W9123622B2041 Amendment 0011.pdf

PDF 379 KB Posted

Attached to
DLA Building 54 Navy Artifact Restoration Federal contract opportunity
Solicitation number
W9123622B2041
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document is an amendment to a solicitation for renovation work at Building 54 at the Defense Center Richmond in Virginia. The solicitation is to provide design and construction services to install new HVAC systems in the Navy Artifact room.

The amendment provides revised specifications and drawings. It updates specification 01 45 04.00 50 with new requirements for contractor quality control personnel experience and roles. The conditions of contract section is also modified with an updated index of drawings and specifications for the project. Twenty-seven attachments are included with project documents such as drawings, specifications, statements of special inspections, and design plans. The opportunity is issued through the Department of the Army Corps of Engineers Engineering District Norfolk. The solicitation number is W91236-22-B-2041 and is for renovations at the DLA Building 54 to restore the Navy Artifact collection. No response or award dates are noted.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Building 54 Navy Artifact Restoration, newest first.
File Type Posted
B.01.02_22B2041 Abstract of Offers.pdf PDF
Attch 27 01 45 04.00 50.pdf PDF
Amendment 10 Final.pdf PDF
Amendment 9 Final.pdf PDF
W9123622D2041 Amendment 0008.pdf PDF
W9123622B2041 Amendment 0006.pdf PDF
Attch 26 EL101.pdf PDF
Attch 23 M602.pdf PDF
Attch 17 FA101.pdf PDF
Attch 10 AD111.pdf PDF
Attch 5 01 50 02 00 50.pdf PDF
Attch 1 Project Table of Contents 00 00 00.pdf PDF
Attch 21 MP101.pdf PDF
Attch 18 MD101.pdf PDF
Attch 13 A111.pdf PDF
Attch 8 AD101.pdf PDF
Attch 7 08 33 23.pdf PDF
Attch 22 M601.pdf PDF
Attch 19 MH101.pdf PDF
Attch 16 A601.pdf PDF
Attch 15 A301.pdf PDF
Attch 14 A112.pdf PDF
Attch 11 AD112.pdf PDF
Attch 9 AD102.pdf PDF
Attch 6 03 30 53.pdf PDF
22B2041 Amendment 0006.pdf PDF
Attch 25 M805.pdf PDF
Attch 20 MH111.pdf PDF
Attch 12 AD122.pdf PDF
Attch 4 01 45 35.pdf PDF
Attch 3 01 45 35 SI Schedule - 1-28-2022.pdf PDF
Attch 2 01 45 35 Statement of Special Inspections - 1 28 2022.pdf PDF
Attch 24 M801.pdf PDF
W9123622B2041 Amendment 0005.pdf PDF
22B2041 B54 HVAC Amendment 4.pdf PDF
19 Jan Site visit.pdf PDF
Amendment 0003 Final.pdf PDF
Amendment 0002 Final.pdf PDF
Amendment 0001 Final.pdf PDF
Site Visit 5 January.pdf PDF
A.01.13_0455737 NAO663A B54-HVAC-ARTIFACT-IFB-DRAWINGS.pdf PDF
A.01.13_0455737 NAO663A B54-ARTIFACT-SPECS.pdf PDF
W9123622B2041 IFB.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W9123622B2041 Renovation of Building 54 Navy Artifact (Construction) Defense Center Richmond (DSCR), Virginia is hereby Amended as follow s:

1.1. Amendment 0011 is issued to add the technical documents that have been revised.(Refer to Continuation Page and attachemnts)

Contracting POC: Allen Scott Brainerd (757)201-7668 allen.s.brainerd@usace.army.mil CC'd dianne.k.grimes@usace.army.mil

All other terms and conditiona remain unchanged

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123622B2041

X 9B. DATED (SEE ITEM 11)

07-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Feb-2022

CODE

USACE NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123622B2041

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0010

B54 DESIGN FOR HVAC SYSTEMS IN NAVY ARTIFACT ROOM

SPECIFICATION CHANGES

The following specification is revised as of 2/25/2022:

1) 01 45 04.00 50 CONTRACTOR QUALITY CONTROL

a. 3.4.2 CQC System Manager

(i) Remove the second sentence in its entirety that reads:

“The CQC System Manager is the same individual as specified in Section 00 22 11, Paragraph 6.4.2.2.5.c.”

(ii) Delete the third sentence and replace with:

“The CQC System Manager shall have at least five (5) years' experience as a project quality control officer on projects involving multiple trades and subcontractors to include a project having a minimum gross area of 15,000 square feet or a minimum total value of $5,000,000.”

b. 3.4.3 CQC Personnel Remove the description paragraph in its entirety and replace with:

“In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, architectural. As specified below, a separate individual does not need to be assigned to each discipline/trade area listed in the preceding sentence; however, the individuals performing the CQC function for the listed areas must be qualified for the area as noted below. In addition, separate individuals are not required to perform the administrative and submittals roles but they must have sufficient time to perform their duties as noted below. These CQC personnel must be directly employed by the prime Contractor and may not be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. A single person may cover more than one area provided that they are qualified to perform QC activities in each designated and that workload allows.

Experience Matrix Area Qualifications

a. Mechanical 5 yrs related construction QC experience with mechanical features of work in the field

b. Electrical 5 yrs related construction QC experience with electrical features of work in the field

c. Architectural 2 yrs related experience”

Specification 01 45 04.00 50 has been updated with the above changes and attached herein.

END OF AMENDMENT

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

A.01.13__0455737 NAO663A B54-HVAC-Artifact-CF-EBC-Drawings.pdf March 23 2021, 59 Pages A.01.13_0455737 NAO663A B54-HVAC-Artifact-CF-EBC-Specifications.pdf March 23, 2021 892 Pages Attch 1 Project Table of Contents 00 00 00 Attch 2 01 45 35 Statement of Special Inspections - 1 28 2022 Attch 3 01 45 35 SI Schedule - 1-28-2022 Attch 4 01 45 35 Attch 5 01 50 02 00 50 Attch 6 03 30 53 Attch 7 08 33 23 Attch 8 AD101

Attch 9 AD102 Attch 10 AD111 Attch 11 AD112 Attch 12 AD122 Attch 13 A111 Attch 14 A112 Attch 15 A301 Attch 16 A601 Attch 17 FA101 Attch 18 MD101 Attch 19 MH101 Attch 20 MH111 Attch 21 MP101 Attch 22 M601 Attch 23 M602 Attch 24 M801 Attch 25 M805 Attch 26 EL101 Attch 27 01 45 04.00 50

(End of clause)

(End of Summary of Changes)