Attachment_Q1_Additional_Q&A_5-16-19.docx
DOCX document 16 KB Posted
- Attached to
- Fort Bragg - Full Food Services
- Solicitation number
- W9124J-18-R-0025
About this file
This document provides answers to questions submitted in response to solicitation number W9124J-18-R-0025 for full food services at Fort Bragg, North Carolina. The solicitation requires the contractor to provide all resources except government furnished property to operate multiple dining facilities across the installation. Services include meal preparation for standard and additional field events. The facility consists of an entranceway, seven offices and a 40' x 100' warehouse for contractor use. The contractor must submit quality control checklists within ten days of award. Pricing policies vary by contract line item number, with some using static staffing levels and others left to the offeror's discretion. The solicitation is set aside for small businesses and subject to Randolph-Sheppard Act preference. The response deadline is April 15, 2019 and it is issued by the Mission and Installation Contracting Command-Fort Sam Houston on behalf of Fort Bragg.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions based on Amendment 3
1. Questions #19 and #79. PWS 3.1.2.5. Prepare meals for additional field service events. In order for proper costing, could the Government provide the number of these events (for example – twice daily or 500 times per year)? Could the Government provide data similar to Attachment F to provide details on what is to be cleaned? Could the Government provide (A10) Remote Sire Feeding Food Preparation Record (annotated field service)?
ANSWER: Please see updated Attachment F with “Additional Field Service Events” broken out separately.
2. Questions #39 and #81. PWS Para 5. Government will provide office space as identified in Attachment C and D. Attachment C and D are silent on office space. Currently the contractor’s office is contractor furnished. How much space will the Government provide for administrative space and warehousing contractor furnished expendable/durable and other items?
ANSWER: The facility consists of an entranceway, a lobby, seven (7) offices and a warehouse. Total facility dimension is 40’x100’. Furnishing are provided by the contractor.
3. Question #66. PWS Para 4.2. We understand that the contractor is to provide an inspections system ten (10) days after award. When is the Government expecting the contractor developed checklists?
ANSWER: Any contractor developed checklist associated with the Quality Control Plan shall be included and submitted within ten (10) days after award.
4. Questions #68. PWS 3.1.2.2 was changed from ARSOF Policy 6-18 to ARSOF Policy 7-18. ARSOF Policy 7-18 was provided in Amendment 3 at Attachment R-16. Are these policies the same?
ANSWER: ARSOF Policy 7-18 is the update to ARSOF Policy 6-18.
5. Questions #74 through #78. The PWS at Para 3.1.2.2 at Performance Standards a) establishes a standard of follow approved Armed Forces Recipes, TM 10-412 and ARSOF Policy 7-18, and approved Standard Operating Procedures and/or manufacture’s instruction. The website address for the Army Nutritional Standards provided in the PWS is for the Go for Green 2.0. Amendment 3 at Attachment R-16 provides the policy ARSOF Policy 7-18. Which of these standards apply?
ANSWER: ARSOF Policy 7-18 applies to buildings 0-1900, 3-2543, A-9073, D-3624 and T-3467. The remaining buildings are subject to Army Nutritional Standards otherwise referred to as “Go for Green”.
6. Questions #85 and #90. The National Guard DFAC Building 4595 at CLINS X008AA and X008AB is required to be priced using the static staffing. The PWS is silent on CLINS X008C, X008DA, and X008FA. Are these CLINS static as well? If so, what are those levels? Are these reimbursable at the CLINS prices entered on the FFS pricing matrix/base period and ordering period or are they cost reimbursable at actual cost incurred?
ANSWER: SubCLINs 0008CA Extended hours; 0008DA Deep Cleaning and 0008FA Open/Close are not static staffing. It is the offeror's discretion how to staff for these SubCLINs. All CLINs/SubCLINs are FFP on this contract.
File details come from the government source that posted it. Updated .