SERVICES FOR FIXTURES AT FLOOR ABOVE.
DEMOLITION INCLUDES DCW, DHW, DHWR, SANITARY AND VENT PIPING.
420 CAP REMAINING SEGMENT OF STORMWATER PIPING TO PREVENT BACKFLOW.
424 REMOVE EXISTING PIPING SERVING RESTROOMS ON FIRST AND SECOND FLOORS.
1/8" = 1'-0"A1 BASEMENT DEMOLITION PLAN - AREA 3
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
E
D
C
B
A
11 12 13 14 15 16 18 1917
001001
002002
026 026
MATCHLINE
A1 PD105A
MA
TC
HL
IN
E
A1
PD
1A
MA
TC
HL
IN
E
A1
PD
7A
AHU AHU
A4 P403
006006
006006006
402402
(E) 3" DCW
(E) 3/4" DHW
(E) 1/2" DHWR
(E) 3" DCW
(E) 1-1/2" DHW
(E) 3/4" DHWR
420420
092 092 432432
6" SSD (VIF)8" SSD (VIF)
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
AREA OF CLIN 002 - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE I PERIOD
EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING SYSTEMS TO
REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND RETURN TO
OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND CLEANOUTS MUST BE REMOVED TO 4" BELOW FINISHED FLOOR,
AND THE FLOOR MUST BE REPAIRED W ITH FINISHED CONCRETE. REFER TO
ARCHITECTURAL DETAIL C1/A534.
5. WHERE DEMOLITION WORK OCCURS ABOVE EXISTING CEILING, REMOVE THE
CEILING PANELS AND REPLACE THEM WHERE REQUIRED. IT IS EXPECTED THAT
THERE WILL BE SOME SUPPORT TEES THAT WILL NEED TO BE REMOVED, BUT
THIS SHOULD BE MINIMAL. SIMILARLY, SOME CEILING PANELS MAY BE DAMAGED.
DAMAGED TEES AND PANELS MUST BE REPLACED WITHIN THE CONTRACT
AMOUNT. ARCHITECTURAL DRAWINGS SHOW W HERE MAJOR WORK REQUIRING
REMOVAL AND REPLACEMENT OF THE CEILING, INCLUDING SUPPORT GRID, IS
REQUIRED.
GENERAL DEMOLITION NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
PD104A
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M B
IN
G
D
EM
O
LI
TI
O
N
KEYED NOTES - FLOOR PLAN
001 PLANTER DRAIN BRANCH PIPING AND MAIN TO BE REMOVED TO FOUNDATION.
002 TRENCH DRAIN/FLOOR DRAIN AND PIPING AT ENTRY TO BE REMOVED.
006 DOMESTIC HOT, COLD AND HOT WATER RETURN PIPING (WHERE PRESENT) TO BE
REMOVED TO LIMITS INDICATED. EXISTING WATER PIPING SECTIONS BEYOND
DEMOLITION SCOPE TO REMAIN IN SERVICE.
012 RESTROOM TO REMAIN IN SERVICE. MAINTAIN SANITARY DRAIN, VENT AND
DOMESTIC WATER SERVICES. REMOVE BRANCH DOMESTIC WATER SERVING
DEMOLITION AREAS. MAINTAIN VENT PIPING THRU TO BUILDING EXTERIOR.
026 REMOVE STORMWATER PIPING AT FOUNDATION. REMAINING PIPING IN BUILDING TO
BE ABANDONED IN PLACE. FOUNDATION OPENINGS TO BE SEALED WATER-TIGHT.
SEE DETAILS C1/A534.
036 REMOVE 3" COLD WATER SUPPLY FOR CHILLER PLANT SERVICE. COORDINATE
DEMOLITION SCHEDULE TO MINIMIZE PLANT OPERATION DISRUPTION.
087 DEMOLISH EXISTING ABOVE CEILING SERVICES FOR FIXTURES AT FLOOR ABOVE.
DEMOLITION INCLUDES DCW, DHW, DHWR, SANITARY AND VENT PIPING.
092 EXISTING STORM WATER PIPING TO REMAIN.
402 RELOCATE AIR COMPRESSORS AND AIR DRYER TO NEW PLUMBING EQUIPMENT
ROOM 0172. REFER TO DRAWINGS P104A AND P403.
403 RELOCATE COOLING TOWER MAKE-UP MOTORIZED VALVE AND WATER METER TO
BUILDING B10264. REFER TO DRAWINGS P401 AND P701.
420 CAP REMAINING SEGMENT OF STORMWATER PIPING TO PREVENT BACKFLOW.
429 DRAINS WITHIN WINDOW WELL TO REMAIN IN SERVICE. PIPING TO BE CLEARED OF
DEBRIS AND SEDIMENT. CAST IRON DOME STRAINER TO BE CLEANED AND
RE-INSTALLED. REPLACE WITH NEW CAST IRON DOME STRAINER IF FOUND TO BE
DAMAGED. TYPICAL OF 3 LOCATIONS WITHIN THIS WINDOW WELL.
430 RETAIN FOUNDATION DRAIN PIPING BENEATH WINDOW WELL BETWEEN B10262 AND
B10264/10263.
432 FOUNDATION DRAIN IS LOCATED AT INVERT 825.17'. THIS IS 4'-0" BELOW THE
FOUNDATION FOR BUILDING B10264 TO THE NORTH. PROVIDE TEMPORARY SHORING
FOR THE FOUNDATION AND AREAWAY FLOOR ABOVE WHILE TUNNELING TO EXPOSE
THE EXISTING PIPE ENDS.
433 PRESERVE THE EXISTING SECTIONS OF THE FOUNDATION DRAIN FROM COLUMN 16
TO COLUMN 22. PROVIDE A TELEVISION VIDEO OF THE PIPING FROM COLUMN 16 TO
COLUMN 22. ALSO, VIDEO THE AREAWAY DRAIN PIPING BETWEEN THE WINDOW WELL
DRAIN BODIES AND THE CONNECTION TO THE FOUNDATION DRAIN.
1/8" = 1'-0"A1 BASEMENT DEMOLITION PLAN - AREA 4
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
K
J
I
H
G
11 12 13 14 15 16 18 1917
012012
012012
012012
M
AT
C H
LI
N
E
A1
PD
8A
MATCHLINE
A1 PD104A
MATCHLINE
A1 PD106A
M
AT
C H
LI
N
E
A1
PD
2A
(E) 3" DCW
(E) 1-1/2" DHW
(E) 3/4" DHWR
(E) 3" DCW
(E) 1-1/2" DHW
(E) 3/4" DHWR
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
AREA OF CLIN 002 - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE I PERIOD
EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING SYSTEMS TO
REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND RETURN TO
OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND CLEANOUTS MUST BE REMOVED TO 4" BELOW FINISHED FLOOR,
AND THE FLOOR MUST BE REPAIRED W ITH FINISHED CONCRETE. REFER TO
ARCHITECTURAL DETAIL C1/A534.
5. WHERE DEMOLITION WORK OCCURS ABOVE EXISTING CEILING, REMOVE THE
CEILING PANELS AND REPLACE THEM WHERE REQUIRED. IT IS EXPECTED THAT
THERE WILL BE SOME SUPPORT TEES THAT WILL NEED TO BE REMOVED, BUT
THIS SHOULD BE MINIMAL. SIMILARLY, SOME CEILING PANELS MAY BE DAMAGED.
DAMAGED TEES AND PANELS MUST BE REPLACED WITHIN THE CONTRACT
AMOUNT. ARCHITECTURAL DRAWINGS SHOW W HERE MAJOR WORK REQUIRING
REMOVAL AND REPLACEMENT OF THE CEILING, INCLUDING SUPPORT GRID, IS
REQUIRED.
GENERAL DEMOLITION NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
PD105A
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M B
IN
G
D
EM
O
LI
TI
O
N
KEYED NOTES - FLOOR PLAN
012 RESTROOM TO REMAIN IN SERVICE. MAINTAIN SANITARY DRAIN, VENT AND
DOMESTIC WATER SERVICES. REMOVE BRANCH DOMESTIC WATER SERVING
DEMOLITION AREAS. MAINTAIN VENT PIPING THRU TO BUILDING EXTERIOR.
1/8" = 1'-0"A1 BASEMENT DEMOLITION PLAN - AREA 5
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
R
Q
P
O
N
11 12 13 14 15 16 18 1917
MATCHLINE
A1 PD105A
M
AT
C H
LI
N
E
A1
PD
3A
M
AT
C H
LI
N
E
A1
PD
9A
AHU
AHU
034034 034 062 062
(E) 3" DCW
(E) 1-1/2" DHW
(E) 3/4" DHWR
012012
(E) 4" DCW
(E) 2" DHW
(E) 1" DHWR
(E) 4" DCW
(E) 1-1/2" DHW
(E) 3/4" DHWR
(E) 5" DCW
(E) 2" DHW
(E) 1-1/4" DHWR
(E) STORMWATER MANHOLE
MUST REMAIN IN SERVICE
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
AREA OF CLIN 002 - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE I PERIOD
EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING SYSTEMS TO
REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND RETURN TO
OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND CLEANOUTS MUST BE REMOVED TO 4" BELOW FINISHED FLOOR,
AND THE FLOOR MUST BE REPAIRED W ITH FINISHED CONCRETE. REFER TO
ARCHITECTURAL DETAIL C1/A534.
5. WHERE DEMOLITION WORK OCCURS ABOVE EXISTING CEILING, REMOVE THE
CEILING PANELS AND REPLACE THEM WHERE REQUIRED. IT IS EXPECTED THAT
THERE WILL BE SOME SUPPORT TEES THAT WILL NEED TO BE REMOVED, BUT
THIS SHOULD BE MINIMAL. SIMILARLY, SOME CEILING PANELS MAY BE DAMAGED.
DAMAGED TEES AND PANELS MUST BE REPLACED WITHIN THE CONTRACT
AMOUNT. ARCHITECTURAL DRAWINGS SHOW W HERE MAJOR WORK REQUIRING
REMOVAL AND REPLACEMENT OF THE CEILING, INCLUDING SUPPORT GRID, IS
REQUIRED.
GENERAL DEMOLITION NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
PD106A
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M B
IN
G
D
EM
O
LI
TI
O
N
KEYED NOTES - FLOOR PLAN
002 TRENCH DRAIN/FLOOR DRAIN AND PIPING AT ENTRY TO BE REMOVED.
012 RESTROOM TO REMAIN IN SERVICE. MAINTAIN SANITARY DRAIN, VENT AND
DOMESTIC WATER SERVICES. REMOVE BRANCH DOMESTIC WATER SERVING
DEMOLITION AREAS. MAINTAIN VENT PIPING THRU TO BUILDING EXTERIOR.
034 PLANTER DRAIN BRANCH PIPING AND MAIN TO BE REMOVED TO CONNECTION AT
SITE CONVEYANCE SYSTEM.
062 SITE STORMWATER CONVEYANCE MAIN TO REMAIN IN SERVICE.
1/8" = 1'-0"A1 BASEMENT DEMOLITION PLAN - AREA 6
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
E
D
C
B
A
4 5 6 7 8 9 10 11 12
026026 001
001 001 037
092 /
MA
TC
HL
IN
E
A1
PD
4A
MA
TC
HL
IN
E
A1
PD
0A
MATCHLINE
A1 PD108A
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
AREA OF CLIN 002 - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE I PERIOD
EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING SYSTEMS TO
REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND RETURN TO
OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND CLEANOUTS MUST BE REMOVED TO 4" BELOW FINISHED FLOOR,
AND THE FLOOR MUST BE REPAIRED W ITH FINISHED CONCRETE. REFER TO
ARCHITECTURAL DETAIL C1/A534.
5. WHERE DEMOLITION WORK OCCURS ABOVE EXISTING CEILING, REMOVE THE
CEILING PANELS AND REPLACE THEM WHERE REQUIRED. IT IS EXPECTED THAT
THERE WILL BE SOME SUPPORT TEES THAT WILL NEED TO BE REMOVED, BUT
THIS SHOULD BE MINIMAL. SIMILARLY, SOME CEILING PANELS MAY BE DAMAGED.
DAMAGED TEES AND PANELS MUST BE REPLACED WITHIN THE CONTRACT
AMOUNT. ARCHITECTURAL DRAWINGS SHOW W HERE MAJOR WORK REQUIRING
REMOVAL AND REPLACEMENT OF THE CEILING, INCLUDING SUPPORT GRID, IS
REQUIRED.
GENERAL DEMOLITION NOTES
KEY PLAN
N
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
1 2 3 4 5
D
C
B
A
8'4' 16'
CUI
CUI
C U
I
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
D
AY
TO
N , O
H
IO
R
EP
AI
R
/R
EN
O
VA
TE
A
FM
C
H Q
B U
IL
D
IN
G
(B
2)
P H
AS
E
B262 PHASE
P2 N
O
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
J.
B
EN
SO
N
PD107A
AR
EA
D
EM
O
LI
TI
O
N F
LO
O
R P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
JA
C
O
BS
E N
G
IN
ER
IN
G G
R O
U P
IN
C
H
IG
H
LA
N
D S
PL
AZ
A D
R
IV
E
SU
IT
E
ST
. L
O U
IS
, M
O
P
BA
K
ER
R C
AT
H
ER
S
J M
C G
O
VE
R N
D
EC
EM
BE
R
B10262 PHASE 1 - CERTIFIED FINAL
PH
AS
E
PL
U
M B
IN
G
D
EM
O
LI
TI
O
N
KEYED NOTES - FLOOR PLAN
001 PLANTER DRAIN BRANCH PIPING AND MAIN TO BE REMOVED TO FOUNDATION.
007 PRIMARY RAINWATER LEADER (VERTICAL) TO BE REMOVED TO 4" BELOW FLOOR.
REMOVE HORIZONTAL PIPING WHERE IT IS IN CONFLICT WITH NEW PIPE
INSTALLATION. REMAINING DOWNSTREAM UNDERFLOOR SECTIONS OF
STORMWATER PIPING SHALL RECEIVE FLOWABLE-FILL CONCRETE FOR PERMANENT
ABANDONMENT-IN-PLACE. FLOOR CLEANOUTS SHALL BE REMOVED TO 4" BELOW
FLOOR AND FILLED FLUSH TO ADJACENT FLOOR WITH CONCRETE. REFER TO
ARCHITECTURAL DETAILS AT A534.
026 REMOVE STORMWATER PIPING AT FOUNDATION. REMAINING PIPING IN BUILDING TO
BE ABANDONED IN PLACE. FOUNDATION OPENINGS TO BE SEALED WATER-TIGHT.
SEE DETAILS C1/A534.
037 FOUNDATION OPENING TO BE SEALED WATER-TIGHT BY OTHER TRADES.
COORDINATE REQUIREMENTS WITH CONTRACTOR OF RECORD.
040 PRIMARY RAINWATER LEADER OVERHEAD THROUGH EXTERIOR WALL TO BE
REMOVED ENTIRELY TO POINT OF CIVIL DEMOLITION.
087 DEMOLISH EXISTING ABOVE CEILING SERVICES FOR FIXTURES AT FLOOR ABOVE.
DEMOLITION INCLUDES DCW, DHW, DHWR, SANITARY AND VENT PIPING.
092 EXISTING STORM WATER PIPING TO REMAIN.
095 DEMOLISH SAFETY SHOWER.
096 DEMOLISH (4) BACKFLOW PREVENTERS.
097 DEMOLISH SERVICE SINK AND RELATED SANITARY, WATER AND VENT PIPING.
401 EXISTING AIR RECEIVER TO REMAIN.
1/8" = 1'-0"A1 BASEMENT DEMOLITION PLAN - AREA 7
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_C U
I_ C
F_ Pl an s_
Vo l5
-0
K
J
I
H
G
4 5 6 7 8 9 10 11 12
MATCHLINE
A1 PD107A
MATCHLINE
A1 PD109A
M
AT
C H
LI
N
E
A1
PD
5A
M
AT
C H
LI
N
E
A1
PD
1A
NO DEMOLITION WORK
ON THIS SHEET
LEGEND
CONSTRUCTION BARRIER - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
SHADED AREA IS NOT UNDER CURRENT CONSTRUCTION
PACKAGE UNLESS OTHERWISE NOTED - WORK TO BE
PERFORMED IN THE SHADED AREAS W ILL NEED TO BE
COORDINATED W ITH COR FOUR WEEKS PRIOR TO
MINIMIZE MISSION IMPACT
AREA OF CLIN 002 - REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
1. COORDINATE DEMOLITION SCHEDULE WITH OTHER TRADES AND WITH THE
PROGRESSION OF NEW WORK TO ENSURE THAT THE AREAS OF THE PROJECT
WHICH ARE TO REMAIN IN OPERATION DURING THE PHASE I PERIOD
EXPERIENCE LIMITED INTERUPTIONS. SEGMENTS OF EXISTING SYSTEMS TO
REMAIN IN SERVICE MUST CONNECT TO NEW SERVICES AND RETURN TO
OPERATIONAL STATUS PRIOR TO DEMOLITION OF THEIR FORMER SERVICES.
2. VOIDS IN STRUCTURE RESULTING FROM REMOVAL OF EXISTING PIPING,
DRAINAGE FIXTURES, AND CLEANOUTS MUST BE COORDINATED WITH THE
GENERAL TRADES SUBCONTRACTOR. VOIDS MUST BE IN-FILLED WITH
APPROPRIATE MATERIALS AND METHODS OUTLINED IN SPECIFICATIONS AND
DETAILED ON THE STRUCTURAL DRAWINGS. WHERE INDICATED BY
CONTRACTOR OF RECORD, VOIDS IN STRUCTURE MAY REMAIN FOR USE AND BE
FINISHED PER SPECIFICATIONS OR DETAILS C1 AND D1/A534.
3. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON 'AS-BUILT'
DRAWINGS AND BEST AVAILABLE INFORMATION. FIELD VERIFY CONDITIONS
PRIOR TO CONSTRUCTION.
4. WHERE PIPING, DRAINAGE FIXTURES, AND CLEANOUTS ARE REMOVED TO
BELOW FINISHED BASEMENT FLOOR, THE CONCRETE, PIPING, DRAINAGE
FIXTURES, AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .