DLA Building 54 Navy Artifact Restoration Federal contract opportunity
Solicitation number
W9123622B2041
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This solicitation seeks proposals for renovations to Building 54 at the Defense Supply Center Richmond. Work includes removing the existing HVAC system and installing new dehumidification equipment, electrical system alterations, building envelope improvements, and fire protection modifications. Bidders are required to provide test and balance services for the new systems.

The total estimated value is between $1,000,000 to $5,000,000. Proposals are due through the DoD SAFE system by February 2nd, 2022. The award will be made to the lowest priced responsible bidder. The scope requires the contractor to provide all labor, materials, and equipment. Site visits were held on January 5th and 19th. Questions must be submitted through ProjNet by January 29th.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Building 54 Navy Artifact Restoration, newest first.
File Type Posted
B.01.02_22B2041 Abstract of Offers.pdf PDF
Attch 27 01 45 04.00 50.pdf PDF
W9123622B2041 Amendment 0011.pdf PDF
Amendment 10 Final.pdf PDF
Amendment 9 Final.pdf PDF
W9123622D2041 Amendment 0008.pdf PDF
Attch 26 EL101.pdf PDF
Attch 23 M602.pdf PDF
Attch 17 FA101.pdf PDF
Attch 10 AD111.pdf PDF
Attch 5 01 50 02 00 50.pdf PDF
Attch 1 Project Table of Contents 00 00 00.pdf PDF
Attch 21 MP101.pdf PDF
Attch 18 MD101.pdf PDF
Attch 13 A111.pdf PDF
Attch 8 AD101.pdf PDF
Attch 7 08 33 23.pdf PDF
Attch 22 M601.pdf PDF
Attch 19 MH101.pdf PDF
Attch 16 A601.pdf PDF
Attch 15 A301.pdf PDF
Attch 14 A112.pdf PDF
Attch 11 AD112.pdf PDF
Attch 9 AD102.pdf PDF
Attch 6 03 30 53.pdf PDF
22B2041 Amendment 0006.pdf PDF
Attch 25 M805.pdf PDF
Attch 20 MH111.pdf PDF
Attch 12 AD122.pdf PDF
Attch 4 01 45 35.pdf PDF
Attch 3 01 45 35 SI Schedule - 1-28-2022.pdf PDF
Attch 2 01 45 35 Statement of Special Inspections - 1 28 2022.pdf PDF
Attch 24 M801.pdf PDF
W9123622B2041 Amendment 0005.pdf PDF
22B2041 B54 HVAC Amendment 4.pdf PDF
19 Jan Site visit.pdf PDF
Amendment 0003 Final.pdf PDF
Amendment 0002 Final.pdf PDF
Amendment 0001 Final.pdf PDF
Site Visit 5 January.pdf PDF
A.01.13_0455737 NAO663A B54-HVAC-ARTIFACT-IFB-DRAWINGS.pdf PDF
A.01.13_0455737 NAO663A B54-ARTIFACT-SPECS.pdf PDF
W9123622B2041 IFB.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Soilcitation W9123622B2041 Renovation of Building 54 Navy Artifact (Construction) Defense Center Richmond (DSCR), Virginia is hereby Amended as Follow s:

1. This Amendmnet is to close out RFI's from Projent. See SF 30 for full breakout

2. Projent w ill be open until 11 Feb 2022.

3. Bid opening w ill be conducted 16 Feb 2022 at 1:00 (EDT) Contracting POC: Allen Scott Brainerd (757)201-7668 allen.s.brainerd@usace.army.mil cc'd dianne.k.grimes@usace.army.mil

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123622B2041

X 9B. DATED (SEE ITEM 11)

07-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Feb-2022

CODE

USACE NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123622B2041

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

Note 1 Technical Projnet Responses that reference Amendment 0005 are actually incorporated in Amendment 0006.

Inquiry ID: 9533780 On the SF1442 the due date is listed as 20 January, but on page 5 in the Electronic Bid Submission in DoD SAFE instructions the due date is stated as 14 January.

Can you please confirm the due date?

Government Response: 9533780 Per the instructions on Page 5 Electronic Bid Submission in DoD SAFE:

All proposals must be uploaded into DoD SAFE infrastructure not earlier than 14 January 2022 and not later than the date/time specified in Block 13 of the solicitation. Bidders will require a unique "request code" to upload bids into DoD SAFE, which must be obtained by email only to the following POCs: Allen Scott Brainerd at allen.s.brainerd@usace.army.mil and Dianne Grimes at Dianne.K.Grimes@usace.army.mil and cc'd PPMDContracts@usace.army.mil with your email request. The POCs must receive the mail for the "request code" NLT 1:00 PM (EDT) 19 January 2022.

The due date is specified in Block 13. The 14th as stated above is the earliest you can upload the proposal.

Inquiry ID: 9546805 Due to the weather there was some confusion at the site walk yesterday and a delay in the visitor center opening.

Some contractors left not knowing there was a delay. Can you schedule another site walk?

Government Response: 9546805 We are having another site visit 19 January 2022 at 1000 AM. Please see amendment to be issued 11 January 2022

Inquiry ID: 9546818 On the site visit we noticed several holes in the ground near the existing transformer. They appear to be a drain of some sort. What is the intent for these holes?

Government Response: 9546818 The holes in the ground are not in the scope of this project. There is space for the generator pad to be located clear of the holes.

Inquiry ID: 9546979 Due to weather and associated delays, we were unable to attend the site visit on 1/5/22. Would the government be willing to schedule another site visit for sometime the week of January 10th? If so, will previously registered attendees need to resubmit personal/vehicle information for the second site visit?

Government Response: 9546979 We are having another site visit 19 January 2022 at 1000 AM. Please see amendment to be issued 11 January 2022

Inquiry ID: 9549040 In room 126, there are four duct detectors that are not listed on the drawings. Are these to be demoed and removed or are they to be saved and reused?

Government Response: 9549040 The duct detectors are not needed and can be demoed and removed.

Inquiry ID: 9549068 Please reference the thickness for the overhead coiling doors on the door schedule. Door schedule calls for a 3" thick door; however, the standard thickness for coiling doors is 25/32". According to our vendor, there are no suppliers that supply a 3" thick door per this specification. Is this a mistake?

Government Response: 9549068 Door schedule is incorrect. Specifications are correct. Product specified is an Insulated Heavy-Duty Rolling Door.

Will be incorporated in Amendment 0005.

Inquiry ID: 9549148 Please clarify the finish for the interior slats of the overhead coiling doors. Should they be bare metal like the existing or painted Manor Brown like the exterior? Also, will the bottom four slats on the interior require the safety yellow paint like the existing?

Government Response: 9549148 Bare metal with the bottom four slats (12 inch AFF min.) painted safety yellow.

Inquiry ID: 9550578 Demo Keynote 10 on sheet AD102 states that the contractor is to breakdown the HDC storage units and store them in a location designated by the DSCR. Has a space been identified for storing these units? Will contractor be allowed to store in a warehouse location on-site or is contractor expected to store these in contractor provided temporary storage units? Lastly, will these units be reassembled in the same location in Room 111 (High Density Compact Storage)?

Government Response: 9550578 DSCR staff will provide a space on-site for storage. No off-site storage or contractor temporary storage will be required. The units are expected to be reassembled in the same location/configuration in room 111.

Inquiry ID: 9550935 01 35 26, 1.5.1.1 states that the SSHO cannot serve as the Quality Control Manager or serve as the Superintendent.

01 45 04 states that the QC cannot serve as the SSHO or the Superintendent.

This would lead us to the conclusion that 3 personnel employed by the prime contractor must be on site 100% of the time to serve as separate and independent Site Superintendent, SSHO, and QC. No one person can dual hat either position.

Please confirm the wording in these spec sections are correct and the government intends to require 3 full time managers/supervisors on site 100% of the time during construction?

Government Response: 9550935 The wording is correct in those specification sections. The Government requires 3 separate persons for the position of SSHO, Superintendent and QC Manager on site 100% of the time during construction

Inquiry ID: 9550942

3.4.2 states that the CQC System Manager shall have projects with a minimum total value of $35,000,000. The government's estimate for this job is $1,000,000 - $5,000,000; why is $35,000,000 the MINIMUM requirement for personnel?

Government Response: 9550942 Please ensure CQC System Manager meets spec requirements and qualifications.

Inquiry ID: 9551064 Can you please provide more information on the HDC storage units to be relocated? What's the quantity, breakdown & install instructions, etc? Also, can you please provide pictures of the units, so we can have an idea on how to price accordingly. Please provide manufacturer cut sheets and O&M's.

How far will the units need to be moved; within the same building or to another location?

Government Response: 9551064 The HDC Storage units will be removed from the scope of work for this project. They will instead be disassembled and moved by others before construction. Will be Incorporated in Amendment 0005.

Inquiry ID: 9551065

Note 1 states to remove ceiling tiles but retain grid. Can the grid remain in place or should it be removed in it's entirety and stored until we are ready to install new ceiling tiles, after MEP work?

If the grid is to be removed and stored for reinstallation at a later date, is there a storage location at the facility or do we need to coordinate for transportation and storage in the laydown area?

Government Response: 9551065 The grid can be removed at the contractor's discretion and reinstalled at a later date. Contractor can provide storage in laydown area not exposed to the elements

Inquiry ID: 9551071 The laydown area is on the opposite side of the artifacts building located at bldg 54. Is there a route through the building to transport materials and haul out trash? Or must we follow the haul route on G-003 for everything?

Government Response: 9551071 There is not an alternate route through the building.

Inquiry ID: 9551075 Will daily or weekly staging of small amounts of material be allowed in the parking lots on the west side of the building?

Will any contractor personnel be able to park in the parking lots on the west side of the building or must all contractor vehicles remain at the storage area and be transported in and out daily to Bldg 54?

Government Response: 9551075 The awarded contractor will need to provide a site plan with their requested area for the staging. For bidding purposes, assume that all material will need to be stored in allocated laydown area or within the building at the loading dock area. No parking will be permitted in the parking lots on the east side of the building. The west side of the building is the construction area for the B54 roof renovation project.

Inquiry ID: 9551083 Note 1 says to reinstall salvaged grid. There is no way 100% of the ceiling grid will remain undamaged during demo. Nor is it likely that all of the existing grid is 100% salvageable. In order to make sure all bidders make the same cost assumptions, and to avoid unnecessary claims for the government, is it possible for the government to mandate an allowance in the base bid for damaged grid, and add a Unit Price Item to the bid form for unsalvageable materials?

Government Response: 9551083 Bidders shall assume a percentage of the ceiling grid to be replaced. Each bidder can decide what percentage to use in their cost assumption.

Inquiry ID: 9551106 In the wall infill details, there are several notes for a steel post and plate shoring assembly. Can you provide additional details and/or a sketch for the shoring system required? Without as-builts and existing building loads, it would be hard to make sure bidders are making fair and even assumptions to cover appropriate costs for the shoring system.

Government Response: 9551106 For shoring post and plate associated with sections E1 and K8 on A-301, see revised sheets AD-101 and A-301. This shoring system will be left in place after glass block removal. For Shoring details D13 and J18 see revised sheets AD-101 and A-301. Will be Incorporated in Amendment 0005.

Inquiry ID: 9551132 There are a few locations where the roof needs to be cut and patched. There are no specifications for the roof. Can you provide more details on the type of existing roofing, patching required, and a spec section?

Are there any existing roof warranties that we should be concerned about?

Government Response: 9551132 Roof work not required per response to bidder inquiry 9551309, "The curb will be reused per MD112. Note on AD122 is incorrect."

Inquiry ID: 9551141

Are there any special phasing considerations we should know about for working around building occupants or moving fixtures & equipment?

Will night and weekend work be required at all?

Government Response: 9551141 The hours of operation for this building are 0700 to 1700 Monday through Friday. No inside work after 1700 or on the weekends allowed.

Inquiry ID: 9551161 With the existing sprinkler main to be demo'd, will a 24 hour/7 days a week fire watch be required to be provided by the contractor during the sprinkler outage? If so, what is the square footage of the building sprinklers affected by the fire main to be demo'd on FD101?

Government Response: 9551161 Fire Watch to be provided in accordance with NFPA 241, NFPA 25, and Base Fire Plan. Only area affected by the removed main shall be placed out of service. Zone may be shut down for a short duration as required to isolate and cap the main at the location indicated on FD101. Remainder of zone must be placed back into immediate service.

Fire watch shall include only areas with sprinkler system impairments

Inquiry ID: 9551176 The existing equipment pad for CU-1 is being demo'd and a new concrete pad for ACC-1, in what looks like the same location. Is it necessary to demo the pad and install a new one in about the same footprint, only slightly smaller?

Government Response: 9551176 The existing CU-1 is a lighter piece of equipment. The new pad must be constructed to support the new 5000# chiller per the detail on M503. Pad shall be replaced to support the heavier equipment.

Inquiry ID: 9551199 Will both CLIN 0001 and CLIN 0002 be awarded at the same time? Or is it possible that only CLIN 0001 will be awarded and CLIN 0002 will not be excecated?

Government Response: 9551199 Both CLIN 0001 and 0002 are base CLINs both will be award at time of award. This solicitation does not have any option CLINs

Inquiry ID: 9551214 What are the limits of construction for CLIN 0002. Is the concrete pad, natural gas piping, and electrical conduit in CLIN 0001 or CLIN 0002? If the generator itself is CLIN 0002, what about the ancillary items and rough in? Do we need to prep the site in CLIN 0001 for a future generator?

Government Response: 9551214 Generator rough in and ancillary items shall be included in CLIN 0002. CLIN 0001 will not included prep for a future generator.

Inquiry ID: 9551226 Once the AHU is removed, is the contractor responsible for temporary heating/cooling and dehumidification? Or are there redundant systems that can cool and dehumidify the artifact room while the mechanic system is being overhauled?

Government Response: 9551226 Temporary heating and cooling is not required

Inquiry ID: 9551232 Please provide the O&M's for the existing fume hood exhaust fan referenced in Note 2 for manufacturer's recommended maintenance.

Government Response: 9551232 The installation does not have any of the O&M Manuals.

Inquiry ID: 9551234

Please provide contact info for the contractor currently servicing the BAS head end equipment and operator workstations referenced in Note 15, concerning updating graphics of the existing system. We will need to contact them for integration of the DDC system.

Government Response: 9551234 Honeywell Tridium N4. This building was recently upgraded from AX to N4

Inquiry ID: 9551246 Can you please provide contact info for the fire alarm contractor currently servicing Bldg 54? We assume the artifact room will have to be integrated with the fire alarm in the rest of Bldg 54 and we will need to coordinate with them directly.

Government Response: 9551246 Requested information will be provided to awarded contractor

Inquiry ID: 9551303 Note 1 says to relocate lockers. What lockers? This is the only time lockers are referenced. Please provide more details with quantities and installation instructions.

Government Response: 9551303 The text below appends or clarifies ALL previous replies.

Lockers in boiler room will be moved by others. See revised drawing EL101 will be incorporated in Amendment 0005.

Inquiry ID: 9551309 Demo Keynote 1 on AD122 states that the contractor is to cut portion of existing roof for installation of new curb and mech. equipment; however, demo keynote 1 on MD112 says to reuse the existing roof curb. Please clarify.

Government Response: 9551309 The curb will be reused per MD112. Note on AD122 is incorrect. Will be Incorporated in Amendment 0005.

Inquiry ID: 9551315 Demo keynote 1 on page AD112 states that contractor is to remove and dispose of ACT. This note is not present in Room 128. Is contractor expected to perform this scope in room 128 as well?

On page A112, there are no keynotes for rooms 128 and 129. Please clarify it contractors are expected perform keynotes 1 & 2 in rooms 128 & 129.

Government Response: 9551315 Keynote 1 on AD112 shall apply to room 128. Keynotes 1 & 2 shall apply to rooms 128 &129.

Inquiry ID: 9551421 There is a wide flange girt welded to posts in the middle of this infill, is this part of the shoring system for the louver infill? There is no structural steel specification, can you provide further details on the steel requirement for this?

Government Response: 9551421 The wide flange girt will not be required.

Inquiry ID: 9551426 There is excavation, reinforced concrete, masonry, structural steel, and welding on this job. However, it does not appear there are any special inspections required. Will the government be hiring a geotechnical engineer directly to provide tests and inspections? Or should the contractor include in CLIN 0001 costs for the special inspector? Please provide a schedule of special inspection for masonry, steel, and concrete.

Government Response: 9551426 Special Inspections spec will be provided. Will be Incorporated in Amendment 0006.

Inquiry ID: 9551439 There are 2 new concrete pads, one for ACC-1 and one for the generator, but there is no concrete spec. Are the details on M-503 sufficient or should there be a Div 03 concrete specification we need to adhere to?

Government Response: 9551439 Concrete spec will be provided. Will Incorporate in Amendment 0006.

Inquiry ID: 9551449 The note on the "typical exterior door still detail", says to scarify "AS REQUIRED" 1 inch of slab on grade concrete and provide topping to install the door threshold. There are 3 doors on the schedule that reference detail A1. This seems to be an ambiguous requirement. What is the determining factor for "as required". Should we assume every door on the schedule with a reference to detail A1 is required to scarify and provide topping for bidding purposes?

Government Response: 9551449 This detail shall apply to all exterior doors as listed on door schedule. Existing concrete has settled in some locations and will need to be built-up for proper installation of door threshold.

Inquiry ID: 9552173 If the site visit occurred on 1/5, can you please provide a copy of the sign-in sheet?

Government Response: 9552173 yes one will be uploaded by the close of business 12 January 2022

Inquiry ID: 9553433 In the RFP it states ProjNet will remain open for questions until 10 days prior to the due date. In Amendment 0001 the revised due date is 1/27 and ProjNet would close 1/17, two days before the second site visit. Can ProjNet remain open until Friday 1/21 in order to submit any questions from the second site visit?

Government Response: 9553433 ProjNet will be closing on 29 January 2022

Inquiry ID: 9553443 Can you please clarify when the bid opening will occur? On page 1 of Amendment 0001 it's listed as 28 January, but on page 3 it's listed as 27 January.

Government Response: 9553443 Per Amendment 0003 released on 19 January 2022 the DoDSAFE closing date is 02 February 2022 at 1:00 PM (EDT). The Bid Opening Date is 03 February 2022 at 1:00 PM (EDT)

Inquiry ID: 9554824 Note 1 on AD122 says to cut roof for a new curb. However, MD122, Note 1, says to reuse existing curb. MH112 also states to use existing curb for EF-1. Please clarify if the curb is new or existing to remain. If the curb is new, please provide roof flashing details.

Government Response: 9554824 The curb will be reused per MD112. Note on AD122 is incorrect. Will Incorporate in Amendment 0005.

Inquiry ID: 9554969 Can you please clarify when proposals are due? On page 1 of Amendment 0001 it's listed as 1/27, but on page 2 it's listed as 1/20. "The required response date/time has changed from 20-Jan-2022 01:00 PM to 20-Jan-7022 01:00

PM."

Government Response: 9554969 Per Amendment 0003 released on 19 January 2022 the DoDSAFE closing date is 02 February 2022 at 1:00 PM (EDT). The Bid Opening Date is 03 February 2022 at 1:00 PM (EDT)

Inquiry ID: 9556614 Reference Spec. 236426, paragraph 3.1.1.3. This paragraph references non destructive examination (NDE) of welded pipe and requires a report per ASME B31.9. NDE of welded joints seems excessive for a project of this size, nature, and scope. Please confirm NDE of welded joints is required. If it is required, please advise what specific methods are necessary as no direction is given on methods in the specification.

Government Response: 9556614 Provide NDE testing as required by the specification. Utilize testing procedures as dictated in ASME B31.9.

Inquiry ID: 9557056 MH101 room 130. There is a piece of equipment tagged "UH-1" that does not appear in any equipment schedule.

Please provide schedule for this equipment.

Government Response: 9557056

The text below appends or clarifies ALL previous replies.

No unit heater is required. See Revised Drawing MH101 that will be Incorporated in Amendment 0005.

Inquiry ID: 9557322 What is the return duct configuration for units CRAC1 through CRAC3? Is the unit to come with a front mounted, integral return grille?

Government Response: 9557322 Yes, front mounted integral return grille shall be provided.

Inquiry ID: 9558535 M601 - Domestic water makeup line connecting to AS-1 references a backflow preventer detail on MP101. There is no reference to a backflow preventer on MP101. Is a backflow preventer required for this connection and/or the domestic water connection serving the 3 CRAC units?

Government Response: 9558535 A single backflow preventer is required to supply both the chiller and CRAC unit make-up water. Please provide.

Will Incorporate in Amendment 0005.

Inquiry ID: 9558582 The electrical room (#130) has domestic water and chilled water piping passing over electrical equipment. Is this permitted? Should the lines be moved down toward AHU-1 to miss the electrical room?

Government Response: 9558582 Yes, the DCW and CWS/CWR shall be routed around the electrical room.

Inquiry ID: 9558795 The gas line serving the generator is shown above ground. There is a new concrete pad for the generator, but no detail is provided for pipe supports on the gas pipe between the building and generator. As this is a grassy area, some sort of substantial support will be needed to support this pipe between the building and the generator. Please provide a detail for the supports on this gas piping.

Government Response: 9558795 The text below appends or clarifies ALL previous replies.

Contractor to support new gas piping from building wall in similar arrangement to existing. See Revised Drawing MP101 that will be Incorporated in Amendment 0005.

Inquiry ID: 9559700 Spec section makes multiple references to water treatment systems being required for HVAC piping (paragraphs 1.3, 2.9, 3.4.3, 3.6). Requirements include a 1 year period of testing, maintenance, and reporting. There is no water treatment system equipment shown on the plans. Is any equipment required? If so, is treatment required on the new CHW system only or does the existing HHW system need to be serviced as well?

Government Response: 9559700 A chemical shot feeder shall be provided for the chilled water system. Based on review of the reference drawings, the existing HW system has its own water treatment system with a shot feeder located adjacent to the HW pumps.

Inquiry ID: 9559888 M801 shows a return fan VFD at AHU1 on the control schematic. The schedule (M602) for this equipment does not note a return fan. Additionally, M804 references only a supply fan. Is a return fan required? If so, please provide an updated schedule on M602 and updated control sequence on M804.

Government Response: 9559888 There is not return fan required for this system.

Inquiry ID: 9559906 Please confirm CRAC4 and all associated work is not part of the scope of work in this contract.

Government Response: 9559906 CRAC-4 is provided under a separate construction project. DPS and bypass will be located on the 1st floor, south floor Area B

Inquiry ID: 9561706 Being required to cut the existing roof for new Mechanical, is there an existing Roof Warranty that must be considered to perform this work. Please publish any details that would pertain to this Warranty work.

Government Response: 9561706 Note 1 on AD122 is incorrect. Curb is existing-to-remain per MD112. Will Incorporate in Amendment 0005.

Inquiry ID: 9562685 Thank you for your response to the RFI on the storage of the HDC Storage units; however, I have a few follow up questions:

1. Is the storage area being provided within building 54? Or is it somewhere else on base?

2. Is the route walkable? If, so approximately how far away from Room 111 is the storage location?

3. If the route is unwalkable and materials must be moved by truck, is there dock near the approved storage location?

Government Response: 9562685 The HDC Storage units will be removed from the scope of work for this project. They will instead be disassembled and moved by others before construction. Will Incorporate in Amendment 0005.

Inquiry ID: 9564628 Please provide contact information for the current fire alarm maintenance contractor for programming.

Government Response: 9564628 Requested information will be provided to awarded contractor

Inquiry ID: 9565103

2.1.2.1 Wind loading. States 110 pounds per square foot. Do you mean 110 mile per hour wind load rating? Please confirm.

Government Response: 9565103 Correct wind pressure is 20 PSF.

Inquiry ID: 9565106

2.2.2.2 Hood. States 22 gauge sheet metal. These hoods are not available. Will 24 gauge be acceptable?

Government Response: 9565106 Provide 22-gauge aluminum or 24-gauge galvanized steel. Will Incorporate in Amendment 0005.

Inquiry ID: 9565108

2.2.1.6 Locking Devices. States to use a slide bolt. This is not recommended with electric motor operators due to the potential for damage to the operator if engaged with the bolt in the slide position. Please confirm this is what you want?

Government Response: 9565108 Slide bolts not required. Will Incorporate in Amendment 0005.

Inquiry ID: 9565124 The door schedule on A-601 states the overhead doors should be painted with Benjamin Moore Manor Brown paint.

The specifications call for a powder coating finish on the doors. Which do you prefer?

Government Response: 9565124 Sheet A-601 and spec 08 33 23 are both revised to show that paint is to match existing. Will Incorporate in Amendment 0005.

Inquiry ID: 9565170 Sheet AD111 states to remove ACT panels in room 126. On the site visit, it was noted there is no ACT ceiling in this room. Please confirm.

Government Response: 9565170 There is no ACT ceiling in this room and the note will be corrected. Will Incorporate in Amendment 0005.

Inquiry ID: 9565554

The solicitation documents state to utilize DoDSAFE to submit our proposal. However, the DoDSAFE site clearly says to not use that site to submit proposals. It also says if it is used it can take up to four hours to deliver. Please advise.

"DoD SAFE is NOT to be used for contract solicitation or proposal submission. Use the Procurement Integrated Enterprise Environment (PIEE) for time-sensitive submissions.

DoD SAFE does NOT guarantee a delivery time. Please allow up to 4 hours for delivery.

File transfers of malware or malicious files are not supported.

Files must be picked up within 7 days of Drop-off. After that, files are automatically deleted from DoD SAFE.

File size, customer network connection, connection type, and number of files are factors in the total upload/download time of files. DoD SAFE is not recommended for time sensitive file transfers."

Government Response: 9565554 Currently we are still using the DoDSAFE for proposal submissions. We have not transitioned to the PIEE requirement. The proposals are to be uploaded 1 day prior to Bid Opening per Solicitation instructions. Even though it may take 4 hours to deliver your submission is timestamped with your upload time.

Inquiry ID: 9565555 Section 00 45 00 - Representations and Certifications: Please confirm what clause fill-ins need to be completed and submitted with our bid if our company has already completed its Annual Representations and Certifications online via SAM. Do we only need to include Pages 14 through 17 of the solicitation with a checkmark next to "Paragraph D Applies" on page 14 along with our bid?

Government Response: 9565555 Fill in Clauses/Provisions that are completed in SAM.gov are not required to be completed in the Solicitation as long as you identify that they are completed in SAM.gov. (Requirement 52.204-7). Any Clauses / Provisions that are not completed are required to be submitted in your bid.

Inquiry ID: 9565562 Do we have to complete and include section 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020) on pages 18-20?

Government Response: 9565562 Please read the instructions in the first paragraph of 52.204-24 as to what information you are required to provide.

Inquiry ID: 9565564 Do we need to complete and include 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2021) on pages 21-23?

Government Response: 9565564 Fill in Clauses/Provisions that are completed in SAM.gov are not required to be completed in the Solicitation as long as you identify that they are completed in SAM.gov. (Requirement 52.204-7). Any Clauses / Provisions that are not completed are required to be submitted in your bid.

Inquiry ID: 9565567 Do any fill-ins need to be completed and included with our bid from the CLAUSES INCORPORATED BY FULL TEXT section starting on page 30 of the solicitation and continuing through page 48?

Government Response: 9565567 Fill in Clauses/Provisions that are completed in SAM.gov are not required to be completed in the Solicitation as long as you identify that they are completed in SAM.gov. (Requirement 52.204-7). Any Clauses / Provisions that are not completed are required to be submitted in your bid

Inquiry ID: 9566676 After the site visit, and investigating the HDC storage shelving more, this is a considerable undertaking with very little information being provided in the plans & specs. Since the site visit was not mandatory, there is no way for bidders to price this scope of work fairly, and those who attended the site visit will understand the actual costs and effort, while those who did not will underbid this portion significantly. Additionally, since this appears to be a specialty item, a certified National Office Systems installer should be required to complete the work, and not just common laborers. Without O&Ms, installation instructions, and/or contact info for the original installer, for the NOS shelving prior to bid time, it will result in unbalanced bids. Please provide detailed sketches and instructions for the HDC storage units or consider making this scope of work an "owner requirement" much like moving other FF&E items prior to construction.

Government Response: 9566676 After the site visit, and investigating the HDC storage shelving more, this is a considerable undertaking with very little information being provided in the plans & specs. Since the site visit was not mandatory, there is no way for bidders to price this scope of work fairly, and those who attended the site visit will understand the actual costs and effort, while those who did not will underbid this portion significantly. Additionally, since this appears to be a specialty item, a certified National Office Systems installer should be required to complete the work, and not just common laborers. Without O&Ms, installation instructions, and/or contact info for the original installer, for the NOS shelving prior to bid time, it will result in unbalanced bids. Please provide detailed sketches and instructions for the HDC storage units or consider making this scope of work an "owner requirement" much like moving other FF&E items prior to construction. Will incorporate in Amendment 0005.

Inquiry ID: 9566688 For the glass block demo, is the government going to require that any portion of the wall removed be installed in the same day? Or will temporary protection be allowed? Without any direction on "phasing" of demo for this area, costs will be considerably different if we are allowed to demo the entire glass block wall and install all the brick at a later date verses having to reinstall steel and brick in the same opening on the same day.

Government Response: 9566688 Any portion of the exterior wall not completed before the end of the work day will require temporary protection to weatherproof the area. Coordination with the government is required for security purposes.

Inquiry ID: 9566690 For glass block demo, will occupants, equipment, and furniture along that wall and in those rooms be relocated for the entire of that scope of work? It would be a hug safety hazard and a high risk for damage if anyone or anything is in that room during the work.

Government Response: 9566690 The work area will be unoccupied, and furniture, fixtures and equipment removed during the entire construction period.

Inquiry ID: 9566692 Will any special interior protection be required during glass block demo? i.e. Building a containment wall inside, or other protection requirements above and beyond poly and ram board to catch debris?

Government Response: 9566692 Any portion of the exterior wall not completed before the end of the work day will require temporary protection to weatherproof the area. Coordination with the government is required for security purposes.

Inquiry ID: 9566693 For glass block demo, can a manlift be used along that front sidewalk and road or will the government require scaffolding up against the building?

Government Response: 9566693 This is a means and method question. Note that any damaged landscape must be restored and the roadway cannot be completely blocked and must be coned off.

Inquiry ID: 9566697 Will the occupants shut down door access to those entryways during demo and brick work? If not, what protection measures will be needed around the doorways? Fencing and overhead cover for the stairs?

Government Response: 9566697 There will be no unauthorized access into the work area by building occupants during the construction period.

Access to the loading dock area will remain and requires coordination with the government during construction.

Inquiry ID: 9566797 On Drawing MH111, there is a note that all existing fans are to remain, and be tied into the new DDC system. We currently have a controls system in Building 54 at DSCR; some of those fans are currently controlled and others are not. Can you verify which fans need to be added to the control system and how you would like them to be carried over (i.e. new controls, new hardware, ETR controls, etc.). Thank you.

Government Response: 9566797 The design intent is to integrate all fans into the DDC system. It is unknown at this time which fans are DDC controlled, and which are not. The author of this question acknowledged that some of the fans are currently controlled by the DDC system which infers that the ones which are not currently tied to the DDC are controlled by standalone controls. That said, intent is to control all through the DDC so provide any additional hardware and programming, etc to realize this design intent.

Inquiry ID: 9567090 Can we get a copy of the 1/19 site visit sign-in sheet?

Government Response: 9567090 The site visit sign in sheet from 19 January 2022 has been uploaded into Sam.Gov

Inquiry ID: 9568323 We reached out to National Office Storage concerning you high density compact storage shelving. Your system is currently under warranty with NOS. If anyone other than an NOS installer touches the shelving, the warranty is voided. Please provide a quote directly from NOS, so that no one bidder has an unfair advantage for this proprietary scope of work. Or consider this scope of work to be not in contract, and owner furnished owner installed.

Government response: 9568323 The HDC Storage units will be removed from the scope of work for this project. They will instead be disassembled and moved by others before construction. Will Incorporate in Amendment 0005.

Inquiry ID: 9569094 Please confirm that the government will handle removing all sensitive items from the space, to include the artifacts, chemicals, etc.

Government Response: 9569094 All artifacts and material will be removed from the areas prior to starting work per building occupants.

Inquiry ID: 9569339 Sheet AD102 note 10 says "high density compact storage, breakdown the HDC storage units, move to a location designated by the DCR and reassemble in designated location" Sheet A-102 note 4 says "at the completion of the project, the high density compact (HDC) storage units will be broken down from their temporary location, and reassembled in the HDC storage room" Are these units supposed to be disassembled and reassembled twice?

Government Response: 9569339 The HDC Storage units will be removed from the scope of work for this project. They will instead be disassembled and moved by others before construction. Will Incorporate in Amendment 0005.

Inquiry ID: 9577404 Detail states to use 6" metal studs at 16" on center. What gauge metal studs should these be?

Government Response: 9577404 Please refer to specifications for this information

Inquiry ID: 9579567

"3.4.3 CQC Personnel In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, civil architectural, CQC administrative assistant, and submittals clerk. These individuals must be directly employed by the prime Contractor and may not be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; have the necessary education and/or experience. These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. A single person may cover more than one area provided that they are qualified to perform QC activities in each designated and that workload allows."

Please confirm this requirement for assistants is requires for this project or can be deleted from consideration.

Government Response: 9579567 Please ensure CQC Personnel meets spec requirements and qualifications

Inquiry ID: 9580120 we are asked to breakdown the HDC Storage Units then reassemble in designated area.

Are we reassembling as fully functional shelving/storage or stationary shelving/storage?

Government Response: 9580120 The HDC Storage units will be removed from the scope of work for this project. They will instead be disassembled and moved by others before construction. Will Incorporate in Amendment 0005.

Inquiry ID: 9580121 Is there an existing track in the Temporary area that these HDC Storage Units can be used fully functional?

Government Response:

The HDC Storage units will be removed from the scope of work for this project. They will instead be disassembled and moved by others before construction. Will be incorporated in Amendment 0006.

Inquiry ID: 9580124 Are we removing the track from the original HDC area and reinstalling that into the Temporary area? If so, are we then removing the track from the Temporary area and reinstalling in the New HDC Area?

Government Response: 9580124 The HDC Storage units will be removed from the scope of work for this project. They will instead be disassembled and moved by others before construction. Will be incorporated in Amendment 0005.

Inquiry ID: 9580695 For commissioning and TABS, is the requirement that the company that does one, cannot do the other? That these tasks are to be performed by two separate first tier subs to the general contractor?

Government Response:

TAB and Commissioning may be performed by the same company. In that case the subcontractor must not be affiliated with any other company participating in work on this contract, including design, furnishing equipment, or construction, in accordance with the specs.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO BIDDERS

1. DESCRIPTION OF PROJECT

The subject project will provide labor, material, and equipment to construct an energy efficient HVAC mechanical system to condition Building 54 Navy Artifact Restoration rooms. Work includes removal of the existing mechanical system and installation of a separate packaged and ducted dehumidifier to provide dehumidification to meet space humidity level requirements. In addition, work includes alterations to the existing electrical system to serve new HVAC equipment, building envelope improvements, fire protection modifications, and the addition of a generator. Contractor will provide Test, Adjustment and Balance (TAB) work for the new systems and provide electrical connections to support new HVAC equipment within the mechanical room.

2. MAGINITUDE OF CONSTRUCTION

The magnitude of construction is between, $1,000,000 and $5,000,000 per FAR 36.204.

3. SOCIO ECONOMIC STATUS VALIDATION

This is a 100% Small Business Set-Aside IFB, in order to verify the bidder’s socio-economic status, the System for Award Management (SAM) website will be used to verify.

Bidders must represent that they are a Small Business.

If you are submitting a bid as a Joint Venture (JV) you need to submit your JV Agreement with your bid.

4. FAR 52.204-7 SAM

In accordance with FAR 52.204-7 SAM Registration please ensure that your Unique Identifier Code (Cage Code or DUNS) is on page 1 of your bid in order to be responsive

5. BID SUBMISSION INSTRUCTIONS

The Norfolk District anticipates the possibility that its building will be closed during the time for bid submission due to the evolving requirements arising in response to COVID-19. Accordingly, the Norfolk District will NOT accept bids my mail, hand-carry, or commercial courier (that is, no physical bids will be accepted in response to this solicitation). All bids must be submitted by electronic commerce only (that is, by submission via DoD SAFE, as discussed below, only).

Electronic Bid Submission in DoD SAFE:

In accordance with (IAW) FAR 52.214-7, Late Submissions, Modifications, and Withdrawals of bids, all bids must be received at the initial point of entry to the Government infrastructure not later than the date and time specified in Block 13 of the solicitation.

Bids will be submitted through DoD Secure Access File Exchange (DoD SAFE) via https://safe.apps.mil/. DoD SAFE is the Government infrastructure utilized to secure bids and IAW FAR 14.202-8, citing FAR 4.5, and as limited by the requirements of the AFARS 5104.502-90. The bid submission shall provide signed bid to include SF 1442 and SF 30 acknowledgements of all amendments.

All proposals must be uploaded into DoD SAFE infrastructure not earlier than 14 January 2022 21 January 2022 31 January 2022 11 February 2022 and not later than the date/time specified in Block 13 of the solicitation. Bidders will require a unique “request code” to upload bids into DoD SAFE, which must be obtained by email only to the following POCs: Allen Scott Brainerd at allen.s.brainerd@usace.army.mil and Dianne Grimes at Dianne.K.Grimes@usace.army.mil and cc’d PPMDContracts@usace.army.mil with your email request. The POCs must receive the mail for the “request code” NLT 1:00 PM (EDT) 19 January 2022 26 January 2022 01February 2022 15 February, 2022.

A copy of the duly executed bid guarantee must be included in the bid submission upload to DoD SAFE in accordance with FAR 52.228-1 Bid Guarantee. A physical copy of the bid guarantee in proper form must be submitted within seventy-two (72) hours to the Government upon request from the apparent low bidder.

The BIDDER IS SOLELY RESPONSIBLE for ensuring that the entire proposal has been received into DoD SAFE with a timestamp of not later than the date and time specified in Block 13 of the solicitation. Bidders are STRONGLY encouraged to avoid waiting until the last minute to attempt to transmit their proposals. The electronic bid submittal contents shall conform to the details of the solicitation and subsequent amendments.

Bidders are responsible for ensuring that their electronic bids are virus-free and shall run an anti-virus scan before uploading into DoD SAFE. Electronic bids shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite (Excel and Project) 2010. The electronic bids shall be in Adobe Acrobat (except for Microsoft and Excel documents) portable document file (pdf) searchable text format. Electronic bids shall be clearly identified for each section and item as detailed in the solicitation. IT IS THE BIDDER’S RESPONSIBILITY TO OBTAIN WRITTEN CONFIRMATION OF RECEIPT OF ALL ELECTRONIC FILES OF THE BID SUBMITTED INTO DOD SAFE. Please forward a copy of this confirmation receipt to POC: Allen Scott Brainerd at allen.s.brainerd@usace.army.mil and copy Dianne.K.Grimes@usace.army.mil and PPMDContracts@usace.army.mil.

Please be advised that in accordance with FAR Deviation 2020-O0016, Class Deviation – Original Documents, Signatures, Seals and Notarizations, Electronic signatures and electronic mechanically-applied or printed dates may be used and shall be considered original signatures and dates, without regard to the order in which they are affixed for all of part 28, as required by the solicitation.

The solicitation hereby incorporates Deviation 2020-O0016 to FAR 28.106-1. For any bid bond, performance bond, or payment bond that may be required under this procurement, a seal is not required. In the event of conflict in another provision in the solicitation, the Deviation will control.

Any questions regarding bid submission should be directed to Mr. Allen Scott Brainerd in ProjNet.

6. BID OPENING

There will be a bid opening conducted by the Government via teleconference on 21 January 2022 27 January 2022 28 January2022 03 February 2022, 16 February 2022 at 1:00 PM (EDT) for participating bidders. The teleconference phone number and access codes will be emailed to participants once bid submission due date and time have lapsed. Bidders will be able to participate in the reading of the bids through this teleconference.

In the event the Norfolk District building is closed at the time of bid opening, a bid abstract containing bid results will be distributed to participating bidders within twenty-fours (24) hours of the bid opening. Upon request, the Norfolk District will make the opened bids available for examination.

7. BIDDERS QUESTIONS AND COMMENTS

All questions and/or comments for this solicitation should be submitted through the bidder inquiry system, ProjNet, as shown below. All submitted questions will be responded to via ProjNet and an amendment issued prior to the solicitation closing date. ProjNet will close 10 days prior to the solicitation closing date.

Submitting a bidder inquiry:

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W9123621B2041 The Bidder Inquiry Key is JI2I4G-2XX857

The Bidder Inquiry System will be unavailable for new inquires 10 days prior to bid opening until 29 January 2022 11 Feburay 2022 10:00 AM in order to ensure adequate time is allotted to form an appropriate…