W91242-17-B-0005-0004_Released.pdf

PDF 187 KB Posted

Attached to
Wilmington Readiness Center Federal contract opportunity
Solicitation number
W91242-17-B-0005
Issued by
Department of the Army North Carolina Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Wilmington Readiness Center, newest first.
File Type Posted
OF_1419-_Abstract_Wilmington_Armory.pdf PDF
Questions_and_Answers_165.pdf PDF
W91242-17-B-0005-0005_Released.pdf PDF
Questions_and_Answers_162-164.pdf PDF
262913.03_-_Manual_and_Magnetic_Motor_Controllers.pdf PDF
Questions_and_Answers_135-161.pdf PDF
105613_fl_-_metal_storage_shelving.pdf PDF
015000_fl_-_temporary_facilities_and_controls.pdf PDF
010000_fl-_general_requirements.pdf PDF
012300_fl_-_additive_bid_items_(abi).pdf PDF
NCARNG_WIlmington_Amendment_Drawings_20170824.pdf PDF
Questions_and_Answers_80-134.pdf PDF
W91242-17-B-0005-0003_Released.pdf PDF
State_Stormwater_Management_Permit_No._SW8_140906.pdf PDF
Questions_and_Answers_60-79.pdf PDF
083323_fl_-_overhead_coiling_doors.pdf PDF
013300_fl_-_submittal_procedures.pdf PDF
NCARNG_Wilmington_RC_Addendum_1_Drawings_20170817_Part_2.pdf PDF
312000_FL_-_Earth_Moving.pdf PDF
087100_-_door_hardware.pdf PDF
114000_-_food_service_equipment.pdf PDF
MILCON_Erosion_Control_Letter_of_Approval.pdf PDF
083313_fl_-_coiling_counter_doors.doc.pdf PDF
W91242-17-B-0005-0002.pdf PDF
NCARNG_Wilmington_RC_Addendum_1_Drawings_20170817_Part_3.pdf PDF
084413_fl_-_glazed_aluminum_curtain_walls.pdf PDF
133423.10_fl_-_fabricated_storage_building.pdf PDF
271513_FL_-_Communications_Copper_Horizontal_Cabling.pdf PDF
084113_fl_-_aluminum-framed_entrances_and_storefronts.pdf PDF
NCARNG_Wilmington_RC_Addendum_1_Drawings_20170817_Part_1.pdf PDF
Questions_and_Answers_41-59.pdf PDF
Questions_and_Answers_8-17-17.pdf PDF
Prebid_Attendance_Roster.pdf PDF
PreBidSlides_W91242-17-B-0005_a.ppt PPT presentation
NCARNG_RC_Bid_Final_Submittal_Drawings_Volume_1__20170619.pdf PDF
NCARNG_RC_Bid_Final_Submittal_Drawings_Volume_2_20170619.pdf PDF
NCARNG_RC_Bid_Final_Specs_Volume_2_20170707.pdf PDF
NCARNG_RC_Bid_Final_Specs_Volume_1_20170707.pdf PDF
W91242-17-B-0005-0001_Released.pdf PDF
W91242-17-B-0005_Released.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE 371301

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

National Guard Readiness Center, Wilmington, North Carolina

The Bid opening remains as August 29, 2017, 2:00PM EST.

Please see next pages for amendment details

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91242-17-B-0005

X 9B. DATED (SEE ITEM 11)

24-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2017

CODE

USPFO FOR NORTH CAROLINA (W91242)

ATTN:MAJ DEREK MEILINGER

4201 REEDY CREEK ROAD

RALEIGH NC 27607-6412

W91242 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91242-17-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

Amendment 0004

North Carolina Army National Guard (NCARNG)

Wilmington Readiness Center

This Addendum forms a part of the Contract Documents and modifies the Bidding Documents with amendments and additions noted below. Acknowledge receipt of this Addendum in the Bid Form. Failure to do so may subject Proposer to disqualification.

Amendment 0004 consists of descriptive changes and revised drawings listed below. Revised specifications and drawings are also provided with this amendment. Additions in specifications are underlined; deletions are noted by strikethrough.

DESCRIPTIVE CHANGES

GENERAL CHANGES:

1. JOINT VENTURE AGREEMENT INSTRUCTIONS

a. Added to Section 00010

2. BID BOND INSTRUCTIONS

a. Updated in Section 00010

CHANGES TO SPECIFICATIONS:

1. SECTION 010000 – GENERAL REQUIREMENTS

a. Article 1.1.e.: Add the following to the end of this paragraph: “Superintendent may also serve, if qualified, as site safety and health officer.”

b. Article 1.26.B: Revise to read as follows: “ The CONTRACTOR shall provide a separate Common-Use field office in accordance with Section 015000 TEMPORARY

FACILITIES AND CONTROLS.”

c.

2. SECTION 012300 – ADDITIVE BID ITEMS (ABI):

a. Article 3.1.D.1. Revise Assembly Room from Room number 124 to Room 132.

3. SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS:

a. Article 1.3. Delete Paragraphs B., C., D., E., and f. in their entirety.

4. SECTION 105613 – METAL STORAGE SHELVING

a. Article 2.2.A.5: Delete this article.

b. Article 2.2.A.6: Delete this article.

c. Article 2.2.A.14.a: Delete this article.

5. SECTION 262913.03 – MANUAL AND MAGNETIC MOTOR CONTROLLERS:

a. Article 1.1.A.4; Add “Combination Full-voltage Magnetic Motor Controllers.”

b. Article 2.4.: Add “COMBINATION FULL VOLTAGE MAGNETIC MOTOR CONTROLLER” specification paragraph in its entirety.

c. Article 2.4.; “ENCLOSURES” Renumbered to 2.5.

d. Article 2.5.: “ACCESSORIES” Renumbered to 2.6.

e. Article 2.6.; “IDENTIFICATION” Renumbered to 2.7.

CHANGES TO DRAWINGS:

1. DRAWING CS700 – CIVIL SITE DETAILS:

a. Revised Detail C1 Concrete Curb and Gutter to a 2 foot dimension.

2. DRAWING A-610 – ARCHITECTURAL WINDOW TYPES:

a. Detail B5, Lobby Storefront: Delete the word “Power”.

3. DRAWING I-001– INTERIORS FINISH LEGEND

a. Finish Legend: Delete “Integral Colored Concrete”.

4. DRAWING P-601 – PLUMBING SCHEDULES:

a. Revise Plumbing Fixture Schedule Item L-1 Model Number to Z5220.

The following revised drawings are included with this Addendum:

DRAWINGS

DRAWING REV. DATE TITLE

CS700 1 08/21/17 Civil Site Details A-610 1 08/24/17 Architectural Window Types

I-001 1 08/21/17 Interiors Finish Legend P-601 2 08/22/17 Plumbing Schedules

END OF AMENDMENT 0004

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been modified:

SECTION 00010 NARRATIVE

TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00010 - BID SCHEDULE, NOTES

SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS

SECTION 00700 - CONTRACT CLAUSES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

ATTACHMENT 1 – PLANS AND SPECIFICATIONS Volume 1 and 2 Project # 85498371301 Dated 04/03/2017 (Note the plans and specifications are not attached to the solicitation and need to be downloaded from FedBizOps, reference notes 3 and 4 below)

ATTACHMENT 2 – WAGE DETERMINATION

ATTACHMENT 3- SECTION 01000 General Requirements

ATTACHMENT 4- BRAND NAME J&A

SECTION 00010 NOTES

NOTES

1. All questions and requests for information regarding this Invitation For Bids (IFB) must be received NOT LATER THAN close of business five days prior to bid date in order to minimize delays in the procurement of this project. See section 00100, #5, for details. Questions shall be emailed to: derek.t.meilinger.mil@mail.mil and to karla.m.garcia4.civ@mail.mil

2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (Contract Clause FAR 52.228-5). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.

3. Reference Contract Clause 252.236-7008, CONTRACT PRICES – BIDDING SCHEDULES (DEC 1991).

The prices shown in the Bidding Schedule must reflect ALL costs involved in performing the work, as described in the plans and specifications.

4. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.

5. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.fbo.gov.

6. Facsimile transmission of bid is not authorized.

7. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.fbo.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.

8. CLINS 0003 through 0012 are additive bid items. The Government will determine apparent low bidder in accordance with the procedure described in DFARS Provision 252.236-7007, Additive or Deductive Items.

9. A complete bid package must contain the following:

(a) Offer, Standard Form (SF) 1442 front and back signed

(b) Section 00010 Line Items 0001 thru 0012- all items must be priced AND Table 1 in Section 00010.

(c) An Original Bid Bond and original Power of Attorney is required along with the bid on the due date.

(d) Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.

(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.

One copy of the SF1442 is required to have an original signature.

(f) All amendments to the solicitation must be acknowledged.

(g) Mark the front of the envelope with the following: “BID No. W91242-17-B-0005”, and the Name and

Address of Bidder. See Block 13A of SF 1442 for required number of copies.

10. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.

NOTE: An Original Bid bond and Original Power of Attorney is required with submission of the bid.

The bid bond is due on the date as stated on the SF1442 block 13. The bid bond must be on a SF24 form.

Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.

Section 00010- Table 1

Description Amount CLIN 0001- Based Bid- Wilmington Readiness Center

Site, Exterior Improvements, and Site Utilities. (this should include civil, utilities, and the "improvements" which include fencing, curbs, sidewalks etc.)

Building General Trades (to include everything that is not covered in a category below) $

Building - Fire Suppression and Alarm Systems $

Building -Plumbing $

Building - Mechanical HVAC $

Building - Electrical $

Building - Communications and Security Systems $

TOTAL CLIN 0001 Base Bid Wilmington Readiness Center $

CLIN 0002 Base Bid- Asbestos Cement Water Line $

TOTAL CLIN 0001 and CLIN 0002 $

CLIN 0003 ABI #1- Controlled Waste Handling Facility Site, Exterior Improvements, and Site Utilities. (this should include civil, utilities, and the "improvements" which include fencing, curbs, sidewalks etc.)

Building General Trades (to include everything that is not covered in a category below) $

Building -Plumbing $

Building - Mechanical HVAC $

Building - Electrical $

Building - Communications and Security Systems $

TOTAL CLIN 0003 $

CLIN 0004 ABI #2 General Purpose Training Bay

Site, Exterior Improvements, and Site Utilities. (this should include civil, utilities, and the "improvements" which include fencing, curbs, sidewalks etc.)

Building General Trades (to include everything that is not covered in a category below)

Building -Plumbing $

Building - Mechanical HVAC $

Building - Electrical $

Building - Communications and Security Systems $

TOTAL CLIN 0004 $

CLIN 0005 ABI #3 Operational Pavement Behind the Readiness Center and Access Drives

CLIN 0006 ABI #4 Ground Faced CMU $

CLIN 0007 ABI #5 Resinous Matrix Terrazzo Flooring $

CLIN 0008 ABI #6 Resinous Flooring $

CLIN 0009 ABI #7 Vehicle Loading Ramp $

CLIN 0010 ABI #8 POV Parking, Additional POV Parking, Concrete Surface MEP Parking, and site work.

CLIN 0011 ABI #9 Landscaping $

CLIN 0012 ABI #10 Basement/Foundation Demolition $

TOTAL CLIN 0001 to CLIN 0012 $

End of Section 00010

(End of Summary of Changes)

File details come from the government source that posted it. Updated .