Attch 22 M601.pdf

PDF 151 KB Posted

Attached to
DLA Building 54 Navy Artifact Restoration Federal contract opportunity
Solicitation number
W9123622B2041
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document contains a flow diagram and technical specifications for a chilled water system for a federal building renovation project. The project involves designing and installing HVAC systems for Navy artifact restoration at Building 54 located at 8400 Jefferson Davis Highway in Richmond, Virginia. The solicitation was posted on December 7, 2022 as solicitation number W91236-22-B-2041 by the Department of the Army Corps of Engineers Norfolk District. The flow diagram depicts the chilled water piping layout including valves, gauges, insulation requirements, and notes regarding equipment access and servicing needs. Detailed specifications are provided for piping installation and components such as air separators, expansion tanks, strainers, and bypass valves.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Building 54 Navy Artifact Restoration, newest first.
File Type Posted
B.01.02_22B2041 Abstract of Offers.pdf PDF
Attch 27 01 45 04.00 50.pdf PDF
W9123622B2041 Amendment 0011.pdf PDF
Amendment 10 Final.pdf PDF
Amendment 9 Final.pdf PDF
W9123622D2041 Amendment 0008.pdf PDF
W9123622B2041 Amendment 0006.pdf PDF
Attch 21 MP101.pdf PDF
Attch 18 MD101.pdf PDF
Attch 13 A111.pdf PDF
Attch 8 AD101.pdf PDF
Attch 7 08 33 23.pdf PDF
Attch 26 EL101.pdf PDF
Attch 23 M602.pdf PDF
Attch 17 FA101.pdf PDF
Attch 10 AD111.pdf PDF
Attch 5 01 50 02 00 50.pdf PDF
Attch 1 Project Table of Contents 00 00 00.pdf PDF
22B2041 Amendment 0006.pdf PDF
Attch 25 M805.pdf PDF
Attch 20 MH111.pdf PDF
Attch 12 AD122.pdf PDF
Attch 4 01 45 35.pdf PDF
Attch 3 01 45 35 SI Schedule - 1-28-2022.pdf PDF
Attch 2 01 45 35 Statement of Special Inspections - 1 28 2022.pdf PDF
Attch 24 M801.pdf PDF
Attch 19 MH101.pdf PDF
Attch 16 A601.pdf PDF
Attch 15 A301.pdf PDF
Attch 14 A112.pdf PDF
Attch 11 AD112.pdf PDF
Attch 9 AD102.pdf PDF
Attch 6 03 30 53.pdf PDF
W9123622B2041 Amendment 0005.pdf PDF
22B2041 B54 HVAC Amendment 4.pdf PDF
19 Jan Site visit.pdf PDF
Amendment 0003 Final.pdf PDF
Amendment 0002 Final.pdf PDF
Amendment 0001 Final.pdf PDF
Site Visit 5 January.pdf PDF
A.01.13_0455737 NAO663A B54-ARTIFACT-SPECS.pdf PDF
W9123622B2041 IFB.pdf PDF
A.01.13_0455737 NAO663A B54-HVAC-ARTIFACT-IFB-DRAWINGS.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHILLED WATER SYSTEM FLOW DIAGRAM

GLOBE VALVE TO FD

AHU CHILLED WATER COIL NOTE:CHILLED WATER PIPING AND

ACCESSORIES INSULATION NOTE:

GENERAL PIPING INSTALLATION NOTE:

AFTER FINAL TAB IS COMPLETE AND APPROVED, THE CONTRACTOR SHALL

PERMANENTLY INSTALL A DIGITAL DIFFERENTIAL PRESSURE GAUGE ACROSS

EACH AHU CHILLED WATER COIL CIRCUIT SETTER. PERFORMANCE CHARTS

INDICATING MEASURED DP AND CORRESPONDING FLOWRATE FOR EACH

CIRCUIT SETTER SHALL BE PERMANENTLY INSTALLED IN GLASSED FRAMES

ON THE WALL OF THE MECHANICAL ROOM FOR EASY REFERENCE BY VIRGINIA

TECH MAINTENANCE PERSONNEL. THE DIFFERENTIAL PRESSURE GAUGE

PROVIDED SHALL HAVE READINGS IN UNITS OF FT OF WATER (GLOBAL WATER

OR APPROVED EQUAL).

CHILLED WATER PIPE INSULATION SHALL BE CONTINUOUS WITHOUT

EXPOSED SECTIONS AND AIR TIGHT. ALL VALVES, STRAINERS, GAUGES,

P/T PORTS AND BLEEDS OR VENTS SHALL BE COVERED. ZESTON ELLS

WILL NOT BE USED FOR CHILL WATER PIPING. AFTER ALL MECHANICAL

WORK IS COMPLETE, AN INSPECTION WILL BE DONE.

CONTRACTOR SHALL REVIEW ALL EQUIPMENT MANUFACTURER'S

INSTALLATION MANUALS PRIOR TO INSTALLATION OF ANY PIPING SYSTEMS

TO DETERMINE EQUIPMENT SERVICING/SERVICE CLEARANCE

REQUIREMENTS. CONTRACTOR SHALL LOCATE AND INSTALL FLANGES

AND/OR UNION CONNECTIONS IN THE PIPING SYSTEMS AS REQUIRED TO

PERMIT COMPLETE TEMPORARY REMOVAL OF PIPING AND VALVE

ASSEMBLIES TO ALLOW FOR EQUIPMENT SERVICING AND REPLACEMENT.

PIPE INSTALLATIONS WHICH WILL RESULT IN THE NEED TO DEMOLISH PIPING

SYSTEMS TO ALLOW SERVICING OF OR REPLACEMENT OF EQUIPMENT IS

NOT PERMITTED. THIS REQUIREMENT APPLIES TO, BUT IS NOT LIMITED TO,

AIR HANDLING UNITS, TERMINAL UNITS, CHILLERS, BOILERS AND HEAT

EXCHANGERS. IN NO CASE SHALL THE PIPING INSTALLATION INTERFERE

WITH THE MANUFACTURER'S RECOMMEND ACCESS TO THE EQUIPMENT.

WELLS FOR PRESSURE /

TEMPERATURE TAP

CONNECTIONS (TYP FOR 4)

1" DRAIN LINE AND BALL VALVE AT

LOW POINT IN PIPING (TYP)

FLOW SWITCH

CF

CF

PRESSURE GAUGE NOTE:

HYDRONIC PIPING INSTALLATION NOTE:

PROVIDE PRESSURE GAUGES ON ALL WATER CONNECTIONS TO HEAT

EXCHANGERS TO MEASURE PRESSURE DROP FOR MAINTENANCE.

PROVIDE DRAIN VALVES AT SYSTEM LOW POINTS AND MANUAL AIR

VENTS AT SYSTEM HIGH POINTS.

C W

S

C W

R

2-1/2"

PRESSURE GAUGE

(-30-100 PSIG TYP.)

COMPOUND

PRIOR TO TAB WORK (TYP.)

REMOVE START-UP STRAINER

FLEX CONNECTION

(TYP. BOTH SIDES)

1/4"

1/4"

2-1/2"

3" 2-1/2" C

W S

°F

CWR (55°F)

1-1/2"

2-1/2"

2-1/2"

DIAPHRAGM EXPANSION TANK,

PRECHARGE TO 12 PSIG

3/4"

ET-2

3/4" DRAIN WITH

THREADED HOSE BIBB

PRESSURE GAUGE

(O-100 PSIG)

VENTURI BALANCE

VALVE, 57.7 GPM

INTEGRAL TO AIR-COOLED

CHILLER ACC-1

VALVE-SET AT 12 PSIG

PRESSURE REGULATION

3/4" BYPASS

M

CHILLED WATER METER

PROVIDE 8 WATT/SF SELF

REGULATING HEAT TAPE ON

EXTERIOR PIPING

1-1/2" TO RACK STORAGE

ROOM CRAC UNITS

INSIDE MECHANICAL

ROOM

RELIEF VALVE

SET AT 21 PSIG

TO AIR HANDLING UNIT2"

2-1/2"

TO TOWER BUILDING

CRAC UNITS

FULL SIZE 2-WAY

MODULATING

BYPASS, LOCATED AT

CRAC-3

FULL SIZE 2-WAY

MODULATING BYPASS,

LOCATED AT CRAC-4

1"

3/4" MAKE-UP WATER,

REFER TO SHEET MP101

FOR BACKFLOW

PREVENTER AND

CONTINUATION

TANGENTIAL AIR

SEPARATOR,

AS-1

HIGH CAPACITY

AIR VENT

DRAIN WITH

THREADED

HOSE BIBB

5 GALLON CHEMICAL

SHOT FEEDER3/4""

3/4"

4" CONCRETE PAD

NO SCALE

CWP-1

CWP-2

ACC-1

V-2

V-3

A I

N I

G

RI

VFOHTLAE

W

N O

M M

O C

P R

O F

E

SS I ONAL ENG

I N E

E R

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S N

O R

F O

L K

D

IS

T R

IC

T

F

R O

N T

S T

N

O R

F O

L K

V

A

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

P

N

M

L

K

J

H

G

F

E

D

C

B

A

SEAL

BRANDON E. WOOD

Lic. No. 35155

10/15/21

N A

O F

IL

E

N O

A

M-601

C H

IL

L E

D W

A T

E R

S Y

S T

E M

F L O

W D

IA

G

R A

M

B U

IL

D

IN

G

J

E F

F E

R S

O N

D A

V

IS

H W

Y R

IC

H

M O

N D

V

A

W S

P B

E N

D

IX

R D

S T

E

V

IR

G

IN

IA

B

E A

C H

V

A

J S

M

IT

H

C B

R A

N N

IN

G

K O

L T

B W

O O

D

O C

T

W G

L G

W

6-

-D

-0

1-

B U

IL

D

IN

G

D

E S

IG

N

F O

R H

V A

C S

Y S

T E

M S

I N

N A

V Y

A R

T

IF

A C

T R

O O

M

A

M E

N D

M E

N T

B

ID

D E

R I N

Q U

IR

IE

S

/3 /2

File details come from the government source that posted it. Updated .