Attch 22 M601.pdf
PDF 151 KB Posted
- Attached to
- DLA Building 54 Navy Artifact Restoration Federal contract opportunity
- Solicitation number
- W9123622B2041
About this file
This document contains a flow diagram and technical specifications for a chilled water system for a federal building renovation project. The project involves designing and installing HVAC systems for Navy artifact restoration at Building 54 located at 8400 Jefferson Davis Highway in Richmond, Virginia. The solicitation was posted on December 7, 2022 as solicitation number W91236-22-B-2041 by the Department of the Army Corps of Engineers Norfolk District. The flow diagram depicts the chilled water piping layout including valves, gauges, insulation requirements, and notes regarding equipment access and servicing needs. Detailed specifications are provided for piping installation and components such as air separators, expansion tanks, strainers, and bypass valves.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHILLED WATER SYSTEM FLOW DIAGRAM
GLOBE VALVE TO FD
AHU CHILLED WATER COIL NOTE:CHILLED WATER PIPING AND
ACCESSORIES INSULATION NOTE:
GENERAL PIPING INSTALLATION NOTE:
AFTER FINAL TAB IS COMPLETE AND APPROVED, THE CONTRACTOR SHALL
PERMANENTLY INSTALL A DIGITAL DIFFERENTIAL PRESSURE GAUGE ACROSS
EACH AHU CHILLED WATER COIL CIRCUIT SETTER. PERFORMANCE CHARTS
INDICATING MEASURED DP AND CORRESPONDING FLOWRATE FOR EACH
CIRCUIT SETTER SHALL BE PERMANENTLY INSTALLED IN GLASSED FRAMES
ON THE WALL OF THE MECHANICAL ROOM FOR EASY REFERENCE BY VIRGINIA
TECH MAINTENANCE PERSONNEL. THE DIFFERENTIAL PRESSURE GAUGE
PROVIDED SHALL HAVE READINGS IN UNITS OF FT OF WATER (GLOBAL WATER
OR APPROVED EQUAL).
CHILLED WATER PIPE INSULATION SHALL BE CONTINUOUS WITHOUT
EXPOSED SECTIONS AND AIR TIGHT. ALL VALVES, STRAINERS, GAUGES,
P/T PORTS AND BLEEDS OR VENTS SHALL BE COVERED. ZESTON ELLS
WILL NOT BE USED FOR CHILL WATER PIPING. AFTER ALL MECHANICAL
WORK IS COMPLETE, AN INSPECTION WILL BE DONE.
CONTRACTOR SHALL REVIEW ALL EQUIPMENT MANUFACTURER'S
INSTALLATION MANUALS PRIOR TO INSTALLATION OF ANY PIPING SYSTEMS
TO DETERMINE EQUIPMENT SERVICING/SERVICE CLEARANCE
REQUIREMENTS. CONTRACTOR SHALL LOCATE AND INSTALL FLANGES
AND/OR UNION CONNECTIONS IN THE PIPING SYSTEMS AS REQUIRED TO
PERMIT COMPLETE TEMPORARY REMOVAL OF PIPING AND VALVE
ASSEMBLIES TO ALLOW FOR EQUIPMENT SERVICING AND REPLACEMENT.
PIPE INSTALLATIONS WHICH WILL RESULT IN THE NEED TO DEMOLISH PIPING
SYSTEMS TO ALLOW SERVICING OF OR REPLACEMENT OF EQUIPMENT IS
NOT PERMITTED. THIS REQUIREMENT APPLIES TO, BUT IS NOT LIMITED TO,
AIR HANDLING UNITS, TERMINAL UNITS, CHILLERS, BOILERS AND HEAT
EXCHANGERS. IN NO CASE SHALL THE PIPING INSTALLATION INTERFERE
WITH THE MANUFACTURER'S RECOMMEND ACCESS TO THE EQUIPMENT.
WELLS FOR PRESSURE /
TEMPERATURE TAP
CONNECTIONS (TYP FOR 4)
1" DRAIN LINE AND BALL VALVE AT
LOW POINT IN PIPING (TYP)
FLOW SWITCH
CF
CF
PRESSURE GAUGE NOTE:
HYDRONIC PIPING INSTALLATION NOTE:
PROVIDE PRESSURE GAUGES ON ALL WATER CONNECTIONS TO HEAT
EXCHANGERS TO MEASURE PRESSURE DROP FOR MAINTENANCE.
PROVIDE DRAIN VALVES AT SYSTEM LOW POINTS AND MANUAL AIR
VENTS AT SYSTEM HIGH POINTS.
C W
S
C W
R
2-1/2"
PRESSURE GAUGE
(-30-100 PSIG TYP.)
COMPOUND
PRIOR TO TAB WORK (TYP.)
REMOVE START-UP STRAINER
FLEX CONNECTION
(TYP. BOTH SIDES)
1/4"
1/4"
2-1/2"
3" 2-1/2" C
W S
°F
CWR (55°F)
1-1/2"
2-1/2"
2-1/2"
DIAPHRAGM EXPANSION TANK,
PRECHARGE TO 12 PSIG
3/4"
ET-2
3/4" DRAIN WITH
THREADED HOSE BIBB
PRESSURE GAUGE
(O-100 PSIG)
VENTURI BALANCE
VALVE, 57.7 GPM
INTEGRAL TO AIR-COOLED
CHILLER ACC-1
VALVE-SET AT 12 PSIG
PRESSURE REGULATION
3/4" BYPASS
M
CHILLED WATER METER
PROVIDE 8 WATT/SF SELF
REGULATING HEAT TAPE ON
EXTERIOR PIPING
1-1/2" TO RACK STORAGE
ROOM CRAC UNITS
INSIDE MECHANICAL
ROOM
RELIEF VALVE
SET AT 21 PSIG
TO AIR HANDLING UNIT2"
2-1/2"
TO TOWER BUILDING
CRAC UNITS
FULL SIZE 2-WAY
MODULATING
BYPASS, LOCATED AT
CRAC-3
FULL SIZE 2-WAY
MODULATING BYPASS,
LOCATED AT CRAC-4
1"
3/4" MAKE-UP WATER,
REFER TO SHEET MP101
FOR BACKFLOW
PREVENTER AND
CONTINUATION
TANGENTIAL AIR
SEPARATOR,
AS-1
HIGH CAPACITY
AIR VENT
DRAIN WITH
THREADED
HOSE BIBB
5 GALLON CHEMICAL
SHOT FEEDER3/4""
3/4"
4" CONCRETE PAD
NO SCALE
CWP-1
CWP-2
ACC-1
V-2
V-3
A I
N I
G
RI
VFOHTLAE
W
N O
M M
O C
P R
O F
E
SS I ONAL ENG
I N E
E R
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S N
O R
F O
L K
D
IS
T R
IC
T
F
R O
N T
S T
N
O R
F O
L K
V
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEAL
BRANDON E. WOOD
Lic. No. 35155
10/15/21
N A
O F
IL
E
N O
A
M-601
C H
IL
L E
D W
A T
E R
S Y
S T
E M
F L O
W D
IA
G
R A
M
B U
IL
D
IN
G
J
E F
F E
R S
O N
D A
V
IS
H W
Y R
IC
H
M O
N D
V
A
W S
P B
E N
D
IX
R D
S T
E
V
IR
G
IN
IA
B
E A
C H
V
A
J S
M
IT
H
C B
R A
N N
IN
G
K O
L T
B W
O O
D
O C
T
W G
L G
W
6-
-D
-0
1-
B U
IL
D
IN
G
D
E S
IG
N
F O
R H
V A
C S
Y S
T E
M S
I N
N A
V Y
A R
T
IF
A C
T R
O O
M
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
/3 /2
File details come from the government source that posted it. Updated .