00-M-805.pdf
PDF 136 KB Posted
- Attached to
- PA 206 HORSHAM HVAC SYSTEMS REPAIRS
- Solicitation number
- W912BU24R0001
About this file
This document contains mechanical system design drawings and specifications for control panels and HVAC equipment at an Army Reserve Training Center. The project involves variable refrigerant flow and fan coil units for office areas, an energy recovery ventilator, make-up air units, exhaust fans, and a dehumidifier. Control sequences are defined for each mechanical system. The related federal contract opportunity is for HVAC system repairs at a Naval Air Station and involves the U.S. Army Corps of Engineers Engineering District in Philadelphia.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BU24R0001 Amendment 0009_Cancellation.pdf | ||
| W912BU24R0001 Amendment 0005.pdf | ||
| 10-M-800.pdf | ||
| AF85D7-1.PDF | ||
| AFA040-1.PDF | ||
| 00-M-806.pdf | ||
| AF0F76-1.PDF | ||
| 00-MP-4.PDF | ||
| AF6B67-1.PDF | ||
| 10-M-803.pdf | ||
| AFDA0C-1.PDF | ||
| 00-M-201.pdf | ||
| AF7DA6-1.PDF | ||
| AF5B0D-1.PDF | ||
| AF4200-1.PDF | ||
| 10-MH-1.PDF | ||
| AF2EB8-1.PDF | ||
| AF7BD0-1.PDF | ||
| AF4273-1.PDF | ||
| 00-M-803.pdf | ||
| 10-M-801.pdf | ||
| 00-MP-2.PDF | ||
| AF1533-1.PDF | ||
| AF9D68-1.PDF | ||
| AFC2EA-1.PDF | ||
| AF2AEE-1.PDF | ||
| AFD99B-1.PDF | ||
| AF26AC-1.PDF | ||
| W912BU24R0001 Amendment 0004.pdf | ||
| AFFB36-1.PDF | ||
| 00-M-807.pdf | ||
| 00-M-808.pdf | ||
| AF9FDC-1.PDF | ||
| AF47CB-1.PDF | ||
| AFRC55-2.PDF | ||
| 00-M-802.pdf | ||
| AFFC3F-1.PDF | ||
| AFC8A7-1.PDF | ||
| AF8E75-1.PDF | ||
| AFD903-1.PDF | ||
| AF54B2-1.PDF | ||
| AFD078-1.PDF | ||
| 00-MH-1.PDF | ||
| AF0EF7-1.PDF | ||
| 00-MP-1.PDF | ||
| 00-MH-4.PDF | ||
| AF377B-1.PDF | ||
| AF9D55-1.PDF | ||
| AFE9FE-1.PDF | ||
| AF2040-1.PDF |
Show 40 more
Latest 50 of 102 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
D O
-1
D O
-2
C O
M
D O
-3
D O
-4
C O
M
D O
-5
D O
-6
C O
M
V
A C
4V
A C
C O
M
E G
N D
S H
LD
N E
T -1
N E
T -2
SPYDER
SRV
JACK
SRV
PIN
18 19 20
D O
-7
D O
-8
C O
M
21 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
A O
-1
C O
M
A O
-2
A O
-3
C O
M
D I-1
D I-2
C O
M
D I-3
D I-4
4V
D C
U I-1
C O
M
U I-2
U I-3
C O
M
U I-4
U I-5
C O
M
U I-6
MECHANICAL ROOM 204
CONTROL PANEL 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
D O
-1
D O
-2
C O
M
D O
-3
D O
-4
C O
M
D O
-5
D O
-6
C O
M
V
A C
4V
A C
C O
M
E G
N D
S H
LD
N E
T -1
N E
T -2
SPYDER
SRV
JACK
SRV
PIN
18 19 20
D O
-7
D O
-8
C O
M
21 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
A O
-1
C O
M
A O
-2
A O
-3
C O
M
D I-1
D I-2
C O
M
D I-3
D I-4
4V
D C
U I-1
C O
M
U I-2
U I-3
C O
M
U I-4
U I-5
C O
M
U I-6
MECHANICAL ROOM 121A
CONTROL PANEL 1
PLAN NOTES:
GENERAL NOTES:
LEGEND:
TRAINING CENTER BUILDING
I. VARIABLE REFRIGERANT FLOW (VRF) SYSTEM (OFFICE AREAS)
A. THE VRF SYSTEM SHALL HAVE ITS OWN MANUFACTURER PROVIDED
CONTROL SYSTEM WITH A LON
GATEWAY COMMUNICATING WITH THE BMS.
THE BMS SHALL BE A SUPERVISORY SYSTEM ONLY.
B. A WALL-MOUNTED THERMOSTAT SHALL CONTROL EACH INDIVIDUAL
CEILING AIR HANDLING UNIT (AHU) AT THE FOLLOWING DESIGN
CONDITIONS (ADJ.):
1. HEATING: 68 DEGF
2. COOLING: 78 DEGF
C. EACH AHU WILL BE CONNECTED VIA A COMMUNICATIONS NETWORK
TO ITS RESPECTIVE HEAT RECOVERY BOX.
D. EACH HEAT RECOVERY BOX WILL BE CONNECTED VIA A
COMMUNICATIONS NETWORK TO THE CONDENSING UNITS.
E. A LON GATEWAY WILL RESIDE ON THE SAME NETWORK AS THE
CONDENSING UNITS. THE LON GATEWAY WILL COMMUNICATE ALL
VRF SYSTEM DATA TO THE BMS AS WELL AS RECEIVE COMMANDS,
SUCH AS OCCUPIED/UNOCCUPIED COMMANDS AND SETPOINT
CHANGES, FROM THE BMS AND SEND THEM TO THE APPROPRIATE
CONTROLLER IN THE VRF SYSTEM.
F. THE VRF MANUFACTURER PROVIDED CONTROLS WILL MAKE ALL
CAPACITY CONTROL DECISIONS AND PROVIDE EQUIPMENT SAFETY
PROTECTION. THE BMS WILL PROVIDE GLOBAL CONTROL FUNCTIONS,
SUCH AS OCCUPIED/UNOCCUPIED COMMANDS AND ALLOW
INDIVIDUAL ZONE SETPOINTS TO BE MODIFIED.
G. SEE THE VRF MANUFACTURER'S LITERATURE FOR A DETAILED
SEQUENCE OF OPERATIONS.
H. INTERNAL ALARMS GENERATED BY THE VRF MANUFACTURER'S
CONTROL SYSTEM SHALL BE ANNUNCIATED BY THE BMS AT THE
OPERATOR WORKSTATION. SEE THE VRF MANUFACTURER'S
LITERATURE FOR A LIST OF THE SYSTEM ALARMS.
ERV SEQUENCE OF OPERATIONS
II. ENERGY RECOVERY VENTILATOR ERV-1/CONDENSING UNIT CU-8
A. GENERAL
1. THE ERV WILL BE CONTROLLED BY THE BMS.
2. THE BMS WILL START AND STOP THE ERV THROUGH A USER
DEFINED OCCUPANCY SCHEDULE.
3. ALARMS
a. THE FOLLOWING ERV ALARMS WILL BE MONITORED AND
ANNUNCIATED BY THE BMS:
1) SMOKE DETECTOR
a) A MANUAL RESET SMOKE DETECTOR ON THE RETURN DUCT WILL
SENSE THE PRESENCE OF PRODUCTS OF COMBUSTION.
b) WHEN PRODUCTS OF COMBUSTION ARE DETECTED BY THE
SMOKE DETECTOR, THE SUPPLY FAN (SF), EXHAUST FAN (EF), AND
ENTHALPY WHEEL SHALL STOP. ALL DAMPERS AND COILS WILL BE
SHUT OFF.
2) SF FAILURE
a) A SF FAILURE ALARM OCCURS WHENEVER THE FAN IS
COMMANDED TO START BY THE ERV CONTROLLER AND THE
SUPPLY FAN STATUS PROVING SWITCH DOES NOT INDICATE THAT
THE FAN IS OPERATING WITHIN 10 SECS.
b) WHEN A SF FAILURE ALARM OCCURS, THE OUTSIDE AIR (OA)
INTAKE DAMPER SHALL CLOSE AND THE EF, ENTHALPY WHEEL,
AND ALL HEATING AND COOLING COILS WILL BE SHUT OFF.
3) EF FAILURE
a) AN EF FAILURE ALARM OCCURS WHENEVER THE FAN IS
COMMANDED TO START BY THE ERV CONTROLLER AND THE EF
STATUS PROVING SWITCH DOES NOT INDICATE THAT THE FAN IS
OPERATING WITHIN 10 SECS.
b) WHEN AN EF FAILURE ALARM OCCURS, THE ENTHALPY WHEEL
SHALL STOP. THE SF AND THE HEATING AND COOLING COILS
SHALL CONTINUE TO OPERATE NORMALLY.
4) ENTHALPY WHEEL FAILURE
a) AN ENTHALPY WHEEL FAILURE ALARM OCCURS WHENEVER THE
WHEEL IS COMMANDED TO START BY THE ERV CONTROLLER AND
THE WHEEL STATUS PROVING SWITCH DOES NOT INDICATE THAT
THE WHEEL IS OPERATING WITHIN 10 SECS.
b) WHEN A WHEEL FAILURE ALARM OCCURS, THE REMAINING
COMPONENTS OF THE ERV SHALL CONTINUE TO OPERATE
NORMALLY.
5) HIGH AND LOW LIMIT DISCHARGE AIR TEMPERATURE ALARMS
WILL BE ANNUNCIATED. THE HIGH LIMIT ALARM WILL OCCUR
WHEN THE DISCHARGE AIR TEMPERATURE RISES ABOVE 80
DEGF. THE LOW LIMIT ALARM WILL OCCUR WHEN THE
TEMPERATURE FALLS BELOW 40 DEGF.
b. ALL ALARMS WILL BE ANNUNCIATED LOCALLY AT THE USER
INTERFACE PC AS WELL AS REMOTELY BY PAGER OR EMAIL, IF
DESIRED BY THE END USER.
B. OCCUPIED MODE
1. SUPPLY FAN/EXHAUST FAN/ENTHALPY WHEEL
a. THE OUTSIDE AIR (OA) INTAKE DAMPER SHALL OPEN.
b. WHEN THE DAMPER IS PROVEN OPEN, THE SF AND THE EF SHALL
START.
c. WHEN THE SF AND EF ARE PROVEN ON, THE ENTHALPY WHEEL
SHALL START.
d. THE SF, EF, AND ENTHALPY WHEEL SHALL RUN CONTINUOUSLY
DURING THE OCCUPIED MODE.
2. COOLING COIL/POST HEATING COIL
a. WHEN THE SF IS OFF, THE ELECTRIC POST HEATING COIL AND
THE COMPRESSORS SERVING THE DX COOLING COIL SHALL BE
OFF. BOTH THE HEATING COIL AND THE COOLING COIL SHALL BE
ENABLED WHEN THE SF IS PROVEN ON.
b. ONCE ENABLED, THE ELECTRIC POST HEATING COIL AND THE DX
COOLING COIL SHALL BE SEQUENCED TO MAINTAIN THE
DISCHARGE AIR TEMPERATURE AT A SETPOINT OF 65 DEGF
(ADJ.).
c. SUFFICIENT ON AND OFF TIMES, DETERMINED DURING
COMMISSIONING, WILL BE INCORPORATED INTO THE CONTROL
LOGIC TO PREVENT SHORT CYCLING AND INTERFERENCE
BETWEEN THE HEATING AND COOLING COILS.
3. ENTHALPY WHEEL FROST CONTROL/PRE-HEATING COIL
a. WHEN THE SF OR EF IS OFF OR THE DIFFERENTIAL PRESSURE
ACROSS THE EXHAUST SIDE OF THE ENTHALPY WHEEL IS BELOW
0.05 IN WC, THE ELECTRIC PRE-HEATING COIL SHALL BE OFF.
THE COIL SHALL BE ENABLED WHEN BOTH THE SF AND EF ARE
PROVEN ON AND THE DIFFERENTIAL PRESSURE EXCEEDS 0.1 IN
WC FOR FIVE (5) MINUTES.
b. ON A CALL TO OPERATE, THE TWO (2) STAGES OF THE ELECTRIC
PRE-HEAT COIL SHALL BE SEQUENCED ON UNTIL THE
DIFFERENTIAL PRESSURE FALLS BELOW 0.05 IN WC.
A. UNOCCUPIED MODE
1. DURING THE UNOCCUPIED MODE, THE SF, EF, ENTHALPY WHEEL,
AND ALL HEATING AND COOLING COILS SHALL BE OFF.
2. THE UNOCCUPIED SPACE TEMPERATURE CONTROL SHALL BE DONE
BY THE VRF SYSTEM CONTROLS.
III. FAN-COIL UNITS FCU-1, 2, 3, 4, 5A, 5B/CONDENSING UNITS CU-1, 2, 3, 4, 5A, 5B
A. THE FAN-COIL UNITS WILL BE CONTROLLED BY A LOCAL THERMOSTAT.
B. THE FAN-COIL UNITS WILL NOT BE CONNECTED TO THE BMS.
C. A TEMPERATURE SENSOR IN EACH ROOM SERVED A FAN-COIL UNIT
WILL BE MONITORED BY THE BMS.
D. IF THE ROOM TEMPERATURE RISES ABOVE 85 DEGF (ADJ.), A HIGH
TEMPERATURE ALARM WILL BE ANNUNCIATED BY THE BMS. IF THE
ROOM TEMPERATURE FALLS BELOW 60 DEGF, A LOW
TEMPERATURE ALARM WILL BE ANNUNCIATED BY THE BMS.
E. ALL ALARMS WILL BE ANNUNCIATED AT THE USER INTERFACE PC AS
WELL AS REMOTELY BY PAGER OR EMAIL, IF DESIRED BY THE END
USER.
IV. MAKE-UP AIR UNIT MUA-1/LOUVER L-4
A THE MUA WILL BE DIRECTLY CONTROLLED BY A LOCAL,
MANUFACTURER PROVIDED CONTROLLER THAT WILL COMMUNICATE
TO THE BMS OVER THE LON NETWORK.
B THE BMS SHALL HAVE THE CAPABILITY TO START AND STOP THE UNIT
AND CHANGE THE DAT SETPOINT.
C UNIT MUA-1 WILL OPERATE CONTINUOUSLY. IT WILL ONLY STOP
WHEN AN INTERNAL UNIT SAFETY TRIPS OR IT IS MANUALLY SHUT
DOWN FOR MAINTENANCE PURPOSES.
D ON A CALL TO OPERATE, THE LOCAL CONTROLLER SHALL OPEN ITS OA
INTAKE DAMPER. ONCE THE DAMPER HAS BEEN PROVEN OPEN, THE
CONTROLLER SHALL START THE MUA-1 SF.
E ONCE THE SF HAS BEEN PROVEN ON, THE LOCAL CONTROLLER SHALL
CONTROL THE HEATING COIL TO MAINTAIN THE DAT AT A SETPOINT OF
65 DEGF (ADJ.).
F LOUVER L-4 WILL BE INTERLOCKED TO OPEN WHEN THE MUA-1 SF IS
ON. IT WILL CLOSE WHEN THE SF IS OFF.
G ALARMS
1. THE FOLLOWING MUA ALARMS WILL BE MONITORED AND
ANNUNCIATED BY THE BMS:
a. INTERNAL MUA ALARMS
1) INTERNAL ALARMS GENERATED BY THE MUA
MANUFACTURER'S CONTROL SYSTEM SHALL BE ANNUNCIATED
BY THE BMS.
2) SEE THE MANUFACTURER'S LITERATURE FOR A LIST OF THE
SYSTEM ALARMS.
b. SF FAILURE
1) A SF FAILURE ALARM OCCURS WHENEVER THE FAN IS
COMMANDED TO START BY THE MUA CONTROLLER AND THE
SUPPLY FAN STATUS PROVING SWITCH DOES NOT INDICATE
THAT THE FAN IS OPERATING WITHIN 10 SECS.
2) WHEN A SF FAILURE ALARM OCCURS, THE OUTSIDE AIR (OA)
INTAKE DAMPER SHALL CLOSE.
c. HIGH AND LOW LIMIT DISCHARGE AIR TEMPERATURE ALARMS
WILL BE ANNUNCIATED. THE HIGH LIMIT ALARM WILL OCCUR
WHEN THE DISCHARGE AIR TEMPERATURE RISES ABOVE 80
DEGF. THE LOW LIMIT ALARM WILL OCCUR WHEN THE
TEMPERATURE FALLS BELOW 40 DEGF.
2. ALL ALARMS WILL BE ANNUNCIATED LOCALLY AT THE USER
INTERFACE PC AS WELL AS REMOTELY BY PAGER OR EMAIL, IF
DESIRED BY THE END USER.
V. EXHAUST FANS EF-1, EF-2/LOUVER L-1, L-2
A. EXHAUST FANS EF-1 AND EF-2 WILL BE MONITORED AND CONTROLLED
BY THE BMS.
B. THE FANS WILL BE CYCLED TO MAINTAIN THEIR RESPECTIVE SPACE
TEMPERATURE AT A SETPOINT OF 85 DEGF (ADJ.).
C. LOUVER L-1 AND L-2 WILL BE INTERLOCKED TO OPEN WHEN THEIR
RESPECTIVE EF STARTS. THEY WILL CLOSE WHEN THEIR RESPECTIVE
EF STOPS.
D ALARMS
1. THE FOLLOWING EF ALARMS WILL BE MONITORED AND
ANNUNCIATED BY THE BMS:
a. EF FAILURE
1) AN EF FAILURE ALARM OCCURS WHENEVER THE FAN IS
COMMANDED TO START BY THE CONTROLLER AND THE
EXHAUST FAN STATUS PROVING SWITCH DOES NOT INDICATE
THAT THE FAN IS OPERATING WITHIN 10 SECS.
2) WHEN AN EF FAILURE ALARM OCCURS, ITS ASSOCIATED
LOUVER SHALL CLOSE.
b. A HIGH SAT ALARM WILL BE ANNUNCIATED. THE HIGH LIMIT
ALARM WILL OCCUR WHEN THE SAT RISES ABOVE 100 DEGF.
2. ALL ALARMS WILL BE ANNUNCIATED LOCALLY AT THE USER
INTERFACE PC AS WELL AS REMOTELY BY PAGER OR EMAIL, IF
DESIRED BY THE END USER.
VI. EXHAUST FAN EF-3/LOUVER L-3
A THE RUN STATUS OF EXHAUST FAN EF-3 WILL BE
MONITORED BY THE BMS.
B THIS FAN WILL RUN CONTINUOUSLY.
C IF THIS FAN STOPS, AN ALARM WILL BE ANNUNCIATED
THROUGH THE BMS.
D LOUVER L-3 WILL OPEN THROUGH A HARD-WIRED
INTERLOCK WHEN EF-3 STARTS. L-3 WILL CLOSE WHEN EF-3 STOPS.
VII. EXHAUST FANS EF-14, 15, 16, 17/LOUVER L-18
A THE TEMPERATURE IN MECHANICAL ROOM 204 WILL BE CONTROLLED
BY THE BMS TO MAINTAIN A ROOM TEMPERATURE SETPOINT OF 50
DEGF (ADJ.).
B THE ROOM WILL BE COOLED BY FOUR (4) EF'S AND THEIR
ASSOCIATED MOTOR OPERATED DAMPERS (MOD) ON
LOUVER L-18.
C THE ROOM WILL BE HEATED BY A ZONE DAMPER SERVED BY MUA-1.
D ON A CALL FOR COOLING, IF THE HEATING IS OFF, THE FIRST EF
SHALL START AND ITS ASSOCIATED MOD SHALL OPEN. THE
REMAINING EF'S AND THEIR ASSOCIATED MOD'S WILLOPEN IN
SEQUENCE TO MAINTAIN THE ROOM TEMPERATURE SETPOINT.
E ON A CALL FOR HEAT, IF ALL OF THE EF'S ARE OFF, THE VAV BOX
DAMPER SHALL MODULATE OPEN TO MAINTAIN THE ROOM
TEMPERATURE SETPOINT.
F SUFFICIENT ON AND OFF TIMES, DETERMINED DURING
COMMISSIONING, WILL BE INCORPORATED INTO THE
CONTROL LOGIC TO PREVENT SHORT CYCLING OF THE EF'S.
G ALARMS
1. THE FOLLOWING EF ALARMS WILL BE MONITORED AND
ANNUNCIATED BY THE BMS:
a. EF FAILURE
1) AN EF FAILURE ALARM OCCURS WHENEVER THE FAN IS
COMMANDED TO START BY THE CONTROLLER AND THE
EXHAUST FAN STATUS PROVING SWITCH DOES NOT INDICATE
THAT THE FAN IS OPERATING WITHIN 10 SECS.
2) WHEN AN EF FAILURE ALARM OCCURS, ITS ASSOCIATED
LOUVER SHALL CLOSE.
b. HIGH AND LOW SAT ALARMS WILL BE ANNUNCIATED BY THE BMS.
THE HIGH LIMIT ALARM WILL OCCUR WHEN THE SAT RISES
ABOVE 100 DEGF. THE LOW LIMIT ALARM WILL OCCUR WHEN THE
SAT DROPS BELOW 40 DEGF.
2. ALL ALARMS WILL BE ANNUNCIATED LOCALLY AT THE USER
INTERFACE PC AS WELL AS REMOTELY BY PAGER OR EMAIL, IF
DESIRED BY THE END USER.
VIII. DE-HUMIDIFIER DH-1
F DE-HUMIDIFIER DH-1 WILL BE CONTROLLED BY A LOCAL HUMIDISTAT.
G THE DE-HUMIDIFIER WILL NOT BE CONNECTED TO THE BMS.
H A HUMIDITY SENSOR IN THE ARMS VAULT WILL BE MONITORED
BY THE BMS.
I IF THE ROOM HUMIDITY RISES ABOVE 70% (ADJ.), A HIGH HUMIDITY
ALARM WILL BE ANNUNCIATED BY THE BMS AT THE USER INTERFACE
PC AS WELL AS REMOTELY BY PAGER OR EMAIL, IF DESIRED BY
THE END USER.
IX. ELECTRIC UNIT HEATER EUH-1
A. ELECTRIC UNIT HEATER EUH-1 WILL BE CONTROLLED BY A UNIT
MOUNTED THERMOSTAT TO MAINTAIN ITS SETPOINT.
THE ELECTRIC UNIT HEATER WILL NOT BE CONNECTED TO THE BMS.
FO
R
U M
S
TU
D
IO
S T.
L O
U
IS
, M O
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N
AM
E:
D W
N B
Y:
C
K D
B Y:
D E
S
IG
N
ED
B Y:
D E
S C
R
IP
TI
O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
TE
FI
LE
N U
M
BE
R
S
IZ
E:
S U
B M
IT
TE
D B
Y:
P
LO
T S
C
AL
E:
P
LO
T
D
AT
E:
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
SHEET
IDENTIFICATION
D A
TE
A
P P
R
SHEET OF
US Army Corps of Engineers
M R
-P -6
4/
C O
N -0
6- B
-N U
M B
A N
S I D
MHOWARD
6/29/2011 12:01 PM
T:\ENGINEERING\PROJECTS\WILLOW GROVE\CONTROLS\00-M-805.DWG
A R
M Y
R E
S E
R V
E T
R
AI
N
IN
G C
EN
TE
R W
IL
LO
W G
R O
V E
N A
VA
L
AI
R
S
TA
TI
O
N W
2Q
R -0
9- C
-0
AS-BUILT
/2
9/
C O
N
TR
O L
P A
N E
LS
(C P-
1& C
P- 2)
M E
C H
R O
O M
S
A
M M
M H
M M
M H
1/ 8"
'-0
2/ 9/
-M
-8
.D W
G
CONTROL PANEL 1 (MECH RM 121A)
CONTROL PANEL 2 (MECH RM 204)
00-M-805
File details come from the government source that posted it. Updated .