22B2041 Amendment 0006.pdf
PDF 383 KB Posted
- Attached to
- DLA Building 54 Navy Artifact Restoration Federal contract opportunity
- Solicitation number
- W9123622B2041
About this file
This amendment modifies a solicitation for the renovation of Building 54 at the Defense Center Richmond in Virginia. The Army Corps of Engineers issued Amendment 0006 to add revised technical drawings and specifications to the solicitation. The drawings include demolition, reflected ceiling, roof, fire alarm, ductwork, piping, controls, and lighting plans. Added specifications cover miscellaneous cast-in-place concrete, overhead coiling doors, and special inspections. The amendment also modifies conditions of the contract to reference the drawings and specifications index. Responses to the solicitation were due by December 7, 2021, and the Corps of Engineers in Norfolk, Virginia is the issuing agency.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W9123622B2041 Renovation of Building 54 Navy Artifact (Construction) Defense Center Richmond (DSCR), Virginia is hereby Amended as Follow s:
1. Amendment 0006 is issued to add technical documents that have been revised (Refer to continuation Page and attachments)
Contracting POC: Allen Scott Brainerd (757) 201-7668 allen.s.brainerd@usace.army.mil CC'd dianne..k.grimes@usace.army.mil
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Feb-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123622B2041
X 9B. DATED (SEE ITEM 11)
07-Dec-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Feb-2022
CODE
USACE NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123622B2041
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0006
CONTRACT DRAWNGS
The following Drawing sheets are revised and accompany this amendment. Delete the existinig associated drawing and add the following:
AD101 FLOOR PLAN – DEMOLITION – AREA A
AD102 FLOOR PLAN – DEMOLITION – AREA B
AD111 REFLECTED CEILING PLAN – DEMOLITION – AREA A
AD112 REFLECTED CEILING PLAN – DEMOLITION – AREA B
AD122 ROOF PLAN – DEMOLITION – AREA B
A-111 REFLECETD CEILING PLAN – AREA A
A-112 REFLECTED CEILING PLAN – AREA B
A-301 WALL SECTIONS AND DETAILS
A-601 DOOR SCHEDULE AND DETAILS
FA101 FLOOR PLAN – AREA A – FIRE ALARM
MD101 FLOOR PLAN – AREA A – DEMOLITION
MH101 FLOOR PLAN – AREA A – DUCTWORK
MH111 ROOF PLAN – AREA A – DUCTWORK
MP101 FLOOR PLAN – AREA A – PIPING
M-601 CHILLED WATER SYSTEM FLOW DIAGRAM
M-602 SCHEDULES
M-801 CONTROLS
M-805 CONTROLS
EL101 FLOOR PLAN – AREA A – LIGHTING
SPECIFICATIONS
The following specifications are revised and accompany this amendment. Delete the existing associated section and add the following:
1) PROJECT TABLE OF CONTENTS 00 00 00
a. Section 03 30 53 added to the Table of Contents.
b. Section 01 45 35 added to the Table of Contents.
2) 01 45 35 SPECIAL INSPECTIONS
a. This specification section is added in its entirety.
3) 01 50 02.00 50 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
a. 2.4 Temporary Artifact Storage Delete paragraph in its entirety and replace with:
“Cabinets (high density units) will be disassembled and moved by DLA, DCSR and NHHC staff prior to the start of this contract. DLA, DSCR and NHHC staff will be responsible for re-installation of the HD Units to the Artifact room upon completion of the contract.”
4) 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
a. This specification section is added in its entirety.
5) 08 33 23 OVERHEAD COILING DOORS
a. 2.1.2.1 Wind Loading:
In the first sentence, delete “110” and replace with “20”.
b. 2.2.1.6 Locking Devices:
Delete first paragraph in its entirety that reads: “Ensure that the slide bolt engages through slots in tracks for locking by padlock, located on both left and right jamb sides, operable from coil side.”
c. 2.2.2.2 Hood:
In the first sentence, delete “B&S galvanized sheet metal” and replace with “or 24 gauge galvanized steel,”.
d. 2.2.5 Surface Finishing:
Add subparagraph 2.2.5.1 in its entirety to read:
“2.2.5.1 Finish Color
a. Interior finish on curtain to be galvanized metal. Paint bottom four slats (12" A.F.F.), safety yellow.
b. Exterior finish on curtain to be factory finished paint to match existing.”
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
A.01.13__0455737 NAO663A B54-HVAC-Artifact-CF-EBC-Drawings.pdf March 23 2021, 59 Pages A.01.13_0455737 NAO663A B54-HVAC-Artifact-CF-EBC-Specifications.pdf March 23, 2021 892 Pages
Attch 1 Project Table of Contents 00 00 00 Attch 2 01 45 35 Statement of Special Inspections - 1 28 2022 Attch 3 01 45 35 SI Schedule - 1-28-2022 Attch 4 01 45 35 Attch 5 01 50 02 00 50 Attch 6 03 30 53 Attch 7 08 33 23 Attch 8 AD101 Attch 9 AD102 Attch 10 AD111 Attch 11 AD112 Attch 12 AD122 Attch 13 A111 Attch 14 A112 Attch 15 A301 Attch 16 A601 Attch 17 FA101 Attch 18 MD101 Attch 19 MH101 Attch 20 MH111 Attch 21 MP101 Attch 22 M601 Attch 23 M602 Attch 24 M801 Attch 25 M805 Attch 26 EL101
(End of clause)
(End of Summary of Changes)