Attch 24 M801.pdf
PDF 126 KB Posted
- Attached to
- DLA Building 54 Navy Artifact Restoration Federal contract opportunity
- Solicitation number
- W9123622B2041
About this file
This document package includes a mechanical control system design drawing and related federal contract solicitation. The solicitation seeks proposals for HVAC system design services for a Navy artifact restoration room in Building 54 at the DLA facility in Richmond, Virginia. The Army Corps of Engineers Norfolk District will award a firm-fixed price contract for the HVAC system design work depicted on the attached drawing. Proposals were due by December 7, 2022 under solicitation number W91236-22-B-2041. The control system drawing provides details on the existing BAS network and sequences of operation, along with requirements for integrating new equipment into the Jace controller system.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AHU-1
SF VFD
BC
ROOF
BCACC-1
VFD
VFD
TYPICAL
PUMP VFD
BCEXHAUST
FANS
SYSTEM CONTROL NETWORK.
RS-485 TYPE NETWORK
TWISTED PAIR WIRE (TYP)
NOTES:
BC
CRAC UNIT MANUFACTURERS
CONTROLLERS
ROOF
FIRST FLOOR
BUILDING LEVEL NETWORK
MINIMUM SPEED 10/100 MBPS
CAT-6 ETHERNET CABLE
(TYP)
BACNET
BMS ETHERNET
SWITCH/HUB
UPS
REPORT
PRINTER
(LASER PRINTER)
ALARM
PRINTER
(DOT-MATRIX)
OPERATOR WORKSTATION
W/ REPORT AND ALARM
PRINTERS
NOTE 2
CRAC-3CRAC-2CRAC-1
NOTE 14
NOTE 1
1. ALL BAS EQUIPMENT, CONTROLLERS AND NETWORK EQUIPMENT SHALL BE FED FROM 120 VOLT STANDBY POWER BY DIV. 26.
2. 24 VOLT WIRING TO CONTROLLERS BY CONTROLS CONTRACTOR.
3. ONLY A REPRESENTATIVE SAMPLE OF CONTROLLERS ARE SHOWN. COMPLETE SYSTEM ARCHITECTURE TO BE PROVIDED BY CONTROLS CONTRACTOR.
4. NETWORK WIRING IS DIAGRAMMATIC, ACTUAL ROUTING DIAGRAM PROVIDED BY DIVISION 23.
5. ALL EQUIPMENT AND WIRING BY CONTROLS CONTRACTOR, UNLESS NOTED OTHERWISE.
6. NETWORK CONFIGURATION SHALL CONFORM WITH ALL PERFORMANCE REQUIREMENTS IN SECTION 23 09 00.
7. PROVIDE LOCKABLE ENCLOSURES FOR ALL BCs AND NETWORK EQUIPMENT.
8. LOCATE ADJACENT TO BASE BUILDING BAS ETHERNET SWITCH.
9. CONFIRM LOCATION WITH CLIENT PRIOR TO INSTALLATION.
10. EACH PANEL TO HAVE AN ETHERNET CONNECTION ON THE OUTSIDE OF THE PANEL FOR A LAPTOP CONNECTION BY FACILITY PERSONNEL.
11. ALL COMMUNICATION CABLE OUTSIDE OR BETWEEN BUILDINGS SHALL BE FIBER OPTIC.
12. REFER TO DRAWING M-800 FOR SYMBOLS AND ABBREVIATIONS.
13. 120 VOLT POWER PROVIDED AS SHOWN ON DRAWING BY DIVISION 26, ALL WIRING FROM JUNCTION BOXES TO POINT OF USE BY DIVISION 23 09 13.
14. THE BUILDING 54 BAS SYSTEM WAS UPGRADED IN 2016 TO HONEYWELL TRIDIUM JACE CONTROLLERS. ALL NEW EQUIPMENT FROM THIS PROJECT SHALL BE CONNECTED TO THE EXISTING JACE CONTROLLERS, EXPANDING UPON THEM IF NECCESSARY. IF IT BECOMES NECESSARY TO REPLACE A JACE CONTROLLER, AN 8000 VERSION 4 CONTROLLER SHALL BE USED.
15. THE BAS HEAD END EQUIPMENT AND OPERATOR WORKSTATION(S) ARE EXISTING AND THE SYSTEM GRAPHICS WILL NEED UPDATED TO REFLECT NEW EQUIPMENT INSTALLED UNDER THIS PROJECT.
GENERATOR MONITORING
SYSTEM
SYSTEM ARCHITECTURE CONTROL DIAGRAM
SCALE: NTS
FIRST FLOOR
DOWN DUCT
STATIC
PRESSURE
SENSOR
VAV1-2 CONVERSATION LAB
PRESSURIZATION
SENSOR
VAV1-1
UNITARY EQUIPMENT CONTROLS NOTE:
(UNITS) EQUIPMENT SHALL BE FACTORY PROVIDED WITH MANUFACTURERS'
UNIT MOUNTED CONTROLLERS. THE (UNITS) UNIT MANUFACTURER SHALL BE
RESPONSIBLE FOR EXECUTING THE SEQUENCE OF OPERATIONS INDICATED ON
THE DRAWINGS. COMMUNICATION TO A 3RD PARTY CONTROLLER IS NOT
ACCEPTABLE.
IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO
ENSURE THE ENTIRE SYSTEM (MECHANICAL EQUIPMENT AND AUTOMATIC
TEMPERATURE CONTROLS) MEETS THE ENTIRE SEQUENCE OF OPERATIONS, IS
FULLY INTEGRATED, BE FREE OF DEFECTS, AND FUNCTION AS SPECIFIED.
SHOULD AN ALTERNATE MANUFACTURER BE SELECTED OTHER THAN THE BASIS
OF DESIGN, THAT MANUFACTURER'S UNIT MOUNTED CONTROLLER SHALL FULLY
MEET THE SPECIFIED CONTROL SEQUENCE. (NO EXCEPTIONS)
A I
N I
G
RI
VFOHTLAE
W
N O
M M
O C
P R
O F
E
SS I ONAL ENG
I N E
E R
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S N
O R
F O
L K
D
IS
T R
IC
T
F
R O
N T
S T
N
O R
F O
L K
V
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEAL
BRANDON E. WOOD
Lic. No. 35155
10/15/21
N A
O F
IL
E
N O
A
M-801
C O
N T
R O
L S
B U
IL
D
IN
G
J
E F
F E
R S
O N
D A
V
IS
H W
Y R
IC
H
M O
N D
V
A
W S
P B
E N
D
IX
R D
S T
E
V
IR
G
IN
IA
B
E A
C H
V
A
J S
M
IT
H
C B
R A
N N
IN
G
K O
L T
B W
O O
D
O C
T
W G
L G
W
6-
-D
-0
1-
B U
IL
D
IN
G
D
E S
IG
N
F O
R H
V A
C S
Y S
T E
M S
I N
N A
V Y
A R
T
IF
A C
T R
O O
M
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
/3 /2
File details come from the government source that posted it. Updated .