This document is a Statement of Special Inspections for the DLA Building 54 Navy Artifact Restoration project located in Richmond, Virginia. The project involves seismic retrofitting and HVAC upgrades for the structure, which is designated Seismic Design Category D and Risk Category I. Special inspections will be required for cast-in-place concrete work. A Special Inspector of Record from IS Group will monitor all critical main wind and seismic force-resisting systems, including vertical and horizontal lateral force elements. Designated Seismic Systems must be certified by the manufacturer to remain operable and contain hazardous substances after a design earthquake. These include any mechanical, electrical, or other non-structural systems so designated. The Registered Design Professional in Responsible Charge must perform a final walk-down inspection and submit a report documenting inspection of Designated Seismic Systems and collection of manufacturer compliance certificates.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project:
Location:
Project #:
Date:
D
IV
No
B54 HVAC Artifact
Richmond, VA
1/31/2022
Project Seismic Design Category:
Project Risk Category:
Project Design Wind Speed (mph):
Number of Stories:
Structure Height Above Grade (ft):
Hazardous Occupancy or attached to such?
STATEMENT OF SPECIAL INSPECTIONS
Special Inspector of Record (SIOR) A Special Inspector of Record (SIOR)
SIOR Name (Registered Professional):
Professional Registration Number:
Consulting Firm Name (if any):
SIOR Office AND Mobile Phone Number:
IS
Group H Occupancies required (per UFGS 01 45 35, Section 1.3.8)
Contractor to provide prior to construction start
Following is a listing of critical main wind/seismic force resisting systems for this structure. Carefully inspect these elements as part of the roles and responsiblities of the Special Inspector (reference the Schedule of Special Inspections for inspection checklists).
Lateral Force Resisting System (LFRS) 2018 IBC 1704.3.2 and 1704.3.3
Vertical LFRS Elements Notes
Horizontal LFRS Elements Notes
Statement of Special Inspections Page 1 of 2
Cast in Place Concrete
Project:
Location:
Project #:
Date:
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
(2018 IBC 1705.13.3) (ASCE 7-16, 13.2.2, C13.2.2) (UFC 3-301-1, 2-5.3)
Non-structural 'Designated Seismic Systems' (DSS) must remain operable and contain hazardous substances following a design earthquake. Accordingly, all Designated Seismic Systems must be listed below and must be certified by the manufacturer to remain both operable and/or to contain hazardous substances after a design earthquake per UFC 3-301-01, Section 3-6.2. Submit said Certificates of Compliance to the Contracting Officer for each DSS after they have been reviewed and accepted by the EOR/DOR.
Additionally, the below listed Designated Seismic Systems must be carefully inspected by the Special Inspector according to the requirements noted in the Schedule of Special Inspections, Section AA.
ELECTRICAL Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
If additional space is required, append an additional sheet listing the remaining DSS
If additional space is required, append an additional sheet listing the remaining DSS
MECHANICAL/PLUMBING Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
OTHER Designated Seismic Systems (DSS) Requiring a Certificate of Compliance
Final Walk Down Inspection and Report
(UFC 3 301 01 SECTION 2-5.4)
Designated Seismic Systems shall receive a final walk-down inspection by the Registered Design Professional in
Responsible Charge
Final Walk Down Report, Prepared by the Registered Design Professional in Responsible Charge, Must Include:
1. Record observations of Final Walk Down Inspection
2. Document that Inspections were performed in accordance with the Schedule of Special Inspections
3. Document that all Designated Seismic Systems are installed according to construction/manufacturer document requirements, and that Compliance Certificates have been collected (UFC 03 301 01, 3-6.2, 13.2.2.2).
Statement of Special Inspections Page 2 of 2
1/31/2022
Richmond, VA
B54 HVAC Artifact
Designated Seismic Systems (DSS)